4
NOTE: Clean platform using (2.A) (2.B) (2.F) Isopropyl Alcohol before installing into modeler. Open the chamber door. Align platform’s rear notch into x-carriage’s locating tab Align platform’s front notch into latch’s front locating tab and secure latch. Close the front door and press ONLINE. (2.C). (2.B) (2.D ) 2.B POWER SUPPLY PLATFORM INSTALLATION 2.D Quick Reference Guide Quick Reference Guide BEFORE OPERATING THE MODELER, ADHERE TO ALL PERSONAL AND SAFE HANDLING OF MATERIALS DESCRIBED IN THE SAFETY SECTIONS TM OF THE PROJET USER GUIDE. 2.A 2.C 2.E 2.F Plug p Switch power on Plug RJ-4C cable into terminal on back side of modeler and into computer’s USB terminal. ower cord into power outlet on back side of modeler and into facility’s power outlet. (A) (B). (C) Verify facility’s electrical service rating before connecting power to the modeler. Facility electrical requirement: Grounded, 1-phase electrical circuit Service rating: 100–127 VAC, 50/60 Hz, 15A (max.) 3D Systems Confidential B C B B A 3-D Modelers NOTE: A Ethernet cable is required when connecting from the modeler to the end user’s computer. shielded (C) PN 305175-00, Rev. C, 10/08 TM TM It will be necessary to register your ProJet 3-D Production System, to access the ProJet Online User Guide. To register, type in “ projet.3dsystems.com” in the explorer browser. You will be asked to supply a “User ID” which should be something that is easily remembered; and a password. Your password is your modeler's serial number that is located on the back side of the machine. Once registered, an email confirmation will be sent to you with a link to 3D Systems' 3dpedia login page. (http://3dpedia.3dsystems.com) . Please log in using the user name and password as in the confirmation email to access the user guide.

Quick Reference Guide SAFE HANDLING OF MATERIALS ...infocenter.3dsystems.com/product-library/sites/default...Orient cartridge flat side up • Lower cartridge into slot • Add 8 max

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • NOTE: Clean platform using

    (2.A)

    (2.B)

    (2.F)

    Isopropyl Alcohol before installing into modeler.

    Open the chamber door. Align platform’s rear notch into x-carriage’s locating tab

    Align platform’s front notch into latch’s front locating tab and secure latch.

    Close the front door

    and press ONLINE.

    (2.C).

    (2.B)(2.D )

    2.B

    POWER SUPPLY PLATFORM INSTALLATION

    2.D

    Quick Reference GuideQuick Reference GuideBEFORE OPERATING THE MODELER, ADHERE TO ALL PERSONAL AND SAFE HANDLING OF MATERIALS DESCRIBED IN THE SAFETY SECTIONS

    TMOF THE PROJET USER GUIDE.

    2.A

    2.C

    2.E2.F

    Plug p

    Switch power on

    Plug RJ-4C cable into terminal on back side of modeler and into computer’s USB terminal.

    ower cord into power outlet on back side of modeler and into facility’s power outlet.

    (A)

    (B).

    (C)

    Verify facility’s electrical service rating before connecting power to the modeler.

    Facility electrical requirement: Grounded, 1-phase electrical circuitService rating: 100–127 VAC, 50/60 Hz, 15A (max.)

    3D Systems Confidential

    BCBB

    A

    3-D Modelers

    NOTE:A Ethernet cable is required when connecting from the modeler to the end user’s computer.

    shielded (C)

    PN 305175-00, Rev. C, 10/08

    TM TM It will be necessary to register your ProJet 3-D Production System, to access the ProJet Online User Guide. To register, type in “ projet.3dsystems.com” in the explorer browser. You will be asked to supply a “User ID” which should be something that is easily remembered; and a password. Your password is your modeler's serial number that is located on the back side of the machine. Once registered, an email confirmation will be sent to you with a link to 3D Systems' 3dpedia login page. (http://3dpedia.3dsystems.com) . Please log in using the user name and password as in the confirmation email to access the user guide.

  • Quick Reference Guide

    1

    TOperator PanelBedienungstafel • Panneau de l'opérateur • Panel del operador • Pannello per l’operatore Operatörspanel • Operatørpanel • Käyttöpaneeli

    Pause jobDruckauftrag pausierenPause de la réalisationPausa del trabajo de impresiónSospensione del lavoro di stampa

    online / offlineDrucker online / offlineImprimante en / hors ligneImpresora en línea / fuera de líneaStampante in linea / fuori linea

    Abort jobDruckauftrag abbrechenInterrompre la réalisationAnular trabajo de impresiónInterruzione del lavorodi stampa

    LCD DisplayLCD-DisplayAffichage LCDPantalla LCDDisplay LCD

    Scroll DownMenüoptionen rollenDéfilement des options de menuOpciones del menú de desplazamientoScorrimento delle opzioni di menu

    Confirm YESBestätigen YESConfirmer YESConfirmar YESConferma YES

    Menu optionsMenüoptionenOptions de menuOpciones de menúOpzioni del menu

    Confirm NOBestätigen NOConfirmer NOConfirmar NOConferma NO

    Light on/offLicht an/ausÉclairage en / horsIluminación encendida /apagadaSpia accesa / spenta

    Scroll UpMenüoptionen rollenDéfilement des options de menuOpciones del menú de desplazamientoScorrimento delle opzioni di menuC D

    F

    E

    A

    BB

    FAMILIARIZATION

    Quick Reference Guide

    Build chamber access door Zugangstür zur Prozesskammer Porte d'accès à la chambre deréalisation Puerta de acceso a la cámara de construcción Sportello di accesso alla camera di costruzioneÅtkomstlucka till byggkammaren Adgangsdør til byggekammerRakennuskammion luukku

    Build platform Bauplattform Plate-forme de réalisation Plataforma deconstrucción Piattaforma di costruzioneByggplattform Byggeplatform Rakennusalusta

    • •

    • • • •

    (Behind (A)• • •

    • •

    Support material feed slot door • Tür zur Stützmaterialzufuhr Porte de la fente de rechargement dumatériau des supportsPuerta con ranura de alimentación para el material del soporte Sportello della scanalatura di alimentazione del materiale di supporto • Dörr till stödmaterialurtaget • Dør til påfyldning af støttemateriale • Tukimateriaalin syöttöaukon luukku

    Model material feed slot door • Tür zur ModellmaterialzufuhrPorte de la fente de rechargement du matériau des modèlesPuerta con ranura de alimentación para el material del modeloSportello della scanalatura di alimentazione del materiale del modelloDörr till modellmaterialurtage • Dør til påfyldning af modelmaterialeMallimateriaalin syöttöaukon luukku

    Power plug and switch (rear) • Netzstecker und -schalter (Rückseite)Prise d'alimentation etcommutateur (face arrière) • Enchufe e interruptor dealimentación eléctrica (posterior) • Interruttore e spina dialimentazione (sul retro) • Eluttag och strömbrytare (baksidan)Netstik og afbryderkontakt (bagsiden) • Vahvavirtapistoke ja kytkin (takana)

    Waste material drawer • Abfallmaterialschublade • Tiroir à déchets • Gaveta para el material de desecho • Cassetto del materiale discarto • Utdragslåda för avfall • Skuffe til affaldsmaterialeJätemateriaalilaatikko

    A

    C

    D

    E

    F

    BB

    BEFORE OPERATING THE MODELER, ADHERE TO ALL PERSONAL AND SAFE HANDLING OF MATERIALS DESCRIBED IN THE SAFETY SECTIONS OF THE USER GUIDE.

    3D Systems Confidential

    3-D Modelers

  • 1ABA

    B

    C

    Open left and right material feed slot doors.

    Insert white support cartridges in left feed slot and black build cartridges in the right feed slots.

    Orient cartridge flat side up • Lower cartridge into slot • Add 8 max. • Close feed slot door.

    (1.B) (2.B)

    NOTE: For proper operation of the feed system, a minimum of three (3) support and three (3) build cartridges must be present.

    Support Material

    Type: S100

    Material

    Type: 200

    Material

    Type: 200

    Material

    Type: 200

    Material

    Type: 200

    BA

    B

    C

    BD

    CAUTION: Before removing waste materials from the waste drawer, adhere to all personal, and safe handling of materials described in the Material Safety section in the User Guide.

    Always follow MSDS guidelines and local regulations regarding handling and disposal of regulated materials

    Keep disposal records if local law requires.

    Press PAUSE and open waste drawer and remove full cartridge bins.

    Remove the material waste bag.

    Replace white liner in left bin and black liner in right bin if the liners are contaminated. Replace waste bag. Close drawer and Press RESUME to resume build.

    Quick Reference GuideQuick Reference GuideBEFORE OPERATING THE MODELER, ADHERE TO ALL PERSONAL AND SAFE HANDLING OF MATERIALS DESCRIBED IN THE SAFETY SECTIONS OF THE USER GUIDE.

    SUPPORT & BUILD MATERIAL CARTRIDGES INSTALLATION

    Support Material

    Type: S100Support M

    aterial Type: S100

    Support Material

    Type: S100

    BA

    BBSUPPORTSIDE

    BUILDSIDE1

    B1.B

    B2.BFlat Side of Cartridges

    C

    BA

    B

    2.F

    C

    BD

    EMPTYING WASTE DRAWER

    3D Systems Confidential

    3-D Modelers

  • OPERATION

    Submit Test Build

    (B1) (B2) (B3) P(B4) (B5) PX (B6) P(B7)

    X (B8)NOTE: It is recommended to submit a Test Build prior to each build job.

    Build Demo(C1) (C2) (C3) P(C4)(C5)

    P(C6)NOTE: Refer to 3dpedia, Projet HD 3-D Modeler User Guide, under the operation section for the build process, how to remove parts from the modeler and cleaning parts procedure.

    Locate the Sample STL files in 3D Modeling\Samples folder.

    Press MENU , Scroll to highlight TEST PRINT and press YES ( ) . The message PLATFORM CLEAR DOOR CLOSED? Y( ) / N ( ) scrolls across the display, Press YES ( ) if the platform is clear and door is closed, otherwise press NO( ).

    Press MENU , Scroll to highlight BUILD DEMO and press YES ( ) ; the system displays PLATFORM CLEAR? Y/N .When platform is clear, press YES ( ) . The modeler will starts the demo build job.

    Quick Reference GuideQuick Reference GuideBEFORE OPERATING THE MODELER, ADHERE TO ALL PERSONAL AND SAFE HANDLING OF MATERIALS DESCRIBED IN THE SAFETY SECTIONS OF THE USER GUIDE.

    ABA

    B

    CB

    TEST BUILD

    B3

    PLATFORM CLEAR DOOR CLOSED? Y/N

    DEMO BUILD

    ABD

    E

    F

    A

    D

    OK TO POWER OFF XXX

    Shut Down ModelerVerify that modeler is not building.

    To shut down immediately, abort the current job.

    Press MENU, scroll to SHUTDOWN, press YES twice .

    When the display shows OK TO POWER OFF XXX, press the power switch on the rear panel.

    To halt shutdown, press ONLINE before pressing power switch.

    G

    EF

    G

    B4C4C6 B6,B6,B8,C5

    B2C2

    B1C1

    C3

    B5C5

    3D Systems333 Three D Systems CircleRock Hill, SC 29730 USATelephone (803) 326-4080TollFree (800) 889-2964

    3D Systems – FranceTelephone (+33) 1 69 35 17 17

    3D Systems – GermanyTelephone (+49) 6151 357-03D Systems – Italy, Spain and PortugalTelephone (+39) 039 68904 00

    3D Systems-SwitzerlandTel. +41-26-439 95 90

    3D Systems – United KingdomTelephone (+44) 1442 282 600

    3D Systems – Hong KongTelephone (+852) 29 23 50 773D Systems – JapanTelephone (+81) 3 5451 1690

    3D Systems Contacts

    3D Systems Confidential

    3-D Modelers