18
PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

Embed Size (px)

Citation preview

Page 1: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development

at Hiroshima U.

Hiroshima ALICE-PHOS Group

(T.Sugitate, K.Shigaki, et al.)17 August, 2004, at CERN

Page 2: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

217 August, 2004

- Presentation Outline - Recent Activities on PWO/APD/CSP at

Hiroshima Universityreadout electronics status update

CSP design version 3continuing property studies of key

componentsbetter expertise on PWO/APD handlingcalorimeter prototype performance evaluation

beam tests at KEK-PS and Hiroshima-REFER

Summary and Outlook Official Business

Page 3: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

317 August, 2004

- Pre-amplifier Design Revised (Ver.3) - slightly modified layout (see next

slide)no circuit change from version 2proposed and discussed in July, 2004

version 3 status and plan100 boards in production

delivery expected in late-September, 200450 of them w/o capacitor “C5” mounted

to decouple test input pin from signal linesto be sent to Iouri at CERN for evaluation

shipping planned in October, 2004

Page 4: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

417 August, 2004

- New Pre-amplifier Layout (Ver.3) -

version 3 mask (black) overlaid on version 2 photo (green)

components moved (from yellow to red) to make space around APD soldering holes

Page 5: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

517 August, 2004

- Pre-amplifier Task and Schedule - early decision of CSP version required

version 2 or 3 on 1st PHOS module ?need to complete mass production in

JFY04 (ending March, 2005) CSP for 1st PHOS module coming soon

to be ready for assembly by late-January, 2005

Page 6: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

617 August, 2004

- Past PWO Crystal Property Studies - Furukawa Co. Ltd. in Tokyo, Japan

density 8.28 [g/cm3]radiation length 0.89

[cm]Moliere radius 2.2 [cm]peak emission 420-440

[ns]refractive index 2.3

20 x 20 x 200 mm

Y-doped PbWO4

light yield mean decay time

transmittancemeasured withHitachi U3010

spectrophotometer

ALICE-PHOSoperation point

ALICE-PHOSoperation point

Page 7: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

717 August, 2004

- Recent PWO Crystal Property Studies - RI&NC Co. in Minsk, Belarus

adopted by CMS investigated; similar properties as

Furukawa’s ref. graduation thesis by K.Yokoyama

(available only in Japanese)

North Crystal Co. in Apatity, Russiaadopted by ALICE-PHOSdetailed investigation ongoing at Hiroshima

further comparison of crystals in progress

Page 8: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

817 August, 2004

- Expertise on PWO/APD Handling - cooling with Peltier modules

stable operation down to ~ 0 ºC better ground handling to reduce

noisesuccessful operation of APD readout

system

Page 9: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

917 August, 2004

- Prototype Performance Evaluation -

prototype components PWO crystals: Furukawa (Japan) / RI&NC

(Belarus) / North Crystal (Russia) PMT: Hamamatsu R1450 APD: Hamamatsu S8664 pre-amplifier: Hiroshima ver.1/2 cooling: Peltier modules

tests in Japan Tohoku-LNS (2002); photons at 0.8 – 1.2 GeV Hiroshima-REFER (2003/04); electrons at 150

MeV KEK-PS (2004); electrons at 0.5 – 2 GeV

Page 10: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

1017 August, 2004

- Past Beam Tests at LNS/REFER - w/ PMT readout

E/E = 2.5 %/E [GeV] 1.3 %

x = 2.3 mm/E [GeV]

noise problem with APD at room temp.

counts

[a.u

.]

Etotal = 141 MeV

σ/Etotal = 7.3 % = 2.8 %

/E

total energy [MeV]

Page 11: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

1117 August, 2004

- Recent Beam Test at KEK-PS - prototype w/ real ALICE-PHOS components

NC PWO + Hamamatsu APD electron enriched non-separated (IT) beam

negatively chargedelectron/beam ~ 1 % before online enrichment

beam momentum scan0.5 GeV/c – 2.0 GeV/c

APD HV scan380 – 430 V (400 V nominal)

Page 12: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

1217 August, 2004

- KEK-PS T564 (16-23 June, 2004) - 31.3 M total (mixed) triggers;

including 664 K electron triggers successful operation of APD readout

Page 13: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

1317 August, 2004

- PWO/APD/CSP/Readout Signals -ADC distributions

punch-through hadrons

electrons

pre-amplifier output

shaping amplifier output

Page 14: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

1417 August, 2004

- Hiroshima’s Prototype Performance - E/E = 5.5 % at 1 GeV/c, 3.1 % at 2

GeV/cwith quick and rough near-line

calibrations including significant beam momentum

spread analysis ongoing to subtract external

contributionsgas cherenkov hit required

electrons in center cell selected

Page 15: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

1517 August, 2004

- cf. Kurchatov’s Prototype Performance - Kurchatov 1616 prototype

E/E at –25 ºC :

1.3 %/E [GeV] 3.6 %/E [GeV] 1.1 %

Page 16: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

1617 August, 2004

- Summary and Outlook - charge-sensitive preamplifier (CSP) design

revised; version 3 in test production CSP for 1st PHOS module by January, 2005 continuing basic property investigation of

PHOS key components (PWO/APD/readout)

several prototypes fabricated/tested better local expertise independent PHOS prototype performance

evaluation in progress

Page 17: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

1717 August, 2004

- Official Business - applied for ALICE associate

collaborationtogether with Tokyo and Tsukuba

Universitiesapproval requested at next ALICE

meeting“official” PHOS participation expected

soon

Page 18: PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

1817 August, 2004

- PHOS Collaboration at Hiroshima U. - 3 staffs, ~10 graduate students

H.Harada, K.Haruna, K.Hirashita, K.Homma, K.Hosokawa, R.Kohara, Y.Nakamiya, M.Ouchida, H.Sakata, K.Shigaki, T.Sugitate, D.Toyoda, Y.Tsuchimoto, K.Yokoyama

Hiroshima PHOS web pagehttp://www.hepl.hiroshima-u.ac.jp/

quark/pwo/