Reactor Decommissioning Program Lessons-Learned .4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research Institute, Inc. All rights reserved. 1

Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

Reactor Decommissioning ProgramLessons-Learned

.4y

*Ralph Andersen, CHP (NEI)

Sean Bushart, Ph.D (EPRI)

C 2005 Electric Power Research Institute, Inc. All rights reserved. 1

Page 2: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

#:rt

Industry Program

*EPRI- Document experience and lessons-learned

- Technology development & transfer.- On-site assessment and technical support

oNEI

- Executive oversight & policy development- Interface with NRC, EPA and Congress

- Resolve generic economic & regulatory issues

0 2005 Electric Power Research Institute, Inc. All rights reserved. 2

Page 3: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

Currently for Power Plants in USA

" Decommissioning of closed units proceeding well- 2 plants have terminated their licenses- significant progress at other plants- transfer of fuel to dry storage completed- funding appears to be adequate in most cases- completion of several plant projects in next 1-2 years

" Remaining issues- Final site characterization- License termination and site release- Materials clearance- Groundwater contamination/ soil remediation

0 2005 Electric Power Research Institute, Inc. All rights reserved.

Page 4: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

7 07 US Plants in Progress, - fuel in dry storage

Maine Yankee

900MW PWR, complete

Yankee Rowe

180MW PWR 90% complete

San Onofre 1

450MW PWR

O •

Page 5: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

0

Big Rock Point

Key EPRI Interactions:

*2 Technical Workshops-Hazardous Waste Remediation-LTP and Final Site Release

,Full System Decon with EPRI DFD process

Page 6: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

0

Maine Yankee

.7

Kev EPRI Interactions:

*Technical Workshops-Radiation Exposure Control-Final Status Survey.*Full System Decon with EPRIDFD process

*Experience Summary Report

Page 7: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

0

Trojan

Kev EPRI Interactions:

*Technical Workshop-Embedded Piping Removal

*Evaluation of DecommissioningStrategy

*SFP Cleanup and Cooling ReportN,

Page 8: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

a. 0

YankeeRowe

Key EPRi Interactions:

,*Technical Workshop-Concrete Removal

*Groundwater ExperienceReport

Page 9: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

Connecticut Yankee

Key EPRI Interactions:

eTechnical Workshops-Final Site Survey and LTP-Groundwater Management

*Experience Summary Report

Page 10: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

0

RanchoSeco

Key EPRI Interactions:

*Technical Workshop-LLW Management

*ALARA Evaluation for Reactor.Internals Segmentation

oExperience Summary Report*Decommissioning strategy peer

review team

Post-Phase I Site Boundary

Page 11: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

Technology Transfer Focus of EPRI ProgramContinues Internationally

* Growing membership internationally in the EPRIProgram

- UKAEA- Scotland, British Energy, BNG- UK

- EdF- France, SOGIN- Italy, JAPC- Japan, TaiPower-Taiwan

- UNESA (All Spanish Utilities), ENRESA, & Iberinco- Spain

* US technical and regulatory experiences are invaluable toALL members

New technologies/experiences being transferred to U.S. aswell

0 2005 Electric Power Research Institute, Inc. All rights reserved. 11

Page 12: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

EPRI CollaborationReducing the Costs and Risks of Decommissioning Nuclear Facilities

Examples: EPRI Reports/Software Available to MembersPlanning= Pre-planning Manual

R tory.Issu License Termination Plan

Site Characterization**Site Release Modeling and Characterization

Initial Activities Optimization of Radioactive Waste Management*

Reactor Primary System Decontamination**Removal of Graphite Cores**

Major'Remnoval Reactor Vessel Internals SegmentationRemoval of Major Components and Structures

Site Survey and Final Release**Major Site Release Site Groundwater Characterization Studies**

Demolition of Major StructuresDisposal of site materials (concrete, soil)

Final Site Survey**ýClosure Tasks License Termination

02005 Electric Power Research Institute, Inc. All rights reserved. ** Technical Topics Available for Site-specific Evaluations 12

Page 13: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

Lessons-Learned - Decommissioning

o Paradigm shifts (operation-shutdown-deconstruction-disposal)* Internal.and external stakeholderso Applicable agencies and standardso Historical site review• Site characterization" Groundwater modeling and monitoring" Decontamination for decommissioning" Reactor vessel/large component disposal" Soil and groundwater remediation" Low-level waste management options" Final site survey

0 2005 Electric Power Research Institute, Inc. All rights reserved. 13

Page 14: Reactor Decommissioning Program Lessons-Learned.Reactor Decommissioning Program Lessons-Learned.4y *Ralph Andersen, CHP (NEI) Sean Bushart, Ph.D (EPRI) C 2005 Electric Power Research

Lessons Learned - New Plants (Examples)

" AE/Construction considerations- Design and construction documentation

- On-site construction practices- Hydro-geological characteriaztion

" NSSS Design Considerations

- Sumps

- Structures and outside areas

- Spentf.uel pool and transfer canal

- Piping.a

- Tanks

- Site water management

- Discharge lines

© 2005 Electric Power Research Institute, Inc. All rights reserved. 14