23
Page1of5 Muhammad Haris Khan Contact Tel : +971 -(50-4615890), Citizenship :Pakistani e-mail :[email protected] Objective I am an innovative, result-oriented and motivated individual seeking for a position as Solar Engineer in a engineering company. I have very good problem-solving skills and extensive background in research and experimentation based on solar energy. I also possess logical skills and the ability to supervise a team of workers PROFESIONALSUMMARY Project engineer, hybrid renewable energy engineer, technical writer, disruptive technologist, web content management, copy editor and communications specialist in renewable energy, sustainable development, and IT systems analysis and administration. Greatest strengths include taking bold, decisive and definitive action to solve problems, adept at networking and building strategic alliances by utilizing conventional, unconventional and creative approaches, developing and working in collaborative teams. Comprehensive knowledge of current research and trends in the field of renewable energy and sustainability development; nationally and internationally. Key Skills/Expertise Proficient or familiar with a vast of concepts, techniques and technologies,including: Tools Text Pad, MS-Office, MS-Project2010, Platform Windows (98/2000/XP/7), Linux(Ubuntu). In-depth knowledge of Solar power generation systems, application tools, and procedures Comprehensive knowledge of electrical power systems, supervisory control and data acquisition systems Extensive knowledge of renewable energy, instrumentation control systems, and data acquisition In-depth knowledge of testing tools, diagnostic equipment, Familiar with the stands and guidelines of power generation industry Skilled in identifying issues and in providing recommendations to solve the same Proficient in communicating effectively with strong organizational skills Address Chak No.202/E.B P/o proper Vehari,Pakistan.

PV- Design Engineer (1)

Embed Size (px)

Citation preview

Page1of5

Muhammad Haris Khan Contact

Tel : +971 -(50-4615890), Citizenship :Pakistani

e-mail :[email protected]

Objective

I am an innovative, result-oriented and motivated individual seeking for a position as Solar Engineer in a engineering company. I have very good problem-solving skills and extensive background in research and experimentation based on solar energy. I also possess logical skills and the ability to supervise a team of workers

PROFESIONALSUMMARY

Project engineer, hybrid renewable energy engineer, technical writer, disruptive technologist, web content management, copy editor and communications specialist in renewable energy, sustainable development, and IT systems analysis and administration. Greatest strengths include taking bold, decisive and definitive action to solve problems, adept at networking and building strategic alliances by utilizing conventional, unconventional and creative approaches, developing and working in collaborative teams. Comprehensive knowledge of current research and trends in the field of renewable energy and sustainability development; nationally and internationally.

Key Skills/Expertise

Proficient or familiar with a vast of concepts, techniques and technologies,including:

Tools Text Pad, MS-Office, MS-Project2010,

Platform Windows (98/2000/XP/7), Linux(Ubuntu).

In-depth knowledge of Solar power generation

systems, application tools, and procedures

Comprehensive knowledge of electrical power systems, supervisory control and data acquisition systems

Extensive knowledge of renewable energy, instrumentation control systems, and data acquisition

In-depth knowledge of testing tools, diagnostic equipment,

Familiar with the stands and guidelines of power generation industry

Skilled in identifying issues and in providing recommendations to solve the same

Proficient in communicating effectively with strong organizational skills

Address

Chak No.202/E.B P/o proper Vehari,Pakistan.

Page2of5

Education

Feb 2008 July 2012 B Tech(Electrical)

UMT, Lahore,Pakistan.

2006 to2008 DAE(Electrical)

PBTE,Lahore,Pakistan.

TechnicalSkills

A minimum of 5-6 years of experience preferably in solar PV system design.

Solid working knowledge of Design Codes & Standards, and other governing standards for design of solar PV systems and familiarity with DC circuitry.

Knowledge of power distribution and transmission systems design is a plus.

Knowledge of PV Module Support Structure design, module array lay-out.

Familiarity with review/design of instrumentation for data acquisition systems.

Knowledge of output, performance and reliability factors of various commercially available PV modules and inverters.

Experience with PV System Energy Modeling tools, specifically PVSyst.

Knowledge of solar design fundamentals.

Experience with shade analysis software and tools.

Knowledge of wind load and dead loads as applied to solar power systems.

Ability to communicate effectively with both technical and non-technical individuals.

Ability to develop, review and translate technical specifications.

Proven AutoCAD and other graphical skills.

Excellent computer skills and familiarity with MS Office and Windows.

Experience

WorkExperience:

Organization: Ibn Al Nafees Dubai

Duration: Sep 2014 to 28th July2016 Designation: Solar Design Engineer

Participate in the design of commercial and utility scale solar systems, including but not

limited to the electrical, orientation/site layout, and mechanical aspects of the projects.

Conduct site visits to plan the locations of equipment and interconnection to the site’s existing electrical system.

Support multidisciplinary engineering designs which produce the associated details and

construction documents (plans, specifications and estimates) necessary to direct the

construction contractors.

Research and develop industry best practices and design standards.

Interpret site survey data to create complete system designs and submit for internal review.

Use AutoCAD LT to create drawings for proposed rooftop and ground-mount systems;

performing ampacity calculations including voltage drop, load flow and short-circuiting,

single line diagrams, PV source and output circuit details, combiner boxes and over

current protections elections.

Provide detailing in AutoCAD of various electrical and facility system components.

Establish/maintain relationships with engineering services providers and solar equipment vendors.

Page3of5

Evaluate PV products and emerging technologies.

Provide technical support during construction, startup, testing, system commissioning and performance monitoring.

Provide technical support during operations and maintenance.

Make technology recommendations based on project site location and geographic conditions.

Develop conceptual designs that consider module placement, conduit routing and inverter locations.

Experience

WorkExperience:

Organization: Hisel PowerSolution

Duration: Aug 2010 to Aug 2013 Designation: Solar Design Engineer

Responsible for identifying requirements to meet the project delivery

schedules and in determining solutions, if any

Handle responsibilities of providing technical guidance to the staff in power system startup and commissioning

Handle the tasks of monitoring solar power performance and record metrics of the same

Perform research on best techniques and strategies to provide full support in all phase of the project

Perform operation and maintenance of power systems to ensure quality control Responsible for analyzing project development documents and provide recommendations, if required

Handle the tasks of preparing work scope and request of proposal for various power energy projects.

Responsible for calculating energy consumption by using standard tools like System Advisor Model and MSI models

Handle the tasks of providing support in handling contract agreement with vendors

Perform responsibilities of providing support in commissioning process and in evaluating design tools

Responsible for conducting performance analysis to provide long term performance of systems

Perform performance guarantee testing and evaluation of new equipment

Handle responsibilities of providing strong technical input in selecting solar technology

Final Project in B.Tech

Experience

WorkExperience:

Organization: TechnoSolar

Duration: Sep 2013 to Oct 2014 Designation: Project Manager

Design of the solar power generators for more than 50localities

Selection contractors

supervision and technical assistance to solar generators installer steam

coordination of acceptance tests

Writing technical reports

Preparation of tenders, technical analysis of the proposals and negotiations with the suppliers

Coordinator of installation and maintenance oftele communication

and electrical networks.

engineering and designing networks intended to: electrical equipment’s

protection, process automation controls (PLC, SCADA, ...),security,

fire detection and corporate

redaction of technical specifications for the installation and testing

of networks.

selection of contractors

coordination of network and equipment’s installations and testing

field technical support

design of control rooms and patch panels

Produce Free Energy Through Free Energy is available all around us in a variety of Speed Breaker, different forms, it just needs to be appropriately

harnessed and used. One such example is our modern streets and roads where thousands of heavy and small vehicles pass everyday non-stop. The amount of energy transferred across the roads by these vehicles could be huge, and easily tapped, especially over the speed breakers where it's much Easily accessible. If correctly implemented, generating electricity from a road speed breaker could be actually very straightforward and a Permanent source of electricity.

Page4of5

Special Interests and Future Concerns

Magnet Generator Produced Free Energy.

Other Renewable Energy Sources.

Become a Part of World Largest Company.

Page5of5

SolarProject Handled

1. Solar Water Pump Project(1Hp To 40Hp) From 20m to 250m Water Head, 2. Solar Street Light Project (40w to 100w) Different Housing Societies and Government Project, 3. Solar Industrial Grid Tied Project200kva, 4. Solar Hospital Project, 5. Domestic Projects, 6. Roof top, Ground Mounting Installations. 7. School Projects, 8. Telecom Project

9. Max. 100 MGW Project in Pakistan, Project Name: Quide-e- Azam Solar Park, Website: http://www.qasolar.com/

10. Green Houses and Farms Project, On Grid, Off Grid and Grid Tie Project. 11. Ground, Pool, Roof MountingExpertise. 12. Expertise in Monitoring System

13. PVSOL Expert.

Personal Information

Father’s Name : Sarfraz AhmedKhan

Religion: Islam Date of Birth: 10-09-1991

N.I.C# :36603-8962895-7

PASSPORT#: CW6918952

Marital Status: Married

Domicile: Punjab

Languages

Urdu Punjabi English

Extra-Curricular Activities

Other Net-surfing Renewable Energy Sources

Please Find Below the Project Complexation Report with Dubai Municipality

References

Top-Notch references available on request.

Project Completion Report

Conservations Project Jan 2016 Page i

Project Completion Report

ع تقرير إنجاز مشر

Drainage & Irrigation Department

لشمسي للمحمي ق لط ي-مش بي, ي - بلدي Conservations Project – for Dubai Municipality, 2015-16

Prepared / ع

M.Haris Khan

Project Completion Report

Conservations Project Jan 2016 Page ii

E X E C U T I V E S U M A R Y لمش ص مل

Project Completion Report

Conservations Project Jan 2016 Page iii

1. General Project Information

Government of Dubai City give much attention to environmental and has long recognized the need to

preserve its unique and beautiful desert habitat, in Dubai City there are many natural conservations

scattered in different locations. Dubai municipality consider these conservations be run on solar system.

Project Completion Report

Conservations Project Jan 2016 Page iv

The purpose of this project is to design a water solution for trees and wild animals that can be fed water

from nearly any source, a system that is relatively price effective, portable and depends only on

renewable solar energy.

The motivation for this project is to provide solutions to the limited availability of clean water resources

and there are many locations where the cost of delivering irrigation & drinking water is very high. Our

goals is to efficiently produce fresh drinkable water to animals as well as irrigation from the available

underground water using solar energy conversion.

لمش م عن م ع معل

ى ع لح ى ع ي فت كت ، ي ل ي ك م هت ي بيتع ي م م ل يلح ي ح بي, يليل ي ج في تم ي لع ك ته ي ح تل قع في تش ل يعي بي. ل ي اعت ع ب ي ل ت ق ت ي , ح ل ف ع ه اش ء اعت ت ب

ي ب ل فق ل ته ت بتشغيل ي ح سيمل لش ق .لي ت ع ش ل ض ءلغ ل في يلح لت ل ت ن لحي للأش سي , من م لش ق ل ي ست ت في , ب ل ي

ت ل ق ل ست م اعت ع م في لح سق مع .م يتف من يل ل ئي ل ل ي ح ل ح في ت ع ش ل ل ه ف اض قعحيثب ل م ي لع ك صيل تت ه ت

ه يمي جل لي بع ن .لش فت هلىه ي ج ء إنت ب است مش لي من خا فع ت ل في ل ه ي لك لم ست يب سيت لش ق .ل

Project Completion Report

Conservations Project Jan 2016 Page 5

Objectives and Scope Using solar system

Providing water for irrigation and drinking by drilling bore wells.

Using submersible pumps running on solar technology.

There are no unexpected or undesirable side-effects to environment.

Using system is environmentally effective and easy to maintain and service.

Considering time and to cost in the project.

Considering remediation plan, if needed.

لعمل نط ف اهدسي لش ق ل ن ست

آبلإ ب لش ي ه ي ل في في مس ت ل ي .ل

سيإ لش ق ل جي ل ىت ع تع س تغ م .ست

ج إ نه ا ت ك ب يلت ل ى ع ي ب غ م غي قع مت غي ي ن ج ث ي ك .ه

اعت إ ماخ ب م سي فع ست لش ق ىل ع ح نل ي ل ل س ي .ل

ب ت إ شتي ل له قت .فع

ي , إ اعت خ ب أماخ ب .لزم

Findings

DM Well drilling is one of the processes that can be used for drinking water and irrigation of trees. This requires an energy input as heat,

electricity and solar radiation could be the source of energy. When solar energy is used for this purpose, it is known as solar water solution. Solar

Project Completion Report

Conservations Project Jan 2016 Page 6

water solution is an attractive process to generate portable fresh water using free of cost solar energy. This energy is used directly for elevating

water inside the reservoir tank.

ئج ت لم ح هي آب لح ل متي يتم هم هلاست من ست ي ق ه. شليل ست ل ج ب ل يت لحشفيلع بيل س ل لش شع ئي ,

ق ل ن نت ي بست . ي ل ح ضخ اغ . يلاست م ل هيع سي لش ق ي ل قت يز هم ي ل فع نلل ل ي لاغ ز ل زين ل لت ت .ل

Cost

Project completed within the planned budget and as per predicted financial estimates.

ل لتكانتالتقديراتالمالي المقررة عضمنالميزاني اءمنالمشر لي قدتماانت قعاا مت .كماه

Schedule

Project was executed within the scheduled timeframe.

ي لمحد للت قت لعضمناإطارالزمنيالمحددقد .تمتنفيذالمشر

Side-Effects

No side effect on implementing solar technologies I the conservations site

يهآ ن لج ث . اقع المحميا جيا الطاق الشمسي بم ل جد اثار جانبي مترتب من استخدام نكن ات

SOLAR WATER SOLUTION Water solution:

This is the process of relocation of the water from one place to another. The goal is to make the solution fit for the specific purpose.

Project Completion Report

Conservations Project Jan 2016 Page 7

Mostly water solution may also be designed for a variety of other purposes including dewatering.

Types of solar water solutions:

1. Dewatering

2. Underground water for drinking and irrigation

ل المائي :الحخرع نقالمياهمنمكانإلى ي خافه م يا الري ا في عم ا استخدام ا تخزينالمياهبا اعح الشمسيستخدا ان :لطاق

السطحي المياه.ازال في الجالريضخ . أغراضالشرب في المياهالج

Project Completion Report

Conservations Project Jan 2016 Page 8

The project

Dubai Municipality awarded IAN to implement project in 10 conservations to use underground water in irrigation

and drinking water for animals in those conservations, these conservations are scattered in different places in

Dubai city

لمش

بي ي حت يIANك شم ع ش ل ي ي ع لت يمح في في ل ه ي ل م فياش است يتت ت ن حي ب لش ه يمي ح ق ،ل تش في م ي م ح ل ه ت ب بيم ي

Project Completion Report

Conservations Project Jan 2016 Page 9

Natural Conservation Parks – Dubai No. Conservation name Job code Area

sqk

No. of Trees Location

1 Ashosh (1) 705/1 25 722 Al Ashosh border of Abu Dhabi & Dubai

2 Ghafar (C) 705/2 16 200 Al Ashosh road AD & Dubai

3 Al Kala (9) 705/3 9 427 Al lisili near Bab al shames

4 Al Salah (7) 705/9 10.5 200 Near Dubai 2020 Expo site

5 Khareejah Busalam (10) 705/8 10 427 Near Truck road High Tension road from last in tunnel in ER

6 Hafeer (B) 705/7 9 364 Al Lisaili – babalshames road, near HT line

7 Seeh Ghashabah (2) 705/4 16 562 Al Lisaili – near Shaikh Mohamed Rshid solar plant

8 Seeh Hwair (3) 705/5 16 1456 Al Ain road, efor Al Faga’a poli e station

9 Manahid (6) 705/10 10.5 200 Emirates road, near new bridge – Shj side

10 Seeh Shouaib East (D) 705/6 11 200 Ghantoot, between shaikh Zaid road & Shaikh Mohammed bin Zaid road

Project Completion Report

Conservations Project Jan 2016 Page 10

Project Completion Report

Conservations Project Jan 2016 Page 11

Project Completion Report

Conservations Project Jan 2016 Page 12

Dewatering Using solar system technology for removing groundwater or surface water from a construction site or any effected area. It is very effective

price wise. Since the water does not need for filtration and can be, utilize in many other aspects.

BASIC BENEFITS OF SOLAR DEWATERING:

1. Less manpower, operates automatically from to dawn to dusk.

2. Works continuously till the sun outraged.

Project: Al lisaili near Bab al shames resort (Al Qudra)

Dewatering project is been installed at Al Quadra on 25 jan 2015. Here the water level was high above the ground level; even natured of

high salinity was destroying the neighboring planted trees around. Installed a suitable and desired 5 KW system with a saline resistance

submersible well pump with a suitable well connected to a manhole, which diverts the water to the well.The discharge point of the water is

2.2 Km from the source point.

Emirates road Underpass No. 8

the water level was very high above the ground level, we Installed a suitable 5 KW system with submersible pumpto discharge surface water

for about 1 Km from the source point.

ن

Project Completion Report

Conservations Project Jan 2016 Page 13

لسطحي لمي ل إ

مإ لسطحي ه لمي أ في لج ه لمي ل إ لشمسي ق لط م ن ي متق د ي ست متمح طق أيم ءأ ل غ في قع لغي م لمي س ت م قع .ب است م بم ن لتي يم : هم ئد عديد خ ب م د ست

. ق لم ل , م لع قل عد من . لمستمل يعما .. لشمسبش .ل غ

ليف. لت قل لمت ب ق لم لمي ب . تقليل مست

قع :لم- ) لقد ق طق س لليسيلي )م

لتم ل ا د هست ي ع لمي د لليسيلي ب طق في بم لمي عل لج نت ه ك ئي , ج جيب م ا , ل ل ف سطح ع ت في م لج لمي سيب نت م , حيث كحت تدم ص ئ , ل ح لمل عمست ع جد من لمز ق شمسي بسع أشج كيب ن يق, تم ت لط صيل .بج ت , ح م للمل س مق ., مع م غط كيل

يف عل بعد ل نقط ت لمي ضخ د . .ب غي عميق لم كيل مت من نقط ب - لع لم ش

لتم ل ا د هست للمي طق في بم قم لج ق شمسي بسع 8مع كيب ن , تم ت ع جد ت في م لج لمي سيب نت م م ., حيث ك س مق ., مع م غط كيل لي يف عل بعد ح ل نقط ت لمي ضخ صيل ب غي عميق ت , ح د . للمل لم كيل مت من نقط

Water treatment system

Project in Mushrif Park

There is a huge consumption of water within the park, which made us install 2 ozzikleen tanks

1. GTS 10 – Grey water from the Masjid is treated and served as irrigation. (2000 l/day)

2. RP 10 – black water is also treated and is liberated to the plants as irrigation (2000 l/day).

3. The sewage treatment system can run on solar.

ف مش حديق مش

كيب ع ي تم ت لح ت ي من م ل ا ع من ست ج حي ل ل ف ل ل مي ع ج لحي . ل ف ل ل مي ل بسع RP 10خز مع م في ست ع م لع حيض ل مي من مي لت يي . م ل ي ل ل ل بسع GTS 10خز مع م في ست ع ي لح س ب ل ت ت من م ل ي ل مي من لت يسي . لش ق ل ل ل ب ع ل ن ن تشغيل خز ي

Project Completion Report

Conservations Project Jan 2016 Page 14

Recommendations

o Concerned Department at Dubai Municipality should Flared the concept of using solar technologies on all remote projects.

o DM lead campaign for awareness among citizen and residents.

o Regular cleaning and monitoring the system from assigned team by

o DM concerned department to take more in depth role.

o Training the stuff that visit the conservation n regularly to be involving in a maintenance activities.

o Adopting & Expanding solar system in all similar projects

صيل تت - ل ق ل يع ب ش ل م ي ع مع تع سي لش ق ل ي ست ت يف تث ي نش بي بت ي تص ب ل سم ل ب ي امي . بي - ي لتث عيي لت لح ي ينت ي ل ي ل .بيلش - ق ل ي ل ل بع ت ل ن ي لسي لل ل . ي ي لي إع - ل ي ب ع ل اقس . سي لش ق ل ست ن ي ت ك ل ق بش لتعي - ن ت ي ل ي ب ع ل تلتيل ل يع ش ل ي ح ل .ت بزي

Project Completion Report

Conservations Project Jan 2016 Page 15

Project Completion Report

Conservations Project Jan 2016 Page 16

Benefits from using solar system & water treatment system ائـــــد انظم معالج مياه الصرف الصحي ف استخدا انظم الطاق الشمسي

- Cost effective of reducing water tanker

- Less emissions of co2 from trucks going to sites

- Reutilizing of the water

- One time installation

- Less maintain required

- Positive Impact on environment

حدمنيفعال - ل ف مياهشاحنا نقالمنحيثالتكمنانبعاث - ي ن التق محميانقل المياه منشاحناتا غاز ثاني اكسيد الكرب لفيه ااستفادة من المياه - االج اقع نفس بالمل - ف تركيبالس ق التكي مقارن باي انظم اخرى - الصيان ققعه يجابياإتأثيرال - ن ىالذي سيك ئ بشكل مباشر البيع

Project Completion Report

Conservations Project Jan 2016 Page 17

Project Completion Report

Conservations Project Jan 2016 Page 18