RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN LAPORAN REALISASI ANGGARAN DAN STOCK ALKON BKKBN S/D NOVEMBER 2011

RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

  • Upload
    thom

  • View
    75

  • Download
    1

Embed Size (px)

DESCRIPTION

LAPORAN REALISASI ANGGARAN DAN STOCK ALKON BKKBN S/D NOVEMBER 2011. RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN. PAGU ANGGARAN BKKBN TA. 2011. Ribuan. PAGU ANGGARAN BKKBN TA. 2011. Ribuan. REALISASI ANGGARAN NASIONAL S/D NOVEMBER 2011. Ribuan. - PowerPoint PPT Presentation

Citation preview

Page 1: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

LAPORAN REALISASI ANGGARAN DAN STOCK

ALKON BKKBNS/D NOVEMBER 2011

Page 2: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

PAGU ANGGARAN BKKBN TA. 2011

PAGU NASIONAL RUPIAH

MURNI (RM) Rp. 2.503.150.000

ADB-DHS II Rp. 3.232.067USAID Rp. 3.161.329UNFPA Rp. 2.633.344HDN Rp. 9.000.000

TOTAL Rp. 2.521.176.740

Ribuan

PENGADAAN BARANG DAN JASA Rp. 1.045.243.406

OPERASIONAL Rp. 1.475.933.334TOTAL Rp. 2.521.176.740

Page 3: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

PENGADAAN BARANG DAN JASA Rp. 977.570.571

OPERASIONAL Rp. 322.936.971TOTAL Rp. 1.300.507.542

PAGU PUSAT RUPIAH

MURNI (RM) Rp. 1.294.062.562

ADB-DHS II (RK) Rp. 650.307

USAID Rp. 3.161.329

UNFPA Rp. 2.633.344

TOTAL Rp. 1.300.507.542

PAGU PROVINSI RUPIAH MURNI (RM) Rp.1.209.087.438

ADB-DHS II (RK) Rp. 2.581.760

HDN Rp. 9.000.000

TOTAL Rp1.220.669.198

PENGADAAN BARANG DAN JASA Rp. 66.551.959

OPERASIONAL Rp. 1.154.117.239TOTAL Rp. 1.220.669.198

PAGU ANGGARAN BKKBN TA. 2011

Ribuan

Page 4: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RUPIAH MURNI ADB -DHS (RM) ( RK )

PAGU 2,521,176,740 2,503,150,000 3,232,067 3,161,329 2,633,344 9,000,000

REAL 2,141,703,284 2,125,828,372 2,755,353 3,050,710 1,860,729 8,208,120

SISA 379,473,456 377,321,628 476,714 110,619 772,615 791,880

TOTAL USAID UNFPA HDN

REALISASI ANGGARANNASIONAL S/D NOVEMBER

2011

Ribuan

Realisasi Nasional Rp.2.141.703.284 (84,95

%)

REAL RATA2

RUPIAH MURNI (RM)

ADB-DHS II (RK)

USAID UNFPA HDN0.00

20.00

40.00

60.00

80.00

100.00 84.95 84.93 85.25 96.50

70.66

91.20

REAL

Page 5: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

PERBANDINGAN REALISASI ANGGARAN

SECARA NASIONAL (RM + RK)S/D NOVEMBER 2010 DAN 2011

RATA-RATA REALISASI : 84,95 %

PAGU DIPA 2.521.176.740

REAL SPM 2.141.703.284

SISA DANA 379.473.456

T.A. 2010 T.A. 2011

RATA-RATA REALISASI 86,64%

PAGU DIPA 1.367.644.433

REAL SPM 1.184.888.480

SISA DANA 182.755.953

Ribuan

Page 6: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI ANGGARAN DIPA SECARA NASIONAL– PER PROGRAM S/D

NOVEMBER TAHUN 2011Ribua

n

Page 7: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI ANGGARAN DIPA SECARA NASIONAL– PER BELANJA S/D

NOVEMBER TAHUN 2011

Catatan :Belanja Pegawai Transito : Rp. 4.847.676,-

Ribuan

MAK JENIS BELANJA PAGU DIPA REALISASI %

1 2 3 4 5=(4:3)NASIONAL

51 Belanja Pegawai 183,183,435 168,480,044 91.97 52 Belanja Barang 2,241,917,413 1,883,709,990 84.02 53 Belanja Modal 96,075,892 89,513,250 93.17

TOTAL 2,521,176,740 2,141,703,284 84.95

Page 8: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RUPIAH MURNI ADB -DHS USAID UNFPA (RM) ( RK )

PAGU 1,300,507,542 1,294,062,562 650,307 3,161,329 2,633,344

REAL 1,157,432,893 1,152,234,304 287,150 3,050,710 1,860,729

SISA 143,074,649 141,828,258 363,157 110,619 772,615

TOTAL

REALISASI ANGGARAN BKKBN PUSAT

S/D NOVEMBER 2011Ribua

n

Realisasi Pusat Rp. 1.157.432.893,- (89,00%)

% PENGADAAN BARANG DAN JASA

977,570,571 957,168,858 97.91 20,401,713

OPERASIONAL 322,936,971 200,264,035 62.01 122,672,936

TOTAL 1,300,507,542 1,157,432,893 89.00 143,074,649

PAGU REALISASI SISA

REAL RATA2

RUPIAH MURNI (RM)

ADB-DHS II (RK)

USAID UNFPA -

20.00

40.00

60.00

80.00

100.00 89.00 89.04

44.16

96.50

70.66

REAL

Page 9: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

PERBANDINGAN REALISASI ANGGARAN DIPA BKKBN PUSAT S/D NOVEMBER 2010 DAN 2011

RATA-RATA REAL : 89,00%

T.A. 2010(Rp. 000)

DANA DIPA 1.300.507.542

REAL SPM 1.157.432.893

SISA DANA 143.074.649

T.A. 2011(Rp. 000)

RATA-RATA REAL : 85,14 %

DANA DIPA 732.820.093

REAL SPM 623.904.041

SISA DANA 104.498.982

Page 10: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI ANGGARAN BKKBN PUSAT (RM + RK) PER SATKER

S/D BULAN NOVEMBER 2011Ribuan

Page 11: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI PENGADAAN BARANG/JASASATUAN KERJA KB-KR S/D DESEMBER 2011

NO. NAMA JUMLAH PAGU NOMOR, TGL KONTRAK HARGA NILAI REALISASI REALISASI SISA  BARANG FISIK ANGGARAN DAN TGL AKHIR SATUAN KONTRAK RUPIAH % ANGGARAN        (Rp.) KONTRAK (Rp.) (Rp.) (Rp.) (Rp.)

1 2 3   4 5 6 7 8 91 Implant 624.773 set 172.362.575.000 104/I/LK.003/E3/2011   159.614.763.935 159.614.763.935 100 12.747.811.065   - Plus Inserter 436.743     17 Januari 2011 274.395          - Tanpa Inserter 188.030     16 Mei 2011 208.615        2 Kondom 140.967 gross 8.598.987.000 82/I/LK.003/E3/2011 59.279 8.356.382.793 8.356.382.793 100 242.604.207           13 Januari 2011                    11 Juni 2011          3 Phantom 6.144 set 39.936.000.000 107/I/LK.006/E3/2011 6.160.000 37.847.040.000 37.847.040.000 100 2.088.960.000           17 Januari 2011                    16 Mei 2011          4 IUD 1.085.964 bh 19.232.422.440 128/I/LK.006/E3/2011 16.335 17.739.221.940 17.739.221.940 100 1.493.200.500           19 Januari 2011                    18 Mei 2011          5 ABPK 14.933 bh 3.904.500.000 80/I/LK.006/E3/2011 156.585 2.338.283.805 2.338.283.805 100 1.566.216.195         13 Januari 2011                    30 Juni 2011          

6 BP3K 23.500 bh 2.585.000.000 2023I/KU.807/E1/2011 110.000 1.930.995.000

1.930.995.000 100 2.585.000.000           12 Desember 2011                31 Desember 2011          7 Implant Kit 1.850 set 4.440.000.000 119/I/LK.006/E3/2011 2.343.000 4.334.550.000 4.334.550.000 100 105.450.000           18 Januari 2011                    17 Mei 2011          8 IUD Kit 22.820 bh 114.100.000.000 172/I/LK.006/E3/2011 4.815.699 109.894.250.400 109.894.250.400 100 4.205.749.600           28 Januari 2011                    18 Oktober 2011          9 Safety Box 179.984 bh 3.419.696.000 1226/I/LK.006/E3/2011 18.083 3.254.648.980 3.254.648.980 100 165.047.020           15 Juli 2011                    20 Oktober 2011          

10 Falope Ring 36.126 bh 993.465.000 586/I/LK.006/E1/2011 27.170 981.543.420 981.543.420 100 11.921.580           18 Maret 2011                    16 Mei 2011          

11 Obgyn Bed 810 bh 6.480.000.000 876/I/LK.006/E1/2011 7.800.000 6.317.999.919 6.317.999.919 100 162.000.081           3 Mei 2011                    01 Agustus 2011          

12 VTP Kit 796 set 1.990.000.000 687/I/LK.006/E1/2011 2.319.900 1.846.640.400 1.846.640.400 100 143.359.600           30 Maret 2011                    27 Juni 2011          

13 Minilap Kit 817 set 6.127.500.000 612/I/LK.006/E1/2011 7.200.598 5.882.888.200 5.882.888.200 100 244.611.800           22 Maret 2011                    19 Juni 2011          

Page 12: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI PENGADAAN BARANG/JASASATUAN KERJA KB-KR S/D DESEMBER 2011

Lanjutan....NO. NAMA JUMLAH PAGU NOMOR, TGL KONTRAK HARGA NILAI REALISASI REALISASI SISA

  BARANG FISIK ANGGARAN DAN TGL AKHIR SATUAN KONTRAK RUPIAH % ANGGARAN        (Rp.) KONTRAK (Rp.) (Rp.) (Rp.) (Rp.)

1 2 3   4 5 6 7 8 9                     

14 Dry Sterilisator 100 bh 300.000.000 613/I/LK.006/E1/2011 2.838.000 283.800.000 283.800.000 100 16.200.000           22 Maret 2011                    19 Juni 2011          

15 Pil KB 62.663.300 cycle 124.699.967.000 799/I/LK.006/E1/2011 1.986 124.417.982.150 124.417.982.150 100 281.984.850           18 April 2011                    15 Agustus 2011          

16 Laparoscopy 112 set 39.615.000.000 950/I/LK.006/E1/2011 251.298.300 28.145.409.600 28.145.409.600 100 11.469.590.400           13 Mei 2011                    9 Oktober 2011          

17 Auto Disable / Distuct Syringe 13.692.737 bh 23.077.248.000 807/I/LK.006/E1/2011 1.480 20.258.404.392 20.258.404.391 100 2.818.843.608   (ADS)       19 April 2011                    17 Juli 2011          

18 Suntikan 14.423.280 vial 93.751.320.000 808/I/LK.006/E1/2011 6.061 87.419.500.080 87.419.500.080 100 6.331.819.920           19 April 2011                  16 Agustus 2011          

19 Laparoscopy 27 set 7.695.000.000 1439/I/LK.006/E1/2011 285.000.000 6.182.999.460 6.182.999.460 100 1.512.000.540           9 September 2011                    22 November 2011          

20 IUD 199.996 bh 3.541.928.560 1792/I/LK.006/E1/2011 17.710 2.923.741.524 2.923.741.524 100 618.187.036           2 November 2011                    31 Desember 2011          

21 Implant Removal Kit 9.071 set 18.142.000.000 1912/I/LK.006/E1/2011 2.000.000 17.601.368.400 17.601.368.400 100 540.631.600           25 November 2011                    31 Desember 2011          

22 VTP Kit 400 set 1.000.000.000 1794/I/LK.003/E1/2011 2.500.000 925.936.000 925.936.000 100 74.064.000           2 September 2011                    31 Desember 2011          

23 Implant Plus Inserter 176.761 set 48.609.275.000 1788/I/LK.003/E1/2011 275.000 48.502.334.595 48.502.334.595 100 106.940.405           2 September 2011                    31 Desember 2011            APBN-P                  

24 Implant Plus Inserter 327.040 set 89.836.000.000 1772/I/LK.003/E1/2011 274.694 89.738.140.800 89.738.140.800 100 97.859.200           28 Oktober 2011                    26 Desember 2011                             

  JUMLAH TOTAL    

826.742.884.000     786.738.825.793

786.738.825.792 100 %

47.592.117.802

Page 13: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI PENGADAAN BARANG/JASASATUAN KERJA SESTAMA S/D DESEMBER 2011

NO.

NAMA JUMLAH PAGU NILAI REALISASI REALISASI SISA

BARANG FISIK ANGGARAN KONTRAK RUPIAH % ANGGARAN

      (Rp.) (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8

1 Peralatan Tambahan Infrastruktur 1 Pkt 1.498.200.000 1.423.285.744 1.423.285.744 100 74.914.256

2 Perangkat Lunak (Software) 1 Pkt 2.034.050.000 1.925.507.112 1.925.507.112 100 108.542.888

3 Pengadaan Sarana dan Prasarana Kantor 1 Pkt 1.667.500.000 1.448.150.000 1.448.150.000 100 219.350.000

4 Document Management System 1 Pkt 486.355.000 396.385.000 396.385.000 100 89.970.000

5 Pengadaan Integrasi Aplikasi 1 Pkt 5.980.350.000 5.781.586.903 5.781.586.903 100 198.763.097

6 Rak Perpustakaan Double 45 Unit 157.500.000 148.500.000 148.500.000 100 9.000.000

7 Fasilitas Meja Kerja 1 Pkt 200.000.000 190.520.000 190.520.000 100 9.480.000

8 Rehab Rumah Jabatan 1 Pkt 900.000.000 867.185.000 867.185.000 100 32.815.000

9 Rehab Ruangan Eselon 1 1 Pkt 750.000.000 726.440.000 726.440.000 100 23.560.000

10 Rehab Gedung Kantor 1 Pkt 3.000.000.000 2.508.070.000 2.508.070.000 100 491.930.000

11 Mobil Operasional 8 Unit 1.600.000.000 1.585.550.000 1.585.550.000 100 14.450.000

12 Assesment Pegawai 1 Pkt 500.000.000 499.825.000 499.825.000 100 175.000

  JUMLAH TOTAL     18.773.955.000 17.501.004.759 17.501.004.759 100 1.272.950.241

Page 14: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI PENGADAAN BARANG/JASASATUAN KERJA DITVOKKOM S/D DESEMBER 2011

NO.NAMA JUMLAH PAGU NILAI REALISASI REALISASI SISA

BARANG FISIK ANGGARAN KONTRAK RUPIAH % ANGGARAN      (Rp.) (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 81 Billboard 8 Unit 11.852.500.000 11.852.500.000 11.852.500.000 100 -

2 Produksi dan Penayangan Jingle di Radio 1 Pkt 4.740.500.000 4.740.500.000 4.740.500.000 100 -

3 Talkshow di Radio 1 Pkt 4.785.400.000 4.785.400.000 4.785.400.000 100 -

4 Produksi dan Penayangan PSA di Radio 1 Pkt 12.872.500.000 12.872.500.000 12.872.500.000 100 -

5 Variety Show 1 Pkt 20.754.000.000 20.754.000.000 20.754.000.000 100 -

6 Produksi dan Penayangan PSA di TV 1 Pkt 26.469.200.000 26.469.200.000 26.469.200.000 100 -

7 Talkshow di TV 1 Pkt 9.880.000.000 9.680.000.000 9.680.000.000 100 200.000.000

8 KIE Kit 1 Pkt 5.450.137.000 5.450.137.000 5.450.137.000 100 -

9 Peralatan MPC 7 Set 6.665.251.670 6.665.251.670 6.665.251.670 100 -

10 Sosialisasi Transit Media 1 Pkt 2.517.471.000 2.517.471.000 2.517.471.000 100 -

11 Advertorial di Televisi 1 Pkt 2.502.000.000 2.502.000.000 2.502.000.000 100 -

12 Sosialisasi KB melalui Media Tradisional 1 Pkt 6.117.606.000 6.117.606.000 6.117.606.000 100 -

 13 Adlips di Radio 363 Keg 998.250.000 881.500.000 881.500.000 100 116.750.000

14 Cerdas Cermat 1 Pkt 2.975.000.000 2.858.000.000 2.858.000.000 100 117.000.000

15 KIE KB Remaja 1 Pkt 6.000.000.000 5.807.981.300 5.807.981.300 192.018.700

16 Materi KIE Klinik 1 Pkt 1.500.000.000 1.451.697.500 1.451.697.500 100 48.302.500

17 Materi KIE (buku) 1 Pkt 1.050.000.000 1.019.810.000 1.019.810.000 100 30.190.000 OPTIMALISASI

18 Iklan Layanan Masyarakat TV 1 Pkt 9.257.301.000 8.794.436.860 8.794.436.860 100 462.864.140

19 Iklan Layanan Masyarakat Radio 1 Pkt 6.905.700.000 3.799.058.120 3.799.058.120 100 3.106.641.880

20 Radio Komunitas 1 Pkt 1.000.000.000 984.720.000 984.720.000 100 15.280.000

21 Produksi Sandiwara Radio 1 Pkt 1.000.000.000 992.200.000 992.200.000 100 7.800.000

22 PSA di Pelabuhan 1 Pkt 4.817.400.000 4.448.000.000 4.448.000.000 100 369.400.000

  JUMLAH TOTAL     150.110.216.670 145.443.969.450 145.443.969.450 100 % 4.666.247.220

Page 15: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI ANGGARAN BKKBN PUSAT (RM + RK) PER SATKER S/D OKTOBER 2011 DAN

RENCANA PENARIKAN S/D BULAN DESEMBER 2011

Ribuan

Page 16: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI ANGGARAN BKKBN PUSAT PER BELANJA

S/D BULAN NOVEMBER 2011

Catatan :Belanja Pegawai Transito : Rp. 306.126,-

Ribuan

MAK JENIS BELANJA PAGU DIPA REALISASI %

1 2 3 4 5=(4:3)PUSAT

51 Belanja Pegawai 36,383,733 37,347,800 102.65 52 Belanja Barang 1,189,686,401 1,048,781,233 88.16 53 Belanja Modal 74,437,408 71,303,860 95.79

TOTAL 1,300,507,542 1,157,432,893 89.00

Page 17: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RUPIAH MURNI ADB -DHS II HDN (RM)

PAGU 1,220,669,198 1,209,087,438 2,581,760 9,000,000

REAL 984,270,391 973,594,068 2,468,203 8,208,120

SISA 236,398,807 235,493,370 113,557 791,880

TOTAL

REALISASI ANGGARANPROVINSI S/D NOVEMBER

2011

Ribuan

% PENGADAAN BARANG DAN JASA

66,551,959 56,448,233 84.82 10,103,726

OPERASIONAL 1,154,117,239 927,822,158 80.39 226,295,081

TOTAL 1,220,669,198 984,270,391 80.63 236,398,807

PAGU REALISASI SISA

Realisasi Rata2 Provinsi Rp. 984.270.391,- (80,63%)

REAL RATA-RATA

RUPIAH MURNI (RM)

ADB-DHS II (RK)

HDN0.00

20.00

40.00

60.00

80.00

100.0080.63 80.52

95.6091.20

REAL

Page 18: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

PERBANDINGAN REALISASI ANGGARAN DIPA PERWAKILAN BKKBN PROVINSI S/D NOVEMBER 2010 DAN 2011

RATA-RATA REAL : 80,63 %RATA-RATA REAL : 88,06 %

DANA DIPA 634.824.340

REAL SPM 559.027.711

SISA DANA 75.796.629

T.A. 2010

(Rp. 000)

DANA DIPA 1.220.669.198

REAL SPM 984.270.391

SISA DANA 236.398.807

T.A. 2011

(Rp. 000)

Page 19: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI ANGGARAN (RM + RK) PROPINSI PER OUTPUT PROGRAM KEPENDUDUKAN DAN KB

S/D NOVEMBER 2011 Ribuan

Page 20: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI ANGGARAN PERWAKILAN BKKBN PROVINSI

PER BELANJAS/D BULAN NOVEMBER 2011

Ribuan

Catatan :Belanja Pegawai Transito : Rp. 4.541.550,-

MAK JENIS BELANJA PAGU DIPA REALISASI %

1 2 3 4 5=(4:3)PROPINSI

51 Belanja Pegawai 146,799,702 131,132,244 89.33 52 Belanja Barang 1,052,231,012 834,928,757 79.35 53 Belanja Modal 21,638,484 18,209,390 84.15

TOTAL 1,220,669,198 984,270,391 80.63

Page 21: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI

ANGGARAN

(RM+RK)PERWAKI

LAN BKKBN

PROVINSI S/D

NOVEMBER 2011

Ribuan

Merah ≤ rata2 Propinsi

80,63 %

Page 22: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI

ANGGARAN

(RM+RK)PERWAKI

LAN BKKBN

PROVINSI S/D

NOVEMBER DAN

RENCANA PENARIKA

N S/D DESEMBE

R 2011

Ribuan

Page 23: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI PERKEMBANGAN PENGADAAN BARANG/JASA PERWAKILAN BKKBN PROVINSI S/D NOVEMBER 2011

Nilai Merah = dibawah

realisasi rata2 Propinsi

85,78 %

Page 24: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

REALISASI ANGGARAN ADB-DHS II S/D NOVEMBER 2011

Ribuan

Page 25: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

HIBAH DALAM NEGERIPERWAKILAN BKKBN PROVINSI JAWA BARAT

Ribuan

Page 26: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

KETERSEDIAAN ALAT & OBAT KONTRASEPSI

Page 27: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

DISTRIBUSI ALKON OKTOBER - DESEMBER 2011

Page 28: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

DISTRIBUSI ALKON OKTOBER - DESEMBER 2011

Lanjutan....

Catatan* Sumber dari Surat Perintah Mengeluarkan Barang (SPMB)** Kondom satuan dalam lusin

Page 29: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

ADA LAPOR(%)PROVINSI 33 33 (100,0%)KOTA/KAB 479 420 (87,68%)

CAKUPAN LAPORAN KAB./KOTA

100% ≥90% <90% Tidak Melapor

DKI Jakarta,Jabar, Jateng, DIY, Jatim, Bali, Banten,

Sumsel, NTB, Kalbar, Kalsel, Sulut, Sulsel, Babel,

Gorontalo, Riau, Jambi, Bengkulu, NTT, Kalteng, Kaltim, Sulteng, Malut,

Kepri dan Sulbar

Aceh, Sumbar dan

Sultra

Lampung dan Papua

Sumut dan Papbar

CAKUPAN LAPORAN EVALUASI ALKONNOVEMBER 2011

Page 30: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

No. Pusat Provinsi Kab/Kota Jumlah Pemakaian perbulan

Ratio Persediaan

1 3 4 5 6 7 8

1 Pil (cycle) 30.484.917 33.669.380 9.381.414 73.535.711 4.024.285 18,3

2 Implant (set) 108.843 302.030 120.156 531.029 52.761 10,1

3 IUD (ea) 532.429 188.615 132.783 853.827 45.341 18,8

4 Kondom (lusin) 618.732 2.024.322 640.308 3.283.362 261.744 12,5

5 Suntikan (vial) 7.329.764 19.776.122 4.644.608 31.750.494 2.152.828 14,7

Jenis Kontrasepsi

2

Persediaan Alat / Obat KontrasepsiBulan November 2011

(F/V/KB)

Page 31: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RASIO KEMAMPUAN STOCK KONTRASEPSI DI GUDANG PUSAT

NOVEMBER 2011

PerkiraanNo. PUSAT rata-rata Ratio

kebutuhanper bulan

1 3 4 51 Pil (cycle) 30.484.917 4.024.285 7,58 2 Implant (set) 108.843 52.761 2,06 3 IUD (each) 532.429 45.341 11,74 4 Kondom (lusin) 618.732 261.744 2,36 5 Suntikan (vial) 7.329.764 2.152.828 3,40

Jenis

2

Kontrasepsi

Page 32: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RASIO KEMAMPUAN STOCK KONTRASEPSI DENGAN CAKUPAN LAPORAN KAB DAN KOTA 100%BULAN: NOVEMBER 2011

PerkiraanNo. Provinsi *) Kab/Kota *) Jumlah rata-rata Ratio

kebutuhanper bulan **)

1 3 4 5 6 71 Pil (cycle) 26.406.510 8.530.685 34.937.195 3.272.864 10,67 2 Implant (set) 274.463 108.876 383.339 44.601 8,59 3 IUD (each) 169.640 126.185 295.825 40.078 7,38 4 Kondom (lusin) 1.674.997 508.180 2.183.177 191.820 11,38 5 Suntikan (vial) 17.943.761 4.280.446 22.224.207 1.875.351 11,85

Jenis

2

Kontrasepsi

Sumber Data*) : F/V/KB di 26 Provinsi**) : Berdasarkan PPM dan KKP

tahun 2011 di 26 Provinsi

Page 33: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RASIO KEMAMPUAN STOCK KONTRASEPSI DENGAN CAKUPAN LAPORAN KAB DAN KOTA >90% s/d <100%BULAN: NOVEMBER 2011

No. Provinsi *) Kab/Kota *) Jumlah rata-rata Ratiokebutuhan

per bulan **)1 3 4 5 6 7

1 Pil (cycle) 3.688.180 754.630 4.442.810 305.015 14,57 2 Implant (set) 10.076 10.183 20.259 2.585 7,84 3 IUD (each) 6.685 4.977 11.662 1.061 10,99 4 Kondom (lusin) 161.206 121.208 282.414 23.851 11,84 5 Suntikan (vial) 727.303 322.037 1.049.340 121.274 8,65

Jenis

2

Kontrasepsi

Sumber Data*) : F/V/KB di 3 Provinsi**) : Berdasarkan PPM dan KKP

tahun 2011 di 3 Provinsi

Page 34: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RASIO KEMAMPUAN STOCK KONTRASEPSI DENGAN CAKUPAN LAPORAN KAB DAN KOTA <90%BULAN: NOVEMBER 2011

PerkiraanNo. Provinsi *) Kab/Kota *) Jumlah rata-rata Ratio

kebutuhanper bulan **)

1 3 4 5 6 71 Pil (cycle) 1.342.041 96.099 1.438.140 205.911 6,98 2 Implant (set) 10.248 1.097 11.345 2.613 4,34 3 IUD (each) 11.580 1.621 13.201 2.213 5,97 4 Kondom (lusin) 68.106 10.920 79.026 7.848 10,07 5 Suntikan (vial) 598.538 42.125 640.663 79.098 8,10

Jenis

2

Kontrasepsi

Sumber Data*) : F/V/KB di 3 Provinsi**) : Berdasarkan PPM dan KKP tahun

2011 di 3 Provinsi

Page 35: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RASIO STOK ALKON TK. PROV & KAB

YG KURANG DARI 3 BULAN s/d NOVEMBER 2011

PILOKTOBER NOVEMBER

-

SEPTEMBER

- -

- Babel 2,25 - Sumsel 2,86 - D.I Yogya 2,15

- Sulbar 2,31 - Papua 2,31 - Babel 2,87

- Papbar 2,22 - Sulteng 2,50

- Sulbar 1,25 - Maluku 2,45 - Papbar 0,00

IUDOKTOBER NOVEMBERSEPTEMBER

Page 36: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RASIO STOK ALKON TK. PROV & KAB YG KURANG DARI 3 BULAN s/d NOVEMBER 2011

Biro Keuangan dan Pengelolaan BMN

- Sumbar 2,32 - Bengkulu 1,68- Maluku 1,72 - Maluku Utara 2,73

SUNTIKANOKTOBER NOVEMBERSEPTEMBER

-

- D.I Yogya 2,51 - Sumsel 2,39 - Sumut 2,95

- Riau 1,10

KONDOMOKTOBER NOVEMBERSEPTEMBER

- Bali 2,37 - Jabar 2,88 - Sumut 2,51

- Sulbar 1,69 - Lampung 1,98 - Kalbar 1,04 - Gorontalo 2,89 - Gorontalo 1,83 - NTT 2,37 - Papua 0,80 - Kaltim 2,27 - Maluku Utara 2,97 - Maluku 2,28 - Papbar 1,54 - Sulbar 0,74 - Sulbar 2,29

IMPLANTOKTOBER NOVEMBERSEPTEMBER

Page 37: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

Biro Keuangan dan Pengelolaan BMN

RATIO STOK ALKON TK. PROV & KAB

YG LEBIH DARI 18 BULAN TAHUN 2011

- Babel 20,66 - Babel 22,29 - Babel 22,28

- Jambi 18,02 - Jambi 23,91 - Jambi 22,76

- Sultra 22,24 - Sultra 23,79

PILOKTOBER NOVEMBERSEPTEMBER

-

IUDOKTOBER NOVEMBER

--

SEPTEMBER

Page 38: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RASIO STOK ALKON TK. PROV & KAB YG LEBIH DARI 18 BULAN TAHUN 2011

Biro Keuangan dan Pengelolaan BMN

- Banten 20,61 - Kalsel 21,98 - Kalsel 20,96 - Kalsel 22,81 - Gorontalo 21,00 - Gorontalo 18,28 - Gorontalo 22,44 - Sulteng 22,16

KONDOMOKTOBER NOVEMBERSEPTEMBER

- DKI Jakarta 22,37 - DKI Jakarta 22,72 - DKI Jakarta 21,82 - Sulsel 20,97 - Sulsel 21,69 - Sumsel 22,64 - Jambi 18,03 - Jambi 23,59 - Jambi 22,43

-Sulteng 19,89

SUNTIKANOKTOBER NOVEMBERSEPTEMBER

- Aceh 20,23

IMPLANTOKTOBER NOVEMBERSEPTEMBER

- -

Page 39: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RASIO STOK ALKON TK. PROV & KAB YG LEBIH DARI 24 BULAN TAHUN 2011

Biro Keuangan dan Pengelolaan BMN

IUDOKTOBER NOVEMBER

- -

SEPTEMBER-

- Sulteng 29,02 - Sulteng 28,30 - Sulteng 24,52 - Sultra 26,82

PILOKTOBER NOVEMBERSEPTEMBER

Page 40: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

RASIO STOK ALKON TK. PROV & KAB YG LEBIH DARI 24 BULAN TAHUN 2011

Biro Keuangan dan Pengelolaan BMN

- Kalbar 25,57 - Kalbar 27,51 - Kalbar 25,54 - Sulbar 33,62 - Babel 37,37 - Sulsel 24,07

- Sulbar 36,98 - Babel 37,65 - Sulbar 36,84

SUNTIKANOKTOBER NOVEMBERSEPTEMBER

- NTB 28,49 - Banten 31,58 - Banten 27,82- Maluku Utara 77,18 - NTB 25,97 - Maluku Utara 72,78

- Bengkulu 25,32 - Maluku Utara 72,30

KONDOMOKTOBER NOVEMBERSEPTEMBER

- Aceh 81,88 - Aceh 25,60

IMPLANTOKTOBER NOVEMBERSEPTEMBER

-

Page 41: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

PERCEPATAN PELAKSANAAN PROSES LELANG

UU NO. 22 TAHUN 2011 APBN 2012

1. Pelelangan paket-paket pengadaan barang dan jasa paling lambat 13 Januari 2012.

2. Hasil pelelangan paket-paket yang telah diumumkan berikut penjelasan untuk paket yang tidak berhasil diumumkan tanggal 16 Januari 2012.

3. Menyelesaikan penandatanganan kontrak paling lambat tanggal 16 Maret 2012.

4. Hasil pelaksanaan penandatanganan kontrak berikut penjelasan untuk paket yang tidak berhasil ditandatangani tanggal 19 Maret 2012.

Memerintahkan KPA :

Arahan Presiden RI dalam Penyerahan DIPA 2012Melalui surat dari Tim Evaluasi dan Pengawasan Penyerapan Anggaran No. TEP/S-1/12/2011

Page 42: RAPAT PENGENDALIAN PROGRAM DAN ANGGARAN

Terima KasihDua anak .... Lebih baik