Purpose and Background• The Cecil County Northeast Advanced Wastewater Treatment

Plant (NEAWWTP) will need to be expanded to support anticipated growth associated with the APG – BRAC development

• The NEAWWTP permitted capacity is capped at 2.67 MGD at an average Total Nitrogen (TN) concentration of 3.0 mg/l, or approximately 24,500 pound TN annually

• On April 26, 2008 MDE adopted the “Maryland Policy for Nutrient Cap Management and Trading in Maryland’s Chesapeake Bay Watershed” to provide guidance to offset increased discharges and nutrient loads through nutrient credits

• Cecil County wishes to pursue all practical opportunities for nutrient credits for use at the NEAWWTP

Page 3: Purpose and Background

Project Scope and Goals• OEA-CSSC Project 9 – Cecil County Wastewater Treatment

Capacity Analysis is intended to develop a plan to obtain nutrient load credits for the expansion of the NEAWWTP from 2.0 MGD to 5.0 MGD

• Identify projects for nutrient credits using the “Maryland Policy for Nutrient Cap Management and Trading in Maryland’s Chesapeake Bay Watershed,” including– Delineate service area boundaries and estimate flow

capacities– Develop preliminary layouts of wastewater collection

systems including alternative studies where feasible– Develop plans and exhibits for selected projects– Develop estimates of probable construction cost– Provide data for MDE approval of nutrient load credits

• Recommend a plan of action

Page 4: Purpose and Background

Project IdentificationCredit Opportunity

Existing Significant WWTP’s

Page 5: Purpose and Background

Project IdentificationCredit Opportunity

Existing Minor WWTP’s

Page 6: Purpose and Background

Project IdentificationCredit Opportunity

On-site Sewage Disposal Systems

Page 7: Purpose and Background

Project IdentificationCredit Opportunity

Community Residential OSDS

Page 8: Purpose and Background

Project IdentificationCredit Opportunity

Schools and Commercial OSDS

Page 9: Purpose and Background

Treatment Regions

Page 10: Purpose and Background

Projects By Area

Page 11: Purpose and Background

Project DevelopmentZoning and Comprehensive Plan

Page 12: Purpose and Background

Project DevelopmentTown of Port Deposit Project

Total Credits = 1.148MGD

Total Cost = $66.7M

Per Credit = $3,000 / credit

Page 13: Purpose and Background

Project DevelopmentTown of Port Deposit Project

Total Cost = $14.3M

Total Credits = 0.525MGD

Page 14: Purpose and Background

Project Ranking

• Each project was ranked for:– Cost– Credit Opportunity– Ease of Implementation

• A project list was developed prioritized by ranking and showing a cumulative total of proposed credits

Page 15: Purpose and Background

Other Credit Opportunities

• Individual OSDS connected to existing sewer• Transfer of development rights• Stormwater management upgrades• Protected lands• Water reuse• Land application of effluent• Trading with municipalities outside of the

County

Page 16: Purpose and Background

Recommended Plan of ActionPriority Project Project Credit

(MGD)Cumulative Credit

(MGD)

1 Carpenters Point 0.43 0.43

2 Port Deposit 1.62 2.05

3 Crystal Beach 0.67 2.72

4 Red Point 0.11 2.83

5 Holloway Beach 0.07 2.90

6 Hances Point 0.31 3.21

7 Piney Ridge 0.01 3.22

8 W. Old Philadelphia Rd.

0.05 3.27

9 Bethel Church Rd. 0.01 3.28