Question 1 - Who do you represent?
Select one Everybody
1.Operator
2.Service company: i.e.
Manufacturers; Well Ops or
Vessel supplier 34%
53%
Vessel supplier
3.Government/regulatory body
4.Academia
5.Other2% 1%
10%
1 2 3 4 5
Question 2 - Why are you here?
Select the most appropriate Everybody
1.Learn more about
abandonment
2.Get an opportunity to
network with other companies
71%
network with other companies
and people
3.Get an insight into regulators
position
4.All of the above
5.My boss told me to come.
6.Other
16%
7%3% 3%
0%
1 2 3 4 5 6
Question 3 - Have you attended SPE
well abandonment seminar before
(2007, 2009 or 2011)? Everybody
1. Yes
2. No
74%
26%
1 2
Question 4 - Do you think the industry
has a realistic view on the cost of
abandonment? Operators
1.Yes
2.No
3.Don’t know
78%
6%
15%
1 2 3
Question 5 - Do you think the industry
has a realistic view on the cost of
abandonment? Service Companies
1.Yes
2.No
3.Don’t know
80%
8%12%
1 2 3
Question 6 - At initial planning stages
how much contingency would you
apply to well abandonment costs?
Operators
1.+/- 25%
2.+/- 50%
3.+ /- 100%
4.+/- 150% or more
53%
4.+/- 150% or more
5.Don’t know
16%
22%
2%
7%
1 2 3 4 5
Question 7 - At initial planning stages
how much contingency would you
apply to well costs? Service Companies
1.+/- 25%
2.+/- 50%
3.+ /- 100%
4.+/- 150% or more
25%
20%
28%
24%
4.+/- 150% or more
5.Don’t know
2%
1 2 3 4 5
Question 8 - For platform wells, what is
your starting point for evaluation &
cost estimation? Everyone
1.Utilise a Rig
2.A Rigless Spread
3.Consider the Needs of the
Well
74%
Well
17%
9%
1 2 3
Question 9 - For subsea wells, what is
your starting point for evaluation and
cost estimation? Everyone
1.Utilise a Rig
2.A Rigless Spread
3.Consider the Needs of the
Well
72%
Well
23%
5%
1 2 3
Question 10 - Where is the biggest
opportunity for cost saving? Everyone
1.New Technology
2.Better Planning
3.Rigless Methodologies 25%
35%
39%
1 2 3
142 / 190 Cross-tab label
Question 11 - When should you engage
DECC on your strategy for field
abandonment? Operators
1. 1 year prior to Cessation of
Production
2. 2 years prior to Cessation of
Production
48%
Production
3. 3 years prior to Cessation of
Production
4. Depends on the project
5. Don’t know
11%8%
15%18%
1 2 3 4 5
Question 12 - Have you used the UK Oil
& Gas methodology for estimating
abandonment costs? Everybody
1.Yes
2.No
84%
16%
1 2
Question 13 - Do you incorporate ease
of abandonment and suspension into
your well designs? Everybody
1.Yes
2.No
3.Sometimes
4.Don’t know
29%
21% 21%
28%
4.Don’t know
1 2 3 4
Question 14 - Are you familiar with the
criteria that abandonment plug-in
materials must satisfy? Everybody
1.Yes
2.No
3.Don’t know
67%
28%
5%
1 2 3
1.Yes
2.No
3.Not sure
Question 15 – Do you feel that the
industry is doing enough on cement
bond evaluation? Everybody
71%
11%
18%
1 2 3
Question 16 - As an industry do we
have an appropriate handle on the
data required for effective well
abandonment? Operators
1.Yes
2.No
3.Don’t know
35%
58%
35%
7%
1 2 3
Question 17 - As an industry do we
have an appropriate handle on the
data required for effective well
abandonment? Everyone else
1.Yes
2.No
3.Don’t know
78%
7%
15%
1 2 3
Question 21 - Would you come to
Interactive Workshop on well
abandonment in 2014? Everyone
1.Yes
2.No
3.Not sure
61%
10%
30%
1 2 3
Question 22- Has the Seminar
highlighted the challenges that exist
around rig less abandonment?
Everyone
1.Yes
2.No
3.Partly
4.Not sure
44%
48%
4.Not sure
4% 4%
1 2 3 4
Question 23 - My company would
consider shale as a barrier if it has 2
independent means of verification?
Operators
1.Yes
2.No
3.Not sure
64%
18% 18%
1 2 3
Question 24 - It is difficult to get
engineers excited about working on
abandonments? Operators
1.True
2.False
67%
33%33%
1 2