55
Ref.No.WR/AHD//SPU/13-14/01 Dated 11 th June 2013 1 Rashtriya Ispat Nigam Limited Visakhapatnam Steel Plant (A Govt. of India Enterprise) Branch Sales Office : NBCC House, 1 st Floor, Near Sahjanand College, Ambawadi, AHMEDABAD – 380 015. Gujarat State ----------------------------------------------------------------------------------------------------------------------------------- SUB: APPOINTMENT OF ROLLING MILLS (TO BE SET UP) AS PROSPECTIVE STEEL PROCESSING UNITS (SPU) FOR TMT REBARS AND/OR STRUCTURAL AT KANDLA, GUJARAT 1) Sealed tenders in prescribed forms are invited from bonafide, resourceful , financially sound Person(s)/firm(s)/ company(s)/Rolling Mills willing to offer total capacity of their plant (to be installed and commissioned within a maximum period of Two (02) years) as per requirements of RINL for appointment as Prospective Steel Processing Unit (SPU). The tenderer shall set up a Rolling Mill with a well established TMT REBARS manufacturing process of either Thermax, Tempcore, Stelmore, Turboquench, Evcon and/or Structurals for conversion of (minimum 72000 metric tons) of TMT REBARS (in the diameter range of 6 mm to 32 mm) and/ or Structurals per year at Kandla, Gujarat . 2) Such firms/companies who can arrange to have BIS registration for manufacturing of TMT REBARS in the size range of 6 mm to 32mm and or Structurals only need to participate in this tender. 3) Mills with single product line / 2 product line will only be considered for SPU- Conversion. Entire capacity of the mill shall be dedicated to RINL/VSP. 4) Although the SPU will be required to convert all the diameters and sizes as per RINL’s requirement, the thrust for conversion for TMT bars will be in the range of 6/8/10/12 & 16 mm. 5) Tender document in duplicate along with all other terms and conditions can be obtained from RINL Branch Sales Office, Ahmedabad at the above address on payment of Rs 5000 (Rupees Five Thousand only ) (non refundable) in cash/ DD/ Pay order in favour of “RASHTRIYA ISPAT NIGAM LIMITED A/c <Bidder Name>” payable at Ahmedabad between 9:00 hrs to 17:30 hrs on any working day up to 01.07.2013 (Monday) . Tender Documents can also be downloaded from the website www.vizagsteel.com. 6) Tender documents duly filled in and signed by an authorized person shall be put in the Tender Box kept for this purpose in the office of the BSO/RINL at the address as mentioned above latest by 02.07.2013 (Tuesday), 3.00 PM. Tenders can also be submitted by Post/Courier and should reach the above address by the stipulated date and time mentioned above. Tenders must be submitted as prescribed in Instruction to Tender for Conversion of Cast Billets /MMSM Billets to TMT Rebars and /or Structurals. 7) By submitting a quotation the tenderer shall be deemed to have fully familiarized himself with all requisite details including the quantity and type of materials expected to be converted/produced, as well as information contained in the enclosed Instructions to Tenderers including the Terms and Conditions of the SPU Contract and have fully satisfied himself/ itself of his/ its capabilities to undertake and perform the jobs to the satisfaction of the company. Any alteration or modification or imposition in deviation to the terms and conditions prescribed by RINL in Tender Papers shall be ignored. 8) Please note that by merely inviting the tenderer to submit the tender, there is absolutely no Commitment, implied or otherwise, at this stage from Company’s side as to the award of actual Contract and no correspondence in this regard will be entertained by the Company. Nor RINL shall be liable in any manner whatsoever, for costs and expenses etc. incurred in responding to this Invitation. 9) The tender document should be submitted with necessary EMD. Downloaded tender documents would, in addition, need to be submitted along with the cost of the tender documents as stipulated above. 10) Tenders will be opened immediately thereafter, in the presence of such tenderers who may wish to be present. 11) RINL reserves the right to accept or reject any one or all the tenders without assigning any reason whatsoever. Sr.Branch Manager, Ahmedabad

Rashtriya Ispat Nigam Limited Visakhapatnam Steel Plant NIT...Ref.No.WR/AHD//SPU/13-14/01 Dated 11 th June 2013 3 2. SPU- Conversion Charges: i) For the conversion job, SPU will be

Embed Size (px)

Citation preview

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

1

Rashtriya Ispat Nigam Limited Visakhapatnam Steel Plant

(A Govt. of India Enterprise) Branch Sales Office : NBCC House, 1st Floor, Near Sahjanand College, Ambawadi,

AHMEDABAD – 380 015. Gujarat State -----------------------------------------------------------------------------------------------------------------------------------

SUB: APPOINTMENT OF ROLLING MILLS (TO BE SET UP) AS PROSPECTIVE STEEL PROCESSING

UNITS (SPU) FOR TMT REBARS AND/OR STRUCTURAL AT KANDLA, GUJARAT

1) Sealed tenders in prescribed forms are invited from bonafide, resourceful , financially sound Person(s)/firm(s)/

company(s)/Rolling Mills willing to offer total capacity of their plant (to be installed and commissioned

within a maximum period of Two (02) years) as per requirements of RINL for appointment as Prospective

Steel Processing Unit (SPU). The tenderer shall set up a Rolling Mill with a well established TMT REBARS

manufacturing process of either Thermax, Tempcore, Stelmore, Turboquench, Evcon and/or Structurals for

conversion of (minimum 72000 metric tons) of TMT REBARS (in the diameter range of 6 mm to 32 mm) and/

or Structurals per year at Kandla, Gujarat.

2) Such firms/companies who can arrange to have BIS registration for manufacturing of TMT REBARS in the

size range of 6 mm to 32mm and or Structurals only need to participate in this tender.

3) Mills with single product line / 2 product line will only be considered for SPU- Conversion. Entire

capacity of the mill shall be dedicated to RINL/VSP.

4) Although the SPU will be required to convert all the diameters and sizes as per RINL’s requirement, the thrust for conversion for TMT bars will be in the range of 6/8/10/12 & 16 mm.

5) Tender document in duplicate along with all other terms and conditions can be obtained from RINL Branch

Sales Office, Ahmedabad at the above address on payment of Rs 5000 (Rupees Five Thousand only) (non

refundable) in cash/ DD/ Pay order in favour of “RASHTRIYA ISPAT NIGAM LIMITED A/c <Bidder

Name>” payable at Ahmedabad between 9:00 hrs to 17:30 hrs on any working day up to 01.07.2013

(Monday). Tender Documents can also be downloaded from the website www.vizagsteel.com.

6) Tender documents duly filled in and signed by an authorized person shall be put in the Tender Box kept for

this purpose in the office of the BSO/RINL at the address as mentioned above latest by 02.07.2013 (Tuesday),

3.00 PM. Tenders can also be submitted by Post/Courier and should reach the above address by the stipulated

date and time mentioned above. Tenders must be submitted as prescribed in Instruction to Tender for

Conversion of Cast Billets /MMSM Billets to TMT Rebars and /or Structurals.

7) By submitting a quotation the tenderer shall be deemed to have fully familiarized himself with all requisite

details including the quantity and type of materials expected to be converted/produced, as well as information

contained in the enclosed Instructions to Tenderers including the Terms and Conditions of the SPU Contract

and have fully satisfied himself/ itself of his/ its capabilities to undertake and perform the jobs to the

satisfaction of the company. Any alteration or modification or imposition in deviation to the terms and

conditions prescribed by RINL in Tender Papers shall be ignored.

8) Please note that by merely inviting the tenderer to submit the tender, there is absolutely no Commitment,

implied or otherwise, at this stage from Company’s side as to the award of actual Contract and no

correspondence in this regard will be entertained by the Company. Nor RINL shall be liable in any manner

whatsoever, for costs and expenses etc. incurred in responding to this Invitation.

9) The tender document should be submitted with necessary EMD. Downloaded tender documents would, in

addition, need to be submitted along with the cost of the tender documents as stipulated above.

10) Tenders will be opened immediately thereafter, in the presence of such tenderers who may wish to be present.

11) RINL reserves the right to accept or reject any one or all the tenders without assigning any reason whatsoever.

Sr.Branch Manager, Ahmedabad

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

2

ANNEXURE – 2

INSTRUCTIONS TO TENDERERS

Scope of work:

i. RINL proposes to enter in to conversion agreement on wet lease basis for the purpose of adding value to its

Cast Billets/MMSM Billets by conversion and to generate additional margin from the converted products.

ii. RINL shall deliver the Cast Billets /MMSM Billets to SPU directly from the Plant or from stockyards of RINL

or from public railway siding situated near the works of the SPU or even at the Private Railway siding of the

SPU.

iii. While, loading will be done free of cost by RINL at the Steel Plant/Stockyards, SPU shall have to make their

own arrangements for unloading the materials and for bringing the same to the SPUs premises from public

railway siding/stockyard. The weight at RINL weighbridge shall be final and no allowance shall be allowed on

account of weighbridge tolerance.

iv. In case of direct delivery by road to the SPU from the Plant, either transportation cost actually incurred by SPU

or freight decided by Mktg/Logistics section from the plant to the nearest stockyard destination of SPU

whichever is lower may be reimbursed to the SPU. However, if the raw materials are dispatched by wagons to

public railway siding, cost of transportation to the public railway siding shall be borne by RINL and SPU shall

have to arrange for unloading and transportation of the same to their premises at their own cost. In case of

demurrages levied by Railways, the same shall be recovered or adjusted from the bills payable to SPU.

v. For delivery of Cast Billets / MMSM Billets from stockyards, the transportation cost for carrying the materials

to the premises of the SPU would be borne by the SPU themselves. They shall unload the Cast billets/MMSM

billets inside their premises at their own cost and stack them after ensuring proper identity of the material. It is

expected that SPU would execute the conversion job to the extent of mill capacity or agreed plan within 7 days from the date of receipt of material at their premises and ensure that proper traceability of finished products is

maintained with reference to the raw materials.

vi. The finished products shall have to be supplied by the SPU within 7 days from the date of presentation of D.O.

or within 7 days from the date of receipt of Cast Billets / MMSM Billets at their premises whichever is later on

actual weighment basis against proper authorization letter from the receiving party/RINL. The SPU must

ensure that the quantity so delivered does not exceed the D.O. quantity. No allowance shall be allowed on

account of weighbridge tolerance.

vii. Stock of converted products shall be evacuated from the SPU’s premises within 15 days of supply of Cast

billets/MMSM billets to the SPU either directly to customers of RINL or to stockyard(s) of RINL, subject to

SPU having completed conversion within 7 days of supply of Cast Billets / MMSM Billets.

viii. SPU shall have to provide Test Certificates in the prescribed format to the receiving party at the time of

delivery. 3rd party inspection will be carried out, for which charges shall be borne by RINL.

ix. The SPU will be responsible for cutting of rolls for embossing for the purpose of branding ‘RINCON TMT”

in the TMT Bars / RINCONS for Structural’s as may be indicated to the SPU. The SPU will have to ensure

that conversion activities are not interrupted due to non-availability of rolls with suitable embossing.

x. SPU shall have to neatly and adequately bundle and tag TMT Bars with binding wires /wire rods/straps, in the

following suggested bundle sizes:

6/8mm-18 pcs 10mm- 12pcs

12mm- 8pcs

16mm- 5pcs

20/25/32mm- 4pcs

(In case RINL supplies any tags/holograms/labels etc the same should be fixed/tied to the bundles of TMT Rebars.)

Tags, as may be decided by RINL, would also have to be fixed on bundles by the SPU. Specific length supplies are

to be made without any mix up.

xi. SPU shall comply with all the relevant statutory provisions with all the statutory authorities like PF, ESI,

Labour Act, Excise, VAT/Sales Tax, Service Tax etc., as applicable.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

3

2. SPU- Conversion Charges:

i) For the conversion job, SPU will be paid a consolidated Conversion charge (rate) for supply of one ton of

finished goods which will broadly be deemed to include the following elements. SPU shall quote their

consolidated rates towards SPU- Conversion charges after considering the elements of cost under A and B

below.

(A) a. Variable Conversion Cost per ton of finished products

b. Fixed Conversion Cost per ton of finished products

c. Profit margin of SPU.

(B) a. Storage/Stacking charges

b. Cost of transportation of Cast Billets/MMSM Billets from RINL stockyard/public railway siding

to SPU premises

c. Handling cost at Public railway siding /Private siding

d. Bending, bundling and metal tagging

e. Weighing charges

f. Testing and inspection charges (for internal)

g. Handling expenses for delivery into customers' trucks

h. Cost of cutting and embossing of rolls as per RINL’s design.

i. Cost of any other services to be rendered to RINL, as well as to RINL customers.

NB: The elements of costs given above are only indicative and not exhaustive.

(ii) The rates shall be quoted in the proforma mentioned at Part-C (Price Bid) for obtaining the SPU- Conversion

charges. Tenderer should invariably quote for all the items mentioned in the Schedule of Rates.

(iii) SPU- Conversion charges shall be kept valid/firm from the date of tender opening/date of acceptance of

negotiated rates till the date of commencement of operations as mentioned in the work order and there after the

charges would be revised every year as per the price variation clause mentioned at clause no 9 of Terms and

Conditions. The base date for price revision shall be the date of commencement of operations as mentioned in

the work order.

3. E. M. D:

a) SPUs are required to pay an amount of Rs 37.50 Lakhs (Rupees Thirty Seven Lacs Fifty

Thousand) in the form of Demand Draft/Pay Order/Banker's Cheque/Bank Guarantee with

Scheduled Banks in favour of Rashtriya Ispat Nigam Limited, towards EMD at the time of submitting

tender documents. No interest will be payable to the tenderers for this EMD amount. Demand Drafts/

Pay Orders/ Bankers Cheques/BGs from Cooperative and Gramin Banks shall not be accepted. No

request for adjustment of earlier dues against the amount of EMD shall be entertained. In case of BG,

the same shall be valid for a period of one year from the date of issue of BG and VSP reserves the

right to ask the tenderer for extension of BG validity for a suitable period. EMD shall be forfeited in

case of withdrawal of tender before its validity date.

b) In the event the offer of any party is rejected during the course of techno commercial scrutiny and evaluation, the EMD shall be returned to such tenderer at the earliest possible time from the date of

rejection of offer. The EMD, of unsuccessful Tenderers, shall be refunded after issue of work order to

the successful tenderer. The same will not carry any interest.

c) EMD in respect of successful tenderer will be retained as a part of Security Deposit, in case EMD is

submitted in the form of DD/Pay order. In case the EMD submitted in the form of BG, the same

would be returned to the successful tenderer after receipt of Security Deposit. In the event of the

successful tenderer failing to comply with the conditions mentioned in the Letter of Intent (LOI), the

EMD shall be liable for forfeiture/encashment subject to confirmation of issuing Bank.

4. Financial Security:

a) Security Deposit (towards performance of contract)

A total amount of Rs.100 Lakhs ( Rupees One Hundred lakhs ) will have to be paid as Security Deposit

(SD) in the form of Pay Order/Demand Draft/Bankers Cheque/Bank Guarantee (as per the format provided at

Annexure-10) drawn on Scheduled Banks favouring Rashtriya Ispat Nigam Limited at Ahmedabad. Demand

Drafts/ Pay Orders/ Bankers Cheques/BG from Cooperative and Gramin Banks shall not be accepted. The SD

shall be submitted within 45 days from the date of issue of LOI. In case of successful tenderer, the EMD of Rs

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

4

37.50 Lakhs submitted along with the tender in the form of DD/Pay order will be converted into SD and in that

case he /they will have to pay a balance amount of Rs 62.50 lakhs to make good the total amount of Rs. 100

Lakhs. In case of BG, tenderer has to submit full amount of SD in the form of BG. Thereafter EMD would be

returned to the tenderer. The Security Deposit shall not carry any interest. BG should be valid for a period of

Fourteen years from the date of LOI.

BG may be submitted initially for a period of 11 years subject to extension of the same for 3 more years.

Extension should be done at least 3 months ahead of date of expiry.

The Security Deposit will be refunded at the end of the contract subject to adjustment of RINL’s claims, if any, due to non-performance/non-compliance of the terms and conditions of the contract.

b) Financial Coverage (towards value of the raw materials):

Besides the performance Security Deposit, the successful tenderer shall submit one more BG (as per the format

provided at Annexure-11) before commencement of operations, for covering the value of raw materials to be

supplied by RINL, as per the details mentioned below :

Monthly Turnover

(Q in M/t)

Total coverage

(Rs in lakhs) for max

tonnage

BG coverage

(Rs in lakhs)

Min 6000 2100 610

> 6000 up to 7000 Max 2450 710

> 7000 up to 8000 Max 2800 810

> 8000 up to 9000 Max 3150 912

The validity of BG to be submitted by prospective SPU initially for a period of 11 years from the date of

commencement of operations as mentioned in the work order. The BG to be subsequently extended for a further period of 2 years. Extension of BG to be done at least 3 months ahead of date of expiry. The SPU may

enhance the value of BG as per his requirement /RINLs requirement for improving the monthly turnover, with

no extra cost to RINL. In addition to the above, Custody and Indemnity Bond as per Annexure 12 shall also be

taken from the SPU.

In exceptional cases, non interest bearing cash deposit in lieu of Bank Guarantee may be allowed for supply of

raw materials to SPUs.

5. Pre bid conference:

To facilitate prospective SPUs to participate in the tender with full understanding of the process RINL shall

hold a Pre-bid conference with the intending bidders on a pre-notified date before submission of filled in tender documents. The interested parties or their authorized representatives may attend pre-bid conference.

6. Submission of Tender:

Documents to be submitted by the Tenderers will be as under:

6.1 The tenderers shall submit their tenders in 3 parts. The EMD shall be put in a sealed envelope No. 1 super

scribed with 'Tender for SPU at Kandla, Gujarat - EMD’ (Part – A). In case the tender documents are

down loaded from company’s website, the cost of tender documents in the form of Pay Order/ Demand

Draft/Bankers cheque shall be submitted in envelope no.1 along with EMD. The tenders without valid EMD

and cost of tender documents shall be rejected summarily.

6.2 The technical bid shall be put in a separate sealed envelope No. 2 super scribed with ' Tender for SPU at

Kandla, Gujarat- Technical Bid' (Part-B). The following documents shall be submitted along with the

technical bid:

A) They shall submit a certificate from their bankers regarding their financial soundness

i.e. Solvency certificate (up to the value of security deposit specified in ITT) as per the proforma

mentioned at Annexure-4.

B) The tender documents with all the pages dully filled in as required, signed by a person authorized to

do so on behalf of the tenderer and stamped with the seal of the tenderer.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

5

C) Constitution of the renderer’s concern /firm /company, including the date of

registration/incorporation.

i. In case of a company, Memorandum & Articles of Association along with the certificate of

incorporation issued by the Registrar of Companies.

ii. In case of a Partnership Firm, an authenticated/attested copy of partnership deed and a copy

of certificate of registration issued by the Registrar of Firms (if the Firm is registered).

iii. In case of a proprietary concern, proof of proprietorship to be produced (either Sales Tax

registration/copy of IT returns or registration under any statutory enactment) which

recognizes them as a proprietary concern.

D) The tenderer shall give an undertaking on Rs 100 non-judicial stamp paper with regard to operational

requirements such as :

(a) The SPU shall install and commission the Rolling Mills with the desired capacity level of Minimum

72,000MT within a maximum period of two (2) years from the date of issue of LOI.

(b) The SPU shall provide following infrastructure/facilities after commissioning of the unit/rolling mill:

(i) The SPU shall manufacture/produce Hot Rolled Long Products of minimum 72000 MT in the

diameter range of 6mm to 32 mm TMT Rebars and/ or Structurals as mentioned below :

TMT Rebars: 6/8 mm –15 %, 10 mm –15 %, 12 mm –30 %, 16 mm –20 % above 16 mm –20 %

Structurals: The SPU shall also be equipped to accept orders in specific length within plant

capability, without any extra charges, as required by RINL, from time to time.

(ii) The SPU shall carryout the documentation and other transactions in RINL/VSP SAP system

through Broad band internet or VPN (Virtual Private Network) at their own cost. However,

RINL/VSP would provide technical advice for establishing the network.”

(iii) The SPU shall have the facility for microstructure study with photographic facility for analysis in

addition, the SPU must have Automated control mechanism for TMT Rebars process. However,

such automated process is not required for entire production process but will only be required for

the water quenching stage of TMT Rebars.

(iv) The SPU shall have a weigh-bridge at their premises, preferably an electronic weighbridge with

printout facility of 60 Mts capacity or more, with a 60 ft platform along with a calibration

certificate issued by weights & Measures Dept. The SPU shall have an AMC to ensure that the

weigh - bridge at their premises is kept in order.

(v) The SPU shall be equipped for supplying 100% embossed material as per branding to be

stipulated/prescribed by RINL. Rolls from the SPU shall have to be cut as per RINL design by

machines like SPARKONIX by the SPU.

(vi) The total mill capacity of the SPU shall be under the control of RINL. The total operation and

maintenance (including labour, power, fuel, machinery, consumables etc) shall have to be provided by SPU.

(vii) Proof of registered lease agreement in case of lease followed by ownership/ possession in the

name of the lessor for the land offered (in compliance with the mile stones mentioned at para-2 of

Terms and conditions of contract)

(viii) Proof of ownership/ possession of the land offered in case of own land (in compliance with

the mile stones mentioned at para-2 of Terms and conditions of contract)

(ix) Proof of ownership/lease to be furnished for other equipment like cranes, Mill units etc required

for running of SPU. and other facilities in line with suggestive specification at Annexure (A)

(c) The SPU shall provide the following facilities/certifications before commencement of full

fledged operations / production :

i. The SPU shall obtain a valid BIS License.

ii. The SPU for TMT Rebars shall obtain a license for Turboquench, Thermax, Tempcore,

Stelmore processes or Evcon processes of TMT Rebars.

iii. The SPU shall obtain ISO 9001 certification.

iv. The SPU shall be registered with VAT/Sales Tax, Excise and service tax authorities (if

applicable).

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

6

(d) Declaration as to whether the tenderer has any relative, within the meaning of Sec. 6 read with

Schedule 1(a) of the Companies Act, 1956, employed in any capacity in RINL.

(e) Copy of the Power of Attorney in favour of the authorized signatory submitting the tender documents

on behalf of the tenderer.

(f) Copy of “Integrity Pact” as per proforma enclosed at (Annexure-13) duly signed on all pages.

(g) Declaration stating that the tenderer has invariably quoted for all Items as per Schedule of Rates.

7. The tenderer shall fill in the price bid (Part C) as follows

(i) Consolidated SPU charges (rate) per ton in respect of TMT Rebars from the input materials of

MMSM billets of 65/75/90 mm Size and the contract value (multiplication of indicative qty and the

consolidated rate) (corresponding Annexure-5 shall be prescribed in the tender by BSO depending

upon the requirement)

(ii) Consolidated SPU charges (rate) per ton in respect of TMT Rebars from the input materials of Cast

billets of 150/200 mm Size and the contract value (multiplication of indicative qty and the

consolidated rate) (corresponding Annexure-6 shall be prescribed in the tender by BSO depending

upon the requirement)

(iii) SPU charges (Rate) per ton in respect of individual items of Structurals from the input materials of

MMSM billets of 65/75/90 mm Size and contract value (multiplication of indicative qty of each item

with the respective rate quoted) (corresponding Annexure-7 shall be prescribed in the tender by BSO

depending upon the requirement)

(iv) SPU charges (Rate) per ton in respect of individual items of Structurals from the input materials of

Cast billets of 150/200 mm Size and contract value (multiplication of indicative qty of each item with

the respective rate quoted) (corresponding Annexure-8 shall be prescribed in the tender by BSO

depending upon the requirement)

(v) Total contract value which is the sum of contract value arrived for TMT Rebars and or Structurals mentioned at Part-C (i to iv) above (the Annexure 9 shall be prescribed in the tender by BSO in the

tender)

The rates/ contract value quoted by the tenderer shall be both in figures and words and shall be free

from corrections or erasures. Any corrections or erasures shall be duly initialled with date by the

tenderer. In case of any discrepancy between the rate quoted in figures and words, the rate quoted in

words shall prevail.

The duly filled up price bids as per the Proforma for 'Schedule of SPU- Charges' at Annexures-

5,6,7,8,9 ((the relevant Annexures shall only be mentioned by BSO in the tender) shall be put in a

separate sealed envelope No. 3 super scribed with 'Tender for SPU- at Kandla, Gujarat- Price Bid' (Part – C).

vi) All the envelopes shall indicate the name and address of the tenderer and shall be sealed and put

inside another master envelope No. 4, which shall be submitted in sealed condition, by the tenderer.

The master envelope No.4 shall be super scribed 'Tender for SPU at Kandla, Gajarat' and shall

indicate the name and address of the tenderer.

vii) In case of correction/erasing etc., the same should be countersigned by the authorized signatory of the

tenderer and stamped with the office seal of the tenderer.

8. Receipt of Tenders:

(a) The following shall be the accepted modes for receipt of tenders:

- Tenders received by post/courier, up to the closing time as specified herein below:

- Tenders received in tender box.

(b) RINL will not take any liability for accepting a tender because of any loss or delay in transit resulting in non

receipt and/or delay in receipt of Tender sent by post and/or through courier service.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

7

(c) Tenders shall also be received in the Tender Box kept for this purpose up to the closing time as specified

herein below:

BID SUBMISSION CLOSING DATE & TIME 02.07.2013 15:00 Hours

BID OPENING DATE , TIME & VENUE 02.07.2013 15:30 Hours

d) Immediately thereafter, the tenders will be opened except the price bid.

9. Rejection of Tenders:

(a) Tenders shall be liable for rejection in case of non-compliance in submission of any above documents i.e as

indicated at para 6.0 above. In case any deviation is found in the downloaded tender documents submitted by

the tenderers than what has been stated in the original tender document, such tenders shall be liable for

rejection, in case the deviations are not withdrawn.

(b) In case of receipt of any adverse report in respect of capabilities and performance of a tenderer, from any

department of RINL or from Ministry of Steel/ Statutory Bodies/CBI/CVC, before or after opening of Price

Bids, then the tender/ quotation submitted by such tenderer shall be rejected stating reasons for rejection and

with approval of competent authority on the basis of recorded reasons.

(c) Tenders submitted after the scheduled date and time as stipulated shall not be accepted.

10. RINL/VSP shall not give time, for submission of Earnest Money Deposit (either DD/Pay order or BG) and for

submission of Cost of tender documents. RINL/VSP shall give 3 (three) weeks time for further clarification

/rectification of any deficiencies in the tender and seek clarifications /confirmations / documents / withdrawal of deviations from the terms and conditions of contract without any revision in prices. In case of failure to

rectify the deficiencies within 3 (three) weeks time, the tender would be rejected summarily and Price bid of

tender would be returned unopened and EMD would be refunded. In case none of the tenderers rectify the

deficiencies within 3 (three) weeks time, RINL/VSP reserves the right to give further time at it’s sole

discretion.

11. Submission of Security Deposit towards Performance Guarantee & Financial Coverage:

Towards Performance Guarantee:

Separate BGs for amounts as mentioned at clause no 2 of Terms and conditions to be submitted by

prospective SPU initially for a period of 11 years from the date of issue of LOI. The BGs are to be

subsequently extended for a further period of 3 years. Extension of BGs to be done at least 3 months ahead of date of expiry.

In case of failure to reach any or both of the first two milestones, SPU has to make good the forfeited amount,

if any , to ensure that the SD amount as stipulated in the tender is submitted to RINL, at the time of issue of

work order.

Towards Financial coverage for Raw Materials:

Bank Guarantee towards Security deposit for financial coverage for Raw Materials can be submitted initially

for a period of 11 years subject to extension of the same for 3 more years later. The extension of the Bank

Guarantee should be done at least three months ahead of date of expiry.

12. Evaluation of Price Bids:

The date and time of the opening of the price bid shall be intimated to such tenderers who qualify technically.

The ranking of tenderer will be done as per the total contract value quoted for the entire range of TMT rebars

and or Structurals.

*************

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

8

ANNEXURE – 3

TERMS AND CONDITIONS OF CONTRACT FOR SPU-CONVERSION

1. Definitions:

The following words and expressions used in this Contract shall have the meaning assigned to them except where the

context otherwise requires.

The 'Company' shall mean Rashtriya Ispat Nigam Limited (RINL) with its Registered Office at Administrative Building, Visakhapatnam 530 031. And also having one of its Branch Sales Office at AHMEDABAD (Address : 1

st

Floor, N.B.C.C. House, Near Sahjanand College, Ambawadi, Ahmedabad – 380 015. Gujarat State).

'Regional Manager' shall mean the Head of the Region or any other Officer of the Company for the time being, in-

charge of the Region.

'Sr Branch Manager' shall mean the Branch Manager of the Concerned Branch under whose jurisdiction the SPU-

Conversion premise is situated or any other Officer of the Company for the time being in charge of the Branch.

'Tenderer' shall mean the person, firm/ company or corporation/Rolling Mills submitting a tender against the Invitation

to Tender and shall include his / its successors and assigns approved by the 'Company'.

Prospective SPU (SPU) shall mean the tenderer whose tender has been accepted by the "Company" and shall include

SPUs successors and assigns approved by the Company. It shall also mean the tenderer who is going to install and

commission a Unit/Rolling Mills within a maximum period of two (2) years.

'Contract' shall mean and include the Agreement between the Company and the SPU duly signed by the parties thereto

for the execution of the work together with all documents annexed / attached therewith or referred to.

'Public railway siding' shall mean the Railway Goods shed where Railway wagons are placed for unloading and / or

booking of goods including Iron & Steel materials (This goods shed may not be a public booking point in the strict

literal sense).

'Private Siding' shall mean the Railway siding as defined in the siding agreement with the railways inside the SPUs

Yard and where railway wagons are placed for unloading and / or booking of Iron & Steel materials.

'Company's Materials'/Materials shall mean Iron and steel materials dispatched from the company's Plant at

Visakhapatnam, materials from other stockyards/locations or other Iron and Steel materials received from time to time

by SPU on company’s account.

‘Excepted Matters’ mean those matters in respect of which decision of the Company shall be final and binding upon

the successful tenderer.

Selling Price: The monthly operating prices for the particular product as decided by the Sr BM

‘Cast Billets’ shall mean Billets of size 150x150mm and 200x200 mm.

‘MMSM Billets’ shall mean Billets of size 65x65mm,75x75mm,90x90mm

‘Raw Materials’ shall mean Cast Billets or MMSM Billets.

1. Capacity to be committed under SPU- Conversion:

(i) The prospective SPU shall adhere to the following schedule of activities with regard to installation and

commissioning of Rolling Mills

(a) Land acquisition and land levelling …. Within 4 months from the date of issue of LOI

(b) Erection and Commissioning of Equipment ….. Within 12 months from the date of issue of LOI

(c) Submission of documents and … Within 1 year 9 months from the date of issue of

Commencement of commercial LOI.

Production

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

9

ii) In case of failure to reach the milestones as mentioned above, charges shall be recovered/adjusted from the S.D

as below:

For (a) …. Rs 5 lakhs

(b) ….. Rs 10 lakhs

(c) …… Balance amount of SD.

Separate BGs for amounts as mentioned at 2 (ii) to be submitted by prospective SPU initially for a period of

3 years from the date of issue of LOI. The BGs are to be subsequently extended for a further period of 3

years . Extension of BGs to be done at least 3 months ahead of date of expiry.

In case of failure to reach any or both of the first two milestones, SPU has to make good the forfeited amount

to ensure that the SD amount as stipulated in the tender is submitted to RINL.

The utilization of the rated capacity will be examined by RINL for the maximum output from the date of

commissioning of plant on a 2 shift basis of 8 hrs each with capital repair of max 10 days in a year apart from

planned 1 day weekly shutdown and 7 days closed holidays for the purpose of identifying the licensed

capacity. Illustration for capacity calculation is given as below:

Example: To achieve a minimum 72,000 MT per annum rated capacity, the required hourly production shall

be calculated as below:

No of days in a year …… 365

Less:

Weekly shut downs in a year …… 52

Capital repairs once in a year ……. 10

Closed holidays in a year …… 7

--------

Total 69

------------

Actual days of production ----- 365- 69=296

Considering the production in 2 shifts per day No of shifts available 296x2 = 592

Required production per shift = 72000 / 592 = 121.62 MT

Required production per hour = 121.62/8 = 15.20 MT.

3. Issue of LOI and Work Order and Agreement:

(a) On approval of appointment of specific SPU, RINL shall issue a Letter of Intent (Annexure-14) to the

successful tenderer to complete the necessary formalities like, submission of Bank Guarantee within a period

of 45 days.

(b) After commissioning the Rolling Mills and trial production, SPU would offer the Rolling Mills to RINL for

final inspection. The facilities provided will be inspected by RINL along with the documents submitted in

compliance with the undertaking mentioned at clause no -6.2( D) of Instructions to tenderers and give final

clearance for acceptance of the SPU. Accordingly, the work order will be issued by RINL. The date of

commencement of operations shall be as per the date mentioned in the work order (Annexure-16). There after

SPU shall start operations after submission of BG against raw materials, custody and indemnity bond.

(c) The SPU shall execute a formal Agreement on non-judicial stamp paper (in the prescribed format as mentioned

at Annexure-15) within 7 days from the date of issue of work order. Till the time of agreement, this letter

together with the letters under reference shall form the contract for the subject work.

4. Transportation of finished products and Door Delivery:

The scheme essentially envisages that SPU shall supply converted products to the customers of RINL against

valid delivery order from SPUs premises. However, if a customer prefers to take door delivery at their

premises, then Branch Sales Office of RINL shall provide door delivery for all converted products from the

SPU’s premises through the transporter appointed by RINL for the purpose. Weight recorded at SPUs

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

10

weighbridge shall be final. Transport contractor shall be held responsible for any shortage with reference to

SPU weighment

Converted product may also be brought to the Stockyard by authorized transporter of RINL for onward

delivery to the customer.

In case of stock transfer of converted products from SPU’s premises to any of the RINL’s stockyards the

weight as recorded at SPU weighbridge shall be final and Transport contractor shall be held responsible for

any shortages with reference to SPU weighment.

In case of delivery from SPUs premises to the customers, the weight recorded in the weigh-bridge of the SPU

shall be accepted.

5. Supply of Cast Billets / MMSM Billets:

(i) Cast Billets / MMSM Billets would be supplied to SPUs on stock transfer basis from plant at

Visakhapatnam/nearby Stockyard.

(ii) The SPUs based at Plant locations may be allowed to collect Cast Billets/MMSM Billts directly from the Plant,

through their own arrangements. Depending upon the specification of the finished products, availability, Cast

Billets / MMSM Billets to be supplied to the SPU will be decided. The Cast Billets / MMSM Billets would be in standard length (up to 15% in short length of Minimum1.5 Mtrs). Linked test certificates for the raw

materials would be made available to SPU.

iii) RINL may decide to supply raw materials from Stockyard. /Public railway siding nearby SPUs premises of

SPUs instead of directly delivering the same at the Plant, at RINLs option. The size of the input material to be

supplied by RINL shall normally be Cast Billets in sizes 150x150mm and 200x200mm. / MMSM Billets i.e

65x65/75x75/90x90mm.

Note: However, RINL reserves the right to supply other sizes/length of Semis, depending on availability.

RINL will arrange for supply of Cast Billets / MMSM Billets up to the minimum guaranteed capacity i.e. 75%

of (indicative quantity in the NIT per annum). Supplies beyond this quantity by RINL will be subject to

availability

6. Recovery of amount in case of non performance/ non compliance of contractual obligations

a) If the company suffers any losses or damages due to any negligence and / or non-performance of the

obligations under the contract by the SPU, the company may without notice and without prejudice to any

other right, recover the amount(s) and appropriate the same from the Security Deposit and/ or the BG towards

the settlement of all loss or damage.

b) However, the company reserves the right to recover such losses and/ or damages by enforcing the Bank

Guarantee and/ or from any of the SPU's Bills pending for payment with the company without prejudice to any

other legal remedies / recourse available to the company to proceed against the SPU for recovering such losses

/ damages.

c) The decision of the company as to the amount of loss (es) / damage(s) suffered by the company shall be final

and binding upon the SPU.

d) In the event of BGs being inadequate or fully encashed, the balance of the total sum recoverable shall be

deducted from any sum due to the SPU under this or any other contract with the company. Should such sum

also be not sufficient to cover the full amount recoverable, the SPU, on demand, shall pay to the company the

balance due.

e) Wherever the BGs fall short of the amount specified in clauses above by the virtue of any recoveries made by

RINL, the SPU shall enhance the value of B/Gs within 15 days so that the total amount of security shall not at

any time be less than the specified amount.

f) The Security Deposit will be released to the SPU on termination/expiry of the contract on his production of:-

No demand certificate from Railways in favour of the Company (to be obtained by the SPU).

No pending demands from statutory authorities like Income-tax etc.

No claim certificate in favour of RINL (As per Annexure-17)

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

11

7. Payment of Bills:

a) Payment to the SPU for the jobs performed shall normally be made on fortnightly basis on the quantity

delivered by the SPU and only after signing of the agreement. Payment shall be made within 30 days (7 days

in case of SSI Units) from the date of submission of bills in the BSO provided SPU complies with submission

of required documents as mentioned below at (b)

b) For release of payment against Conversion, SPU shall submit following documents to RINL-BSO for

verification of correctness of the quantities billed for, the rates and recoveries in respect of materials released

to him and other terms and conditions of the contract: i. Bills of SPU Charges,

ii. Copies of Delivery Challans,

iii. Copies of Excise Invoices issued under extant excise rules pertaining to (ii) above and

iv. Test Certificates pertaining to the deliveries at (ii) above.

8. Metal loss:

a) For every ton of Cast Billets/MMSM billets supplied, SPU shall have to return 0.95 MT OR 0.98 MT of tested

finished product for Cast Billets and MMSM Billets respectively..

b) If the SPU is able to deliver higher yield (exceeding 95 % or 98% of material handed over) of finished product in standard length (10-12 Metres), then RINLwill pay bonus @ equal to the prevailing selling price of RINL

for the concerned item/minus Rs. 500 per ton in respect of such excess quantity. The Selling Price of the

product will be decided by the concerned Sr Branch Manager, communicated on a monthly basis and shall be

final. No claim for such quantity or rate would be referable for adjudication.

c) In case SPU fails to supply 95 % or 98% as the case may be of the input as finished products, RINL shall

recover 110% of the value of the shortage of finished product at the prevailing selling price by RINL of the

items having highest selling price in the contract. The decision of the Sr Branch Manager of RINL will be final

in this regard.

d) The arisings including the short length may be disposed by the SPU on monthly basis after due inspection by

RINL officials.

9. Revision of rates:

The SPU conversion charges (quoted rate) shall be kept firm till the date of “Commencement of operations” as

mentioned in the work order. Thereafter SPU charges shall be revised for every one year, as per the price

revision formula laid down under, based on the following weightages and neutralization for each of the

components:

The base date for indices shall be the date of commencement of operations as mentioned in work order.

Minimum average wages applicable to the skilled, semi skilled and unskilled workmen employed by SPU, as

notified by the Asst Labour Commissioner Central, Ministry of Labour and Employment, Govt of India

published in the Gazette of India.

10. Taxes and Duties:

a) The SPU shall, in accordance with prevailing procedure prescribed by VAT/Sales Tax and Excise Authorities,

comply with all necessary formalities such as Registration with VAT/Sales Tax; Excise Dept, etc. and also

shall undertake the documentation and timely furnishing of return as stipulated by Excise Authority.

Components Weight Neutralization Basis

Labour 10 % 100 % Min or statutory Wages as per notification of labour

department of the concerned Central government.

Fuel ( furnace Oil) 20 % 60 % Any PSU oil companies retail outlet

Electricity 25 % 60 % Unit electricity rate (applicable to the SPU category)

as per the Electricity provider Co/ SEB in the

concerned locality

Overhead 30 % 50 % End month RBI Index on machinery and M/c tools,

and transport equipments and parts on a simple

average basis.

Profit 15 % Nil

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

12

b) The SPU shall ensure that the delivery of converted/finished products is made after payment of the excise duty

as applicable. The SPU shall ensure that the applicable excise duty is paid within due date as per Excise law on

delivery of converted/finished products.

c) The SPU shall be reimbursed the differential between Excise Duty deposited on the finished products and

credit of Excise duty availed on Cast billets/MMSM billets supplied by RINL subject to Excise law in force

upon submission of proof of payment along with the bills.

d) The SPU shall bear and pay all taxes, duties and other liabilities in connection with the discharge of his

obligations under this contract, except Service Tax if applicable. In case Service tax is applicable, the SPU shall submit the tax invoice in the format specified by the Department for obtaining the reimbursement.

Income Tax or any other taxes or duties which the Employer may be required by Law to deduct shall be

deducted at source and the same shall be paid to the Tax Authorities for the account of the SPU and the

Employer shall provide the SPU with required Tax Deduction Certificate. All applicable taxes as per directives

of respective state government shall be deducted from the bills of the SPU. Necessary receipt to this effect will

be issued to the SPU in the prescribed proforma.

11. Guarantee of work & Imposition of fine:

a) RINL shall utilize the agreed capacity of the SPU on a monthly basis. (While the dia/section wise percentage break up may be indicated in the tender in order to indicate the extent of output desired in each size /size

range), a consolidated rate will be obtained for TMT rebars in the rate schedule. The actual percentage of work

in the specific diameter range can vary.

b) If RINL fails to supply Cast billets/MMSM billets for conversion up to 75% of 72000 T or agreed capacity of

SPU capacity, (the minimum guarantee per annum), compensation amounting to 48 % of the SPU conversion

charges per ton for the quantities short supplied from the minimum guaranteed quantity shall be paid to the

SPU as per the example given below:

c) Example: In case actual cast billets/MMSM billets supplied are to the extent of 52000T of SPU capacity, then

2000 T will be the short supplied quantum in terms of minimum guaranteed quantity per annum (75% of

72,000 MT is 54,000 MT). Assuming the SPU-conversion charges are Rs. 2500/- per ton of finished product and billets equivalent to 2000 T of TMT short supplied, then compensation payable will be Rs.24 lakhs (48%

of 2500 X 2000).

However, Force Majeure provision shall be invoked if supply of cast billets/MMSM billets is affected due to

break down of Plant and Machinery of the company, conditions like strike, lock out, natural calamity etc. or

due to any other act beyond its control and no compensation shall be payable in such an eventuality.

Force majeure clause: If the Company and/or the SPU be prevented from discharging its or their obligation

under this contract by reasons of arrests or restraints of privacy of rules, Government or people, War,

Blockade, Revolution, Insurrection, Mobilization, Strikes, Riots, Civil Commotions, Lockouts, Accidents,

Acts of God, plague, or other epidemics destruction of the materials by fire or flood or other natural calamity or on account of any other cause interfering with the production and/or delivery of the materials as herein

above contemplated, the time for delivery shall be postponed by the time or time during which production

and/or delivery is prevented by any such causes as herein above mentioned, provided that in the event of such

delay exceeding ninety days, the party other than the party which invokes the force majeure may at their

option, cancel this contract by Notice in-writing to the other party in respect of the undelivered quantity of the

materials without, however, any right against or being responsible to the other party for such cancellation. The

party invoking force-majeure shall within 15 days of the occurrence of force-majeure causes; put the other

party on notice supported by certificate from the Chamber of Commerce or concerned governmental authority

and shall likewise intimate the cessation of such causes. If the force-majeure condition continues beyond a

period of six months the Company or the Contractor may at his option cancel this contract by notice in writing

to other party in respect of the undelivered quantity of the materials without, however, any right against or

being responsible to the other party for such cancellation.

d) The SPU shall have to ensure above minimum monthly production of 4500 MT (75% of 6000 MT) of SPU

capacity failing which fine amounting to 48% of the SPU conversion charges per ton in respect of the shortfall

in the volume shall be paid by the SPU, in a manner similar to the example given at Para (c) above. In case

force majeure conditions like strike, lockout, natural calamity etc. affects totally the production in the SPU

plant, fine commensurate with the period in which production was suspended due to force majeure conditions,

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

13

the same may be waived subject to submission of authenticated documents like print media etc. In such an

event, SPU-Conversion Charges shall not be payable by the company in respect of the shortfall quantity, if

any, towards minimum guaranteed volume.

While the above fine on either side shall be calculated on a monthly basis, there shall be a makeup provision

on a quarterly basis on either side, for the purpose of actual payment / recovery. In other words, shortfalls

during a month or two during the quarter (1st Quarter – April to June, 2

nd Quarter- July to September, 3

rd

Quarter October to December, 4th Quarter – January to March) under consideration can be made good during

the quarter as a whole.

12. Basis for determining Excess/shortage:

(i)In respect of supply of Cast Billets / MMSM Billets directly from the Steel Plant, the quantity as indicated in

the Stock Transfer Challan shall be the basis of receipt of the said material by the SPU in case of rail and in

case of receipt by road, weight of SPU weighbridge shall be final and RINL transporter shall be held

responsible for any shortage with reference to SPU weighment. In case if SPU directly lifts from plant, weight

as recorded in the stock transfer Challan shall be the basis of receipt.

(ii) In case of stock transfer of converted products from SPU premises to any of the RINL’s stockyards the weight

as recorded at SPU weighbridge shall be final and in case of shortage, RINL’s transporter shall be held

responsible for such shortage.

(iii)In case of delivery to customers from SPU premises by vehicle of the RINL authorized transporter/ customer,

the weight recorded in the weigh-bridge of the SPU shall be accepted. For this purpose SPU shall get his /their

weighbridge(s) duly certified at regular intervals by Weights & Measures, Dept. of the Govt.

Shortage/excess exercise shall be carried out, at the end of every financial year or contract period whichever is

earlier, followed by stock verification for which the charges shall be borne by the SPU. RINL reserves the

right to conduct stock verification either surprise or periodic.

13. Monitoring of conversion:

RINL may at its sole discretion post its employee(s) in the premises of SPU to oversee the conversion

activities. However, this will not dilute the responsibility of the SPU to ensure proper utilization of cast

billets/MMSM billets supplied for conversion, process, inspection including sample testing, and quality control of converted materials. Visits and support from RINL’s technical staff shall also exist. Third party inspection

agency would also inspect the process activities. The conversion details on weekly basis shall be submitted by

SPU as per the format at Annexure-18

14. Inspection and Quality control:

To ensure that all materials dispatched to customer/other Branches conform to the BIS specification, regular

inspection/testing is to be carried out by SPU as per BIS norms. The SPU shall have facility for microstructure

study with photographic facility for analysis. They will have to keep regular samples along with the

photographs of microstructure on every 100 Mt of rolling. In addition, representatives of RINL will be visiting

SPU's premises for inspection of the following, from time to time:

i) Whether finished materials are produced out of Cast Billets / MMSM Billets given by RINL for conversion

unless otherwise specified.

ii) Sample analysis for confirmation of mechanical properties.

iii) Converted products are dispatched to the customers/RINL's allottees exactly as per description

given in the D.O.

iv) Verification of stock and calibration of Weigh Bridge by the weight and measure department of the state.

v) To take care of specific requirements of the customers on quality aspects and inspection by outside agencies

like, Lloyds, SGS, RITES etc. at the SPU premises for which the cost shall be borne by RINL. (The roles and

responsibilities of Third party inspection Agency for SPU Conversion is as per Annexure- 19.)

vi) To inspect as to whether documentation through the RINL’s ERP /SAP System is being effectively managed.

vii) To ensure proper traceability of the finished products with reference to the Cast Billets/MMSM Billets

supplied by RINL.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

14

For the above purpose, the SPU shall extend all the necessary help and facilities to the executives of RINL and

also to BIS/any other Inspectors, as and when they visit the premises of the SPU. The role and responsibilities

of SPU Conversion In-charge has been mentioned at Annexure -21

15 . Issuance of Test Certificates:

i) On appointment, SPU shall apply to the BIS to obtain permission for allowing issuance of Test Certificate in

the name of RINL. For this purpose, a copy of the agreement between RINL and SPU shall be provided by the

SPU to the BIS unit which grants licenses to the rerollers.

ii) Test Certificate shall incorporate the following in addition to the regular Information:

a) Name, address of the rerollers, ISI mark and their BIS license number.

b) RINL logo and the brand name “RINCON TMT” for TMT REBARS / “RINCONS” for Structurals.

c) The draft format of TC to be provided (Annexure-20) may be got approved from BIS, as per Jurisdiction of

the marks area of BIS.

iii) Holding of a valid BIS License is a requirement of the contract. Therefore, if the BIS License has been

suspended by the concerned authorities, the same shall be intimated by SPU to Sr BM. Then the Sr Branch

Manager shall take immediate steps to suspend supply of input materials (viz. Semis) and suspend rolling operation until the license is reinstated / revoked. In case there is a delay of more than 30 days in revoking of

the suspension, action may be taken for removal/disposal of the inventory of semis and finished products by

the concerned Branch, from the premises of the SPU at the cost of SPU. The SPU would also be liable for any

losses on account of non-certified (BIS) finished materials if any. Concerned RM would get the matter

reviewed before according approval for resumption of the activities. Other terms and conditions remain

unchanged.

16. Quality Complaints and its settlement:

a) SPU shall be responsible for all the losses/damages and deterioration caused to materials while these are in the

custody of SPU. The materials shall be deemed to be in the custody of the SPU as soon as the Railway

Receipts/Consignment Advice/Stock Transfer Challans are handed over to SPU. Such loss/damage/deterioration and/or pilferage in the SPU's premises/custody will be compensated in full by the

SPU.

Assessment of loss made by RINL on damage/deterioration to the materials in the custody of the SPU shall be

binding on the SPU.

Though the responsibility lies with RINL for shortage/missing wagons, SPU shall co-ordinate with Railways

for lodging the claim, follow up with Railways etc for settlement of claim. If required, SPU shall lodge the

claim on behalf of RINL and pursue the same till the settlement of claim.

b) The SPU shall be informed about the QC in writing or over phone (later on to be confirmed in writing) by RINL. Any quality complaint received from the customers for converted products supplied by SPUs shall be

inspected by RINL and their decision on the matter will be final and binding on the SPU.

c) Converted products returned under quality complaint shall be disposed by RINL and SPU will be responsible

for paying to RINL the loss in realization on account of quality complaints.

d) In case of any rejection of finished products after 3rd party inspection, such materials will be taken back by

RINL for disposal. The loss in realization and transportation cost for taking back such materials shall have to

be borne by the SPU.

e) SPU will have to settle the loss on account of QC /materials rejected by 3rd party inspection agency within

seven days of the intimation by RINL of such loss. In case of failure, the same shall be recovered from the

pending /forthcoming bills of the SPU.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

15

17. Embossing:

a) All converted products produced from RINL billets only by SPU will be 100% embossed as per RINL

specification i.e.”RINCON TMT ” for TMT rebars and “ RINCONS” for structural products or as decided by

RINL officials from time to time.

b) The SPU shall have to undertake 100% embossing of the converted materials as per design and direction given

by RINL.

c) To have embossing of TMT for branding purposes the rolls will have to be cut as per RINL design by machines like SPARKONIX by the SPU.

18. Reports & Returns:

a) The SPU shall keep proper daily account of the converted or finished products viz. quality, size, quantity,

length of semis rolled, actual size, quality, quantity of converted /finished products, actual yield test results,

inspection notes etc. and arrange for delivery of material against original delivery orders issued to company’s

customers or their representatives against proper letter of authorization, the copy of which are to be properly

retained.

b) The SPU shall keep delivery order register indicating therein our delivery order(s) number and date, names and addresses of company’s customers, size, quality and quantity of materials indicated on the delivery orders,as

also the size, quality and quantity of the materials actually delivered to our allottee(s) against specific challan

number and date.

c) The SPU shall, for every delivery to the customers, raise four copies of invoices meant for following purposes:

- The original being marked as ORIGINAL FOR BUYER shall be handed over to the customer

- The duplicate copy being marked as DUPLICATE FOR TRANSPORTER shall be handed over

to the transporter of finished goods

- The triplicate copy being marked as TRIPLICATE FOR ASSESSEE shall be retained by the

SPU.

- The fourth copy being marked as ‘NOT FOR CENVAT PURPOSES’ shall be sent to the concerned branch.

- Every invoice shall clearly indicate the amount of excise duty paid.

- Every invoice shall invariably bear signature of SPU or his duly authorized representative (for which he will

attest the signature) as also the signature of the authorized representative of our Customer. The details of the

invoices shall be entered on the reverse side of the delivery order immediately on each delivery.

d) The Tax Invoice (Not for CENVAT) shall also be generated by the SPU in three copies on the stationery of

RINL through the ERP connectivity provided to it by RINL. For this purpose the SPU shall be required to own

suitable computers and also make arrangement for Internet connectivity for availing connectivity to RINLs

ERP System. In the Tax Invoice Just below the word “TAXINVOICE”, the Words “NOT FOR CENVAT

PURPOSES” shall be printed in bold letters.

- The original copy of Tax Invoice being marked as “ORIGINAL -BUYER’S COPY” shall be handed

over to the customer

- The next copy being marked as “SELLER’S COPY” shall be sent to the concerned Branch.

- The extra copy being marked as “EXTRA COPY” shall be retained by the SPU.

e) The SPU shall, on completion of delivery against each delivery order, return executed delivery order(s) along

with a copy of the related invoice to the concerned branch.

19. Liabilities of the SPU:

a) The SPU shall comply with all the statutory requirements towards fulfilment of all the obligations under all the

prevailing labour laws and other applicable laws. The SPU shall indemnify RINL against any claim that may

be made on RINL arising out of any non-compliance of above statutory requirements by SPU.

b) SPU shall be responsible for any injury/damage caused by him or his agents to any man and material at his

premises as well as when materials are in transit. The SPU shall indemnify RINL against any claim that may

be made on RINL arising out of any negligence or otherwise on the part of SPU and/or his agent.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

16

c) SPU shall not assign any part of this contract to any other SPU/third party without prior clearance and

permission from RINL in writing to this effect.

d) In case of inability on the part of SPU to perform to the full satisfaction of RINL under this contract, RINL shall

have the right to terminate the contract on serving due notice and appoint another SPU for the same job at the

cost and risk of SPU .

e) The SPU (s) will be held responsible for damage caused to materials, inside the SPU- Conversion premises by

his/their staff, transport, equipment, etc., employed by him/them or any injury/death caused to the customer(s), visitor(s) and employee(s) in the SPU- Conversion premise as also to any other third parties. The claim(s) in

this regard as assessed by the company shall be final and binding on the SPU and shall be paid by him/them or

deducted from his/their dues/bills.

f) The provisions of above Clause (e) shall also apply to assessment of damage caused to materials due to

negligence of the SPU during the performance of various operations covered by the contract. The decision of

the company as to the extent of damages and the amount recoverable from the SPU in this regard shall be final

and binding upon the SPU . No materials will be allowed to be stacked / kept outside the premises or on the

road within the yard or at places where it might impede the free movement of traffic.

g) The company is not obliged to provide the SPU with any equipment for transporting, handling and storage of different types of materials and the SPU should employ his / own / hired equipment and manual labour for the

same.

h) In the event of the SPU 's failure or default to provide sufficient equipment and timely labour at any time to do

any of the jobs entrusted with him / them under the contract or in the event of the SPU ,unilaterally terminating

the contract, the company shall have the right to get the work done through alternate arrangements, and all the

charges and expenses incurred by the company in this behalf shall be recovered from the SPU either from

his/their bill(s) or from any other amount(s) payable to the SPU , either under this contract or any other

contract with the Company and /or by encashing the Bank guarantees furnished under this Contract.

i) The SPU shall be solely responsible for any injury/damage that may be caused to his personnel and should

provide full medical treatment to his staff and labour in case of accidents on duty. The company shall in no manner be liable to the SPU or any member of his staff or any other person for injuries or death caused as a

result of accidents either within or outside the yard premises in the courses of work and / or arising out of

work.

j) Whenever the contract expires / is terminated, the SPU shall be required to submit the following documents

failing which his final payment as well as release of Security Deposit/ Bank Guarantee would be withheld till

such time the requirement mentioned below are met by him in full:

- No demand Certificate from Railways in favour of RINL (to be obtained by the SPU).

- No pending demands from statutory authorities like Labour Deptt. (in respect of PF, Gratuity, Compensation to

workmen etc.) - No claim certificate in favour of RINL (Annexure-17)

In case the SPU fails to submit the above mentioned documents within a reasonable period, the Company

would be within its right to forfeit / appropriate any amount of the SPU lying with the Company to his credit

either under this contract or any other contract towards settlement of the claims of the above mentioned

Agencies.

k) In the event of the SPU 's failure to execute the work under the contract to the satisfaction of the company, the

company shall put the SPU on notice calling upon him to execute/complete the work strictly in terms of the

contract, within the time stipulated in the said notice and upon the SPU 's failure to comply with the same

within the prescribed time, the company shall be entitled to terminate the contract, and/or offload the work or

items of work so defaulted to any other alternate agency at SPU 's risk and costs. The SPU shall immediately

pay to the company the differential, if any, in the costs and expenses so incurred by the company, within the

time prescribed by the company failing which the company shall recover and appropriate from any amount

payable to the SPU either under this contract or any other contract without any reference to the SPU and / or

by encashing the guarantees furnished under this contract with the Company.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

17

l) On termination of the contract for any reason whatsoever or completion of contract, the SPU will have to

handover all company's properties and documents including stocks produced out of RINL’s material and

obtain a clearance certificate from RINL before the Security Deposit can be claimed and / or Bank Guarantee

custody cum Indemnity Bond returned /discharged. The refund of Security Deposit, Bank Guarantee and

custody cum Indemnity Bond would be subject to his fulfilling the conditions indicated at clause above.

m) Any sum of money due and payable to the SPU including Security Deposit under the contract may be adjusted

and appropriated by the company and set off against any claims of the company for the payment of any sum of

money arising out of this contract or any other contract.

n) The SPU shall pay his labourers (male or female) not less than the minimum wages prescribed by the

Minimum Wages Act, or such minimum wages as may be prescribed from time to time by the Central

Government.

o) SPU shall perform and observe all the provisions relating to the Employees Compensation Act. Employee

State Insurance Act (ESI) and all labour and other legislations.

p) The SPU shall be liable for any injury or death arising out of any accident either within or outside the SPU

premises in the course of work. The SPU shall be responsible for such contingencies and will make good all

claims for compensation claimed by his / their heirs/ workmen or others as adjudicated by the Tribunal /

commissioner of Employees compensation and/or any other Authority as the case may be under the provisions of Employees Compensation Act and other relevant laws of the land. The SPU shall also indemnify the

company and pay all such sums as may be awarded in respect of claims for compensation arising out of or in

consequence of any accident of any staff or employee working under him / them as per the provisions of the

employee's compensation Act or any subsequent modification or amendment to the said Aact thereof.

The SPU shall be responsible for effecting Insurance under the Indian Employee’s Compensation Act, Third

Party liability Insurance, any other insurance in accordance with the Indian Laws and Regulations at his own

cost, with the company as the Principal holder, the said policy should be valid during the period of contract

and deposited with the company. The insurance should cover for all liabilities both for the staff and labour

engaged by the SPU and also for any employee of RINL who visits the site or any third party. Further the SPU

should insure its plant and machinery to cover all risks.

q) The SPU shall also carry out and observe the provisions of all other laws, Workmen Compensation Insurance,

Third party insurance and other applicable Acts and Statutes in respect of the said operations and also

indemnify the company of any liability that may be imposed upon the company for non-observance of the SPU

of any of the provisions of the various Laws/ Act /Statutes or for the SPU's failure in ensuring the compliance

as aforesaid, and shall keep the company indemnified and reimburse and discharge all sums that may be

claimed by appropriate authorities in any manner whether as penalty, fine, levy demands or compensation fee,

arising out of or consequent upon the breach of the requirements and provisions of any statute(s), Law, Rules

and Regulations by the SPU or their representative.

r) The SPU shall be liable for all complaints and / or claims made by and received from company's customers

due to any default or negligence on the part of the SPU or his representative or workmen.

s) The SPU shall provide the representative(s) of the company suitable office accommodation and necessary

secretarial assistance in the discharge of his duties.

t) The SPU shall be further liable for all the losses that might be caused to RINL on account of any of the breach

of contract or misconduct as stated above.

u) Proper security shall have to be made by the SPU (s) at their costs for the safe custody of materials supplied by

RINL. Any loss, damage or deterioration whatsoever and/or pilferage in premises/custody of SPU(s) shall be

solely to the account of the SPU and they will be bound to compensate RINL suitably for such loss, damage

and/or deterioration.

v) If it comes to the notice of VSP at any stage right from request for tender document that any of the

certificates/documents submitted by tenderer is found to be false /fake/doctored, they shall be debarred from

participation in all VSP tenders for a period of 5 years including termination of contract, if awarded. EMD,

Security Deposit, etc if any, shall be forfeited. The SPU in such cases shall make good to VSP any loss or

damage resulting from such termination. Contracts in operation anywhere in VSP shall also be terminated with

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

18

attendant fall outs like forfeiture of EMD, Security Deposit, if any, and recovery of risk and cost charges etc.

Decision of VSP management shall be final and binding.

w) Similarly, if any of the declarations given in the affidavit by the tenderer is found incorrect or not adhered to,

then the tenderer shall be debarred from participation in all VSP tenders for a period of 5 years including

termination of contract if awarded. EMD, Security Deposit etc if any shall be forfeited. The tenderer shall

make good to VSP any loss or damage resulting from such termination. Contracts in operation any where in

VSP shall also be terminated with attendant fall outs like forfeiture of EMD and Security Deposit if any, and

recovery or risk and cost charges etc. Decision of VSP Management in this regard shall be final and binding.

x) Liquidated Damages:

Due to delay/failure in arranging the finished products by SPU, and RINLs customers deduct or levy liquidated

damages on RINL, then RINL is entitled to recover the same from the bills of SPU.

20. Banning of Business Dealings:

a) RINL reserves its rights to ban business dealings if the SPU is found to have committed misconduct and also

to suspend business dealings pending investigations. Further, in case the SPU, his partner, member, servant,

labour, agent, representative and/or any person working for and on behalf of the SPU is found involved in any

unauthorized, or wrongful removal of materials not sold or makes any attempt for such removal using the mill capacity for their own production/marketing need of finished product, using RINL logo or reputation or brand

name for marketing of their own product produced at other mills, this shall amount to breach of contract as

well as misconduct caused by the party and Company shall be entitled to forfeit the Security Deposit and any

other amount, money or material that may be lying with RINL at the risk and cost of the SPU in addition to

suspension/ banning of the business dealings . No charge will be payable by RINL for the suspended business

period.

b) The decision of the Director (Commercial),RINL or any other person delegated to exercise powers in his

absence from duty or due to his non-availability for any other reasons, whatsoever will be final and binding on

the SPU in all such cases.

c) Notwithstanding anything contained in previous paragraphs, RINL shall reserve its right to terminate/short-close the contract summarily, in case on enquiry it is found that the SPU has committed misconduct

/malpractice in connection with present contract. In that event RINL shall reserve its rights to suspend business

dealings in relation to other contracts also.

21. Responsibilities of SPU upon Completion/Termination of Contract:

On completion/termination of the contract for any reason whatsoever, the SPU shall have to hand over all

properties and documents belonging to RINL. The unadjusted portion of Security Deposit shall be released by

RINL to SPU subject to (i) their production of 'No Demand Certificate' from Railways in favour of RINL (in

case of receipt of materials by Railway Wagons), (ii) adjustment of claims/dues by RINL from SPU for

unsatisfactory performance/lapses on the part of the SPU, if any, in this or any other contract and iii) No pending demands from statutory authorities like Income Tax, Labour Deptt. (in respect of PF, Gratuity,

compensation to employees etc.) and the like.

This agreement may be terminated by RINL at any time at its sole discretion due to non-performance/

misutilization by giving 60 days notice in writing. The clauses for non-performance/ misutilization have been

stipulated elsewhere in the contract. For termination for reasons other than above, there would be a notice

period of 120 days on both side and termination can take place without payment of any compensation. Both

the parties to this agreement shall have to settle their account within the notice period.

22. Losses / Damages:

a) The SPU shall be responsible for all losses/ damages /deterioration’s caused to the materials, when the

materials are in SPU’s custody, including losses if any, caused during transportation and handling by the SPU.

The materials shall be deemed to be in the SPU's custody as soon as the Railway receipts / Stock Transfer

Challans are handed over to the SPU by the Company, irrespective of the fact whether the materials are in

transit or are actually received by the SPU.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

19

b) The receipt of materials shall be accounted for by the SPU on the basis of the quantities despatched by the

Company as per the Stock Transfer Challans issued by the Company. The SPU shall be accountable to the

Company for the entire quantity as mentioned in the Stock Transfer Challans in case of rail, and weight of SPU

weighbridge shall be final in case of receipt by road and if any shortage, the RINL transporter shall be held

responsible for such shortages, STC quantity in case of SPU directly lifts from plant and no claims for

shortages would be entertained by the Company other than the yield loss of 5 % or 2% as the case may be. The

SPU is to accept the Company's practice of determination of weight for dispatch by the plant/ Stockyards as

prevailing from time to time. No allowance shall be given on account of weighbridge tolerance.

c) The SPU shall not hypothecate and / or charge and / or encumber in any manner whatsoever the materials despatched to / stored by them either in full or in part to any bank, a financial institution or association(s) or

Company or firm as security or otherwise.

d) The SPU shall not suffer any injunction and / or attachment and / or appointment of Receiver in respect of the

Company's materials despatched to / stored by them.

e) No cognizance will be taken by the Company of the cases where Railways refuse to accede to the SPU's

request for open delivery or delivery after reweighment or for issue of shortage certificate or for witnessing

inspection, by independent surveyor. It will be SPU's responsibility to handle such cases.

SPU has to account for total weight charged in the Stock Transfer Challan(s) as mentioned above. In case of the dispatch of raw materials by RAIL, any material shortage/missing wagons, RINL shall lodge a claim

against Railways. However SPU shall cooperate with RINL to lodge a claim with the Railways and pursue the

matter for settlement of claim with Railway Authorities, diligently and keep RINL informed from time to time.

If required RINL shall give the SPU the authorization to lodge claims on behalf of RINL with the Railway

Authorities.

In case of levy of any demurrages by Railways, the same shall be borne by SPU

23. Tenure & Termination of contract:

Tenure:

The contract will be for a period of Ten years from the date of commencement of the operations as mentioned in the work order, extendable by Two years with mutual consent, at the same terms and conditions of the

contract subject to availability of billets from RINL and satisfactory performance of SPU.

Termination of the Contract:

a) The objective of this contract is primarily to make additional margin through conversion process under this

agreement. In case such margin is either zero or negative, the contract would be terminated without payment of

any compensation.

b) The company shall have the option to terminate the contract at any time at its sole discretion due to non-

performance/ misutilization by giving 60 days notice in writing and without payment of any compensation.

The clauses for non-performance, misutilization have been stipulated elsewhere in the contract. For termination for reasons other than above, there would be a notice period of 120 days on both side and

termination can take place without payment of any compensation. Both the parties to this agreement shall have

to settle their issues/accounts within the notice period.

c) In the event of the SPU's failure to discharge their duties stipulated in the contract, to the satisfaction of the

company, the company may terminate the contract summarily and without notice.

d) In the event of the contract being terminated in exercise of the rights under the clauses mentioned above, the

SPU shall not be entitled to claim any special or general damages from the company on account thereof.

e) RINL will have an option to terminate the contract with 30 days notice period in case average net margin for a

continuous period of 6 months happens to be negative. The period of six months will be calculated beginning

with the first day of the calendar month following the date of commencement of operations as mentioned in the

work order.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

20

24. Alternative arrangement:

a) If at any time during the continuance of this Contract, the company is of the opinion that in the best interest of

its business, it is necessary to take possession of the materials from the SPUs custody, the company may

forthwith issue notice to the SPU and take possession of the materials by physically removing the materials to

such places as the company may decide in this regard.

b) The SPU however will be entitled to claim the charges as due to him under the provisions of the contract upto

the point of final removal of the material from his premises. The SPU shall extend all cooperation as may be

required by the company in exercise of its right to secure its materials.

c) The company may also, if necessary, and if the exigencies of situations so warrant make its own security

arrangement over the materials in addition to the arrangement of the SPU. This however, will not absolve the

SPU from his duties and responsibilities under the contract.

25. Liabilities / Obligations on Expiry / Terminations:

Notwithstanding the expiry / termination of the contract the liabilities and obligation of both company and the

SPU as set out herein will continue to be in force, until all the materials supplied / despatched by the company

to the SPU up to the date of the said expiry /termination are delivered by the SPU. After termination /expiry of

the contract, the materials if any, lying in the SPU's yard shall be lifted by the company within two months from the date of the termination of the contract and the SPU shall be responsible to arrange delivery of the

materials as directed by the company for which the SPU shall be entitled to claim remuneration as is due to

him under the provisions of the contract.

26. Resolution of Disputes:

26.1 In the event of any dispute/difference whatsoever arising between the parties relating to or arising out of the

contract; the parties shall endeavour to resolve such dispute through conciliation as per provisions of the

Arbitration and Conciliation Act 1996.

26.2.1. Conciliation: Any dispute or difference whatsoever arising between the parties relating to or arising out of

Contract, shall be settled first by conciliation in accordance with the provision of the Arbitration and Conciliation Act – 1996 and the Settlement so rendered between the parties in pursuance thereof shall be final

and binding on the parties.

26.2.2. In case conciliation fails, all questions, claims, disputes or differences of any kind whatsoever arising between

the parties relating to or arising out of the contract shall be referred by the parties hereto for the decision by a

Sole Arbitrator to be appointed as hereinafter mentioned.

26.2.3. The notice regarding the invoking of the arbitrator clause shall be served by registered post and addressed to

the, Director (Comml) Rashtriya Ispat Nigam Limited,

26.3.1 Matters in question, disputed claim or differences other than the excepted matters shall be referred for decision to a Sole Arbitrator to be appointed by Chairman-cum-Managing Director.

26.3.2 In this clause, the expression means the Chairman-cum-Managing Director or any other person delegated to

exercise the authority and the power of the CMD due to his absence on duty or due to his non-availability for

any reason whatsoever.

The Arbitrator, so appointed, shall adjudicate upon all the disputes between the parties hereto.

26.3.3 The Arbitrator shall hear the cases independently and impartially and shall not represent the interest of any

party.

26.3.4 The question of procedure for conduct of the arbitration proceedings shall be decided by the Arbitrator in

consultation with the parties before proceeding with the reference. The Arbitrator may hold preparatory

meeting (s) for this purpose.

In the preparatory meeting(s) as aforesaid, the Arbitrator in consultation with the parties shall also determine

the manner of taking evidence the summoning of the expert evidence and all such matters for the expeditious

disposal of the arbitration proceedings.

26.4 Excepted matters as per the contract shall not be the subject matter of Conciliation/ Arbitration.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

21

26.5 The Court/s at Visakhapatnam only shall have jurisdiction over all matters of dispute.

26.6 The venue of the Arbitration shall be the place of Branch Sales Office where the agreement is signed with the

Steel Processing Unit.

26.7 Work/supply under the contract shall be continued by the SPU under the contract pending

Conciliation/Arbitration proceedings and recourse to Conciliation/ Arbitration shall not be bar to continue with

the work/supply.

26.8 The provisions of the Arbitration and Conciliation Act, 1996 and rules framed there under, if any, and all

modifications/amendments thereto shall deem to apply and/or to be incorporated in this contract as and when

such modifications / amendments to the Act/Rules are carried out.

27. General:

a) Proper security shall have to be made by SPU at their costs for the safe custody of materials supplied by RINL.

Any loss, damage or deterioration whatsoever and/or pilferage in premises /custody of SPU shall be solely to

the account of SPU who will be bound to compensate RINL suitably for such loss, damage and/or

deterioration.

b) RINL may post their employee(s) at the premises of SPU who would, over-see the conversion activities.

c) At the end of contract period the rolls are to be disfigured in front of RINL executive to erase impression of

embossing and refund / return of Security deposit and BG/ Custody & indemnity bond shall be dependent on

RINL satisfying itself about such defacement.

d) SPU shall not receive or accept any payment from customers of RINL. No employee of the Company shall

handle a case of contract with any of his relations or a firm of which the relation is a partner or a company of

which the relation is a Director unless specifically approved by his higher authority on proper disclosure of the

fact or relationship.

--00000--

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

22

ANNEXURE – 4

(TO BE ISSUED BY THE BANK ON THEIR LETTER HEAD)

To,

Rashtriya Ispat Nigam Limited

BSO : NBCC House, 1st Floor, Near Sahjanand College,

Ambawadi, Ahmedabad - 380 015. Gujarat State

Dear sir,

Sub: Financial standing of M/s _____________________

This is to certify that M/s ____________________________ (Name of the tenderer), a _____________ (Proprietorship

Firm / Partnership Firm / Company) with Sri / Smt __________________________ as _____________ (Proprietor /

Partners / Directors) having their Registered / Head Office at ______________________ have been banking with us

since __________________. The operation of their _______________ (nature of account) No.________ with us is

satisfactory. The financial standing of M/s ___________________ is sound based on the transactions dealt with us.

This is also to certify that M/s ___________ is solvent worth Rs. ______ (value of BG /security deposit specified

against this work)

Date: ( )

Place: Authorized Signatory

Name:

Seal: Designation:

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

23

ANNEXURE – 5 PROFORMA FOR SCHEDULE OF SPU - CONVERSION CHARGES

RAW MATERIAL: M S GRADE IS: 2830 MMSM BILLET (65/75/90 mm)

Details of Finished products

to be produced

Consolidated

Indicative

Quantity(all sizes

put together) (*)

SPU- Conversion Charges

Contract value

Materials (1) Size( MM) (2)

(In MT)

(3)

Consolidated single rate for

TMT Rebars in Rs/MT

(in figures & words) (4)

Multiplication of

indicative quantity

and SPU conv charges in Rs (3) x (4)

TMT

Rebars

Fe 500/

Fe 500 D

6,8,10,12,16,20,25,

28,32

24,000

1) Rates to be quoted both in figure and words. In case of any discrepancy between rate quoted in figures and

words, the rate quoted in words will prevail.

2) Indicative percentage breakup of TMT Rebars shall be as below:

6mm/8mm --- 15%, 10mm -- 15%, 12mm -- 30%

16 mm --- 20%, 20mm/25mm/28mm/32mm – 20%

3) The estimated percentage breakup for TMT Rebars is only indicative the actual quantum of work in the

Specific dia/size range can vary. (Regions/Branches may vary the above percentage breakup in their tender

documents depending upon market requirements and the other capacities available in their Region/Branch).

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

24

ANNEXURE –6

PROFORMA FOR SCHEDULE OF SPU - CONVERSION CHARGES

RAW MATERIAL: M S GRADE IS: 2830 CAST BILLET (150X150mm & 200X200 mm)

Details of Finished products

to be produced

Consolidated

Indicative

Quantity (all sizes

put together)

SPU- Conversion Charges

Contract value

Materials (1) Size( MM)

(2)

(In MT)

(3)

Consolidated single rate for TMT

Rebars in Rs/MT (in figures & words)

(4)

Multiplication of

indicative quantity and SPU conv charges

quoted in

Rs

(3) x (4)

TMT

Rebars

Fe 500/

Fe 500 D

6,8,10,12,16,

20,25,28,32

24,000

Note:

1) Rates to be quoted both in figure and words. In case of any discrepancy between rate quoted in figures and

words, the rate quoted in words will prevail.

2) Indicative percentage breakup of TMT Rebars shall be as below:

6mm/8mm --- 15%, 10mm -- 15%, 12mm -- 30%

16 mm --- 20%, 20mm/25mm/28mm/32mm – 20%

3) The estimated percentage breakup for TMT Rebars is only indicative the actual quantum of work in the

Specific dia/size range can vary. (Regions/Branches may vary the above percentage breakup in their tender

documents depending upon market requirements and the other capacities available in their Region/Branch).

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

25

ANNEXURE – 7

PROFORMA FOR SCHEDULE OF SPU - CONVERSION CHARGES

RAW MATERIAL: M S GRADE IS: 2830 MMSM BILLET (65/75/90mm )

Details of Finished

products

to be produced

Indicative

Quantity

in MT

SPU- Conversion Charges

Rs/MT (in figures & words)

Contract value

Materials

(1)

Size( MM)

(2)

(3) (4) Multiplication of

indicative quantity and SPU conv charges

in Rs

(3) X (4)

Equal

Angles

35-65mm 3000

Un Equal

Angles

35-65mm 1000

Channels

40-75mm 1000

Joists

- -

Total Value in Rs =

1) Rates to be quoted both in figure and words. In case of any discrepancy between rate quoted in figures and words, the

rate quoted in words will prevail.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

26

ANNEXURE – 8

PROFORMA FOR SCHEDULE OF SPU - CONVERSION CHARGES

RAW MATERIAL: M S GRADE IS: 2830 CAST BILLETS (150/200mm)

Details of Finished

products

to be produced

Indicative

Quantity(*)

(In MT)

SPU- Conversion Charges

Rs/MT (in figures & words)

Contract value

Materials

(1)

Size( MM)

(2)

(3) (4) Multiplication of

indicative quantity and SPU conv chages

in Rs

(3) X (4)

Equal

Angles

75-150mm

or higher

6000

Un Equal

Angles

75-150mm

or higher

3000

Channels

100-

175mm or

higher

5000

Joists

100-

150mm or

higher

5000

Total Value in Rs =

1) Rates to be quoted both in figure and words. In case of any discrepancy between rate quoted in figures and words, the

rate quoted in words will prevail.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

27

ANNEXURE – 9

Sl no Rs

Contract value of TMT Rebars (with Input materials as MMSM Billets

65/75/90)

Contract value of TMT Rebars (with Input materials as Cast Billets

150 & 200)

Contract value of Structurals (with Input materials as MMSM Billet

65/75/90s)

Contract value of Structurals (with Input materials as Cast Billets)

Total contract value

The tenderer has to arrive at the total contract value by adding the value of all individual items (TMT Rebars and

Structurals) and quote the same in the schedule of rates. In case of any error between total contract value quoted in

schedule of rates and sum of individual value of each item of schedule of rates, the lower of either total contract value

quoted in the schedule of rates or sum of individual value of each item of schedule of rates would be considered .In case total contract value quoted is lower, the difference would be adjusted proportionately on each individual item of

schedule of rates for arriving at the individual item rate.

In case of any error in arriving at the value of individual items, while multiplying the individual item rates with

respective indicative quantities, the rate/amount that is advantageous to the Company shall be considered.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

28

ANNEXURE -10

SECURITY DEPOSIT BANK GUARANTEE TOWARDS PERFORMANCE GUARANTEE (FROM ANY

SCHEDULED BANK EXCEPT GRAMIN / COOPERATIVE BANKS

RASHTRIYA ISPAT NIGAM LIMITED

1. In consideration of the Rashtriya Ispat Nigam Limited, Govt. Company incorporated under the Companies

Act, 1956 and having its registered office at Administrative building, Visakhapatnam Steel Plant, Visakhapatnam 530 032 and also having inter-alia one of its Branch Sales Offices at

…………………………….(hereinafter called the 'Company') having agreed to accept this Guarantee towards

the Security (and as Security Deposit) for the due performance of all the obligation contained in the Contract

dated (hereinafter called the "said Contract", which expression shall include any formal agreement entered into

subsequent thereto or in supersession thereof and all modification to and amendments in the said agreement)

made between the Company and M/s. ………(hereinafter called the ‘Contractor’ or ‘SPU’) for SPU

conversion situated at …………………. under the said Contract,

We…………..(Name of the Bank) (hereinafter referred to as the 'said Bank') do hereby undertake to pay the

Company an amount not exceeding Rs lakhs (Rupees lakhs only) against the Contractor's failure and/or

non observance and/or breach(s) of any of its obligations and/or the terms and conditions contained in the contract dated ……….

2. We ……….. (Name of the Bank) do hereby undertake to pay at cash counter the amount (s) due and payable

under this Guarantee to the extent of Rs. Lakhs (Rupees lakhs) only without any demur or protest,

merely on receipt of a demand from the Company stating that the said Contractor has failed to fulfill and / or

observe and/or committed breach (es) of the obligations as stipulated in the Contract dated ……..and the

amount claimed is due and payable to the Company by the said Contractor on account thereof.

Any such demand made on the said Bank shall be conclusive as regards the amount due and payable by the

Bank under this Guarantee. It is hereby expressly agreed and affirmed that the Company shall have the fullest

liberty to claim payment of the amount under this Guarantee subject to the ceiling limit of Rs lakhs (Rupees

lakhs only) as referred to above and this Guarantee shall not become infructuous or invalid because of the partial payment or payments made by us to the Company pursuant to the demand or demands made by the

Company upon us for payment from time to time. It is further affirmed that this Guarantee shall hold good in

favour of the Company to the extent of the balance amount covered under this Guarantee.

It is also agreed and affirmed that the Company shall be the sole judge as to whether the said Contractor has

failed to observe / fulfill / any or all the obligations contained in the Contract dt ……… referred to above,

and/or committed any breach or breaches in respect thereof as also the amount become due and payable by the

Contractor/SPU on account therefore, and such decision of the Company shall be final and binding upon us.

However, our liability under this Guarantee shall be restricted to an amount not exceeding Rs lakhs (Rupees

lakhs only).

3. We the said Bank, further agree that this Guarantee shall remain in full force and effect until the said

Contractor fulfills all the obligations under the contract dated ……… in due performance thereof and that it

shall continue to be enforceable for the period that would be taken for satisfactory performance and

fulfillments in all respects of all obligations under the Contract dated…… and that it shall continue to be

enforceable till any notice of no claim is given by the Company.

4. We, the said Bank, further agree that the Company has the fullest liberty without affecting in any manner our

obligations herein to vary any of the terms and conditions of the said Contract dated …… and to forebear or

enforce any of the terms and conditions relating to the said Contract and we shall not be relieved of our

liability under this Guarantee by reason of any such variation or extension being granted to the said Contractor

or for any forbearance and/or commission on the part of the Company.

5. We …….(name of the Bank) state and affirm that this Guarantee will be valid and effective for a period of five

years from the date of issue and we further agree that the guarantee herein contained shall not be affected by

any change in the Constitution of the said Contractor.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

29

6. We (mention the name of the Bank), hereby agree that any claim due and arising under this guarantee shall be

enforceable against our Bank’s Branch --- (mention the name and address of the Branch ) at ----------------

(VSP’s controlling Branch city) and they shall honour such demand in any case not later than next working

day.

7. Issuance of this Bank Guarantee may also be got confirmed from our controlling branch/ office/higher

Authority as per the name & address mentioned below:

________________________ ________________________

Yours faithfully,

Designated Officer of Bank with Seal

Dated : ……………………………..day of……………….(month) ……………..(year)

for_______________________________

(Name of the Bank)

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

30

ANNEXURE –11

PROFORMA OF BANK GUARANTEE (Financial Coverage) FOR SPU CONTRACT

(On non judicial stamp paper of appropriate value from a Scheduled Bank)

(to be vetted by Finance of Branch Sales Office)

To

Rashtriya Ispat Nigam Limited

Branch Sales Office

Ahmedabad ……………………………..

…………………………….

1. In consideration of Rashtriya Ispat Nigam Limited, a government Company incorporated under the Companies

Act, 1956 having its registered Office at Administrative Building, Visakhapatnam Steel Plant, Visakhapatnam

530 031also having interalia, one of its Branch Sales office at

………………………………………………………………….(hereinafter called `the Company’) having

agreed to accept this Guarantee for due security and safe custody of the materials dispatched to M/s.

__________________ (hereinafter called ‘the said Prospective Steel Processing Unit (SPU) for Conversion of

Semis supplied by RINL under the Agreement dated _____________ (hereinafter called ‘the said Agreement’

which expression shall include any formal agreement entered into subsequent thereto or in suppression thereof and all modifications to and amendments in the said Agreement) made between the Company and the said

SPU for conversion of the Steel materials covered under the said Agreement on furnishing a Bank Guarantee

for Rs…………… (Rupees …………………………….) only, we________________ (Name of the Bank) …

(hereinafter referred to as ‘the Bank’) do hereby undertake to pay to the Company an amount not exceeding

Rs……………………………… (Rupees…………………………….) only against any shortage, loss or

damage or deterioration caused to or suffered by or would be caused to or suffered by the company in respect

of the said materials by reason of any breach(es) of any of the terms and conditions contained in the said

Agreement, or for any reason whatsoever.

2. We ………………………………………. do hereby undertake to pay (name of the Bank) the amount or

amounts due and payable under this Guarantee from time to time up to the extent of Rs…………….

(Rupees……………………………………………) only without any demur / protest / question, merely on

receipt of a demand from the Company stating that the amount (s) claimed is / are by way of loss or damage caused to / suffered by or would be caused to or suffered by the Company in respect of the said materials by

reason of any breach of any of the terms and conditions contained in the said agreement by reason of the

SPU’s failure to perform the said agreement or for any reason whatsoever. Any such demand made on the

Bank shall be conclusive as regards the amount or amounts due and payable by the Bank after this Bank

Guarantee.

3. It is hereby expressly agreed and declared that the Company shall have the fullest liberty to claim payment of

the amount or amounts from time to time under this Guarantee subject to the ceiling limit of Rs.

……………………….. (Rupees……………………………) only, as referred to above and this guarantee shall

not become invalid or in fructuous because of the partial demand(s) made by the company upon us for

payment under the circumstances stipulated hereinabove and it is further declared that this Guarantee shall

hold good in favour of the Company to the extent of the balance amount covered under this guarantee. It is

further agreed and declared that the Company shall be the sole judge of and as to whether the said SPU has

committed any breach or breaches of any of the terms and conditions of the said agreement the extent of loss

and damage, caused to or suffered by or that may be caused to or suffered by the Company on account thereof

and the decision of the Company that the said SPU has committed such breach or breaches and as to the

amount or amounts of loss and damages shall be final and binding on us. Any such demand or demands made

on the Bank shall be conclusive as regards the amount due and payable by the Bank under this Guarantee.

However, our liability under this guarantee shall be restricted to an amount, not exceeding Rs.

………………….. (Rupees……………………. …………………….) only.

4. We, the said Bank, further agree that the Guarantee herein contained shall remain in full force and effect

during the period that would be taken for the performance of the said agreement and that it shall continue to be

enforceable till all the dues of the Company under or by virtue of the said agreement have been fully paid and

its claims satisfied or discharged or till the Company certifies that the terms and conditions of the said

agreement have been fully and properly carried out by the said SPU and accordingly discharges this guarantee.

Unless a demand or claim under this guarantee is made on us in writing on or before the …………………. (i.e.

six months after the date of expiry of the said Agreement) and payment is made by us, we shall be discharged

from our liability under this guarantee thereafter.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

31

5. We, the said Bank, further agree that the Company shall have the fullest liberty, without our consent and

without affecting any manner our obligations hereunder contained to vary / modify any of the terms and

conditions of the said agreement or to extend time of performance from time to time or to postpone for any

time or from time to time any of the powers exercisable by the Company against the said SPU and to forbear

or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved of our

liability by reason of any such variation / modification or extension being granted to the said SPU or for any

forbearance, act or omission on the part of the Company or any indulgence by the Company to the said SPU or

by any such matter or thing whatsoever which under the law relating to sureties would but for this provision

have effect of so relieving us.

6. We …………… (name of the Bank) agree and declare that this Guarantee will be valid and effective for a period of 6 years from the date of its issue and we further agree that the Guarantee herein contained shall not

be affected by any change in the constitution of the said SPU .

7. We, the said Bank, lastly undertake not to revoke this Guarantee during its currency except without the

previous consent of the Company in writing.

8. We (mention the name of the Bank), hereby agree that any claim due and arising under this guarantee shall be

enforceable against our Bank’s Branch --- (mention the name and address of the Branch ) at ----------------

(VSP’s controlling Branch city) and they shall honour such demand in any case not later than next working

day.

9. Issuance of this Bank Guarantee may also be got confirmed from our controlling branch/ office/higher

Authority as per the name & address mentioned below:

________________________

________________________

Yours faithfully,

Designated Officer of Bank with Seal

Dated : ……………………………..day of……………….(month) ……………..(year)

for_______________________________

(Name of the Bank)

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

32

ANNEXURE – 12

PROFORMA FOR CUSTODY AND INDEMNITY BOND FOR SPU CONVERSION

CONTRACT (To be executed on Stamp Paper of appropriate value)

To

Rashtriya Ispat Nigam Limited

WHEREAS We have agreed to act as your Steel Processing Unit at ………………for conversion of Steel to be handed over to us at railway siding/your Rolling Mill / Stockyards for proper transportation, storage, handling, offering 72000

T of capacity of the new mill exclusively for RINL, safe custody and delivery to your various customers against valid

delivery orders issued by your BSO at ……………… pursuant to the Agreement dated …………………….(hereinafter

referred to as the said Agreement')

AND WHEREAS we have agreed to execute a Custody and Indemnity Bond in terms of the said Agreement for and in

respect of the Steel materials delivered to us, we hereby declare and state as under:

1. NOW by this Custody and Indemnity Bond we hereby agree and undertake that we shall keep and hold the

Steel materials meant for conversion as well as converted steel materials under the said agreement and keep the same

under safe custody at our premises located at………… on your behalf and as your property in trust for you.

2 We shall be entirely responsible for the safe custody and protection of the said Steel materials at our risk till

the same are duly delivered to your various customers OR as may be directed by you from time to time or at any time

and shall indemnify you against any loss, damage or deterioration suffered by you or against shortages whatsoever in

respect of said Steel materials delivered to us from time to time under said Agreement while the same remain in our

custody.

We further agree that the said Steel materials shall at all time be open to inspection by any person authorized by you.

3. SHOULD any loss or damage or deterioration or shortage occur or refund becomes due and receivable by you,

on demand we undertake to compensate or to pay or to refund the amount forthwith and without any deduction

whatsoever. You shall be entitled to recover from us compensation for such loss or damage or deterioration or shortage without prejudice to any other remedies available to you by deduction from any sum which at any time hereinafter may

become due to us either under aforesaid Agreement or under any other Agreement (s). The amount

so claimed by you shall be final and binding upon us.

4. WE further agree and affirm that you shall have the fullest liberty to vary any of the terms and conditions of

the said Agreement without affecting in any manner whatsoever our obligation under this Bond and we shall not be

released from our liabilities under this Bond by the exercise of your liberty to vary and / or modify the terms of the said

Agreement or by reason of any time being given to us or any other forbearance or indulgence given to us or any other

act or omission

on your part.

5. We further agree and undertake that we shall not hypothecate and / or change and / or encumber in any manner

whatsoever the materials, despatched to us, either in full or in part to any Bank or Financial Institution or any

Association or any company or firm as a security or otherwise.

6. WE further agree and undertake that we shall not suffer any injunction and/or attachment and/or appointment

of Receiver in respect of materials either in full or in part, delivered to us.

7. AND we further agree that this Bond shall remain in force till all the obligations under the said Agreement are

fulfilled and the accounts relating thereto are finally settled by and between ourselves and yourselves and unless you

expressly discharge this Bond in writing the same shall remain valid and in full force.

8. THIS Bond with all its provisions herein contained are in addition to and not by way of limitation of or

substitution for any other Bond or Indemnity / Undertaking here before given to you by us, whether jointly with others

or alone and now existing un cancelled and that this Bond is not intended to nor shall revoke or limit such Bond or

guarantee / undertaking.

9. THIS Bond shall not be affected to any change in our constitution not shall it be affected by any change in

your constitution or by any amalgamation or absorption thereof or therewith but will ensure for and be available to and

enforceable by the absorbing or amalgamated company or concern IN Witness whereof we put our seal and signature on

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

33

this ………… ………..

(day)………………(month)……………………………….(year)

Signed sealed and delivered

By M/s………………………………………

For and on behalf of

………………………………………..

……………………………………….. In the presence of:

1)

2)

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

34

Annexure-13

INTEGRITY PACT FORMAT

Rashtriya Ispat Nigam Limited (RINL) hereinafter referred to as “The Principal”,

And

…………………………………………………. hereinafter referred to as “The Bidder/Contractor”

Preamble

The Principal intends to award, under laid down organizational procedures, Appointment of Steel Processing

Units(SPU) for conversion of Surplus semis in to finished products on wet lease basis aginst NIT Ref

No._______________ . The Principal values full compliance with all relevant laws of the land, rules, regulations,

economic use of resources, and of fairness/transparency in its relations with its Bidder(s) and /or Contractor(s).

The Principal will nominate an Independent External Monitor(s) (IEM(s)) by name at the tender stage/will appoint in

case of receipt of any reference, from the panel of IEMs, for monitoring the tender process and the execution of the

contract in order to ensure compliance with the Integrity Pact by all the parties concerned.

Section 1 – Commitments of the Principal:

(1) The Principal commits itself to take all measures necessary to prevent corruption and to observe the following

principles:-

(a) No employee of the Principal, personally or through family members, will in connection with the tender for, or the execution of a contract, demand, take a promise for or accept, for self or for third person, any

material or non material benefit which the person is not legally entitled to.

(b) The Principal will, during the tender process treat all bidders with equity and reason. The Principal will in

particular, before and during the tender process, provide to all Bidders the same information and will not

provide to any Bidder confidential/additional information through which the Bidder(s) could obtain an

advantage in relation to the tender process or the contract execution.

(c) The Principal will exclude from the process all known prejudiced persons.

(2) If the Principal obtains information on the conduct of any of its employees which is a criminal offence under the

IPC/ PC Act, or if there be a substantive suspicion in this regard, the Principal will inform Chief Vigilance

Officer of RINL and in addition can initiate disciplinary action.

Section 2 – Commitments of the Bidder(s)/contractor(s) :

(1) The Bidder(s)/ Contractor(s) commits to take all measures necessary to prevent corruption. He commits

to observe the following principles during his participation in the tender process and during the contract

execution.

(a) The Bidder(s)/Contractor(s) will not, directly or through any other person or firm, offer, promise or give to

any of the Principal’s employees involved in the tender process or the execution of the contract or to any

third person any material or other benefit which he/she is not legally entitled to, in order to obtain in

exchange any advantage of any kind whatsoever during the tender process or during the execution of the

contract or to vitiate the Principal’s tender process or contract execution. (b) The Bidder(s)/ Contractor(s) will not enter with other Bidders into any undisclosed agreement or

understanding, whether formal or informal. This applies in particular to prices, specifications,

certifications, subsidiary contracts, submission or non-submission of bids or any other actions to restrict

competitiveness or to introduce cartelization in the bidding process or to vitiate the Principal’s tender

process or execution of the contract.

(c) The Bidder(s)/Contractor(s) will not commit any offence under the IPC/ PC Act; further the

Bidder(s)/Contractor(s) will not use improperly, for purposes of competition or personal gain, or pass on

to others, any information or document provided by the Principal as part of the business relationship

regarding plans, technical proposals and business details including information contained or transmitted

electronically.

(d) The Bidder(s)/Contractor(s) of foreign origin shall disclose the name and address of the

Agent(s)/representative(s) in India, if any. Similarly the Bidder(s)/Contractor(s) of Indian Nationality

shall furnish the name and address of the foreign supplier/contract Agency, if any. Further details, as

mentioned in the Guidelines on Indian Agents of Foreign “Suppliers/contract agencies”, shall be disclosed

by the Bidder(s)/Contractor(s) wherever applicable. Further, as mentioned in the Guidelines, all the

payments made to the Indian agent(s)/representative(s) have to be in Indian Rupees only.

Copy of the Guidelines on Indian Agents of Foreign “Suppliers/contract agencies” is enclosed.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

35

(d) The Bidder(s)/ Contractor(s) will, when presenting his bid, disclose any and all payments he has made or

committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the

contract.

(2) The Bidder(s)/Contractor(s) will not instigate third persons to commit offences outlined above or be an

accessory to such offences.

Section 3 – Disqualification from tender process and exclusion from future contracts: (1) A transgression is considered to have occurred, if the principal after due consideration of the available evidence,

concludes that a reasonable doubt is possible.

(2) If the Bidder(s)/Contractor(s), before award of contract or after award of contract has committed a transgression

through a violation of Section 2 above or in any other form such as to put his reliability or credibility in question,

the Principal is entitled to disqualify the Bidder(s) from the tender process or to terminate the contract, if already

awarded, for that reason, without prejudice to other remedies available to the Principal under the relevant GCC of

the tender/contract.

(3) If the bidder/Contractor has committed a transgression through a violation of any of the terms under Section 2

above or in any other form such as to put his reliability or credibility into question, the Principal is entitled also

to exclude the bidder / Contractor from future tenders/Contract award processes. The imposition and duration of

the exclusion will be determined by the principal keeping in view the severity of the transgression. The severity

will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the bidder /Contractor and the amount of the damage.

(4) If it is observed after payment of final bill but before the expiry of validity of Integrity pact that the contractor

has committed a transgression through a violation of any of the terms under Section 2 above during the execution

of contract, the Principal is entitled to exclude the Contractor from future tenders/Contract award processes.

(5) The exclusion will be imposed for a minimum period of six (6) months and a maximum period of three (3) years.

(6) If the bidder / Contractor can prove that he has restored/ recouped the damage to the principal caused by him and

has installed a suitable corruption prevention system, the Principal may revoke the exclusion before the expiry of

the period of such exclusion.

Section 4 – Compensation for Damages:

(1) If the Principal has disqualified the bidder from the tender process prior to the award in accordance with Section

3 above, the Earnest Money Deposit (EMD)/Bid security furnished, if any, along with the offer as per the terms

of the Invitation to Tender (ITT) shall be forfeited. This is apart from the disqualification of the Bidder as may

be imposed by the Principal as brought out at Section 3 above.

(2) If the Principal has terminated the Contract in accordance with Section 3 above, or if the Principal is entitled to

terminate the Contract in accordance with Section 3 above, the Security Deposit/performance bank guarantee

furnished by the contractor, if any, as per the terms of the ITT/Contract shall be forfeited without prejudicing the

rights and remedies available to the principal under the relevant General conditions of contract. This is apart

from the disqualification of the Bidder, as may be imposed by the Principal, as brought out at Section 3 above.

Section 5 – Previous transgressions:

(1) The Bidder declares that, to the best of his knowledge, no previous transgression occurred in the last five (05)

years with any Company or Organization or Institution in any country or with any Government in any country

conforming to the anti-corruption approach that could justify his exclusion from the tender process. (2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process. The

contract, if already awarded, can be terminated for such reason.

Section 6 – Equal treatment of all Bidders / Contractors / Subcontractors:

(1) The Bidder(s)/Contractor(s) undertakes to demand from all his subcontractors a commitment in conformity with

this Integrity Pact, and to submit it to the Principal before seeking permission for such subcontracting.

(2) The Principal will enter into agreements with identical conditions as this one with all Bidders and Contractors.

(3) The Principal will disqualify from the tender process all bidders who do not sign this Pact or violate its provisions.

Section 7 – Criminal charges against violating Bidder(s) /Contractor(s)/ subcontractor(s):

If the Principal obtains knowledge of conduct of a Bidder, Contractor, Subcontractor or of any employee or a

representative or an associate of a Bidder/Contractor/ Subcontractor which constitutes corruption, or if the

Principal has substantive suspicion in this regard, the Principal will inform the same to CVO of RINL.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

36

Section 8 – Independent External Monitor(s)(IEM(s)):

(1) The Principal appoints competent and credible Independent External Monitor(s) with clearance from Central

Vigilance Commission & Transparency International (India). The IEM(s) reviews independently, the cases

referred to him/them to assess whether and to what extent the parties concerned comply with the obligations

under this Integrity Pact.

(2) In case of noncompliance of the provisions of the Integrity pact, the complaint/noncompliance is to be lodged by the aggrieved party with the Nodal Officer only appointed by CMD/RINL. The Nodal Officer shall refer the

complaint / non compliance so received by him to the IEM, already appointed or to be appointed for that case.

(3) The IEM is not subject to instructions by both the parties and performs his functions neutrally and independently.

The IEM(s) will submit report to the CMD, RINL.

(4) The Bidder(s)/Contractors(s) accepts that the IEM has the right to access without restriction, to all

tender/contract documentation of the Principal including that provided by the Bidder/Contractor. The

Bidder/Contractor will also grant the IEM upon his request and demonstration of a valid interest, unrestricted and

unconditional access to his tender/contract documentation. The same is applicable to Subcontractors also. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/

Contractor(s)/Subcontractor(s) with confidentiality.

(5) The Principal will provide to the IEM sufficient information about all meetings among the parties related to the

tender/contract for the cases referred to IEM, provided such meetings could have an impact on the contractual

relations between the Principal and the Contractor. The parties offer to the IEM the option to participate in such

meetings.

(6) As soon as the IEM notices, or believes to notice, a violation of this pact, he will so inform the Principal and request the Principal to discontinue or take corrective action or to take other relevant action. The IEM can in this

regard submit non binding recommendations. Beyond this, the IEM has no right to demand from the parties that

they act in a specific manner, refrain from action or tolerate action.

(7) The IEM will submit a written report to the CMD, RINL within four (04) to six (06) weeks from the date of

reference or intimation to him by the Principal and, should the occasion arise, submit proposals for corrective

actions for the violations or the breaches of the provisions of the agreement noticed by the IEM.

(8) IEM may also submit a report directly to the CVO of RINL and the Central Vigilance Commission, in case of

suspicion of serious irregularities attracting provisions of the IPC/ PC Act.

(9) Expenses of IEM shall be borne by RINL/VSP as per terms of appointment of IEMs.

(10) The word ‘Monitor’ means Independent External Monitor and would include both singular and plural.

Section 9 – Duration of the Integrity Pact:

(1) This Pact comes into force upon signing by both the Principal and the Bidder/Contractor. It expires for the

Contractor twelve (12) months after the last payment under the contract, and for all unsuccessful Bidders, six

(06) months after the contract has been awarded and accordingly for the Principal after the expiry of respective

periods stated above.

(2) If any claim is made/ lodged during the valid period of the IP, the same shall be binding and continue to be valid

even after the lapse of this pact as specified above, unless it is discharged/determined by CMD of RINL.

Section 10 – Other provisions:

(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the Registered Office of the

principal, i.e. Visakhapatnam, State of Andhra Pradesh, India.

(2) Changes and supplements as well as termination notices need to be made in writing. Side agreements to this pact

have not been made.

(3) If the Contractor is a partnership firm/ consortium, this agreement must be signed by all partners/ consortium members, or their Authorized Representative(s) by duly furnishing Authorization to sign Integrity Pact.

(4) Should one or several provisions of this agreement turnout to be invalid, the remaining part of this agreement

remains valid. In this case, the parties will strive to come to an agreement to their original intentions.

(5) Wherever he or his is indicated in the above sections, the same may be read as he/she or his/her, as the case may be.

_____________________________ _____________________________________

(For & On behalf of the Principal) (For & On behalf of Bidder/ Contractor)

(Office Seal) (Office Seal)

Place ---------------

Date ---------------

Witness 1: Witness 2:

(Name & Address) Name & Address)

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

37

GUIDELINES FOR INDIAN AGENTS OF

FOREIGN “SUPPLIERS/CONTRACT AGENCIES”

1.0 There shall be compulsory registration of Indian Agents of foreign suppliers/contract Agencies with RINL

in respect of all Global (Open) Tenders and Limited Tenders. An agent who is not registered with RINL

shall apply for registration in the prescribed Application Form.

1.1 Registered agent needs to submit before the placement of order by RINL, an Original certificate issued by

his foreign supplier/ contract Agency (or an authenticated Photostat copy of the above certificate duly

attested by a Notary Public) confirming the agency agreement and giving the status being enjoyed by the

agent along with the details of the commission /remuneration /salary /retainer being paid by them to the agent(s).

1.2 Wherever the Indian representative has communicated on behalf of their foreign supplier/contract Agency

and/or the foreign supplier/contract Agency have stated that they are not paying any commission to their

Indian agent(s) but paying salary or retainer, a written declaration to this effect given by the foreign

supplier/contract Agency should be submitted before finalizing the contract.

2.0 DISCLOSURE OF PARTICULARS OF AGENT(S)/REPRESENTATIVE(S) IN INDIA, IF ANY:

2.1 Bidders of Foreign nationality shall furnish the following details in their quotation/bid:

2.1.1 The name and address of their agent(s)/representative(s) in India, if any, and the extent of authorization and authority given to them to commit them. In case the agent(s)/representative(s) is a foreign Company,

it shall be confirmed whether it is a really substantial Company and details of the company shall be

furnished.

2.1.2 The amount of commission/remuneration included in the quoted price(s) for such

agent(s)/representative(s) in India.

2.1.3 Confirmation of the Bidder that the commission/remuneration if any, payable to his

agent(s)/representative(s) in India, may be paid by RINL in Indian Rupees only.

3.0 DISCLOSURE BY INDIAN AGENT(S) OF PARTICULARS OF THEIR FOREIGN

SUPPLIER/CONTRACT AGENCY AND FURNISHING OF REQUISITE INFORMATION:

3.1 Bidders of Indian Nationality shall furnish the following details/certificates in/along with their offers:

3.1.1 The name and address of foreign supplier/contract agency indicating their nationality as well as their status, i.e., manufacturer or agent of manufacturer holding the Letter of Authority.

3.1.2 Specific Authorization letter by the foreign supplier/contract agency authorizing the agent to make an

offer in India in response to tender either directly or through their agent(s)/representative(s).

3.1.3 The amount of commission/remuneration included for bidder in the price (s) quoted

3.1.4 Confirmation of the foreign supplier/contract Agency of the Bidder, that the commission/remuneration, if

any, reserved for the Bidder in the quoted price (s), may be paid by RINL in India in equivalent Indian

Rupees.

4.0 In either case, in the event of materialization of contract, the terms of payment will provide for payment of

the commission/remuneration payable, if any, to the agent(s)/representative(s) in India in Indian Rupees,

as per terms of the contract.

4.1 Failure to furnish correct information in detail, as called for in para 2.0 and/or 3.0 above will render the bid concerned liable for rejection or in the event of materialization of contract; the same is liable for

termination by RINL. Besides this, other actions like banning business dealings with RINL, payment of a

named sum etc., may also follow.

Note: The following persons have been appointed as Independent External Monitors (IEMs) to oversee the

implementation of 'Integrity Pact' in RINL.

1. Sri PC Parakh, IAS (Retd.) ] (for details please see our

2. Sri V Velayutham, Ex.DG (RD)&SS ] website www.vizagsteel.com)

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

38

ANNEXURE-14

LETTER OF INTENT (LOI)

To

M/s._________________

____________________

Dear Sir,

Sub: Our Tender Notice No…………….dtd…………for conversion of TMT Rebars and or Structurals under

SPU- Conversion arrangement at ………………….

Ref: Your Tender Quotation dt……….. in response to the subject Tender Notice.

1 Please refer to your above Tender Quotations opened on ……….and also (strike out whatever is not applicable) the

subsequent negotiation held on …….. and/ or your correspondence dated …………

2 We have the pleasure to inform you that your above tender has been accepted by us. You are, therefore, requested

to submit BG towards Security Deposit for performance of the contract for Rs_____________ to us on or

before……………, the following documents, amongst others, as already stipulated in the Tender Terms.

3. Further, you shall adhere to the following schedule of activities with regard to setting up of the Unit i.e

installation and commissioning of Steel Processing Unit.

(a) Land Acquisition and land levelling …. Within 4 months from the date of issue of LOI

(b) Erection and Commissioning of Equipment ….. Within 12 months from the date of issue of LOI

(c) Submission of documents and }… Within one years 9 months from the date of issue of LOI. Commencement of commercial Production }

(d) In case of failure to reach milestones as mentioned above, fine shall be recovered/ adjusted from S.D as below:

For (a) …. Rs 5 lakhs

For (b) ….. Rs 10 lakhs

For (c ) ….. Balance SD

i. Separate BGs for amounts as mentioned at 3 (d) to be submitted by prospective SPU initially for a period

of 3 years from the date of issue of LOI. The BGs are to be subsequently extended for a further period of 3

years. Extension of BGs to be done at least 3 months ahead of date of expiry.

ii. In case of failure to reach any or both of the first two milestones, SPU has to make good the forfeited

amount to ensure that the SD amount as stipulated in the tender is submitted to RINL.

iii. Original BIS Certificate and process license or undertaking for submission.

iv. Any other documents necessary as per the local conditions **

4. In the event you fail to submit the above document(s) within the prescribed time, the acceptance of your tender shall

be withdrawn and you will be held responsible for all consequences.

5. On your compliance of the above within the time and prescribed herein, we shall issue you a Work Order enabling

you to commence Conversion work envisaged under the contract awarded to you.

On non compliance/ non submission of any of the documents indicated above by the date indicated at para 2 above, the EMD/SD deposited by you shall be liable for forfeiture/encashment by the Company and you may be debarred

from participating in future tenders for Conversion.

Till the date of signing the agreement, this LOI along with Tender, NIT,ITT, Terms and conditions, and the letters

under reference shall be considered as contract.

Please acknowledge receipt.

Thanking you,

Yours faithfully,

For Rashtriya Ispat Nigam Limited

Sr Branch Manager

** to be deleted wherever required.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

39

ANNEXURE –15

PROFORMA AGREEMENT FOR STEEL PROCESSING UNIT (SPU) ARRANGEMENT OF RASHTRIYA

ISPAT NIGAM LIMITED AT ………………..

Contract No./Ref. No ……………………….. ………… dated…………

THIS AGREEMENT made on this ……….. day of ……………. between the Rashtriya Ispat Nigam Limited

(RINL) , a Govt. Company incorporated under the Companies Act, 1956 having its registered office at

Administrative Building, Visakhapatnam Steel Plant, Visakhapatnam 530 031 and also having interalia one of its Branch Sales Office (BSO) at ……………. hereinafter referred to as 'The Company' (which expression shall

wherever the subject or the context so requires shall include its successors and assigns) of the ONE PART AND

M/s. ……………………………. A Company/Partnership Firm or Proprietorship Firm (as the case may be) having

their Registered Office/principal place of business at ……….hereinafter referred to as 'The Steel Processing Unit

(SPU) (which expression shall wherever the subject or the context so requires shall include their successors and

permitted assigns) of the OTHER PART.

WHEREAS the Company has issued advertisement for appointment of SPU at……… on the terms and conditions

as specified in the Tender documents as well as in its Annexures.

AND WHEREAS the SPU has submitted the Tender for appointment of SPU as per the terms and conditions and rates specified in the Tender which has been accepted by the Company and the job of Production/ Conversion of

steel materials at …………(place) has been awarded to the SPU vide its Work Order No………………..dated

…………………… .

AND WHEREAS it has been considered necessary and expedient to incorporate the terms and conditions as

contained in the Tender documents in an instrument in writing.NOW THESE PRESENT WITNESSETH and it is

hereby agreed to and declared by and between parties hereto as follows: -

1. In consideration of the payments to be made by the Company in terms of the contract, the SPU covenants and

agrees with the Company to undertake the job of Production/ Conversion of Steel materials at……… in the manner

required and the SPU agrees to do all such Conversion job strictly as per the terms and conditions as are mentioned

in the Tender documents referred to in the various Annexures as under.

2. The various Annexures set out below and hereby annexed and marked as Annexures-1 to 24 and Annexure A

mentioned hereunder shall constitute the contract for the purpose of construction, interpretation and effect thereof.

(a) Annexure – 1 Notice inviting Tender

(b) Annexure – 2 Instructions to Tenderers

(c) Annexure – 3 Terms & Conditions of SPU.

d) Annexure- 4 Solvency Certificate to be issued by Bankers

(e) Annexure – 5,6,7,8,9 Schedule of SPU Charges

(f) Annexure – 10 Bank Guarantee towards performance

(g)Annexure – 11 Bank Guarantee Towards Financial coverage (h) Annexure –12 Custody & Indemnity Bond for SPU Contract

(i) Annexure – 13 Integrity Pact format

(j) Annexure – 14 Letter of Intent

(k) Annexure- 16 Format for Work Order.

(l) Annexure – 17 No claims certificate

(m) Annexure- 18 weekly report of conversion details

(n) Annexure- 19 Roles and Responsibilities of Third Party Inspection

agency

(o) Annexure - 20 Format for Test Certificate

(p) Annexure – 21 Roles and responsibilities of RINL In-charge

(q) Annexure- 22 Covering Letter for submission of Tender

(r ) Annexure- 23 Consent for E-payment

(s) Annexure - 24 Check list

3. In consideration of the due performance, execution and completion of the job strictly in terms of this Agreement, the

Company covenants and agrees to pay to the SPU such sum(s) as may become payable to the SPU as the agreed rates as

borne out by the Schedule of Conversion Charges referred to in the Annexure-5,6,7,8,9 of Clause 2 above.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

40

4. The Agreement shall be effective from ………(date) and shall remain in force for a period of three years from the

date for commencement of work as mentioned in the Work Order unless terminated earlier by the Company.

5. No modification of this Contract shall be valid and binding upon the parties hereto unless the same are made in

writing and are signed by the parties and termed as an amendment to the Contract.

6. Failure to enforce any of the terms and conditions contained in this Contract shall not operate as a waiver of the terms

and conditions or be construed as breach thereof.

IN WITNESS WHEREOF the parties hereto have executed these present on the day, month and year above written at……….. . (Name of the place)

_________________ _________________________

Name & Signature of Sr Branch Manager

For and on behalf of For and on behalf of

Wet Leasing Agent Rashtriya Ispat Nigam Limited

WITNESSES WITNESSES

1._______________________ 1.____________________________

________________________ ____________________________

2.______________________ 2 ._____________________________

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

41

ANNEXURE-16

WORK ORDER

To,

M/s._______________

___________________

Dear Sir,

Sub: Our tender Notice No…………………. dtd………………

Ref: i) Your tender No………………..dtd…………

ii) Our letter no. ………dtd………..

(Letter accepting tender)

iii) Your letter No…………….dtd…………

(Letter under cover of which documents indicated in letter accepting tender have been produced by the successful

tenderer).

This has reference to your letter no………….dtd………. under cover of which you have submitted the documents as

indicated in our letter no………………..dtd………. (Letter of Intent) .We are issuing this work order to enable you to

commence the work under the Wet Leasing Contract immediately/ on and from………. (date).

You are advised to submit Bank Guarantee for financial coverage for material as per the Proforma at Annexure-11)

from a scheduled Bank and Custody-cum-Indemnity Bond (Annexure –12) for due performance of all the obligations

under the contract.

Thanking you,

Yours faithfully,

For and on behalf of

RASHTRIYA ISPAT NIGAM LIMITED.

SR BRANCH MANAGER

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

42

Annexure-17

PROFORMA FOR NO-CLAIM CERTIFICATE

To,

The Sr Branch Manager

BSO Ahmedabad

Dear sir,

Sub: No claim certificate

I/WE hereby certify that, except for the unpaid bills mentioned hereunder for work done as per our

Contract No............... dated.......... with you for conversion of RINLs Cast Billets/MSMM Bilelts in to

TMT Rebars and or Structurals , I/WE have no claims against your Company.

Bill no. Date Amount

Further it is to inform that this certificate is issued without prejudice to the pending claims (if any)

against RINL by us.

Date: -----------------------------

(Signature of the Contractor)

Place:

Name of the signatory:

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

43

ANNEXURE – 18

PROFORMA FOR REPORTING WEEKLY STATUS OF CONVERSION

UNDER SPU-CONVERSION

Position as on ……

A) Conversion details and stock

Stock of

Semis

as on beginning

of the

month

(MT)

Semis

received

during the fortnight

(MT)

Size wise

Conversion

done (MT)

Stock of

converted

product held

(MT)

Stock of

semis

in hand (MT)

B) Supply position

D.O. No.

&

Date

Size

Quantity

(MT)

Qty

delivered

during the

week (MT)

D.O.

Balance

(MT)

C) Please remit payment of Rs. _________ (Rupees ___________) towards SPU charge.

Signature with Seal

(Name & Add of SPU)

To

The Branch Manager

Branch Sales Office

Ahmedabad

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

44

ANNEXURE 19

ROLES AND RESPONSIBILITIES OF THE THIRD PARTY INSPECTION AGENCY(TPIA) FOR SPUs

The TPIA will be required to assume full responsibility on behalf of RINL in regard to receipt of

Semis(cast billets/MMSM billets), production, quality and despatch of finished steel at SPU premises related to RINL’s

contract with its Steel Processing Unit (SPU). This would include inspection of raw materials and finished products

through the SPU route as well as of despatch clearance.

Further, they should also ensure that

(1) The finished products converted with RINL embossing under the contract are produced only from the raw

materials supplied to the SPU by RINL for the purpose.

(2) The materials having RINL’s embossing is delivered by the SPU only against delivery orders issued by RINL.

(3) No material rolled by SPU out of raw materials not issued under SPU contract should have RINL embossing.

The TPIA will be required to take all actions that are in the interest of RINL in operation of the

contract with SPU.

The TPIA shall be required to carry out following tasks

1. To certify chemical composition (by witnessing, Testing in Spectrometer/ Stolhor’s apparatus), mechanical

properties(by witnessing Tensile test in UTM, Bend Test, Hardness Test in Brinel/Vickers machine and Fracture

test through Charpy machine) and microstructure pattern of the products rolled based on sample testing, drawn as

per sampling plan detailed below. The inspection will be carried out as per the Quality Assurance Plan drawn and

the TPIA should inspect/ supervise testing accordingly.

2 To certify that the material tested meets the requirements of the ordered specification of RINL on the SPU in all

respect as given in the IS/RINL specification for that grade including tolerances, surface characteristics etc.

3 To certify that proper tracing back of the tested sample has been done up to the raw material stage and they have

been rolled from the raw material supplied by RINL to the Steel Processing Unit.

For the same, the TPIA should witness all operational activities like witnessing receipt of RINL’s raw materials in

SPU’s yard, ensure appropriate marking and stacking of the semis at the designated location, witness cutting (if

carried out) and charging of RINL’s semis in the furnace and subsequent rolling into finished products.

Further, in order to facilitate the tracing back, the TPIA should ensure proper maintenance of the

master log book by the SPU, as may be required, detailing the lot number, size, grade, vehicle number, date of

receipt, TC number of the plant, Heat No., chemical composition as given in the TC, No. of pieces received, results

of visual inspection carried out, check analysis report on chemical composition on the input side and should assign

a unique lot No. per vehicle load.

In case of variations beyond prescribed limit of IS/RINL specification between heat and product analysis of input

material, the chemical composition of input material should be got retested by the third party Inspection Agency

and recorded under his signature. Only if the same are established to be within prescribed limit of IS/ RINL

specification the rolling should be undertaken. Any Semis(Cast billets/MMSM billets) found unsuitable for Rolling

will be sent back to the stockyard under the Joint inspection of TPIA, SPU & Branch Officials.

On the output side, sizes of material rolled, grade, tonnage, date of rolling and results of mechanical and chemical

testing should be entered into against the unique lot No. allotted. When

the material of that inspected lot is despatched from the premises of the SPU the challans No., Test Certificate No.

issued, Vehicle No., and date of despatch and destination should be entered into against the unique lot No. allotted.

The same unique lot No. should also be assigned to the final product. In the master log book, the third party

Inspection Agency should affix his signature with the date of inspection of the lot. This will enable complete

tracing back of the finished material up to the raw material stage.

4. To countersign and certify the test certificate issued by the SPU with their official seal. TPIA should also

ensure that the TC’s issued for the finished products contain the Heat Number, (available from the Test

certificate issued from the plant as corresponding link to the Semis), along with Lot Nos. allotted before

countersigning the TC’s.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

45

5. To also affix their seal on the tag of the product bundle.

6. Submission of report to the Sr Branch Manager on daily basis, listing out the lot numbers inspected and

certified by them detailing the size, grade, tonnage and date of inspection/certification of both input and output

products.

7. The following sampling plan will have to be followed by the TPIA:

a) In case of Reinforcement Bars, one sample per 10 Mt or part thereof should be tested. In case different sizes

are rolled, one sample from each size out of 10 Mt of that size should be tested.

b) In case of Structurals, one sample per 5 Mt on one size should be tested.

8 a) Deployment of TPIA personnel at the premises of SPU on 24 hrs basis is the essence of

the contract.

b)The TPIA shall deploy their employees at SPU’s premises (as the case maybe) from the date of

commencement of work as stipulated in the Work Order.

c) TPIA shall employ for RINL’s work under this contract only those inspectors who have minimum Educational

qualification of a Graduate Degree in science/ Engineering Degree/Diploma, preferably with qualifications &

experience in Testing & inspection.

d) RINL reserves the right to seek replacement of unsuitable inspector. RINL’s decision in this regard shall be

final.

e) Successful tenderers’ representative(s) shall maintain a daily attendance register which will be kept at the SPU premises at all times.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

46

ANNEXURE-20

TEST CERTIFICATE

RINL TMT/ STRUCTURALS

(Name of the SPU)

Steel Processing Unit of RINL for the year

…….

(Address of the Reroller)

(BIS License No.)

REGULAR TEST CERTIFICATE INFORMATION

ISI

MARK

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

47

ANNEXURE-21

ROLES & RESPONSIBILITIES OF STEEL PROCESSING UNIT INCHARGE (RINL)

1. PRIMARY ROLE :

Responsible for overseeing the conversion process through SPU at the location and

Implementation of the SPU agreement.

2. REPORTING/RELATIONSHIP :

Reporting Officer: Concerned Sr B.M

3. FUNCTIONS AND RESPONSIBILITIES:

A Implementation of Terms and Conditions of SPU Contract.

B. Planning of input material, Regular Test Certificate information.

C. Ensuring through close Supervision, Receipt, appraisal, proper Stacking and identification of semis (Cast

Billets/MMSM Billets), Documentation thereof and linkage with test certificates.

D. Production in consultation with RM/Sr BM and SPU.

E. Ensuring sample testing of finished products and record keeping thereof.

F. Ensuring through close supervision, bundling painting, marking/tagging of converted materials.

G. Ensure proper linkage exists between finished & input material through proper documentation and records.

H. Conduct random test checks of finished product samples.

I. Ensuring regular calibration of the weigh-bridge(s) of SPU and maintenance of records of zero error readings.

J. Coordination with concerned branch/stockyard for placement of vehicles.

K. Facilitating delivery of finished goods, through scheduling of vehicles.

L. Drawing schedules for delivery of materials from SPU; i.e to Customers, concerned stockyard and other

Stockyards (if required).

M. Calculating the cost of economics for stock transfer to various stockyards.

N. Facilitate the process of third party inspection.

O. Coordination of activity related to rejection of finished materials.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

48

ANNEXURE-22 COVERING LETTER FOR SUBMISSION OF TENDERS

To,

The Sr Branch Manager

Branch Sales Office, Ahmedabad

Rashtriya Ispat Nigam Limited,

Visakhapatnam Steel Plant

Dear Sir,

Sub: Tender for entering into contract as Steel Processing Unit of Rashtriya Ispat Nigam Limited for Production / Conversion of TMT rebars and or Structurals at Kandla, Gujarat.

1. Subject to the instructions and conditions given in the tender document, terms and conditions of contract and

draft agreement annexed thereto, I/We hereby tender for the contract for working as Steel Processing Unit for

Rashtriya Ispat Nigam Ltd. I/We hereby certify that I/We have examined and am/are familiar with all the

provisions of this tender document and agree to abide by all the terms and conditions laid therein.

2. The following certificates/documents are enclosed:

- My self declaration stating that I have the resources to undertake the SPU Conversion job envisaged in

the tender.

Self Declaration as to whether I have any relative within the meaning of Section 6 read with Schedule 1A of

the Companies Act 1956, employed in any capacity in RINL. This tender document with all pages intact and duly signed by the authorized person.

3. A sum of Rs._______________ (Rupees _____________________) only is forwarded herewith as Earnest

Money in the form of demand draft / PO / Banker's Cheque No._______ drawn on ______________ in favour

of Rashtriya Ispat Nigam ltd payable at ___________.

4. I/We agree to keep this tender open for a period of 120 (One Hundred Twenty) days from the

date fixed for opening and the same cannot be withdrawn from the said period of 120 (One hundred Twenty)

days or until a contract for the said work is fully executed, with a third party, whichever is earlier.

5. I/We do hereby declare that the entries made in the tender document and the annexures /appendices attached

there are true.

Yours faithfully,

Signature of authorised representative of Tenderer

Name of the authorised signatory):

Tenderer's address:

____________________________

_______________________

Telegraphic Address:

Telephone Numbers:

E-Mail Address:

Signature of Witnesses Address of Witnesses

1._____________________________

____________________

2._____________________________

____________________

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

49

Annexure-23

CONSENT FOR E - PAYMENT

From

-------------------------------

-------------------------------

-------------------------------

To

Sr BM,

BSO _________

Sub :Consent for E-Payment

Ref : Contract /WO No :

“ I/We hereby convey our consent that the payment made by RINL/VSP of any sum due to me /us, directly remitting

the same to my /our Bank, the address and the number of which is furnished shall be in full discharge of the particular

bills, raised by me/us and I/We shall not have any claim in respect of the same.

Undertaking:

“I/We hereby undertake that any payment made direct to me/us or to bank account shall be in full discharge of the

obligations of RINL/VSP and I/We shall have no claim whatsoever in respect of the bill for which the payment is

made.”

I/We opt for EFT/Direct Credit (Strikeout whichever is not applicable)

I/We furnish here below the bank account details:

Name of the Bank

Branch Name, place and MICR Code of the Branch

Account Number in full

Type of Account

Name and style of account

For__________________& Company

Authorised Signatory /Proprietor

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

50

Annexure-24

Check ListCheck ListCheck ListCheck List 1. Part-A is submitted in a sealed cover along with following documents

(i). EMD in the form of DD/PO/BG Yes/No

(ii) Cost of tender documents in case of down loading from website Yes/No

2. Part-B is submitted in a sealed cover along with following documents-5 sets

(Original + 4 copies)

(i)Covering Letter duly signed Yes/No

(ii) Tender documents issued by RINL/VSP (or) Tender documents Yes/No

down loaded from VSP’s website duly signed on all pages

3. Other Documents along with Part-B (5 sets -(Original + 4 copies))

(i)Land Documents/Undertaking (a)In case of own land: Copy of title deed in the name of the tenderer Yes/No

(b)In case of Leased Land: Registered Lease Agreement for eight years

along with title deed of the offered land in the name of the lessor/lessors

(ii) PF registration Certificate or an Undertaking to submit the same before Yes/No

Commencement of work

(iii) ESI Registration Certificate (if applicable) or an Undertaking to submit the Yes/No

same before commencement of work

(iv) Notarised Affidavit (Original) Yes/No

(v)Details of the tenderer Yes/No

(a)Copy of partnership deed and proof of registration of the firm for

Partnership firms (b)Copy of Articles and Memorandum of Association for Companies

(vi)Solvency Certificate as per the prescribed format (Original) Yes/No

(vii)List of equipments proposed to be deployed Yes/No

(viii)Copy of Service Tax registration Certificate (if applicable) Yes/No

(ix)Details of the land proposed for the SPU along with dimensional sketch Yes/No

(x) Blank price bid format duly signed on all pages Yes/No

(xi) Integrity Pact format duly signed on all pages Yes/No

4. All the copies being submitted are duly authenticated by notary Yes/No

5. Any other relevant documents submitted Yes/No

6. Part-C (Price bid) is submitted in a separate sealed cover Yes/No

RINL VIGILANCE ���� TOLL FREE NUMBER 1800 425 8878

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

51

Annexure- A

Suggestive Specifications for Minimum72000 TPA New TMT Bar Mill and or Structurals with allied facilities

1 INTRODUCTION

It is proposed to establish new TMT Bar Mill/Structurals Mill with new machineries with annual capacity of Minimum

72000 tpa. The proposed mill shall produce TMT rebars of dia. 6-32 mm in straight lengths and or Structurals from Cast

Billets 150x150 mm /200x200mm / and Rolled Billets of size 90x90mm/75x75mm/65x65mm input billets. It will be a

semi-continuous, cross country type, single strand configuration Mill.

The proposed requirement of land is around 12 acres.

2 TECHNOLOGICAL PARAMETERS

The proposed mill shall have technological parameters as given below:

• Mill Capacity : 72000 tpa

• Working days / year : 307 days

• Working pattern: 3.shifts (8 h)

• Available hours / year : 7368 h

• Mill utilisation : Min 6000 T per month.

• Overall yield : 95%

• Power requirement : 120 kWh/t

• Hot hours / year : 5526 h

• Required rolling rate : 18-20 tph

• Input material : Rolled / Concast billets

• 1500 mm (two rows)

• 3000 mm (single row)

• Finished product: TMT bars in straight lengths dia. 6-32 mm and or /Structurals

3 PROCESS DESCRIPTION

The mill shall have the configuration of single strand rolling. The mill shall have a pusher type reheating furnace of

adequate size to discharge billets at a rate of 20 tph to the mill.

The full length rolled / concast billets shall be received from rail / road transport.

The billets shall be unloaded and stacked in racks in the yard. The billets of full length received shall be cut (gas / shear)

to required length and stacked in cut billet racks. The billet yard shall have adequate space to store purchased billets

stock of 15 days and cut billet stock of 7 days.

The cut billets shall be placed on charging grids by EOT crane, from where they shall be placed on charging roller table

in lots. The charging roller table shall carry the billets in front of furnace pusher. Billets in single row / double row

depending on the size shall be pushed inside the furnace by the furnace pusher.

The heated and soaked billets, one at a time, shall be discharged on the discharge roller from the furnace at 1150- 1250 0C by the ejector. The billet shall be made to fall on the mill approach table by the discharge skid mechanism. The

primary scale generated in the furnace shall get removed from the billet during this process.

The billet shall be taken into the 3 Hi mill stand of the roughing mill train. The billet will undergo multi-pass reduction

with the help of roller tables, tilting table and tilting mechanism. The rolled stock shall then enter the alternate 2 Hi mill

stands of the roughing mill trains and undergo continuous rolling through inter stand connecting repeaters.

The front end of the rolled stock shall be cropped in a crop cum cobble shear before it is taken to the intermediate mill

train by a guide channel and pinch roll.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

52

The rolled stock shall undergo reduction in the alternate 2 Hi stands of this mill train connected by repeaters. The rolled

stock shall then enter the alternate 2 Hi /continuous 2 Hi stands of the finishing mill train for further reduction to

finished size.

The rolled bar shall be quenched in the water cooling tubes of the TMT line. The TMT bars (quenched bars) shall be

taken to the cooling bed after being cut in the dividing shear. The quenched bars shall be normailsed in natural air

during stay in the cooling bed and shall gain the desired metallurgical properties of TMT bar. The cooled TMT bars

shall then be taken in lots by the delivery roller table to the cold shear for cutting into marketable lengths.

The cut TMT bars shall be bundled, tied and stored in the storage bay for dispatch.

4 MAJOR FACILITIES

The proposed mill shall be installed in a total area of about 30,000 to 40,000 m2.

The brief description of the proposed mill shall be as mentioned below:

1) Common facilities

i) Billet yard

ii) Reheating furnace of suitable capacity

iii) Mill trains: • Roughing mill

• Intermediate mill

• Finishing mill

iv) Crop cum cobble shears

v) Cooling train comprising of water cooling boxes, etc.

2) Facilities for line producing TMT bars in straight lengths.

i) Pinch roll

ii) Dividing shear

iii)Cooling bed with roller tables

3) Facilities for storage & handling

4) Arrangement of bulk power supply from state electricity board and for transmission of power

5 DESCRIPTION OF MAJOR FACILITIES

5.1 BILLET YARD

Billets shall be stored in stacks in the billet yard. Two furnace charging grates of suitable size shall be provided

in the billet yard for charging of billets to the reheating furnace by means of charging roller tables. Billets shall

be loaded on charging grates by overhead EOT crane of the billet yard. The charging grates shall have the

facilities of rejecting the billets, if required.

5.2 REHEATING FURNACE

The mill shall have a pusher type of reheating furnace with end charging and side discharging facilities. The

capacity of the furnace shall be suitable to the mill configuration and working pattern of the mill. The billets

shall be heated and soaked upto a rolling temperature about 1250oC. Heated and soaked billets shall be

ejected from the furnace by means of ejector mechanism.

5.3 BILLET FEEDING MECHANISM TO THE MILL TRAIN

The proposed mill shall have a single strand configuration. A draw out pinch roll drive mechanism shall ensure

complete trouble free ejection of billets, from the furnace and feeding to the mill.

5.4 ROUGHING MILL TRAIN

The roughing mill train shall consist of adequate number of mill stands of suitable size. The first stand shall be

a 3 Hi horizontal mill stand and subsequent stands shall be of alternate 2 Hi horizontal configuration. The mill

stands shall be connected by repeaters. The mill stands shall be driven by a common main drive motor of

adequate capacity with suitable gear box and pinion stand.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

53

5.5 INTERMEDIATE MILL TRAIN

The intermediate mill train shall consist of adequate no of 2 Hi horizontal mill stands of suitable size. The mill

stands shall be connected by repeaters. The stands of this mill train shall be driven by a common main drive

motor of adequate capacity with suitable gearbox and pinion stands. The mill train can have provisions of

speed increaser, if required.

5.6 CROP CUM COBBLE SHEAR

The crop-cum-cobble shear shall be provided after roughing mill trains. The crop-cum cobble shear shall cut

the front end and the back end of the rolling stock to ensure smooth entry to the intermediate mill train. The

crop-cum-cobble shear shall be provided with crop removal system.

5.7 FINISHING MILL TRAIN

The finishing mill train shall consist of adequate no. of 2 Hi horizontal mill stands with direct drive of suitable

size. The mill train shall consist of drive motor with reduction gear box cum pinion stands. The intermediate

and finishing mill trains shall be connected by repeaters if required.

5.8 COOLING TRAIN WITH WATER COOLING BOXES

The mill shall have cooling train with water cooling boxes for production of TMT bars.

5.9 FACILITIES FOR LINE PRODUCING TMT BARS IN STRAIGHT LENGTHS

5.9.1 Pinch Roll and Dividing Shear

The rolling stock from cooling train shall be fed to a pinch roll unit with bifurcator and a dividing shear. This

unit shall ensure the proper transportation of cut pieces to the cooing bed.

5.9.2 Cooling Bed with Roller Tables

The cut pieces shall be accommodated on cooling bed of adequate size. The cooling bed shall be provided with

run-out roller table for smooth conveyance of cut pieces to cold shear.

5.10 Cold Shear

The long pieces from cooling bed shall be cut to marketable lengths by this cold shear. The cold shear shall

have measuring gauge, roller tables and the transfer rack with cradles.

5.11 ELECTRICS

5.11.1 HT Power Supply Scheme

The envisaged specific consumption of electricity per tonne of finished products shall be about 120 kW/t. A 11

kV board with incomer panels and adequate no. of outgoing feeders with breakers, metering and protection

shall be located in mill area to cater HT / LT power requirements of entire mill drives.

5.11.2 LT Substation

LT substation to meet the LT power requirement shall be located within mill area with power transformers, LT

boards. Power supply to various MCCs, PDBs for main mill drives and auxiliary drives shall be catered

through the proposed LT boards.

5.11.3 Electric House / Electric Rooms

As per load centres electric houses are required to be located at different locations. Distribution transformers,

HT/LT boards, MCCs, PDBs and other control panels shall be housed in these electric houses.

All electrical rooms for housing electronic panels including operator’s pulpit shall be kept in suitably

controlled environment. LT boards / electrical panels shall be kept in pressurised air ventilated rooms.

5.11.4 Shop Electrics

For fixed speed, and step control, if any, relay logic shall be used with MCCs and motor control panels. The

EOT cranes, welding points and mechanisms with local starters will be fed from power distribution boards

(PDBs).

5.11.5 Illumination

Sufficient illumination shall be provided to electrical houses, pulpits, cable galleries, shop bays, area lighting

and road lighting within the mill complex.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

54

5.11.6 Earthing

Suitable number of electronic and electrical earthing pin shall be provided for earthing of all current carrying

equipment as per IS and IE standards.

5.11.7 Drive Control and Automation

Process control for essential automation and sequence logic controls shall be used for equipment envisaged, if

required depending on the level of automation.

The control shall basically comprise of control of reheating furnace equipment, control of shears, etc. The

modes of control shall be local, local-manual, remote-manual, etc. For operator interface MMIs shall also be installed, if required.

5.11.8 Fire Detection and Alarm System

Automatic fire detection and alarm system shall be provided in control pulpits, Instrumentation rooms,

electrical rooms, computer room, cable gallery, false floors / ceiling, transformer rooms, etc.

5.12 STRUCTURAL WORKS

Structural steel works in the proposed mill shall comprise of all building structures such as columns, gantry

girders, rails, trusses, bracings, posts, walkways, platform, lighting walkways, purlins, side runners, louvers,

access stairs, ladders, handrails, steel doors, gutters, downtake pipes, monorails, etc. CGI sheeting for roof and

side covering shall be as per IS specifications / standards provided by the client.

5.13 CIVIL WORKS

5.13.1 It shall involve the design philosophy, construction materials and other aspects related to civil works for

construction of the proposed mill. All civil erection works shall be carried out as per applicable standards,

drawings, specifications and regulations. The erection tolerances shall be within the standard specified limits.

Seismic loads shall be taken accordingly to IS specification / standards furnished by the client for earthquake

resistance design of structures. Administrative building, shift buildings, boundary wall, main and other gates,

road within works, area drainage, connecting road from highway, water reservoir, tunnels, canteen etc

5.13.2 Free movement of vehicles both inward and outwards shall be ensured.

5.14 GENERAL UTILITIES

5.14.1 Water System

Water shall be required for cooling, cleaning, flushing, fire fighting and other process needs. Direct as well as

indirect water cooling circulation systems shall be required for use at different consumer points in the mill. The

clean industrial water shall be required for indirect cooling purposes such as lubrication / hydraulic systems,

heat exchangers of motor room, air cooler, furnace, etc.

The hot return water from lubrication system / hydraulic systems, air coolers and heat exchanger will be

further used as direct cooling water for various consumers. The water requirement shall be about 300 to 500

m3/h.

5.14.2 Compressed Air Compressed air at a pressure of about 4-8 kg/cm2 shall be required at different consumer points. Depending on

the type of the equipment selected, compressor of suitable size shall be provided.

5.14.3 Air Conditioning and Ventilation

The maximum temperature should not exceed 40oC inside substation, control room & other lubrication /

hydraulic equipment enclosures and 45oC for pressure water station. Fresh, filtered and cooled air shall be

supplied to substations, control rooms, etc. Electrical control room and substation shall be kept pressurised to

prevent any dust entry in the room. Air conditioned premises shall be maintained at a temperature of 25+2oC

and at relative humidity of 55+10 %.

5.14.4 Fire fighting facilities

Suitable and adequate fire fighting facilities shall be provided. Adequate type fire extinguishers shall be

provided for lubrication systems / hydraulic systems and electrical control rooms & substations.

Ref.No.WR/AHD//SPU/13-14/01 Dated 11th June 2013

55

5.15 OTHER FACILITIES

5.15.1 Roll turning & Guide Shop, Workshops

A guide and roll shop shall be located at suitable location to cater to the daily rolling and various maintenance

and operation needs. The work shops shall be equipped with adequate number of machines like lathes, surface

grinders. Welding transformers, gas cutting equipment, etc

5.15.2 Transfer cars (if required)

5.15.3 EOT Cranes The mill shall have adequate no. of EOT cranes in all the bays to ensure proper handling of materials.

5.15.3 Hydraulic and lubrication systems, Weigh bridge

5.15.5 Industrial water & drinking water system, rain water harvesting

5.15.6 Pollution control measures for air, water, ground and noise

5.15.7 Telecommunication facilities and Instrumentation

-----0------