S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
SH-1 Earth work
1 1.1
Earth work in excavation over areas(Exceeding 30cm in depth ,1.5 mtrs in
width as well as 10 sqmt on plan ) incl.
disposal of excavated earth ,and lift upto
1.5 mtrs , disposed earth to be leveled
and neatly dressed with in a lead of 50
mtrs in
993.32 M3 55.00 54632.60
2 1.2a
Pumping out water accumulated due to
broken water main drain or the like and
due to spring tidal or rivers seepage.
382.04 KL 22.00 8404.88
1.50 Anti Termite Treatement
Below PCC 120.00 m2 30.00 3600.00
Around plinth walls and below floor 242.53 m2 30.00 7275.90
3 1.3
Filling availale excavated earth in
trenches all around foundations etc. and
under floors, lead up to 50 mtrs and lift
upto 1.5 mtrs, in layers not exceeding 20
cm in depth, consolidating eachdeposited layer by ramming and
watering.
761.00 m3 47.00 35767.00
4 1.4
supply and filling of excavated earth for
filling including ramming watering and
conolodating in layers (incl. carriage from
available source).
456.37 m3 150.00 68455.50
5 1.6
Supply, filling of sand under floors incl.
ramming and watering including
consolidation.
21.31 m3 210.00 4475.10
SH-2 CONCRETE WORK
6 2.1
Providing and laying in position cement
concrete of 1:4:8 nominal mix. (1 Cement
: 4 Coarse Sand : 8 graded crushed
stone agg. Of 40mm nominal size)
excluding cost of centering and
shuttering all work upto plinth level.
2.88 m3 1450.00 4176.00
7 2.2
Providing and laying in position cement
concrete of 1:5:10 nominal mix. (1
Cement : 5 Coarse Sand : 10 gradedcrushed stone agg. Of 40mm nominal
size) excluding cost of centering and
shuttering all work for PCC bed concrete.
49.50 m3 1300.00 64350.00
Providing and laying in position cement
concrete of 1:5:10 nominal mix (1
Sub-contract
JAGTI (JAMMU) PROJECT- BILL OF QUANTITIES
8/13/2019 Rate Analysis and BOQ
2/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
9 2.4
Providing and laying Damp Proof course
40mm thk with cement concrete 1: 2 :4
grade (1 Cement : 2 Coarse Sand : 4
graded crushed stone agg.) of nominal
size 12.5mm
56.55 m2 120.00 6786.00
10 2.5
Providing and laying bitumen of
penetration 80/100 of approved quality
(@1.70Kg/Sqm) on DPC and binding
with sand incl. cleaning the surface with
brushes and kerosene soaked cloth.
56.55 m2 61.00 3449.55
11 2.6
Filling with sunken floor of Toilets etc.
with cinder incl. necessary compaction as
directed with all lead and lift for all f loors.
19.51 m3 450.00 8779.50
12 2.7
Providing and laying water proofing
treatment to vertical and horizontal
surface of depressed portion W/C and
the like consisting of :
94.28 m2 235.00 22155.80
13 2.8
Cast in situ plum concrete work of
nominal mix concrete 1:4:8 grade (1
Cement : 4 Coarse sand : 8 graded
crushed stone agg. Of 20mm nominal
size aggregates), volumetric batching
using plums (Size over 160mm split
nallah stone or quarry stones) @ 20% of
gr
32.94 m3 1350.00 44469.00
14 2.9
Providing and laying of Cement Concrete
1:3:6 (1 Cement : 3 coarse sand : 6
crushed stone agg. Of 20mm nominal
size) excluding the cost of form work
using plums (Size over 160mm split
nallah stones or quarry stone @20%ofgross volume) including cost of st
32.94 m3 1600.00 52704.00
15 2.10
Cast in situ concrete work of nominal mix
1:2:4 (1 Cement : 2 Coarse Sand : 4
graded crushed stone agg. Of 20mm
nominal size) including curing but
excluding cost of form work plinth
protection alround building.
14.07 m3 2180.00 30672.60
SH-3 R.C.C WORK
16 3.1
Providing and laying in position machinebatched, machine mixed and machine
vibrated Design mix Cement concrete of
specified grade for reinforced Cement
concrete structural elements, excluding
the cost of centering Shuttering
8/13/2019 Rate Analysis and BOQ
3/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
20 3.3 Roof beam lv1,2,3&mummty 82.58 m3 2750.00 227095.00
22 3.4 Above plinth beam RCC work in columns 66.42 m3 2750.00 182655.00
26 3.5 Stair case lv1,2&3 8.31 m3 2800.00 23268.00
29 3.6 In Chajjas 3.02 m3 2750.00 8305.00
FORM WORK:
30 3.7 PCC 9.23 m2 88.00 812.24
31 Coloumns and footing 199.56 m2 88.00 17561.28
32 3.8 Pedastals&columns upto L3 856.99 m2 89.00 76272.11
37 3.9 beams up to L3 1071.22 m2 89.00 95338.58
41 3.10 slabs including Stair case up to L3 1027.16 m2 89.00 91417.24
45 3.11
Form work to sides and soffits of arches
(span up to 6 mtrs) for in-situ concrete
work (upto level -V)
59.00 m2 89.00 5251.00
46 3.12 Edges of slab L1 to L3 633.81 rm 13.00 8239.53
REINFORCEMENT:
3.13
Providing, assembling and placing high
strength (TMT) deformed bars, Fe - 415
grade (confirming to IS: 1786 - 1985) forRCC work, including cost of binding
wires for all floors.
61386.12 kgs 36.00 2209900.32
50 4.1.a BRICK WORK (1:6)
51pb top to dpc level in CM(1:6) 80.31 m3 2033.00 163270.23
52 4.1.b supper structure CM (1:6) 276.17 m3 2033.00 561453.61
53 4.2 Half Br. Masonry in CM(1:4) 614.20 m2 277.00 170133.40
SH-7 FLOORING:
5440mm thick marble chips(Makrana)
8/13/2019 Rate Analysis and BOQ
4/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
56
7.3
Providing and fixing glass strips in joints
of Terrazo/cement concrete floors of
nominal size of 40 mm wide and 4 mm
thick in flooring.
1449.60 rm 15.00 21744.00
57
7.4
Providing 40mm thk flooring in 1:2:4 Max
size of crushed stone aggregate 20mm
nominal finished with a flaoting coat of
neat cement
710.98 m2 170.00 120866.60
58 7.5
Providing 21mm thk cement plaster
skirting upto 30cm height with cment
mortar 1:3 (1 Cemwnt :3 Coarse Sand )
Finish With a floating Coat of neat
cement
55.44 m2 100.00 5544.00
59 7.6 Providing KOTA Stone in Kitchen counterover 20mm average thkl base (1:5:10)
59.04 m2 467.00 27571.68
60 7.7
P & F 1st Quality Ceramic Glased tile th
5mm of approve(Khajaria/Orient/Bell/
Johnson) with 12mm thk bed concrete
314.64 m2 448.00 140958.72
SH-8ROOFING WATER PROOFING &
INSULATION
61 8.1
Providing and laying 4 layers coarse
water proofing treatment with bitumin felt
over roofs bitumin 85/25 or 90/15
299.59 m2 207.00 62015.13
62 8.2
P & Laying 100mm thk mud puska or
damped brick earth on roof laid considate
and plastered with 25mm thk mud mortar
mixed with busha@35kg/cum including
Brick Tiles in gruted in ceval material
299.59 m2 235.00 70403.65
63 8.3
Provisind Gola 75X75mm cement
concrete M-15 grade of 20mm nominal
size with a dose of 100ml CICO super in
the ration 1 cement:4 sand:100mm CICO
268.48 rm 56.00 15034.88
64 8.4
Making Khurras 450 X 450mm with an
average minimum thk of 50mm cement
concrete M-15over PVC Sheet
8.00 nos 112.00 896.00
SH-9 FINISHING:
65 9.1
18mm thk cement plaster in two coats
12mm thk(1:5) and 6mm thk for parapet
wall
179.75 m2 85.00 15278.75
66 9.2
15mm thick cement palster 1 cement:6
coarse sand on rough side of single/ half 1965.89 m2 64.00 125816.96
8/13/2019 Rate Analysis and BOQ
5/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
71 9.7
Finishing new works with two (or more)
coats of cement based paints of specified
shade of (Supper plus,Super ex,
Snowsum) for exterior to an even shade.
1942.00 m2 24.50 47579.00
72 9.8
Painting to new metalic surfaces with 2
coats synthetic enamel of nerolac or ICI
paints primimh and preparation of
surfaces but including cost of sand
574.56 m2 29.00 16662.24
73 9.9
Applying prime coat on new wooden /
wood based surfaces with new white
primer of nerolac enamel or ICI Paints
1081.31 m2 22.50 24329.48
74 9.10 Painting to new Wood and new woodbased surfaces with 2 coats of synthetic
enmel of nerolac ICI paints
1135.75 m2 29.00 32936.75
SH-10 MISCELLANEOUS:
75 10.1
p & f Palin grills of specified design ,ade
of MS square bars in windows
/ventilators/ stair railingsincl incl .welding
with flat iron frame and finished smooth
with a primer coat of red oxide metallic
primer
1500.00 kgs 64.00 96000.00
76 10.2
Making Plith protection 50mm thk of CC
1:3:6 (1 Cement :3 Coarse Sand :6
Graded crushed stone agg of 20mm
nomial size )over 75 mm bed of dry brick
ballest 40mm nomial size well rammed
and consolidated and grouted with fine
sand incl finishing
637.00 m2 244.00 155428.00
77 10.3Supplying & Fixing of MS Pipe 50mm
dia in staircases and Balconies(Railing)
637.00 m2 73.00 46501.00
78 10.4
Brick tile coping 80mm th ick 1 cement ,3
coarse sand mortar with first class 100 A
brick tiles (Laid in specfied design) with
plastering 1:3 mix (1 cement :6 sand )as
per perspective view
842.70 m2 260.00 219102.00
79 10.5
Providing and fixing duly welded and built
up section of structural steel for O.T.S
portion and nosing of steps.
7.50 kgs 73.00 547.50
80 10.60
P & F Poly Corbonate Corrugated sheet
having depth 17mm and overall width
1070mm manufactured by VMI plastics
(for roofing)
22.59 m2 1038.00 23448.42
8/13/2019 Rate Analysis and BOQ
6/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
82 5.2
Providing and fixing 3.00 mm thick glass
panes (Modi / Ashai Float/ Saint Gobain)
for fixing in the ventilators/ windows to be
fixed with putty (of Eagle make) & glazing
pins for fixed glazing.
1.26 m2 336.00 423.36
83 5.3
Providing and fixing glazed shutters for
windows/ventilators of 1st class deodar
wood using 10kg / sqm. (4mm thick)
glass panes Modi / Asahi Float / Saint
Gobain with necessary screws 35mm
thick (excluding cost of aluminium fittings
and hinges).
130.46 m2 1447.00 188775.62
84 5.4
Providing and fixing 35mm thick wire
gauze shutters of 1st class deodar wood
termite treated and kiln seasoned wood
85G (wire dia 0.56 mm) wire gauge (12
mesh to an inch) complete but excluding
cost of hinges and Aluminium fittings.
164.32 m2 1012.00 166291.84
85 5.11
Providing and fixing 35 mm FRP flush
door shutter (manufactured by RR prefab
industry)Rajshree and should be water
proof, fire proof,termite resistant andwashable fixed frame of angle i ron
50X50x5mm with all necessary
accessories/fittings, all as specifi
31.92 m2 2188.00 69840.96
SH-6 METAL WORK 0.00
86 6.1
Providing and fixing pressed steel door
frames incl. horizontal member (made of
1.25mm thick sheet) 80*90 mm nominal
section single rebate (of specified width)to door frames, incl. cost of f ixed M.S.
Butt hinges and provision for tower bolts,
aldrops, mo
373.92 rm 174.00 65062.08
87 6.2
Providing and fixing pressed Door /
Window / Ventilator frames including
boxed member (made of 1.25mm thick
sheet) 80*125 mm size double rebate (of
specified width) to frames incl. cost of
fixed M.S. Butt hinges and provision of
stay hooks, T-bolts and fl
1052.80 rm 196.00 206348.80
Fittings to doors and windows:
88 5 5Providing and fixing of tower bolts with
8/13/2019 Rate Analysis and BOQ
7/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
96 5.10Providing and fixing of door and windows
handles
97 a 100 mm 490.00 nos 32.00 15680.00
98 b 125 mm 102.00 nos 39.00 3978.00
99 5.12 Providing and fixing of Mild steel hooks 280.00 nos 28.00 7840.00
100 5.13Providing and fixing of Helical door
spring48.00 nos 258.00 12384.00
Civil works Sub-total 7,810,676.96
ELECTRIFICATION ITEMS
1
Points wiring for one light
point/fan/point/call bell point with
1.5sqmm,PVC Insulated copper
conductor wire (of
Finolex/Shalimar/Grandlay make) laid in
high density PVCconductor of 25mm dia
(2mm thick for ceiling,1.5mm in
walls),(High Power make), conce
101 a)One light/fan/bell push point controlledby one 5/6 amp one way switch 213 nos 325.00 69225.00
105b) Twin control light pointwith 2 No. two
way 5/6 Amps switch5 nos 336.00 1680.00
106 2
Providing circuit wiring from switch
fuse/DB to switch board using
2x2.5sqmm along with 1x1.5sqmm PVC
insulated copper conductor wire (of
Finolex/Shalimar/Grandlay make) in high
density PVC conduit (High Power make),
(2mm thick for celing 1.5 mm in wals)
950 rm 84.00 79800.00
107 3
Wiring for power socket outlet with
2x4.0sqmm PVC insulated copper
conductor wire (of
Finolex/Shalimar/Grandlay make) in high
density PVC conduit, (25mm dia 2mm
thick) (High Power make) concealed in
walls/ceiling with all accessories as
required, with 1
750.00 rm 95.00 71250.00
108 4
Wiring with 2x6.0sqmm along with 1x4.0
sqmm PVC insulated copper conductor
wire (of Finolex/Shalimar/Grandlay make)
in high density PVC Conduit, (40mm dia
2 thi k) (Hi h P k )
100 rm 179.00 17900.00
8/13/2019 Rate Analysis and BOQ
8/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
110 6
Flush button type socket outlet,6 pin
Multipurpose type with one switch 1516
amps on and includeing MS/GI Boxes of
suitable size with 3.0mm laminated
sheet, sunken flush along withwall, ofAnchor/S.S.K/Bajaj make and labour
complete all as specified.
96 nos 157.00 15072.00
111 7
Wall bracket, made out of CRCAsheet
steel 18 SWG and 15mm squire tubing
canopy 65mm dia, 18mm deep, 20SWG
sheet, stove painted with heat resistant
glass fixed with accessories of Anchore
make EG. Lamp holder, incandescent
lam wiring , connector etc.
48 nos 112.00 5376.00
112 8
Fluorescent Tube fitting Rail ( Patti) type
complete with polyester
(Philips/Crompton Greves/ Bajaj make)
ballast, capactor, rotary lamp holder,
started holder, starter connector blocks,
fluorescent tubes rod, all accessories of
above make pre wired, 1x4
48 nos 252.00 12096.00
113 9
Celing Rose bakelite 65x50mm of
(Anchor/S.S.S.K/ Bajaj make) 3 terminalsupplied and fixing in complete all as
specified Economical range.
48 nos 17.00 816.00
114 10
Lamp holder bakelite body of
Anchor/S.S.S.K/ Bajaj suitable for batten
fitting straight or angle faced as required
Material and Labour complete all as
specified.
87 nos 22.00 1914.00
115 11
CI/MS box (not less than 16 SWG sheet)fixed in lintel , slab , recessed, 75mm dia,
including mild steel hook made to sharp
the accommodate ceiling fan ( Gupta
make ) with material and labour complete
all as s ecified excludin cost of fan .
48 nos 44.50 2136.00
116 12
Supply installation Testing Distributed
Board SPN 220/230 Volt, comprising
MCB SPN 20 Amps, one No. as
incomming MCB 6 Amps 2 Nos. 10
Amps 2 Nos. as outgoing with bus bar
enclosed in shet metal box, (of Standard,
Indo Asian / L&T make) matrial and
Labour
24 nos 1290.00 30960.00
supply and fixing of Distribution board,
8/13/2019 Rate Analysis and BOQ
9/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
119 15
Earthing complete with Copper Earthing
Plate Electrode 600x6.3mm buried
directly in ground to a depth not less than
2.25mm below ground level, connected
to 25x5mm GI stip, including charcoal,common salt, necessary earthwork,
providing funnel, with wire m
2 nos 5610.00 11220.00
120 16
Supply and fixing Aluminum Strip
25x3mm, completely connected from
Earth link to equipment.
20 nos 56.00 1120.00
121 17Supply and fixing Bell/ Buzzer of
Anchor/S.S.K/Bajaj make.24.00 nos 56.00 1344.00
Labour charges for electrical works. 1.00 42802.04 42802.04
Electrical works Sub-total 520,876.04
PLUMBING WORKS
122 1.1
Providing, laying and jointing PVC pippe
of 3/6mtr. Length Type-B (ISI:3592-1992)
(Supreme or Finolex make) of the
following internal diameters includingtesting of pipes and joints complete
(including earth cutting Wherever
required).
a) 150mm dia 20.00 rm 341.00 6820.00
123 1.2
Providing and laying cement concrete
1:5:10 (1 cement, 5 coarse sand, 10
graded stone aggregates 40mm nominal
size) bedding and all round for PVC
pipes of the following internal diameternecessary from work and curing
complete.
a) 150mm 20.00 rm 146.00 2920.00
124 1.3
Providing laying and jointing with a stiff
mixture of cement mortar in proportion
1:1 (1 cement: 1 fine sand) salt glazed
stone ware pipes grade 'A' of the
following internal diameter including
testing of pipes and joints complete.
a) 150mm dia 40.00 rm 146.00 5840.00
Providing and laying cement concrete
1:5:10 (1 cement, 5 coarse sand, 10
EXTERNAL DRAINAGE/SEWERAGE
8/13/2019 Rate Analysis and BOQ
10/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
a) 100x100mm size with FPS bricks. 12.00 no 527.00 6324.00
127 1.6
constructing P- type manhole with RCC
top slab in 1:2:4 mix (1 cement: 2 coarse
sand :4 graded stone crushed
aggregates 20mm nominal size)foundation concrete 1:4:8 mix (
1cement:4 coarse sand 8 crushed stone
aggregates 40mm nominal size) inside
plasterin
128
a) With 230mm tick walls of brick
masonry using bricks of class
designation 75 in cement mortar 1:3 (1
cement, 3 coarse sand ) of size 450mm x
450mm.
16.00 3130.00 50080.00
129
b) With 115mm thick walls of brick
masonry using bricks of class
designation 75 in cement mortar 1:3 (1
cement,3 Coarse sand) of size 450mm x
450mm.
4.00 2244.00 8976.00
2SOIL,WASTE AND VENT PIPE
PLUMBING WORKS
2.1
Providing and fixing sand cast iron
spigot and socket soil waste ,Rain water
and ventilating pipes (Bengal Iron
Foundry make/equivalent) of the
following nominal size (Lead caulked
joints to be measured and paid for
separately)
130 a) 75mm dia 75.00 562.00 42150.00
131 b) 100mm dia 300.00 658.00 197400.00
2.2
Providing and fixing M.S holder clamps
including steel bolts to sand cast /cast
(spun) iron pipes of the following nominal
diameters size embedded in and
including cement concrete block 100mm
x100mm x 100mm of 1:2:4 mix (1
cement, 2 coarse sand agg., 4
132 a) 100mm dia 190.00 51.00 9690.00
2.3
Exter over item 2.1 for providing and
fixing sand cast iron fitting andaccessories (Bengal Iron Foundry
make/equivalent).
133 a) Plain bends:
8/13/2019 Rate Analysis and BOQ
11/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
138 i) 100mm x 75mm nominal size 48.00 421.00 20208.00
139 d) Door bends
140 i) 100mm nominal size 16.00 298.00 4768.00
2.4 Providing and fixing:
141a) Cast iron cowl (Bengal Iron Foundry/
equivalent) of the following diameter
142 i) 100mm nominal size 24.00 220.00 5280.00
2.5
Providing lead caulked joints to sand
iron /cast (spun) iron soil waste and
ventilating pipes and fitings of following
nominal size / diameter including testing
of joints:
143 i) 100mm nominal size 350.00 68.00 23800.00
144 ii)75mm nominal size 120.00 60.00 7200.00
2.6
Proivding and fixing cast iron trap of self
cleaning design with C.P. screwed
dowmn or hinged with or withoutvent,arm complete, including cost of
cutting and making good and Walls and
floors (floor Trap).
145 i) 75mm dia 72.00 382.00 27504.00
146 ii)100mm dia
147 2.7Providing and fixing Waste Coupling of
35mm dia (CP).24.00 169.00 4056.00
148 2.8Providing and fixing Waste Water pipe
of 32mm dia (PVC).24.00 51.00 1224.00
2.9
Painting heavy cast iron soil, Waste vent
pipe , rain water pipe and fittings With
paint of color such as chocolate, grey or
buff etc. Over a coat of primer for new
Work.
149 a) 100mm dia pipe 279.00 28.00 7812.00
150 b) 75mm dia pipe
Providing and laying cement concrete
1:2:4 mix (1 cement 2 coarse sand 4
8/13/2019 Rate Analysis and BOQ
12/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
3.1
Providing and fxing Wall,ceiling and floor
galvanized mild steel tubes (medium
grade of Prakash Surya/Jindal/Tata
make) of the following nominal bore ,
tube fitting and clamps (of ship/ unique/sun /heavy pipe fittings) including making
good the wall , c
153 a) 15mm dia ( Concealed) 500.00 89.00 44500.00
154 b) 25mm dia (Exposed) 311.00 166.00 51626.00
C) 40mm dia (Exposed) 100.00 252.00 25200.00
155 3.2
Making connections of G.I distributionbranch with galvanized mild steel main
25mm to 40mm nominal bore by
providing and fixing the Tee including
cutting and threading the pipes complete.
48.00 no 36.00 1728.00
3.3
Painting GI pipes and Fitting with white
paint over a ready mix primer coat, both
of approved quality for new work.
156 a) 15mm dia 500.00 rm 16.00 8000.00
157 b) 25mm dia 311.00 rm 17.00 5287.00
158 c) 40mm dia 100.00 rm 17.00 1700.00
3.4
Providing and fixing brass full way valve
of Type Class-I (Fly Wheel) of Neva
make or Zoloto make the following
nominal bore wheel:
159 a) 15mm dia
160 b) 25mm dia 4.00 no 365.00 1460.00
161 c) 40mm dia 16.00 no 561.00 8976.00
3.5
Providing and fiximg PVC water tanks
with lockable covers of (Sintex make)
including connections of inlet/ outlet,
overflow and clearing pipes , capacity of
tanks tobe measured (1500 liter capacity)
of ISI make; Double layer.
16.00 no 8415.00 134640.00162 3.6 100 mm dia., steel jalli 48.00 no 23.00 1104.00
163 3.7 C.I Manhole cover 16.00 no 1908.00 30528.00
4 SANITARY FIXTURES
8/13/2019 Rate Analysis and BOQ
13/37
S.NO DESCRIPTION OF ITEM Qty. UNIT
Rate Amount
Sub-contract
165 4.2
Providing and fixing white glazed vitreous
China wash basins
(parryware/Hindware/Cera make ) with
C.P. waste coupling , 32mm and sealing
of joints between wash basins and wallaround the wash basin with white cement
of matching color all complete includ
24.00 no 1040.00 24960.00
4.3
Providing and fixing C.P. brass bib taps
of double 'O' ring system with Copper
Platting Before nickle and crome platting
of make Jaquare Queen/Plumber
Nectar/Nova with P Cup.
166 i) Long Nose Bib Cock 24.00 no 637.00 15288.00
167 ii) Short Body Bib Cock. 24.00 no 388.00 9312.00
168 iii) Long Body Bib Cock 72.00 no 432.00 31104.00
4.4
Providing and fixing 15mm Cp brass
angle valve of double 'O' ring system with
Copper Platting Before nickle and crome
platting with CP Cup of make Jaquare
Queen/Plumber Nectar/Nova with CP.
brass connection pipe nuts,washers and
CP brass flange complete
169 i) 15mm dia 96.00 no 397.00 38112.00
170 4.5
Providing and fixing concealed stop cock
of double 'o' ring system with Copper
plating before nickle and crome plating
(of make Jaquare Queen/ Plumber
Nectar/nova with CP cup of 15mm
nominal bore.
48.00 no 490.00 23520.00
171 4.6
Providing and fixing C.P. brass shower
with arm with CP Cup of make jaquar
Queen/Plumber Nectar/Nova 230mm
long.
24.00 no 393.00 9432.00
172 4.7Providing and fixing CP connection pipe
with unions of 450mm length.48.00 no 90.00 4320.00
173
Labour charges for Plumbing , sanitary
and water supply excluding extern al
drianage system.
1.00 45000.00 45000.00
Plumbing Works-Sub total 1,028,447.00
Grand total Contract amountSub-
contract 9,360,000.00
8/13/2019 Rate Analysis and BOQ
14/37
Rate Amount Metal Sand Cement/limestone/Marble/Bric
kEarth
Miscellane
ousFormwork Steel
1 2 3 4 5 6 7 8 9 10 11 12
SH-1 Earth work
1 1.1 Earthwork excavation for footings 868.78 M3 110.00 95565.25 868.78
2 1.2 Earth work in surface excavation .100 Sqm 15.00 0.00
0.00
1.2aBailing out of water during PCC,
footings.0.00 KL 50.00 0.00 0.00
1.50 Anti Termite Treatement 348.30 m2 76.00 26470.80 152.38
3 1.3 Back filling upto G.L 636.47 m3 43.00 27368.38 636.47
4 1.4 Back filling upto DPC level. 92.76 m3 320.00 29682.22 92.76
1.4 Back filling with excavated earth 218.15 m3 43.00 9380.36 218.15
5 1.6 Sand filling under floors 0.00 m3 280.00 0.00 0.00
SH-2 CONCRETE WORK
6 2.1
PCC(1:4:8) using 40mm upto
Plinth beam. m3 2776.00 0.00 0.00 0.00 0.00
7 2.2PCC(1:5:10) using 40 mm under
footings and floors.77.17 m3 2435.00 187916.37 69.46 38.20 204.51
8 2.3PCC(1:4:8) using brick bats under
floors.45.83 m3 2555.00 117104.61 41.25 22.69 151.71
9 2.4DPC Course PCC(1:2:4) using 20
mm42.46 m2 296.00 12568.16 1.53 0.84 11.24
10 2.5B.T coat using 80/100 B.T over
DPC Course.42.46 m2 115.00 4882.90 96.00
11 2.6Filling with sunken floor of Toilets
etc. with cinder material.24.70 m3 833.00 20575.10 24.70
12 2.7
Water proofing treatment to
vertical and horizontal surface of
depressed portion W/C .
131.24 m2 385.00 50527.57 131.24
13 2.8Plum concrete PCC (1:4:8) for
balcony10.00 m3 2683.00 26830.00 7.20 3.17 33.20 2.00
Plum concrete PCC (1:3:6) for
S.NO
Material
DESCRIPTION OF ITEM Qty. UNIT
Contract
8/13/2019 Rate Analysis and BOQ
15/37
Rate Amount Metal Sand Cement/limestone/Marble/Bric
kEarth
Miscellane
ousFormwork Steel
S.NO
Material
DESCRIPTION OF ITEM Qty. UNIT
Contract
ornamental brick work 41/2" 168.80 m2 422.00 71234.44 5.24 36.88 9706.12
SH-7 FLOORING:54
7.140 mm thick Marble chips
(Makrana) flooring.208.50 m2 420.00 87570.00 5.37 2.69 86.74 3919.00
55
7.2Marble chips skirting riser or dedo
(up to 30cm height) .102.44 m2 441.00 45176.04 1.23 22.02 921.96
56
7.3Glass strips in joints of
Terrazo/cement concrete floors.1449.60 rm 24.00 34790.40 1449.60
57
7.440mm th. flooring in CC( 1:2:4)
with a flaoting coat of neat cement.710.98 m2 300.00 213294.00 26.16 13.08 244.90
58 7.521mm th. plaster skirting upto
30cm height with CM(1:3) .55.44 m2 191.00 10589.04 1.16 13.64
59 7.6Providing KOTA Stone in Kitchen
counter.59.04 m2 904.00 53372.16 1.09 0.54 3.13 70.85
60 7.7Ceramic Glased tile 5mm
thickness.314.64 m2 724.00 227799.36 3.47 1.74 31.46 314.64
SH-8ROOFING WATER PROOFING &
INSULATION
61 8.1
Water proofing treatment with
bitumin felt over roofs ( bitumin
85/25 or 90/15 )
299.59 m2 282.00 84484.38 1797.54
62 8.2100mm thick mud puska over roof
slab .299.59 m2 350.00 104856.50
63 8.3Gola 75X75mm with M-15 (1:2:4)
concrete .268.48 rm 87.00 23357.76
64 8.4
Khurras 450 X 450mm with th. of
50mm cement concrete M-15over
PVC Sheet.
8.00 nos 241.00 1928.00
SH-9 FINISHING:
65 9.118mm thk cement plaster in two
coats .454.83 m2 205.00 93240.15 8.19 56.22 0.09
8/13/2019 Rate Analysis and BOQ
16/37
Rate Amount Metal Sand Cement/limestone/Marble/Bric
kEarth
Miscellane
ousFormwork Steel
S.NO
Material
DESCRIPTION OF ITEM Qty. UNIT
Contract
81 5.1Flush door shutters of 35 mm
thick.using 3 mm ply on both sides.
175.31 m2 1800.00 315549.00 175.305
82 5.23.00 mm thick glass panes for
fixing in the ventilators/ windows .90.00 m2 571.00 51390.00 90.000
83 5.3
glazed shutters for
windows/ventilators of 1st class
deodar wood using 10kg / sqm.
(4mm thick) glass panes .
130.46 m2 2250.00 293535.00 130.460
84 5.4
35mm thick wire gauze shutters of1st class deodar wood termite
treated and kiln seasoned wood
85G (wire dia 0.56 mm) wire gauge
(12 mesh to an inch)
165.06 m2 1389.00 229264.17 165.057
85 5.11
35 mm FRP flush door shutter with
fixed frame of angle iron
50X50x5mm .
31.92 m2 2787.00 88961.04 31.92
SH-6 METAL WORK
86 6.1 Pressed steel door frames. 359.04 rm 400.00 143616.00 359.040
87 6.2Pressed Door / Window /
Ventilator frames.1046.50 rm 400.00 418600.00 1046.500
Fittings to doors and
windows:
88 5.5Tower bolts with necessary screws
aluminium fittings
89 a 150 mm x 10 mm 980.00 nos 51.00 49980.00 980.000
90 b 225 mm x 10 mm 352.00 nos 73.00 25696.00 352.00
91 5.6Sliding door bolts with necessary
screws
92 300 x 16 mm 24.00 nos 102.00 2448.00 24.000
93 5.7 Lock-in-bolts for doors 50.00 nos 60.00 3000.00 50.00
94 5.8 Door rubber buffer 124.00 nos 25.00 3100.00 124.00
95 5.9 Door stoppers 124.00 nos 29.00 3596.00 124.00
96 5.10 Door and windows handles
97 a 100 mm 490.00 nos 49.00 24010.00 490.00
8/13/2019 Rate Analysis and BOQ
17/37
Rate Amount Metal Sand Cement/limestone/Marble/Bric
kEarth
Miscellane
ousFormwork Steel
S.NO
Material
DESCRIPTION OF ITEM Qty. UNIT
Contract
119 15Earthing complete with Copper
Earthing Plate .2.00 nos 11156.00 22312.00 2.000
120 16
Aluminum Strip 25x3mm,
completely connected from Earth
link to equipment.
20.00 nos 297.00 5940.00 20.000
121 17 Bell/ Buzzer 24.00 nos 89.00 2136.00 24.000
Labour charges for electrical
works.
Sub-total
PLUMBING WORKS
122 1.1 PVC pipes
a) 150mm dia 19.80 rm 510.00 10098.00 19.8
123 1.2PCC (1:5:10) bed alround the pipe
.
a) 150mm 19.80 rm 271.00 5365.80 19.8
124 1.3salt glazed stone ware pipes grade
'A'
a) 150mm dia 40.00 rm 177.00 7080.00 40
125 1.4PCC (1:5:10) bed alround the pipe
.
a) 150mm 40.00 rm 271.00 10840.00 40
126 1.5
Square mouth S.W gully trap
grade 'A' with brick masonry
chamber and C.I cover.
a) 100x100mm size with FPS
bricks.12.00 no 945.00 11340.00 12
127 1.6P- type manhole with RCC(1:2:4)
top slab
128 a) With 230mm tick walls of brickmasonry of size 450mm x 450mm. 16.00 4429.00 70864.00 16
129b) With 115mm thick walls of brick
masonry) of size 450mm x 450mm.4.00 4116.00 16464.00 4
EXTERNAL DRAINAGE/SEWERAGE
8/13/2019 Rate Analysis and BOQ
18/37
Rate Amount Metal Sand Cement/limestone/Marble/Bric
kEarth
Miscellane
ousFormwork Stee
S.NO
Material
DESCRIPTION OF ITEM Qty. UNIT
Contract
149 a) 100mm dia pipe 279.00 35.00 9765.00 279
150 b) 75mm dia pipe
2.10Bed concrete 1:2:4 mix 75mm thick
all round pipe
151 a) 75mm and 75.00 276.00 20700.00 75
152 b) 150mm 30.00 394.00 11820.00 30
3 WATER SUPPLY
3.1 Galvanized mild steel tubes
153 a) 15mm dia ( Concealed) 556.08 246.00 136795.68 556.08
154 b) 25mm dia (Exposed) 311.00 314.00 97654.00 311
C) 40mm dia (Exposed) 100.00 396.00 39600.00 100
155 3.2 G.I distribution branch 48.00 no 248.00 11904.00 48
3.3Painting GI pipes and Fitting with
white paint
156 a) 15mm dia 500.00 rm 8.00 4000.00 500
157 b) 25mm dia 311.00 rm 10.00 3110.00 311
158 c) 40mm dia 100.00 rm 14.00 1400.00 100
3.4 brass full way valve of Type
159 a) 15mm dia
160 b) 25mm dia 16.00 no 518.00 8288.00 16
161 c) 40mm dia 4.00 no 598.00 2392.00 4
3.5
PVC water tanks with lockable
covers of (Sintex make) 1500 lits
capacity
16.00 no 11475.00 183600.00 16
4 SANITARY FIXTURES
4.1 W.C pan
164 a) H.S.I.Orissa Pan W.C.580mm. 24.00 no 3112.00 74688.00 24
8/13/2019 Rate Analysis and BOQ
19/37
Rate Amount Metal Sand Cement/limestone/Marble/Bric
kEarth
Miscellane
ousFo
S.NO
Material
DESCRIPTION OF ITEM Qty. UNIT
Contract
8/13/2019 Rate Analysis and BOQ
20/37
8/13/2019 Rate Analysis and BOQ
21/37
8/13/2019 Rate Analysis and BOQ
22/37
8/13/2019 Rate Analysis and BOQ
23/37
8/13/2019 Rate Analysis and BOQ
24/37
8/13/2019 Rate Analysis and BOQ
25/37
8/13/2019 Rate Analysis and BOQ
26/37
Rate Amount Metal SandCement/lim
e
stone/Marble/Bri
ckEarth
Miscellane
ousFormwork
1 2 3 4.00 5 6 7 8 9 10 11
SH-1 Earth work
1 1.1 Earthwork excavation for footings 868.78 M3 110.00 95565.25 868.78
2 1.2 Earth work in surface excavation . nonoper
atio
nal
100
Sqm15.00 0.00
0.00
1.2a Bailing out of water during PCC,footings.
0.00 KL 50.00 0.00 0.00
1.50 Anti Termite Treatement 348.30 m2 76.00 26470.80 152.38
3 1.3 Back filling upto G.L 636.47 m3 43.00 27368.38 636.47
4 1.4 Back filling upto DPC level. 92.76 m3 320.00 29682.22 92.76
1.4 Back filling with excavated earth 218.15 m3 43.00 9380.36 218.15
5 1.6 Sand filling under floors 0.00 m3 280.00 0.00 0.00
SH-2 CONCRETE WORK
6 2.1PCC(1:4:8) using 40mm upto Plinth
beam.
oper
atiom3 2776.00 0.00 0.00 0.00 0.00
7 2.2PCC(1:5:10) using 40 mm under
footings and floors.77.17 m3 2435.00 187916.37 61.74 37.04 204.51
8 2.3PCC(1:4:8) using brick bats under
floors.45.83 m3 2555.00 117104.61 36.67 22.00 151.71
9 2.4DPC Course PCC(1:2:4) using 20
mm42.46 m2 296.00 12568.16 1.36 0.03 11.24
10 2.5B.T coat using 80/100 B.T over DPC
Course.42.46 m2 115.00 4882.90 96.00
11 2.6Filling with sunken floor of Toilets etc.
with cinder material.24.70 m3 833.00 20575.10 24.70
12 2.7
Water proofing treatment to vertical
and horizontal surface of depressed
portion W/C .
131.24 m2 385.00 50527.57 131.24
Plum concrete PCC (1:4:8) for
Qty.
Material
UNITDESCRIPTION OF ITEM
Contract
S.N
O
8/13/2019 Rate Analysis and BOQ
27/37
Rate Amount Metal SandCement/lim
e
stone/Marble/Bri
ckEarth
Miscellane
ousFormwork
Qty.
Material
UNITDESCRIPTION OF ITEM
Contract
S.N
O
577.4
40mm th. flooring in CC( 1:2:4) with a
flaoting coat of neat cement.
710.98 m2 300.00 213294.00 26.16 13.08 244.90
58 7.521mm th. plaster skirting upto 30cm
height with CM(1:3) .55.44 m2 191.00 10589.04 1.16 13.64
59 7.6Providing KOTA Stone in Kitchen
counter.59.04 m2 904.00 53372.16 1.09 0.54 3.13 70.85
60 7.7 Ceramic Glased tile 5mm thickness. 314.64 m2 724.00 227799.36 3.47 1.74 31.46 314.64
SH-8ROOFING WATER PROOFING &
INSULATION
61 8.1Water proofing treatment with bituminfelt over roofs ( bitumin 85/25 or
90/15
299.59 m2 282.00 84484.38 1797.54
62 8.2100mm thick mud puska over roof
slab .299.59 m2 350.00 104856.50
63 8.3Gola 75X75mm with M-15 (1:2:4)
concrete .268.48 rm 87.00 23357.76
64 8.4
Khurras 450 X 450mm with th. of
50mm cement concrete M-15over
PVC Sheet.
8.00 nos 241.00 1928.00
SH-9 FINISHING:
65 9.118mm thk cement plaster in two
coats .454.83 m2 205.00 93240.15 8.19 56.22 0.09
66 9.2
mm c cemen p as er n
(1:6) on rough side of single/ half 1448.87 m2 145.00 210086.31 21.73 125.18
67 9.312mm thick plaster in CM( 1:6) on
wall1490.84 m2 135.00 201263.62 17.89 103.05
68 9.4 6mm thick ceiling plaster in CM (1:3) 1042.35 m2 127.00 132379.07 6.25 72.05
69 9.5Making grooves in walls/ corners of
slab2700.00 rm 10.00 27000.00
70 9.6
e was ng new oc s w
three(or more) coats of lime to an
even shade.
6137.44 m2 22.00 135023.68 9.00 1963.98
71 9.7
Two (or more) coats of cement based
paints of specified shade or exterior
to an even shade.
1942.00 m2 45.00 87390.00 621.44
72 9.8Painting to new metalic surfaces with
2 coats of synthetic enamel paint.574.56 m2 51.00 29302.56 63.20
73 9.9Applying prime coat on new wooden
/ wood based surfaces .1081.31 m2 61.00 65959.91 64.88
74 9.10Painting to new Wood surfaces with 2
coats of synthetic enamel paints.1135.75 m2 51.00 57923.25 136.29
8/13/2019 Rate Analysis and BOQ
28/37
Rate Amount Metal SandCement/lim
e
stone/Marble/Bri
ckEarth
Miscellane
ousFormwork
Qty.
Material
UNITDESCRIPTION OF ITEM
Contract
S.N
O
99 5.12 Mild steel hooks 280.00 nos 42.00 11760.00 280.00
100 5.13 Helical door spring 48.00 nos 382.00 18336.00 48.00
577.76 501.32 5031.44 201534.24 1816.15 4022.84
ELECTRIFICATION ITEMS Meatal Sand Cement Bricks E/w Formwork
1
Wiring for light point/fan point/calling
bell with 1.5 sq mm pvc insulatedcopper conducted wire.
101
a)One light/fan/bell push point
controlled by one 5/6 amp one way
switch
213.00 nos 520 110760.00 213.000
105b) Twin control light pointwith 2 No.
two way 5/6 Amps switch5.00 nos 743 3715.00 5.000
106 2
Circuit wiring from switch fuse /DB to
switch board using 2x 2.5 sq mmalong with 1x 1.5 sqmm wire. 950.00 rm 119 113050.00 950.000
107 3Wiring for power socket 2x 4 sq mm
wire.750.00 rm 208.00 156000.00 750.000
108 4
Wiring with 2x6.0sqmm along with
1x4.0 sqmm PVC wire in walls,
ceiling .
100.00 rm 282.00 28200.00 100.000
109 5 Sub main cable with PVC wire of 2x10 sqmts concealed in wall/ceiling.
75.00 rm 386.00 28950.00 75.000
110 6
Flush button type socket outlet,6 pin
Multipurpose type with one switch
1516 amps
96.00 nos 223.00 21408.00 96.000
111 7 Wall bracket. 48.00 nos 297.00 14256.00 48.000
112 8Fluorescent Tube fitting Rail ( Patti)
type48.00 nos 431.00 20688.00 48.000
113 9 Celing Rose bakelite 65x50mm. 48.00 nos 44.00 2112.00 48.000
114 10 Lamp holder bakelite body. 87.00 nos 52.00 4524.00 87.000
M t i lC t t
8/13/2019 Rate Analysis and BOQ
29/37
Rate Amount Metal SandCement/lim
e
stone/Marble/Bri
ckEarth
Miscellane
ousFormwork
Qty.
Material
UNITDESCRIPTION OF ITEM
Contract
S.N
O
2.2
M.S holder clamps including cement
concrete block 100mm x100mm x
100mm of 1:2:4 mix
132 a) 100mm dia 190.00 60.00 11400.00 190
2.3 sand cast iron fitting and accessories
133 a) Plain bends:
134 i) 100mm nominal size 36.00 377.00 13572.00 36
135 b) T-C.I bends
136 i) 100mm nominal size 24.00 603.00 14472.00 24
137 C) C.I Reduced T bends
138 i) 100mm x 75mm nominal size 48.00 547.00 26256.00 48
139 d) Door bends
140 i) 100mm nominal size 16.00 452.00 7232.00 16
2.4 Providing and fixing:
141 a) Cast iron cowl
142 i) 100mm nominal size 24.00 309.00 7416.00 24
2.5
Lead caulked joints to sand iron /cast
(spun) iron soil waste and ventilating
pipes .
143 i) 100mm nominal size 350.00 202.00 70700.00 350
144 ii)75mm nominal size 120.00 146.00 17520.00 120
2.6 Cast iron trap (floor Trap).
145 i) 75mm dia 72.00 542.00 39024.00 72
146 ii)100mm dia
MaterialContract
8/13/2019 Rate Analysis and BOQ
30/37
Rate Amount Metal SandCement/lim
e
stone/Marble/Bri
ckEarth
Miscellane
ousFormwork
Qty.
Material
UNITDESCRIPTION OF ITEM
Contract
S.N
O
165 4.2White glazed vitreous China wash
basins24.00 no 1528.00 36672.00 24
4.3C.P. brass bib taps of double 'O' ring
system.
166 i) Long Nose Bib Cock 24.00 no 331.00 7944.00 24
167 ii) Short Body Bib Cock. 24.00 no 374.00 8976.00 24
168 iii) Long Body Bib Cock 72.00 no 467.00 33624.00 72
4.4 Providing and fixing 15mm Cp brassangle valve of double 'O' ring system
169 i) 15mm dia 96.00 no 238.00 22848.00 96
170 4.5Concealed stop cock of double 'o'
ring system with Copper plating48.00 no 542.00 26016.00 48
171 4.6C.P. brass shower with arm with CP
Cup24.00 no 569.00 13656.00 24
172 4.7CP connection pipe with unions of
450mm length.48.00 no 60.00 2880.00 48
173
Labour charges for Plumbing ,
sanitary and water supply excluding
extern al drianage system.
13712244
Initial Rebate = 4.5% 617051
13095193
925626
12169567
Rebate after negotiation = 7.06844
NET TOTAL COST FOR ONE BLOCK
8/13/2019 Rate Analysis and BOQ
31/37
SLNO ITEM OF WORK QTY RATE UNIT AMOUNT
Framed strucutre:
1 Cement 5108.33 252.00 BAGS 1287298
2 Sand 495.35 176.00 CUM 87181
3 Metal 592.98 423.00 CUM 250831
4 Bricks 199710.19 2.65 EACH 529232
5 steel 60.10 46600 MT 2800886
6 B.T Coat 96.00 27.00 kg 2592
7 Cynder 24.70 355.00 cum 8769
8 Water proofing treatment 131.24 190.00 sqm 24936
9 Boulder stone for plum concrete 3.36 200.00 cum 672
10 Marble chips 4840.96 8.00 cft 3872811 Glass strips 1449.60 10.00 rmt 14496
12 Kota stone 70.85 300.00 sqm 21255
13 Ceramic glazed tiles 314.64 280.00 sqm 88099
14 Roofing treatment 1797.54 30.00 sqm 53926
15 100 mm thick mud pushka 299.59 160.00 sqm 47934
16 Gola 75x75 268.48 45.00 rmts 12082
17 Khurrass 450x450 mm 8 50.00 nos 400
18 White washing 1963.98 15.00 kgs 29460
19 Cement based paints 621.44 40.00 kgs 24858
20 Synthetic enamel paint 63.20 80.00 lts 5056
21 Wood primer 64.88 40.00 lts 2595
22 Synthetic enamel paint 136.29 80.00 lts 10903
23 M.S square grills 1500.00 55.00 kgs 82500
TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )
8/13/2019 Rate Analysis and BOQ
32/37
SLNO ITEM OF WORK QTY RATE UNIT AMOUNT
TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )
28 Doors , Windows and Ventilators
29 Flush dooor shutters 35 mm 175.305 900.00 sqm 157775
30 3 mm thick glass panels 90 280.00 sqm 25200
31
Glazed shutters for windows and
ventilators 130.46 1290.00 sqm 168293
32 35 mm thick wire gauge shutters 165.057 900.00 sqm 148551
33 35 mm FRP Flush door shutters 31.92 2000.00 sqm 63840
34 Pressed steel door frames 359.04 275.00 rmt 98736
35
Pressed steel windows and ventilator
frames 1046.5 275.00 rmt 287788
36
Accessories for doors and windows
fittings 100295
50 Plumbing
51 150 mm dia. PVC Pipe ( Type-B) 19.8 198.00 rmt 3920
52 PCC ( 1:5:10) alround the pipe 19.8 135.00 rmt 2673
53
150 mm Salt glazed stone ware pipe
grade-A 40 161.67 rmt 6467
54 PCC ( 1:5:10) alround the pipe 40 135.00 rmt 5400
55 100x100 Square mouth SW Gully trapgrade-A 12 612.00 each 7344
56
P- type manholes with 9" br. Walls
(450x450) 16 3000.00 each 48000
57
P- type manholes with 41/2" br. Walls
(450x450) 4 2800.00 each 11200
58 75 mm C.I S/S joint pipes 75 423.00 each 31725
59 100 mm C.I S/S joint pipes 300 500.50 each 150150
60 100 mm M.S holder clamps 190 28.69 each 5451
61 100 mm C.I Plain bends 36 266.00 each 9576
8/13/2019 Rate Analysis and BOQ
33/37
SLNO ITEM OF WORK QTY RATE UNIT AMOUNT
TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )
68 75 mm C.I Trap 72 400.00 each 28800
69 35 mm dia., waste coupling 24 183.00 each 4392
70 32 mm dia., waste pvc pipe 24 30.00 each 720
71 Painting to 100 mm dia., C.I pipe 279 18.00 each 5022
72
75 mm thick bed concrete for C.I
Pipes 105 130.00 each 13650
73 Water supply:
74 15 mm dia., G.I pipe 556.08 92.47 rmt 51421
75 25 mm dia., G.I pipe 311 172.36 rmt 53604
76 40 mm dia., G.I pipe 100 224.00 rmt 22400
77 G.I distribution branch 48 32.00 rmt 1536
78 Painting to 15 mm dia., pipe 500 3.90 rmt 1950
79 Painting to 25 mm dia., pipe 311 4.84 rmt 1505
80 Painting to 40 mm dia., pipe 100 6.75 rmt 675
81 25 mm dia., brass full way valve 16 566.00 each 9056
82 40 mm dia., brass full way valve 4 1198.00 each 4792
83 1500 lit capacity Sintex tank 16 6225 each 99600
84 Sanitary fittings:
85 580 mm Orrisa W.C pan 24 2080.00 each 49920
86 White glazed china wash basin 24 755.00 each 18120
87 C.P brass bib tap
88 Long nose bib tap 24 375.00 each 9000
89 Short body bib tap 24 317.00 each 7608
90 Long body bib tap 72 375.00 each 27000
91 15 mm dia., c.p brass angle valve 96 305.00 each 29280
8/13/2019 Rate Analysis and BOQ
34/37
SLNO ITEM OF WORK QTY RATE UNIT AMOUNT
TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )
105
PCC ,Footins, Balcony, Dpc
Course,Kitchen partition wall.333.30 45.00
sqm 14999
106 Pedastals&columns upto Mumty 720.14 50.00 sqm 36007
107 beams up to Mumty 1091.65 75.00 sqm 81874
108
slabs including Stair case up to
Mumty1068.84 75.00
sqm 80163
109
Form work for arches (span up to 6mtrs) for in-situ concrete work (upto
level -V)
59.00 75.00
sqm 4425
110 Edges of slab upto Mumty 665.05 6.00 rmt 3990
8122903
1 Framed strucutre: 5537537
2 Doors , Windows and Ventilators 1050478
3 Electrical fittings: 460907
4
External sewage, plumbing, sanitary
and water supply 852523
5 Formwork: 221458
Total 8122903
Abstract of Materials
6%10% 3%
MaterialFramed strucutre:
Doors , Windows and Ventilators
Electrical fittings:
External sewage, plumbing, sanitary and water supplyFormwork:
8/13/2019 Rate Analysis and BOQ
35/37
SLNO ITEM OF WORK QTY RATE UNIT AMOUNT
TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )
8/13/2019 Rate Analysis and BOQ
36/37
CONSTRUCTION OF MINITOWNSHIP FOR KASHMIRI MIGRANTS AT JAGTI, NAGROTA, JAMMU
Sl,No Items Material Labour T&P Total
1 Framed strucutre: 5537537 1110192 124084 6771814
2 Doors , Windows and Ventilators 1050478 1050478
3 Electrical fittings: 460907 45000.00 505907
4 External sewage, plumbing, sanitary and water supply 852523 86360.00 938883
5 Formwork: 221458 221458
Total 8122902.6 1241552 124084 9488539
cost per squre foot as per recorded quantities 677 103 10 791
Total bill amount per building 12169567
Bill amount per suare foot 1014.131
Total bill amount per building 8104932
Bill amount per suare foot+addl steel cost 755 excluding service tax
Total bill amount per building 12900000
Bill amount per suare foot 1075
Total bill amount per building 8591400
Bill amount per suare foot 716 excluding service tax
due to hike in steel cost Rs 80 per sft addl expenditure for JV
Sub contractor billing
Present billing
Amounts considered at the time of award ing sub contract
TOTAL AMOUNT REQUIRED FOR ONE UNIT
As per billing quantities
Sub contractor billing
As per Technical Sanctioned estimate quantities
8/13/2019 Rate Analysis and BOQ
37/37
Material Labour Total
8122902.6 1241552 9364455
87%
13%
Material
Labour