El Paso, Texas 79901
915.533.6811
TBPE Registration F-560
501 West San Antonio
KEITH A. RUTHERFORD
92821
P
R
O
F
E
S S
I
O
N
R
E
E
N
I
G
N
E
LA
S
T
A
T
E
OF
T
E
S
A
X
S
E
D
N
E
C
I
L
PA
R
K
H
I
L
L
S
M
I
T
H
&
CO
O
P
E
R
,
I
N
C
.
F
-
5
60
11/12/2020
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\G
00
1-6
93
9.d
wg
L
AY
OU
T N
AM
E: G
1 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:2
1a
m U
SE
R: o
sa
nch
ez
KEITH A. RUTHERFORD
92821
P
R
O
F
E
S S
I
O
N
R
E
E
N
I
G
N
E
LA
S
T
A
T
E
OF
T
E
S
A
X
S
E
D
N
E
C
I
L
PA
R
K
H
I
L
L
S
M
I
T
H
&
CO
O
P
E
R
,
I
N
C
.
F
-
5
60
11/12/2020
D
C
B
A
1 2 3 4 5
1 2 3 4 5
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\G
00
2-6
93
9.d
wg
L
AY
OU
T N
AM
E: G
2 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:2
1a
m U
SE
R: o
sa
nch
ez
EL PASO 6939.19
FRE
D H
ER
VEY
WR
PE
QU
ALI
ZA
TIO
N P
UM
PS
RE
PLA
CE
ME
NT
EL
PA
SO
WA
TER
1170
0 R
AIL
RO
AD
DR
IVE
EL
PA
SO
, TE
XAS
799
24
1 G1 COVER AND VICINITY MAP
2 G2 LOCATION MAP, LEGEND, GENERAL NOTES, SHEET INDEX AND ABBREVIATIONS
3 C1 EXISTING PLANT LAYOUT, EQUALIZATION PUMPS AND AERATION BASINS
4 C2 EXISTING UTILITY PIPING AND EQUALIZATION PUMPS
5 C3 SCREW PUMP DEMOLITION PLAN AND SECTIONS
6 C4 SLUICE GATE DEMOLITION PLAN
7 C5 EXISTING TRAIN 3 PE PUMP STATION PLAN AND SECTIONS
8 C6 BYPASS PUMPING PLAN
9 C7 SCREW PUMP PROPOSED PLAN AND SECTIONS
10 E1 ELECTRICAL EXISTING POWER CONTROL AND INSTRUMENTATION
SECTION OR DETAIL IDENTIFICATION
NUMBER OR LETTER
No. OF SHEET ON WHICH SECTION
OR DETAIL IS SHOWN
No. OF SHEET ON
WHICH SECTION
OR DETAIL IS TAKEN
DIRECTION OF VIEW
PARKHILL, SMITH & COOPER, INC.
501 W. SAN ANTONIO
EL PASO, TX 79901
(915) 533-6811
MR. KEITH RUTHERFORD, P.E.
EL PASO WATER UTILITIES
1154 HAWKINS
EL PASO, TX 79925
MR. JAVIER DOMINGUEZ P.E.
(915) 594-5697
MP
EPWU MARKER POST
UNDERGROUND CABLE
FIBER OPTIC
W/ VALVE BOX
PIPE PLUG
PERMANENT EASEMENT
CONSTRUCTION EASEMENT
W/ MANHOLE
COMB AIR VALVE
SEWER LINE
TEE
REDUCER
GATE VALVE
CROSS
ROW LINE
FENCE
UNDERGROUND TELEPHONE
STEEL CASING
W/ MANHOLE
BLOWOFF VALVE
BACKFILL MATERIAL
CEMENT STABILIZED
VEGETATION
90° BEND
GATE VALVE
PAVEMENT
STRUCTURES
SANITARY SEWER
EASEMENT
LIMITS OF EXCAVATION
AND/OR PAVEMENT
REPLACEMENT
20'
(1 FOOT INTERVALS)
CONTOURS
3
8
1
5
BUTTERFLY VALVE
W/ MANHOLE
CATHODIC PROTECTION
TEST STATION
45° BEND
(OR METER BOX,
AS INDICATED)
MANHOLE
BUTTERFLY VALVE
FIRE HYDRANT
OVERHEAD ELECTRIC
WATER PIPELINE
GAS PIPELINE
CITY MONUMENT
POWER POLE
UNDER GROUND ELECTRIC
STORM SEWER
E
E
W
W
WATER METER
EXEXISTING
RECLAIMED WATER PIPELINE
SHEET NO. DESCRIPTIONDRAWING NO.
R
A
I
L
R
O
A
D
D
R
I
V
E
S
S
P
A
T
R
I
O
T
F
W
Y
(
U
S
5
4
)
FRED HERVEY WATER
RECLAMATION PLANT (WRP)
1. ALL EXISTING UTILITIES CURRENTLY IN SERVICE MUST REMAIN IN SERVICE THROUGHOUT
CONSTRUCTION OF THE PROJECT AS NOTED IN THE DRAWINGS. THE CONTRACTOR IS
RESPONSIBLE FOR PROTECTING ALL EXISTING UTILITIES FROM DAMAGE AS A RESULT OF
CONSTRUCTION ACTIVITIES.
2. ALTHOUGH ALL EFFORTS HAVE BEEN MADE TO INDICATE ALL MAJOR EXISTING UTILITIES
ON PLANS, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND PROTECT
ALL SAID UTILITIES AS WELL AS SERVICE CONNECTIONS (WHETHER OR NOT INDICATED
ON PLANS) PRIOR TO AND DURING CONSTRUCTION. SERVICE CONNECTIONS ARE NOT
SHOWN ON THE PLANS.
3. PRIOR TO BEGINNING CONSTRUCTION, CONTRACTOR SHALL COORDINATE WITH EPWU
TO VERIFY LOCATION OF EXISTING UTILITIES.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH EPWU FOR ELECTRIC,
NATURAL GAS, COMMUNICATION, SEWER AND WATER UTILITIES. FOR ANY RELOCATION
AND/OR PROTECTION OF EXISTING LINES OR CABLES AS REQUIRED, DUE TO
CONSTRUCTION ACTIVITIES.
5. UNLESS OTHERWISE INDICATED, ALL EXISTING ROADWAYS, SIDEWALKS, & SURFACE
GRADING AFFECTED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED TO ORIGINAL
CONDITION AND ELEVATION BY CONTRACTOR.
6. CONTRACTOR SHALL KEEP ALL EQUIPMENT, MATERIAL, DEBRIS & SPOIL OUT OF THE WAY
OF PLANT OPERATIONS.
7. THE INFORMATION PROVIDED IS FOR THE CONTRACTOR TO PLAN HIS CONSTRUCTION
ACTIVITIES, SO AS NOT TO INTERFERE WITH PLANT OPERATIONS.
8. IN SOME CASES ACCESS MAY BE LIMITED TO THE AVAILABLE SPACE AS DETERMINED BY
THE ENGINEER AND THE EPWU PLANT SUPERINTENDENT.
9. CONTRACTOR IS SOLEY RESPONSIBLE FOR WORK SITE SAFETY AND FOR COMPLYING
WITH ALL APPLICABLE SAFETY REQUIREMENTS.
11700 RAILROAD DRIVE
EL PASO, TX 79924
MR. ROBERT HERNANDEZ
(915) 594-5476
D
Y
E
R
S
T
.
EQUALIZATION PUMPS
A
S
H
L
E
Y
R
D
.
UNION PACIFIC
RAILROAD TRACKS
ACCESS ROAD
M
PUMP
FLOW METER
SANITARY SEWER
MANHOLE
POLE MOUNTED
LIGHT
SANITARY SEWER
MANHOLE
ELECTRICAL
MANHOLE
ELECTRICAL
TRANSFORMER
WATER VALVE
VAULT
DIGESTED PRIMARY SLUDGE
PLANT WATER
RETURN HOT WATER
HOT WATER
SEWER GAS
EQUALIZATION
RAW SEWAGE
WASTE FLOW
PLANT AIR
PRIMARY SLUDGE
LOCATION MAP,LEGEND, GENERAL NOTES,
SHEET INDEX ANDABBREVIATIONS
G2
CONFINED SPACE - CONTRACTOR SHALL ABIDE BY REGULATIONS IN OSHA
STANDARDS: 29 CFR-1910.146 APPENDIX A, B, C, D, E & F.
FALL PROTECTION - CONTRACTOR SHALL ABIDE BY ALL RULES & REGULATIONS
IN OSHA STANDARDS: 29 CFR - 1926.500 THROUGH 1926.505
ALUM ALUMINUM
BF BLIND FLANGE
BKWH BACKWASH WATER
BOP BOTTOM OF PIPE
CONC CONCRETE
CDF CHEMICAL DRAIN
CLS CHLORINE SOLUTION
DFT DRY FILM THICKNESS
DPSL DIGESTED PRIMARY SLUDGE
DR DRAIN
DIA DIAMETER
DIP DUCTILE IRON PIPE
EPWU EL PASO WATER UTILITIES
EXIST EXISTING
FLG FLANGE
FB FLAT STEEL BAR
FBE FUSION BOND EPOXY
F.G. FINISHED GRADE
FRP FIBER REINFORCED POLYMER
GAC GRANULAR ACTIVATED CARBON
HD HOT DIPPED GALVANIZED
HDG HOT DIPPED GALVANIZED
HW HOT WATER
ICRI INTERNATIONAL CONCRETE
REPAIR INSTITUTE
LF LINEAR FEET
LS LIME SLUDGE
LTE LIME THICKENER EFFLUENT
MH MANHOLE
MP MARKER POST
NG NATURAL GAS
OAL OVER ALL LENGTH
O.C. ON CENTERS
O.C. ON CENTERS
O.C.E.W. ON CENTERS EACH WAY
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
PE PRIMARY EFFLUENT
PI PRIMARY INFLUENT
PLTW PLANT WATER
POTW POTABLE WATER
PP POWER POLE
PROP PROPOSED
PS PRIMARY SLUDGE
PSC PRIMARY SCUM
PSL PRIMARY SLUDGE LINE
PW PRODUCT WATER
PYS POLYMER SOLUTION
R, RAD RADIUS
RCE RECARBONATION EFFLUENT
RCP REINFORCED CONCRETE PIPE
RHW HOT WATER
ROW RIGHT OF WAY
S.S. STAINLESS STEEL
T.L. TRUE LENGTH
T.O.G. TOP OF GRATING
T.O.C. TOP OF CONCRETE
1W CITY WATER
2W NON POTABLE (CITY WATER)
3W NO. 3 WATER
(SECONDARY EFFLUENT)
WF WASTE FLOW
HAND RAIL
HAND RAIL
PLANT ENTRANCE
CONTRACTOR LAYDOWN AREA
GATE
LIIMITS OF PROJECT AREA
EQUALIZATION PUMPS
AERATION BASINS
ON-GOING CONSTRUCTION BY OTHERS
DIGESTER NO. 1
BLOWER BUILDING
KEITH A. RUTHERFORD
92821
P
R
O
F
E
S S
I
O
N
R
E
E
N
I
G
N
E
LA
S
T
A
T
E
OF
T
E
S
A
X
S
E
D
N
E
C
I
L
PA
R
K
H
I
L
L
S
M
I
T
H
&
CO
O
P
E
R
,
I
N
C
.
F
-
5
60
11/12/2020
D
C
B
A
1 2 3 4 5
1 2 3 4 5
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\C
-0
1-6
93
9.d
wg
L
AY
OU
T N
AM
E: C
1 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:2
1a
m U
SE
R: o
sa
nch
ez
EL PASO 6939.19
FRE
D H
ER
VEY
WR
PE
QU
ALI
ZA
TIO
N P
UM
PS
RE
PLA
CE
ME
NT
EL
PA
SO
WA
TER
1170
0 R
AIL
RO
AD
DR
IVE
EL
PA
SO
, TE
XAS
799
24
NOTES:
1. CONTRACTOR SHALL COORDINATE ALL LAYDOWN AREAS AND
EQUIPMENT SET-UP LOCATIONS WITH PLANT OPERATIONS TO AVOID
DAMAGING EXISTING FACILITIES, EQUIPMENT AND UNDERGROUND
UTILITIES.
2. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO
EXISTING FACILITIES, PLANT ROADWAY, EQUIPMENT, AND
UNDERGROUND UTILITIES CAUSED BY HIS WORK. PRE-CONSTRUCTION
VIDEO WILL BE USED TO DETERMINE EXISTING CONDITIONS PRIOR TO
CONTRACTOR ENTERING SITE.
3. SEE SHEET C2 FOR EXISTING UTILITY LOCATIONS.
EXISTING PLANTLAYOUT,
EQUALIZATION PUMPS ANDAERATION BASINS
C1
SCALE:1" = 80'
KEITH A. RUTHERFORD
92821
P
R
O
F
E
S S
I
O
N
R
E
E
N
I
G
N
E
LA
S
T
A
T
E
OF
T
E
S
A
X
S
E
D
N
E
C
I
L
PA
R
K
H
I
L
L
S
M
I
T
H
&
CO
O
P
E
R
,
I
N
C
.
F
-
5
60
11/12/2020
D
C
B
A
1 2 3 4 5
1 2 3 4 5
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\C
-0
2-6
93
9.d
wg
L
AY
OU
T N
AM
E: C
2 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:2
1a
m U
SE
R: o
sa
nch
ez
EL PASO 6939.19
FRE
D H
ER
VEY
WR
PE
QU
ALI
ZA
TIO
N P
UM
PS
RE
PLA
CE
ME
NT
EL
PA
SO
WA
TER
1170
0 R
AIL
RO
AD
DR
IVE
EL
PA
SO
, TE
XAS
799
24
NOTES:
1. ALL EXISTING UTILITIES MUST REMAIN IN SERVICE THROUGHOUT CONSTRUCTION OF THE PROJECT. THE
CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING UTILITIES FROM DAMAGE AS A RESULT OF
CONSTRUCTION ACTIVITIES.
2. ALTHOUGH ALL EFFORTS HAVE BEEN MADE TO INDICATE ALL MAJOR UTILITIES ON PLANS, IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO LOCATED AND PROTECT ALL SAID UTILITIES AS WELL AS SERVICE
CONNECTIONS (WHETHER OR NOT INDICATED ON PLANS) PRIOR TO AND DURING CONSTRUCTION. SERVICE
CONNECTIONS ARE NOT SHOWN ON PLANS.
3. TO THE EXTENT POSSIBLE, THE CONTRACTOR SHALL PLAN ON PLACEMENT OF CRANE AND LIFTING EQUIPMENT
SO THAT IT WILL NOT BE PLACE OVER EXISTING UTILITY TRENCHES. IN THE EVENT THIS IS NOT POSSIBLE, THE
CONTRACTOR SHALL PROVIDE MATS TO DISTRIBUTE THE LOADS UNDER THE WHEELS AND OUTRIGGERS.
EXISTING UTILITYPIPING AND
EQUALIZATION PUMPS
C2
SCALE: 3/16" = 1'
EXISTING MANHOLE
EXISTING LIGHT POLE
EXISTING TRANSFORMER FOR PE PUMPS
EXISTING 36" PE LINE TO SCREW PUMPS
PE PUMP STATION
EXISTING PUMPS
EXISTING PAVEMENT
EXISTING SCREW PUMPS
TO BE REPLACED
EXISTING BLOWER ROOM
PE LINE TO TRAIN 3
EXISTING JIB CRANE
TO BE REPLACED
EXISTING SCREW PUMP SUMP
EMPTY PUMP BAY
EXISTING JOCKEY PUMP
EXISTING TRAIN 3 PE LIFT STATION
EXISTING 8" JOCKEY
PUMP DISCHARGE
SEQUENCE OF CONSTRUCTION:
1. INSTALL TEMPORARY BY PASS PUMP AND ASSOCIATED PIPING IN EXISTING TRAIN 3 PRIMARY EFFLUENT (PE) LIFT STATIONWET WELL TO CONVEY FLOW TO EXISTING AERATION BASINS. (SEE SHEET C6)
2. INSTALL TEMPORARY PLUG IN EXISTING INLET TO SCREW PUMP SUMP. (SEE SHEET C6)
3. REMOVE AND REPLACE EXISTING INLET GATES ON SCREW PUMP SUMP. (SEE SHEET C4)
4. REMOVE EXISTING SCREW PUMPS AND GROUT FROM EXISTING TROUGHS. (SEE SHEET C3)
5. INSTALL NEW SCREW PUMPS AND GROUT IN EXISTING TROUGHS. (SEE SHEET C7)
6. PROVIDE STARTUP AND TRAINING FOR NEW SCREW PUMP MECHANISMS.
SLUICE GATES TO BE REPLACED
EXISTING JUNCTION BOX
EQ
PUMP 1
EQ
PUMP 2
EQ
PUMP 3
PROJECT WORK AREA
TRANSFORMER
T4
TRANSFORMER
T3
MC
C 8
MC
C 7
MC
C 6
EXISTING MCC'S
EXISTING TRANSFORMER
EXISTING ELECTRICAL TRENCH
EXISTING 36" PE LINE
EXISTING 36" PE LINE FROM
PRIMARY CLARIFIERS
PLUG
PLOG
4
'
-
6
"
1
'
-
9
"
1
0
"
1
1
"
E
X
I
S
T
I
N
G
3
"
G
R
O
U
T
EL. 64.33
EL. 63.83
EL 74.17
EL. 67.17
EL. 85.17
EL. 87.08
EL. 86.82
EL. 90.33
EL. 87.28
EL 67.00
@ 5 MGD
MAX HWS
DESIGN HWS
EXISTING JIB CRANE TO BE REMOVED
REMOVE EXISTING SCREW PUMP AND APPURTENANCES (TYPICAL OF 3)
REMOVE EXISTING GATES (TYPICAL OF 3)
LOWER BEARING LUBE
SYSTEM TO BE REMOVED
23'-6"
6'-6" 6'-6" 6'-6"
4'-0"
R
2
'-
3
"
REMOVE EXISTING LOOSE OR DELAMINATED GROUT
EXISTING JIB CRANE TO BE REMOVED
23'-6"
6'-6" 5'-9" 5'-9"
2'-6"
EXISTING JIB CRANE SUPPORT
COLUMN TO BE REMOVED
REMOVE EXISTING LOOSE OR DELAMINATED GROUT
CUT OFF ANCHOR BOLT
TO BE ABANDONED
EXISTING ANCHOR BOLT
PLACE NON-SHRINK
EPOXY GROUT IN
DEPRESSION AND
LEAVE WITH FINISHED
SURFACE
CHIP OUT CONCRETE TO A
DIAMETER THAT IS 2 TIMES
THAT OF THE ANCHOR BOLT
AND 1 INCH DEEP
11/12/2020
KEVIN D. FREDLEY
100757
P
R
O
F
E
S S
I
O
N
R
E
E
N
I
G
N
E
LA
S
T
A
T
E
OF
T
E
S
A
X
S
E
D
N
E
C
I
L
PA
R
K
H
I
L
L
S
M
I
T
H
&
CO
O
P
E
R
,
I
N
C
.
F
-
5
60
D
C
B
A
1 2 3 4 5
1 2 3 4 5
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\C
-0
3-6
93
9.d
wg
L
AY
OU
T N
AM
E: C
3 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:2
7a
m U
SE
R: o
sa
nch
ez
EL PASO 6939.19
FRE
D H
ER
VEY
WR
PE
QU
ALI
ZA
TIO
N P
UM
PS
RE
PLA
CE
ME
NT
EL
PA
SO
WA
TER
1170
0 R
AIL
RO
AD
DR
IVE
EL
PA
SO
, TE
XAS
799
24
NOTES:
1. CONTRACTOR SHALL REMOVE EXISTING SCREW PUMPS, DRIVE MOTOR AND GEAR BOX, SUBMERGED
BEARINGS AND APPURTENANCES CONNECTED TO SCREW PUMP.
2. CONTRACTOR SHALL COORDINATE WITH PLANT STAFF ON WHAT EQUIPMENT WILL BE SALVAGED TO
OWNER AND WHAT WILL BE DISPOSED OF.
3. CONTRACTOR SHALL PRESSURE WASH CONCRETE STRUCTURE TO REMOVE LIME SCALE AND DEBRIS
AND EXPOSE EXISTING CONCRETE.
4. ENGINEER TO REVIEW CONCRETE SURFACES AFTER CONTRACTOR HAS CLEANED THEM.
5. ALL ANCHOR BOLTS AND OTHER METALLIC PROJECTIONS THAT ARE NOT GOING TO BE REUSED SHALL
BE CUT OFF AND TORCHED BACK FROM THE CONCRETE SURFACE AND REPAIRED IN ACCORDANCE
WITH THE DETAIL ON THIS SHEET.
SCREW PUMPDEMOLITION
PLAN AND SECTIONS
C3
C3 C3
C3 C3
SCALE:1/4" = 1'
SCALE: 1/4" = 1'
C3 C3
C3 C3
SCALE: 1/4" = 1'
C3 C3
SCALE: 1/4" = 1'
C3 C3
SCALE: 1/4" = 1'
C3 C4
C3 C4
C3 C3
C3 C3
SCALE: NONE
C3 C4
EL. 74.17
EL. 72.42
EL. 63.83
EL. 63.17
36" Ø RCP
GATE NO. 12 GATE NO. 13 GATE NO. 14
7'-6" 7'-6" 4'-3"
23'-6"
EXISTING 36"x48" GATE AND ACTUATOR
TO BE REMOVED AND REPLACED
WITH NEW (TYPICAL OF 3)
EL. 74.17
2'-6"
4'-0"
EL. 63.83
2'-0"
6"
23'-6"
1'-0" 6'-6" 1'-0" 6'-6" 1'-0" 6'-6"
EXISTING OPENINGS
REMOVE EXISTING GATES
LOWER BEARING LUBE
SYSTEM TO BE REMOVED
EXISTING 36" PE LINE
12
'-6
"
1'-6
"
10
'-4
"
4'-0"
6'-0"
KEITH A. RUTHERFORD
92821
P
R
O
F
E
S S
I
O
N
R
E
E
N
I
G
N
E
LA
S
T
A
T
E
OF
T
E
S
A
X
S
E
D
N
E
C
I
L
PA
R
K
H
I
L
L
S
M
I
T
H
&
CO
O
P
E
R
,
I
N
C
.
F
-
5
60
11/12/2020
D
C
B
A
1 2 3 4 5
1 2 3 4 5
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\C
-0
4-6
93
9.d
wg
L
AY
OU
T N
AM
E: C
4 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:2
8a
m U
SE
R: o
sa
nch
ez
EL PASO 6939.19
FRE
D H
ER
VEY
WR
PE
QU
ALI
ZA
TIO
N P
UM
PS
RE
PLA
CE
ME
NT
EL
PA
SO
WA
TER
1170
0 R
AIL
RO
AD
DR
IVE
EL
PA
SO
, TE
XAS
799
24
NOTES:
1. CONTRACTOR SHALL REMOVE GATES AND ACTUATORS.
2. CONTRACTOR SHALL COORDINATE WITH PLANT STAFF ON WHAT EQUIPMENT WILL BE SALVAGED TO
OWNER AND WHAT WILL BE DISPOSED OF.
3. CONTRACTOR SHALL PRESSURE WASH INTERIOR OF CONCRETE STRUCTURE TO REMOVE LIME SCALE
AND DEBRIS AND EXPOSE EXISTING CONCRETE.
4. ENGINEER TO REVIEW CONCRETE SURFACES AFTER CONTRACTOR HAS CLEANED THEM.
SLUICE GATEDEMOLITION PLAN
C4
C3 C4
SCALE:3/8" = 1'
C3 C4
SCALE:3/8" = 1'
C3 C4
SCALE:1/2" = 1'
EL. 73.50
EL. 57.50
EL. 63.18
1'-0
"
6'-4" 6'-0" 6'-0" 6'-0" 6'-0" 5'-0"
30'-4"
3'-0"
EL. 67.00 HWS
EL. 63.18 LWS
1'-0"
EL. 57.50
EL. 73.50
EL. 76.00
12'-8"10'-0"
6'-4"
4'-0"
KEITH A. RUTHERFORD
92821
P
R
O
F
E
S S
I
O
N
R
E
E
N
I
G
N
E
LA
S
T
A
T
E
OF
T
E
S
A
X
S
E
D
N
E
C
I
L
PA
R
K
H
I
L
L
S
M
I
T
H
&
CO
O
P
E
R
,
I
N
C
.
F
-
5
60
11/12/2020
D
C
B
A
1 2 3 4 5
1 2 3 4 5
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\C
-0
5-6
93
9.d
wg
L
AY
OU
T N
AM
E: C
5 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:3
1a
m U
SE
R: o
sa
nch
ez
EL PASO 6939.19
FRE
D H
ER
VEY
WR
PE
QU
ALI
ZA
TIO
N P
UM
PS
RE
PLA
CE
ME
NT
EL
PA
SO
WA
TER
1170
0 R
AIL
RO
AD
DR
IVE
EL
PA
SO
, TE
XAS
799
24
NOTES:
1. CONTRACTOR SHALL COORDINATE ALL WORK IN EXISTING PUMP STATION WET WELL WITH
PLANT STAFF.
2. CONTRACTOR MAY USE EXISTING, OPEN PUMP SLOT TO INSTALL BYPASS PUMP OR SUCTION
LINES TO CONVEY FLOW AROUND SCREW PUMP SUMP AND TROUGHS. HATCH OVER JOCKEY
PUMP MAY BE USED FOR SUCTION LINE ACCESS AS WELL.
3. FLOW TO BE BYPASSED IS 10 MGD.
4. SEE SHEET C6 FOR LOCATION OF BYPASS DISCHARGE.
5. EXISTING TRAIN 3 PUMPS MUST REMAIN IN OPERATION AT ALL TIMES.
6. SEE BY PASS PUMPING PLAN ON SHEET C6.
EXISTING TRAIN 3PE PUMP STATIONPLAN & SECTIONS
C5
C5 C5
SCALE:3/8" = 1'
SCALE: 1/4" = 1'
C5 C5
SCALE: 3/8" = 1'
C5 C5
C5 C5
EXISTING PUMP SLOT AVAILABLE
FOR BYPASS PUMP DURING
CONSTRUCTION
EXISTING PUMP SLOT AVAILABLE
FOR BYPASS PUMP DURING
CONSTRUCTION
NOTE: NO GUIDE RAILS INSTALLED
TEMPORARY PLUG
BY CONTRACTOR
SECONDARY PLUG
MAY BE INSTALLED
AT CONTRACTORS
OPTION
EXISTING MANHOLE
EXISTING JUNCTION
BOX
OPENING AVAILABLE FOR
BYPASS PUMP SUCTION
LINE AS NECESSARY
EXISTING 36" PE LINE
EXISTING 36"
PE LINE
EXISTING 8" JOCKEY
PUMP DISCHARGE LINE
KEITH A. RUTHERFORD
92821
P
R
O
F
E
S S
I
O
N
R
E
E
N
I
G
N
E
LA
S
T
A
T
E
OF
T
E
S
A
X
S
E
D
N
E
C
I
L
PA
R
K
H
I
L
L
S
M
I
T
H
&
CO
O
P
E
R
,
I
N
C
.
F
-
5
60
11/12/2020
D
C
B
A
1 2 3 4 5
1 2 3 4 5
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\C
-0
6-6
93
9.d
wg
L
AY
OU
T N
AM
E: C
6 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:3
4a
m U
SE
R: o
sa
nch
ez
EL PASO 6939.19
FRE
D H
ER
VEY
WR
PE
QU
ALI
ZA
TIO
N P
UM
PS
RE
PLA
CE
ME
NT
EL
PA
SO
WA
TER
1170
0 R
AIL
RO
AD
DR
IVE
EL
PA
SO
, TE
XAS
799
24
NOTES:
1. CONTRACTOR SHALL ESTABLISH BYPASS PUMPING
WITH BACKUP CAPABLE OF PUMPING 10 MGD FROM
EXISTING TRAIN 3 PUMP STATION WET WELL TO THE
SCREW PUMP DISCHARGE PRIOR TO PERFORMING ANY
DEMO WORK.
2. ONCE BYPASS IS ESTABLISHED, CONTRACTOR CAN
PLUG PIPE THAT FEEDS THE SCREW PUMPS. A
SECONDARY PLUG CAN BE INSTALLED IF DEEMED
NECESSARY BY THE CONTRACTOR.
3. CONTRACTOR MAY INSTALL PLATES OR PLYWOOD AT
THE TOP OF THE SCREW TROUGH TO PREVENT WATER
FROM FLOWING BACK INTO THE TROUGH FROM THE
DISCHARGE CHANNEL.
4. BYPASS SHALL REMAIN ACTIVE UNTIL THE GATES HAVE
BEEN REPLACED AND AT LEAST TWO OF THE THREE
SCREW PUMPS HAVE BEEN INSTALLED AND TESTED.
BYPASS PUMPINGPLAN
C6
SCALE: 3/16" = 1'
PE PUMP STATION
EXISTING PUMPS
EXISTING PAVEMENT
EXISTING SCREW PUMPS
TO BE REPLACED
EXISTING BLOWER ROOM
PE LINE TO TRAIN 3
EXISTING JIB CRANE
EXISTING SCREW PUMP SUMP
EMPTY PUMP BAY
EXISTING JOCKEY PUMP
EXISTING TRAIN 3 PE LIFT STATION
JOCKEY PUMP DISCHARGE
BYPASS PUMPING LINE
EXISTING STAIR SHALL NOT BE
USED TO SUPPORT BYPASS LINE
BYPASS LINE TO DISCHARGE INTO OPEN
CHANNEL AREA - FLOWS TO AERATION BASINS
INSTALL TEMPORARY PUMP. SEE SHEET C5
3
'
-
1
1
"
2
'
-
0
1
/
2
"
1
'
-
1
1
/
2
"
1
1
"
E
X
I
S
T
I
N
G
G
R
O
U
T
EL. 64.33
EL. 63.83
EL 74.17
EL. 67.17
EL. 85.17
EL. 87.08
EL. 86.82
EL. 90.33
EL. 87.28
EL 67.00
@ 5 MGD
MAX HWS
DESIGN HWS
NEW SLUICE GATE
SEE DETAIL SHEET C4
NEW MOTOR AND GEAR BOX ASSEMBLY
NEW 2 TON JIB CRANE WITH 14' REACH
MANUFACTURED BY DAYTON OR EQUAL
NEW SUPPORT COLUMN BY CRANE MANUFACTURER
NEW GROUT PER SCREW
PUMP MANUFACTURERS
INSTRUCTIONS
NEW 47"Ø SCREW PUMP (TYPICAL OF 3)
EXISTING GRADE
23'-6"
6'-6" 6'-6" 6'-6"
4'-0"
Ø
3
'-
1
1
"
R
1
'
-
1
1
1
/
2
"
EXISTING GROUT TYPICAL
NEW GROUT PER SCREW PUMP MANUFACTURERS INSTRUCTIONS
TYPICAL OF ALL 3 SCREW PUMPS
MODULAR FRP COVERS
TO BE INSTALLED
OVER SCREW PUMPS
NEW SCREW PUMPS
2'-6"
JIB CRANE SUPPORT COLUMN
EXISTING GROUT
NEW GROUT PER SCREW
PUMP MANUFACTURERS
INSTRUCTIONS
NEW SCREW PUMP
KEITH A. RUTHERFORD
92821
P
R
O
F
E
S
S
I
O
N
R
E
E
N
I
G
N
E
LA
S
T
A
T
E
OF
T
E
S
A
X
S
E
D
N
E
C
I
L
PA
R
K
H
I
L
L
S
M
I
T
H
&
CO
O
P
E
R
,
I
N
C
.
F
-
5
60
11/12/2020
D
C
B
A
1 2 3 4 5
1 2 3 4 5
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\C
-0
7-6
93
9.d
wg
L
AY
OU
T N
AM
E: C
7 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:3
5a
m U
SE
R: o
sa
nch
ez
EL PASO 6939.19
FRE
D H
ER
VEY
WR
PE
QU
ALI
ZA
TIO
N P
UM
PS
RE
PLA
CE
ME
NT
EL
PA
SO
WA
TER
1170
0 R
AIL
RO
AD
DR
IVE
EL
PA
SO
, TE
XAS
799
24
NOTES:
1. CONTRACTOR SHALL COORDINATE MOTOR AND GEARBOX LAYOUT WITH SCREW PUMP MANUFACTURER
2. CONTRACTOR SHALL COORDINATE METHOD FOR MOUNTING LOWER BEARING WITH SCREW PUMP
MANUFACTURER.
3. GROUT SHALL BE RUN IN WITH SCREW PUMP MECHANISM AS DIRECTED BY PUMP MANUFACTURER.
4. GROUT AT TOP AND BOTTOM OF EACH TROUGH SHALL BE FINISHED TO CONFORM WITH THE LINES OF
THE ORIGINAL STRUCTURE, FILLING VOIDS LEFT BY SCREW PUMP OPERATIONS.
SCREW PUMPPROPOSED
PLAN AND SECTIONS
C7
C6 C6
C6 C6
SCALE:1/4" = 1'
SCALE:1/4" = 1'
C6 C6
C6 C6
SCALE:1/4" = 1'
C6 C6
SCALE:1/4" = 1'
C6 C6
NEW SLUICE GATE TYPICAL OF 3
SEE DETAILS SHEET C4
MODULAR FRP COVERS TO BE
INSTALLED OVER PUMPS
COVERS NOT SHOWN
FOR CLARITY
NEW 2TON JIB CRANE
WITH MANUAL HOIST
MODULAR FRP COVERS TO BE
INSTALLED OVER PUMPS
LIQUID TIGHT FLEXIBLE
METAL CONDUIT,
2' MAX LENGTH
E-STOP SWITCH, CLASS 1, DIV 2
RATED, WITH LOCKOUT HOLES
ON STOP, CROUSE HINDS
EDSC215 OR EQUAL
HEAVY DUTY, 3 POLE, 600VAC, NEMA 4X,
STAINLESS STEEL DISCONNECT,
AMPERAGE AS INDICATED
TO
MCC/VFD
NEW STAINLESS STEEL
MOUNTING PLATE
EXISTING HANDRAIL
MOTOR
ALUMINUM RMC
EXISTING CONCRETE FLOOR
30A
M
100A
M
M
M
M
M
30A100A
30A
100A
TO VFD 1
TO MCC 6
4-#4
4-#12
2"C
8-#12, 1" C
8-#12
1" C
4-#4
4-#12
2"C
4-#4
4-#12
2"C
8-#12, 1" C
4-#12
3/4" C
4-#4
2" C
4-#12, 3/4" C
4-#4
2" C
4-#4
2" C
4-#12
3/4" C
EQUALIZ.
PUMP 1
LUBE
PUMP 1
EQUALIZ.
PUMP 2
LUBE
PUMP 2
EQUALIZ.
PUMP 3
LUBE
PUMP 3
TO
VFD 3
TO
MCC 7
TO MCC 7
TO VFD 2
VFD 1 VFD 2
VFD 3
3/4" RMC CONDUIT. SECURE
TO MOUNTING BRACKET
E-STOP PULL
BUTTON
HAND RAILING
SCREW PUMP
J-BOX
3/4" SCH. 40 PVC
WITH 6-#12 THHW
D
C
B
A
1 2 3 4 5
1 2 3 4 5
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
FIL
E N
AM
E: X
:\2
01
9\6
93
9.1
9\0
3_
DS
GN
\0
1_
DW
G\0
50
_C
IV
IL
\E
-0
1-6
93
9.d
wg
L
AY
OU
T N
AM
E: E
1 P
RIN
TE
D: T
hu
rsd
ay, N
ove
mb
er 1
2, 2
02
0 - 1
0:3
9a
m U
SE
R: o
sa
nch
ez
EL PASO 6939.19
FRE
D H
ER
VEY
WR
PE
QU
ALI
ZA
TIO
N P
UM
PS
RE
PLA
CE
ME
NT
EL
PA
SO
WA
TER
1170
0 R
AIL
RO
AD
DR
IVE
EL
PA
SO
, TE
XAS
799
24
NOTES:
1. CONTRACTOR TO REMOVE AND REPLACE ALL CONDUCTORS AND
CONDUIT BETWEEN EQUALIZATION PUMP MOTORS, DISCONNECTS AND
VFDS.
2. ALL NEW EXPOSED RIGID CONDUITS TO BE ALUMINUM RIGID METAL
CONDUIT.
3. CONDUCTORS BETWEEN VFD AND EQUALIZ. PUMP MOTORS TO BE
MULTI-CONDUCTOR VFD CABLE, BELDEN 29506 OR EQUAL.
4. CONTRACTOR TO REMOVE AND REPLACE ALL EXPOSED LUBE PUMP
MOTOR CONDUITS. BELOW GRADE CONDUITS ROUTED TO MCC TO
REMAIN IN PLACE.
5. CONTRACTOR TO REMOVE AND REPLACE ALL CONDUCTORS BETWEEN
LUBE PUMP MOTORS AND MCCS.
6. NON VFD CONDUCTORS SHALL BE THHW TYPE.
7. NEW CONDUIT RUNS TO FOLLOW SAME ROUTING AS EXISTING.
8. CONTRACTOR TO DISPOSE OF REMOVED EQUIPMENT, INCLUDING BUT
NOT LIMITED TO CONDUIT, CABLE, DISCONNECTS, CAPACITORS, AND
SWITCHES.
9. INSTALL NEW E-STOP PUSH BUTTON STATIONS AT BOTTOM OF SCREW
PUMPS. ROUTE CONTROL CONDUCTORS IN COMMON 3/4" CONDUIT FROM
E-STOPS TO VFD'S. USE PVC COATED RMC ELLS WHEN TRANSITIONING
FROM BELOW GRADE TO ABOVE GRADE. UTILIZE PULL BOXES TO AVOID
MORE THAN THREE 90 DEGREE TURNS.
ELECTRICALEXISTING
POWER CONTROL AND INSTRUMENTATION
E1
M
HOME RUN
MOTOR
E-STOP WITH NAME PLATE
CONDUCTORS: CONTROL (TYP THHW)
NEMA 4X, DISCONNECT AMPS AS INDICATED
ELECTRICAL LEGEND
SCALE: NONE
SCALE:1/4" = 1'
CONDUCTORS: GROUND, HOT (BELDEN 29506
OR EQUAL FOR VFD DRIVEN LOADS)
PUMP MOTOR
VFD 3 VFD's 1 & 2
EXISTING GRADE
SCALE:1/4" = 1'
SCREW PUMP 1 DISCONNECT REFER TO DETAIL THIS SHEET
LUBE PUMP 1 DISCONNECT
LUBE AND SCREW
PUMPS DISCONNECTS
E1 E1
E1 E1
SCALE: 3/16"" = 1'
TRANSFORMER
T4
TRANSFORMER
T3
MC
C 8
MC
C 7
MC
C 6
SCREW PUMPS
EXISTING
BLOWER ROOM
DISCONNECTS TYPICAL OF 6
EXISTING HAND RAILING
LUBE PUMP ASSEMBLY
E-STOP
E-STOP SWITCH, CLASS 1, DIV 2 RATED,
WITH LOCKOUT HOLES ON STOP,
CROUSE HINDS EDSC215 OR EQUAL
3/4" ALUMINUM RMC
WITH 2-#12 THHW
TO EACH VFD
3/4" SCHEDULE 40 PVC WITH 6-312 THHW
3/4" ALUMINUM RMC WITH 2-#12
THHW TO EACH E-STOP
3/4" SCHEDULE 40 PVC
WITH 6-#12 THHW
E-STIP MOUNTING DETAIL