Page 1: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

04.03.2013 vertraulich - confidential

Quality Assurance of PV Power Plants

Romanian Photovoltaic Projects Trade 2013

BEC-Engineering GmbH

Page 2: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

vertraulich - confidential 2

Innovative

Multidisciplinary Experienced

services and

solutions for

photovoltaic systems

and renewable

energies

successfully completed

services for more than

750 pv projects

worldwide correlating

with a total volume of

more than 1.250 MWp

engineers, physicians

and software developers

from project development

to applied research and

development

Independent

engineering company

with R&D department

Page 3: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

Portfolio Overview – services for…

• Engineering & Project Management

Independent Project Management and Detailed Engineering for PV Systems up to multi MWp

• Quality Control & Certification

Examination and Characterization of Photovoltaic Modules and Systems to ensure Investment Quality

• Monitoring & Evaluation

Innovative Solutions for the Measurement and Evaluation of Photovoltaic Modules and Systems in field and lab

• Analysis & Optimisation

Expertises and Studies, Failure Analysis, Research Projects, System Optimisation and Operation Management

• Technical Support for all legal issues

Technical approval of contracts with suppliers, check of warranty conditions…

vertraulich - confidential 3

Page 4: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

successfully realized services for more than 750 projects worldwide

with a total volume of more than 1.250 MWp

Page 5: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

vertraulich - confidential 5

(Independent) Quality Management

Optimization of Return

Protection of Investment

Technology & Experience

• Specific Behaviour of

• CIS, CdTe, C-Si, a-Si, a-Si/µ-Si

• Inverter MPP-Tracking

• electrical and mechanical interfaces

Professional & Objective

• Analysis of

• stabilization

• degradation

• seasonal behaviour

• long term behaviour (degradation)

• early recognition of error pattern

Page 6: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

6

vertraulich - confidential

Field measurement

PV-Generator (basic architecture)

Field

measurement

Wechselrichter

Modul

String

Superstring

Page 7: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

7 vertraulich - confidential

on site measurement of pv modules with mobile pv lab

Page 8: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

8 vertraulich - confidential

Mobile PV laboratory (placed in Bucharest)

Page 9: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

9 vertraulich - confidential

Mobile PV-Lab – Measurement Possibilities Example EL-picture with strong cracks

measurement principle – mobile PV-Lab

Page 10: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

10 vertraulich - confidential

Example result – 1 MWp pv plant DC power distribution

-> Detection of low power strings and superstrings

Page 11: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

11 vertraulich - confidential

percentual deviation between measured and nominial power

nu

mb

er

of

str

ing

s

Average -8.0 %

Standard deviation 4.9 % Plant ****

Example result – 2 MWp on roof pv plant DC power distribution

Page 12: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

12 vertraulich - confidential

Air IR images equipment

Page 13: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

13

roof pv generator with overheated cells

vertraulich - confidential

example result – field IR images

free field pv generator with different thermal Phänomena

Page 14: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

Independent Performance Ratio measurement system

14 vertraulich - confidential

Page 15: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

Example

Performance Ratio Audit

15 vertraulich - confidential

Monthly results of Performance Ratio depending to technology and seasons

Page 16: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

BEC takes the closer look.

BEC-Engineering GmbH is listed as recommended company

in several renowned banks and insurance companies.

Page 17: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

vertraulich - confidential 17

BEC-Engineering GmbH

Bahnhofstr. 1

85586 Poing

Germany

Phone: +49 8121 884567 0

Fax: +49 8121 884567 88

E-mail: [email protected]

Web: www.bec-engineering.de

Thanks for your Attention

Page 18: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

18 vertraulich - confidential

BEC Research Testfield (2 hectar, close to munich)

example – R&D outdoor pv module test facility

Page 19: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

19 vertraulich - confidential

example result: characteristics of thin film module under outdoor conditions

Performance chart of thin film module

under outdoor conditions

initial stabilization of thin film modules

under outdoor conditions

Page 20: Quality Assurance of PV Power Plants · Quality Assurance of PV Power Plants Romanian Photovoltaic Projects Trade 2013 BEC-Engineering GmbH . vertraulich - 2confidential ... 85586

vertraulich - confidential

Lab

Measurement

example result: Lab EL + IR imaging – polycristalline cell with cracks

conspicuous EL image, consequences for the

power are difficult to quantify

an additional high-resolution IR image shows

clear significant consequences for the power