Portal RATOL & Rates PreMo CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015 Work Item Unit Overall Average (RM) GEOTECHNICAL WORKS GEOTECHNICAL WORKS INSTRUMENTATION Report. 3 copies of the monthly monitoring report. sum Location Range (RM) Average (RM) RM 250.00 F 250.00 - 250.00 250.00 GEOTECHNICAL WORKS SLOPE STABILISATION WORKS HORIZONTAL DRAINS Supply and install 100mm diameter horitonzal darins with 75mm diameter perforated pvc pipe wrapped with non-woven geotextile as shown in the drawing. 12.00 m long no Location Range (RM) Average (RM) RM 744.00 F 744.00 - 744.00 744.00 GEOTECHNICAL WORKS SLOPE STABILISATION WORKS HORIZONTAL DRAINS Channel drain Supply and construct concrete Grade 20/20 channel drain from weephole of horizontal drain to berm drain as shown in the drawing to serve as outlet for horizontal drain m Location Range (RM) Average (RM) RM 30.85 F 30.85 - 30.85 30.85 GEOTECHNICAL WORKS SOFT GROUND IMPROVEMENT SOFT GROUND REPLACEMENT / STABILITY Carry out field calibration test on an area of 20m x 20m no Location Range (RM) Average (RM) RM 50000.00 F 50000.00 - 50000.00 50000.00 GEOTECHNICAL WORKS SOFT GROUND IMPROVEMENT SOFT GROUND REPLACEMENT / STABILITY Dynamic Replacement Columns and prefabricated Vertical Drains Carry out dynamic replacement (DR) column of 2.5m diameter + prefabricated vertical drain(PVD) works to achieve Acceptance Criteria to treatment depth with DR not exceeding 5m from working platform and PVD installed in between to maximum depth of 15m from the working platform level or refusal depth, which ever m2 Location Range (RM) Average (RM) RM 40.00 1 / 7

rates-02032015 (5)

Embed Size (px)

DESCRIPTION

jkr

Citation preview

Page 1: rates-02032015 (5)

Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item Unit Overall Average (RM)

GEOTECHNICAL WORKSGEOTECHNICAL WORKSINSTRUMENTATIONReport.3 copies of the monthly monitoring report.

sum Location Range (RM) Average (RM) RM 250.00

F 250.00 - 250.00 250.00

GEOTECHNICAL WORKSSLOPE STABILISATION WORKSHORIZONTAL DRAINSSupply and install 100mm diameter horitonzal darinswith 75mm diameter perforated pvc pipe wrapped withnon-woven geotextile as shown in the drawing.12.00 m long

no Location Range (RM) Average (RM) RM 744.00

F 744.00 - 744.00 744.00

GEOTECHNICAL WORKSSLOPE STABILISATION WORKSHORIZONTAL DRAINSChannel drainSupply and construct concrete Grade 20/20 channeldrain from weephole of horizontal drain to berm drainas shown in the drawing to serve as outlet forhorizontal drain

m Location Range (RM) Average (RM) RM 30.85

F 30.85 - 30.85 30.85

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYCarry out field calibration teston an area of 20m x 20m

no Location Range (RM) Average (RM) RM 50000.00

F 50000.00 - 50000.00 50000.00

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYDynamic Replacement Columns and prefabricatedVertical DrainsCarry out dynamic replacement (DR) column of 2.5mdiameter + prefabricated vertical drain(PVD) works toachieve Acceptance Criteria to treatment depth withDR not exceeding 5m from working platform and PVDinstalled in between to maximum depth of 15m fromthe working platform level or refusal depth, which ever

m2 Location Range (RM) Average (RM) RM 40.00

1 / 7

Page 2: rates-02032015 (5)

Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item Unit Overall Average (RM)

comes first as specified in the specification exclusiveof supply, place and level selected granular fill.

F 40.00 - 40.00 40.00

GEOTECHNICAL WORKSGEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYExcavate unsuitable material below O.G.L as shown indrawing or as per specification as approved by S.Oand dispose to contractor's dump site approved by S.O

m3 Location Range (RM) Average (RM) RM 12.00

F 12.00 - 12.00 12.00

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYSurchargeTransport, placement and compaction suitable fillmaterials from stockpile as surcharge

m3 Location Range (RM) Average (RM) RM 3.00

F 3.00 - 3.00 3.00

GEOTECHNICAL WORKSGEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYDewatering using Water Pumps of adequate capacity(including the construction of earth drains) to keepearthworks free from water from whatever causes.

sum Location Range (RM) Average (RM) RM 70000.00

F 70000.00 - 70000.00 70000.00

GEOTECHNICAL WORKSGEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYSupply and install 400mm thick single size rock asrock toe as described in accordance to drawing

m3 Location Range (RM) Average (RM) RM 50.00

F 50.00 - 50.00 50.00

GEOTECHNICAL WORKSSLOPE STABILISATION WORKSHORIZONTAL DRAINSSupply and install 100mm diameter horitonzal darinswith 75mm diameter perforated pvc pipe wrapped withnon-woven geotextile as shown in the drawing.9.00 m long

no Location Range (RM) Average (RM) RM 558.00

F 558.00 - 558.00 558.00

2 / 7

Page 3: rates-02032015 (5)

Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item Unit Overall Average (RM)

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYSurchargeRemoval of surplus surcharge material to stockpileincluding compaction

m3 Location Range (RM) Average (RM) RM 3.00

F 3.00 - 3.00 3.00

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYDynamic Replacement ColumnsSupply, deliver, place and level selected granular fillfrom Contractor's own source of 1000mm thick toestablish working platform, backfilling the DR columnusing material taken from 1000mm, top up backgranular fill to maintain the working platform to1000mm thick as drainage blanket and to carry outsurface roller compaction

m3 Location Range (RM) Average (RM) RM 28.00

F 28.00 - 28.00 28.00

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYCarry out post treatment in-situ field test to depth notexceeding 15m from working platform or refusal depthwhichever come first:Pressuremeter test (PMT)

no Location Range (RM) Average (RM) RM 4000.00

F 4000.00 - 4000.00 4000.00

GEOTECHNICAL WORKSGEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYType A non-woven geotextile as separator.

m2 Location Range (RM) Average (RM) RM 5.47

F 5.47 - 5.47 5.47

GEOTECHNICAL WORKSGEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYPlacement and compaction of excavated suitablematerial from the road way.

m3 Location Range (RM) Average (RM) RM 28.00

F 28.00 - 28.00 28.00

3 / 7

Page 4: rates-02032015 (5)

Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item Unit Overall Average (RM)

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYDynamic Replacement ColumnsCarry out dynamic replacement (DR) column of 2.5mdiameter works to achieve Acceptance Criteria torequired treatment depth with DR not exceeding 5mfrom working platform as specified in the specificationexclusive of supply, place and level selected granularfill.

m2 Location Range (RM) Average (RM) RM 30.00

F 30.00 - 30.00 30.00

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYCarry out post treatment in-situ field test to depth notexceeding 15m from working platform or refusal depthwhichever come first:Cone penetration (CPT)

no Location Range (RM) Average (RM) RM 3000.00

F 3000.00 - 3000.00 3000.00

GEOTECHNICAL WORKSGEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYEngineering submission consisting of detailed shopdrawing, as-bulit drawing, method statement,pre-engineering report and final report.

sum Location Range (RM) Average (RM) RM 50000.00

F 50000.00 - 50000.00 50000.00

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYCarry out post treatment in-situ field test to depth notexceeding 15m from working platform or refusal depthwhichever come first:Plate bearing test (PBT)

no Location Range (RM) Average (RM) RM 6300.00

F 6300.00 - 6300.00 6300.00

GEOTECHNICAL WORKSGEOTECHNICAL WORKSINSTRUMENTATIONSurface settlement marker.Supply and install settlement gauge.

no Location Range (RM) Average (RM) RM 2000.00

F 2000.00 - 2000.00 2000.00

4 / 7

Page 5: rates-02032015 (5)

Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item Unit Overall Average (RM)

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYDynamic Replacement Columns and prefabricatedVertical DrainsSupply, deliver, place and level selected granular fillfrom Contractor's own source of 1000mm thick toestablish working platform, backfilling the DR columnusing material taken from 1000mm, top up backgranular fill to maintain the working platform to1000mm thick as drainage blanket and to carry outsurface roller compaction

m3 Location Range (RM) Average (RM) RM 28.00

F 28.00 - 28.00 28.00

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYDynamic Replacement Columns and prefabricatedVertical DrainsSupply and deliver prefabricated vertical drain(PVD)including all necessary fixing accessories as specificand shown in the drawings. (PVD shall have minimumweight filter of 130g/m2 and tensile strength of 2.1KN

m Location Range (RM) Average (RM) RM 0.60

F 0.60 - 0.60 0.60

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYCarry out pre-engineering in-situ field tests to depthnot exceeding 15m from working platform or refusaldepth which ever come first:Pressuremeter test (PMT)

no Location Range (RM) Average (RM) RM 4000.00

F 4000.00 - 4000.00 4000.00

GEOTECHNICAL WORKSSOFT GROUND IMPROVEMENTSOFT GROUND REPLACEMENT / STABILITYCarry out pre-engineering in-situ field tests to depthnot exceeding 15m from working platform or refusaldepth which ever come first:Cone penetration (CPT)

no Location Range (RM) Average (RM) RM 3000.00

F 3000.00 - 3000.00 3000.00

GEOTECHNICAL WORKS no Location Range (RM) Average (RM) RM 100.00

5 / 7

Page 6: rates-02032015 (5)

Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item Unit Overall Average (RM)

GEOTECHNICAL WORKSINSTRUMENTATIONSurface settlement marker.Supply and install surface settlement marker.

F 100.00 - 100.00 100.00

6 / 7

Page 7: rates-02032015 (5)

Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

NotaSekiranya anda mempunyai sebarang pertanyaan, sila hubungi: Ketua Penolong Pengarah KananBahagian Perolehan dan Khidmat KosCawangan Kontrak dan Ukur BahanIbu Pejabat JKR MalaysiaTingkat 19, Menara Tun Ismail Mohamed AliNo 25, Jalan Raja Laut50582 Kuala Lumpur

u.p: En Husnan HusinTel: 03-26161111Email: [email protected]

Catatan

7 / 7