Report run on: March 15, 2013 11:06 AM
RECAPP Facility Evaluation Report
St. Mark Elementary SchoolB2813ACalgary
Calgary RCSSD #1
Report run on: March 15, 2013 11:06 AM Page 2 of 33
B2813ABuilding Id:
St. Mark Elementary SchoolBuilding Name:
CalgaryLocation:4589 Marbank Drive N. E. Address:
2,559.94Gross Area (sq. m): $7,207,000Replacement Cost:1974Construction Year:
Evaluation Date: August 20 2012
ARUP DATTA ARCHITECT LTD.Evaluation Company:
Brian DennisEvaluator Name:
St. Mark is an elementary school constructed in the year 1974. It is a single story structure with a gross area of 2287m2. This includes three portables attached to the south side of the building.
General Summary:
Structural Summary:This building was constructed in 1974. The building is sitting on concrete foundation walls with load bearing masonrywalls running up to an OWSJ roof construction. This building is a single story structure. No major work is recommended. Overall, the structure is in Acceptable Condition.
Envelope Summary:The exterior walls are constructed with concrete block, painted. With similar type of concrete block accent pillar plowout to deviate the long wall. Wood Siding for the canopy and articulation at the window area. Wood sidings aredeteriorating. Windows are older version of dark bronze anodized aluminum frame 2 pane vented windows withexpanded metal mesh in front. Roofing observed as modified bituminous membrane SBS system Recommended major works: - Replace wood siding with new metal siding. - Replace caulking at flashing joints and interior caulking around exterior windows. Overall, the envelope is in Acceptable Condition.
Interior Summary:Resilient sheet flooring in classrooms, hallways, general office area and staff lounge, resilient tile flooring in storages,infirmary, caretakers office and some hallways, carpet flooring in library, E.C.S. Room, principal's office and mosaicflooring in students washrooms and shower areas and painted concrete floor finish in change room and mechanicalroom. Walls are painted concrete block, painted gypsum board walls and demountable walls. Major work is recommended: - Install stair handrails to the gym exit. Overall, the interiors are in Acceptable Condition.
Mechanical Summary:Heating is provided by 8 gas fired boilers feeding perimeter radiation and a heating coil within the single Air HandlingUnit serving the site. The control system is pneumatic. Domestic hot water is provided by a gas fired DHWH. Plumbing, sanitary and domestic water lines are in satisfactorycondition. Overall the Mechanical System is in Acceptable condition
21.17%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $1,525,646
Calgary - St. Mark Elementary School (B2813A)
Report run on: March 15, 2013 11:06 AM Page 3 of 33
Electrical Summary:This school has a 400 Amp 120/208 Volt Westinghouse electrical service that feeds five branch circuit panelsthroughout the building. Electrical switchboards and branch circuit panels are in good condition. Lighting is T12fixtures. Emergency light , exit signs and fire alarm system are operational. Overall the Electrical Systems are in acceptable condition
Calgary - St. Mark Elementary School (B2813A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: March 15, 2013 11:06 AM Page 4 of 33
A1010 Standard Foundations*
A1030 Slab on Grade*
B1010.01 Floor Structural Frame (Building Frame)*
B1010.05 Mezzanine Construction*
B1010.09 Floor Construction Fireproofing*
B1010.10 Floor Construction Firestopping*
B1020.01 Roof Structural Frame*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1974
1974
1974
1974
1974
1974
1974
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - St. Mark Elementary School (B2813A)S1 STRUCTURAL
Reinforced cast in place concrete foundation
Reinforced cast in place concrete Slabs.
Masonry concrete block interior and exterior bearing walls
Steel/Concrete mechanical mezzanine
Fire proofing of the floor structure is integral in the concrete slab.
No signs of unprotected penetrations.
Metal roof deck is supported be steel open web joist (OWSJ).
Report run on: March 15, 2013 11:06 AM Page 5 of 33
B1020.04 Canopies*
B1020.06 Roof Construction Fireproofing*
B1020.07 Roof Construction Firestopping*
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1974
1974
1974
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Calgary - St. Mark Elementary School (B2813A)
Wood siding canopies on exterior east side of the school.
Spray fire proofing to the roof mechanical mezzanine. Some damaged areas were observed. Should be repaired as partof maintenance item. Estimated cost is less than $1000.
No signs of unprotected penetrations.
Report run on: March 15, 2013 11:06 AM Page 6 of 33
B2010.01.02.02 Concrete Block: Ext. Wall Skin*
B2010.01.06.04 Wood Siding**
4 - Acceptable
2 - Poor
Rating
Rating
1974
1974
Installed
Installed
0
40
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Replace with Pre-finished Metal Siding Panels(BOE 50 sqm.)
Failure Replacement 2013 $18,000 High
Wood siding panels were cracked and deformed. There wasevidence of moisture damage to wood window casing.
Concern:
Replace with pre-finished metal siding.Recommendation:
Calgary - St. Mark Elementary School (B2813A)S2 ENVELOPE
Event:
Type Year Cost Priority
Updated: MAR-13
Painted concrete block walls on all sides of the building. For painting refer to B2010.01.13 Paints (& Stains): Ext. Wall.
Painted wood siding panels to below and above windows, above gym exit door and to canopies & soffits. Wood sidingsare showing serious signs of failure and may actually pose a safety problem if hit with objects such as balls etc.
Consequences of Deferral:Safety problem and is affecting building envelope.
Report run on: March 15, 2013 11:06 AM Page 7 of 33
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
B2010.01.13 Paints (& Stains): Ext. Wall**
B2010.02.01 Cast-in-place Concrete: Ext. Wall Const*
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1974
1974
1974
Installed
Installed
Installed
20
15
0
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Repair Interior Caulking around Exterior Windowsand Caulking at Flashing Joints (BOE 60 lm.)
Replace Caulking (BOE 160 lm.)
Repaint Exterior Walls and Doors (BOE 770 sqm.)
Repair
Lifecycle Replacement
Lifecycle Replacement
2013
2016
2016
$2,000
$5,800
$32,000
Low
Unassigned
Unassigned
There were damages to the interior caulking around exteriorwindows.
Concern:
Replace interior caulking around exterior windows.Recommendation:
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Caulking is applied around exterior windows, doors and at flashing joints.
Concrete block walls, wood siding panels and exterior doors have paint finish. Wood siding panels are showing serioussigns of failure. Refer to B2010.01.06.04 Wood Siding.
Painted cast-in-place concrete wall at lower portion of the building. For painting refer to B2010.01.13 Paints (& Stains):Ext. Wall.
Consequences of Deferral:Potential moisture ingress.
Report run on: March 15, 2013 11:06 AM Page 8 of 33
B2010.02.03 Masonry Units: Ext. Wall Const.*
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*
B2010.06 Exterior Louvers, Grilles, and Screens*
B2010.09 Exterior Soffits*
B2020.01.01.01 Steel Windows (Glass & Frame)**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1974
1974
1974
1974
1974
Installed
Installed
Installed
Installed
Installed
0
0
0
0
40
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace Steel-Framed Window (BOE 2 sqm.)
Lifecycle Replacement 2016 $2,500 Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Type Year Cost Priority
Updated: MAR-13
Exterior back-up walls are generally load-bearing masonry block walls.
The school wall assemblies are assumed to have a vapor retarder and insulation.
Pre-finished metal louvers and protection screens on windows.
Painted wood siding to the soffits. Refer to B 2010.01.06.04 Wood Siding.
One exterior window at main entrance consists of double glazed sealed unit set in pressed steel frame.
Report run on: March 15, 2013 11:06 AM Page 9 of 33
B2020.01.01.02 Aluminum Windows (Glass & Frame)**
B2030.01.02 Steel-Framed Storefronts: Doors**
4 - Acceptable
4 - Acceptable
Rating
Rating
1974
1974
Installed
Installed
40
30
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Replace Exterior Windows (BOE 20 sqm.)
Replace Interior Wood Trim around ExteriorWindows (BOE 58 lm.)
Replace Metal Entrance Doors (BOE 10 Doors)
Lifecycle Replacement
Repair
Lifecycle Replacement
2016
2013
2016
$30,000
$6,000
$24,000
Unassigned
Low
Unassigned
Interior wood trim were showing water damage.Concern:
Replace Interior wood trims around exterior windows afterreplacing wood siding.
Recommendation:
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Exterior windows consist of double glazed sealed units set in aluminum frames. Interior wood trim around exteriorwindows were shown water damages most likely water comes through wood siding panels. After replacing wood sidingpainted wood trims should be replaced.
Painted metal doors in painted metal frames at entrances. Damaged weather strips were observed. Should be repairedas part of maintenance item. Estimated cost is less than $1000.
Consequences of Deferral:Further deterioration and poor visual image.
Report run on: March 15, 2013 11:06 AM Page 10 of 33
B2030.02 Exterior Utility Doors**
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**
4 - Acceptable
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
1974
1974
2002
Installed
Installed
Installed
40
25
25
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Replace Exterior Utility Door (BOE 1 Door)
Repair Membrane
Replace SBS Roofing Membrane (BOE 2141 sqm.)
Lifecycle Replacement
Repair
Lifecycle Replacement
2016
2012
2027
$1,500
$2,253
$440,000
Unassigned
Unassigned
Unassigned
Immediate repair of south facing lap joints up the parapets isrequired where there are opening of 12mm which could allowwater to penetrate the roof system.
Concern:
Repair membrane in this area.Recommendation:
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Painted metal doors in painted metal frames to the gymnasium exit.
In general the roof is sound. BUR roofing has been replaced with SBS roofing.
Roof is equipped with modified bitumen membrane assembly (SBS). Nothing was reported regarding installation year.Assuming the roofing is 10 years old based on weathering material. No major leaks were reported.
Consequences of Deferral:Water will penetrate the school and cause further damage tothe interior of the building.
Report run on: March 15, 2013 11:06 AM Page 11 of 33
C1010.01 Interior Fixed Partitions*
C1010.02 Interior Demountable Partitions*
C1010.03 Interior Operable Folding Panel Partitions**
C1010.07 Interior Partition Firestopping*
C1020.01 Interior Swinging Doors (& Hardware)*
C1020.03 Interior Fire Doors*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1974
1974
1974
1974
1974
1974
Installed
Installed
Installed
Installed
Installed
Installed
0
0
30
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Updated
Replace Metal Rolling Partitions (BOE 4 sqm.)
Lifecycle Replacement 2016 $2,400 Unassigned
Calgary - St. Mark Elementary School (B2813A)S3 INTERIOR
Event:
Type Year Cost Priority
Updated: MAR-13
Painted concrete block walls.
Demountable partitions in several locations.
Prefinished metal rolling partitions at the office and kitchen pass through windows.
Penetrations through rated walls appear sealed.
The majority of interior swinging doors are painted wood door set in painted metal frames. Some doors include glazedsidelites and transoms.
Interior fire doors are painted metal doors set in metal frames.
Report run on: March 15, 2013 11:06 AM Page 12 of 33
C1030.01 Visual Display Boards**
C1030.02 Fabricated Compartments (Toilets/Showers)**
C1030.10 Lockers**
C1030.12 Storage Shelving*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1974
1974
1974
1974
Installed
Installed
Installed
Installed
20
30
30
0
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Visual Display Boards (BOE 7chalkboards, 32 whiteboards and 61 tackboards)
Replace fabricated toilet Compartments (BOE 13Compartments)
Replace Lockers
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2016
$70,000
$18,000
$108,268
Unassigned
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Chalkboards, whiteboards, tackboards in classrooms and tackboards in hallways. Smartboards in some classrooms.
Toilet partitions in students washrooms. Shower stalls are not applicable as they are not used by programs and are usedfor gym storage
Metal lockers.
Metal cabinets in classrooms, metal storage shelving in storages and metal shoe racks in some entrance lobbies.
Report run on: March 15, 2013 11:06 AM Page 13 of 33
C1030.14.01 Toilet Accessories
C2010 Stair Construction*
C2030 Interior Ramps*
C3010.06 Tile Wall Finishes**
4 - Acceptable
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1974
1974
1974
1974
Installed
Installed
Installed
Installed
0
0
0
40
Design Life
Design Life
Design Life
Design Life
FEB-08
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Install Metal Hand Rail to the Stair lead to Gym Exit
Replace Mosaic Tile Wall Finishes (BOE 15 sqm.)
Code Repair
Lifecycle Replacement
2013
2016
$1,500
$4,000
Medium
Unassigned
There is no handrails of stair lead to gym exit. Stair height ismore than 2'.
Concern:
Install stair handrail.Recommendation:
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Accessories include paper towel dispenser, soap dispenser, and toilet paper dispenser.
Concrete stairs.
Ramp with wood hand rail and metal posts leads to gymnasium.
2x2 mosaic tiles to the base in students washrooms and shower areas. 4x4 ceramic tiles at urinal in one boys washroom.Some areas of broken tiles and missing tiles were observed.
Consequences of Deferral:Safety issue.
Report run on: March 15, 2013 11:06 AM Page 14 of 33
C3010.09 Acoustical Wall Treatment**
C3020.01.02 Painted Concrete Floor Finishes*
C3020.02 Tile Floor Finishes**
C3020.07 Resilient Flooring** - Sheet (2000 Section)
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1974
1974
1974
2000
Installed
Installed
Installed
Installed
20
0
50
20
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Acoustical Wall Treatment (BOE 627 sqm)
Replace Mosaic Tile Floor Finishes (BOE 130 sqm.)
Replace Resilient Sheet Flooring (BOE 740 sqm.)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2024
2020
$130,000
$25,000
$70,000
Unassigned
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Spray on acoustic treatment on wall and ceiling.
Painted concrete floor finish in students change rooms and mechanical room.
2x2 mosaic tile finishes in students washrooms and shower areas.
Newer resilient sheet flooring in classrooms, staff room, office and portion of library. Nothing was mentioned regardinginstallation year in previous report. Assuming, the newer sheet flooring is 10+ years old.
Report run on: March 15, 2013 11:06 AM Page 15 of 33
C3020.07 Resilient Flooring** - Sheet (1974 Section)
C3020.07 Resilient Flooring** - Tile
C3020.08 Carpet Flooring**
C3020.14 Other Floor Finishes*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1974
1974
1974
1974
Installed
Installed
Installed
Installed
20
20
15
0
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Resilient Sheet Flooring (BOE 165 sqm.)
Replace Resilient Tile Flooring (BOE 420 sqm.)
Replace Carpet Flooring (BOE 330 sqm.)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2016
$15,000
$25,000
$28,000
Unassigned
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Resilient sheet flooring in east and west side hallways.
12x12 resilient tile flooring in hallways, storages, kitchen, Infirmary, caretakers office and staff washrooms.
Carpet flooring in library, general office area, principal's office and E.C.S. room.
Membrane type rubber flooring in gymnasium.
Report run on: March 15, 2013 11:06 AM Page 16 of 33
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**
C3030.07 Interior Ceiling Painting*
4 - Acceptable
4 - Acceptable
Rating
Rating
1974
1974
Installed
Installed
25
0
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Replace Acoustic Susp. T-Bar Ceiling Tile (BOE1740 sqm.)
Lifecycle Replacement 2016 $95,000 Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Type Year Cost Priority
Updated: MAR-13
Acoustic susp. T-bar ceiling tiles in classrooms, offices, storages and hallways. Stained tiles were observed in severallocations. Should be replaced as part of maintenance item.
Painted gypsum board ceiling in kitchen, students change rooms and shower areas.
Report run on: March 15, 2013 11:06 AM Page 17 of 33
D2010.04 Sinks**
D2010.05 Showers**
D2010.08 Drinking Fountains/Coolers**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1974
1974
1974
Installed
Installed
Installed
30
30
35
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Replace Sinks BOE (5) SS, BOE (1) Janitor
Replace Showers BOE (14)
Replace Drinking Fountains BOE (3)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2016
$9,700
$22,000
$4,700
Unassigned
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Typical stainless sinks throughout
Gang showers in Male and Female change rooms. Female also has 4 showers in cubicles. Tempered water supply
Wall hung non-refrigerated drinking fountains throughout.
Report run on: March 15, 2013 11:06 AM Page 18 of 33
D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1974
D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 2006
D2020.01.01 Pipes and Tubes: Domestic Water*
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1974
2006
1974
Installed
Installed
Installed
35
35
0
Design Life
Design Life
Design Life
MAR-13
MAR-13
FEB-08
Updated
Updated
Updated
Replace Washroom Fixtures BOE (7) WC, (15) Lav,(4) Urnl
Replace Washroom Fixtures BOE (11) WC
Lifecycle Replacement
Lifecycle Replacement
2016
2041
$32,000
$17,800
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Combination of American Standard floor mounted and Mansfield wall mounted urinals. Floor mounted, open front seat, flush valve WC and Porcelain Lavs.
Newer Water Closets installed. Standard porcelain.
4" domestic water service. 1 1/2" domestic water meter. 1 1/2" Irrigation with meter. 2" fire line. Copper tubing. Majority is original. New piping added as required
Report run on: March 15, 2013 11:06 AM Page 19 of 33
D2020.01.02 Valves: Domestic Water**
D2020.01.03 Piping Specialties (Backflow Preventers)** - 1994
D2020.01.03 Piping Specialties (Backflow Preventers)** - 2010
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1974
1994
2010
Installed
Installed
Installed
40
20
20
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Replace Valves BOE (15)
Replace Backflow Preventers BOE (3)
Replace Backflow Preventer BOE(1)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2030
$17,200
$9,200
$3,100
Unassigned
Unassigned
Unassigned
Concern:
Concern:
Recommendation:
Recommendation:
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Majority original to building. Some replaced as required
Installed on irrigation line, DCW line and Fire line. All regularly inspected and replaced as required
Installed on Boiler Feedwater line.
Report run on: March 15, 2013 11:06 AM Page 20 of 33
D2020.02.02 Plumbing Pumps: Domestic Water**
D2020.02.06 Domestic Water Heaters**
D2020.03 Water Supply Insulation: Domestic*
D2030.01 Waste and Vent Piping*
D2040.01 Rain Water Drainage Piping Systems*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
2005
2002
1974
1974
1974
Installed
Installed
Installed
Installed
Installed
20
20
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
FEB-08
FEB-08
Updated
Updated
Updated
Updated
Updated
Replace DHWR Pump BOE (1)
Replace DHWH BOE (1)
Lifecycle Replacement
Lifecycle Replacement
2025
2025
$1,200
$3,200
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
In-line domestic hot water recirc pump
Single AO Smith "master Fit" model "BTRC 180" DHWH located in Mechanical Mezzanine. 179,100 BTU Input, Storage288 liters, Recovery 173 gal/hr (659 l/hr).
Pipe insulation generally appears acceptable.
Tied to city sewer
Tied to city storm water
52Capacity Size
kWCapacity Unit
Report run on: March 15, 2013 11:06 AM Page 21 of 33
D2040.02.04 Roof Drains*
D3010.02 Gas Supply Systems*
D3020.02.01 Heating Boilers and Accessories: H.W.**
D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**
D3020.02.03 Water Treatment: H. W. Boiler*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1974
1974
1974
1974
1974
Installed
Installed
Installed
Installed
Installed
0
0
35
35
0
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-08
MAR-13
MAR-13
MAR-13
FEB-08
Updated
Updated
Updated
Updated
Updated
Replace Heating Boilers BOE (1)
Replace Flues BOE (12m)
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$53,700
$7,900
Unassigned
Unassigned
Recommendation:
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Full flow roof drains installed throughout
Gas distribution piping to DHWH, boilers and portables.
Main heating plant consists of 8 "multi temp" atmospheric, gas fired modular boilers, model MR-2400. 7 of the modulesare original to building with 1 replaced approximately 20 years ago. Total input 2400 MBH, output approx. 1920 MBH.
Flues in acceptable condition. Combustion air ducted to low level frost box.
Chemical pot feeder installed, treatment added as required. 3/4" micron filter.
560Capacity Size
kWCapacity Unit
Report run on: March 15, 2013 11:06 AM Page 22 of 33
D3040.01.01 Air Handling Units: Air Distribution**
D3040.01.03 Air Cleaning Devices: Air Distribution*
D3040.01.04 Ducts: Air Distribution*
D3040.01.07 Air Outlets & Inlets: Air Distribution*
D3040.03.01 Hot Water Distribution Systems**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1974
1974
1974
1974
1974
Installed
Installed
Installed
Installed
Installed
30
0
0
0
40
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
FEB-08
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace AHU BOE (1)
Replace Hot Water Distribution Systems BOE(2286m2/gfa)
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$88,300
$216,200
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
A single AHU original to the building provides all ventilation air, heated through hot water coil and 3 way valve. Trane model T31-HF-LP-THD, Serial # 605879
AHU provided with panel filters.
Galvanized ductwork to classroom ceilings and spaces throughout the facility.
S/A fed via a combination of square cone diffusers and wall mounted grilles.
Duplex parallel pumps provide heating water distribution through steel piping to AHU heating coil and perimeter radiation.
Report run on: March 15, 2013 11:06 AM Page 23 of 33
D3040.04.01 Fans: Exhaust**
D3040.04.03 Ducts: Exhaust*
D3040.04.05 Air Outlets and Inlets: Exhaust*
D3050.05.03 Finned Tube Radiation**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1974
1974
1974
1974
Installed
Installed
Installed
Installed
30
0
0
40
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Roof Mounted Exhaust Fans BOE (3)
Replace Finned Tube Radiation BOE (2286m2/gfa)
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$5,500
$106,500
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Roof mounted washroom and kitchen exhaust fans generally in acceptable condition
Duckwork from washroom and service areas to roof mounted exhaust fans.
Exhaust and return typically via eggcrate grille in ceiling.
Perimeter radiation in classrooms and other spaces.
Report run on: March 15, 2013 11:06 AM Page 24 of 33
D3060.02.02 Pneumatic Controls**
D4010 Sprinklers: Fire Protection*
D4020 Standpipes*
D4030.01 Fire Extinguisher, Cabinets and Accessories*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1974
1974
1974
1974
Installed
Installed
Installed
Installed
40
0
0
0
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
FEB-08
MAR-13
Updated
Updated
Updated
Updated
Replace Pneumatic Controls BOE (2286m2/gfa)
Lifecycle Replacement 2016 $33,300 Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Type Year Cost Priority
Updated: MAR-13
HVAC pneumatic controls with low voltage wiring. Paragon system for energy management. Webster brand airCompressor appears in reasonable condition. Honeywell thermostats throughout.
The building is not sprinklered.
Standpipe feeding fire hose cabinets.
Fire Extinguishers are located throughout the facility.
Report run on: March 15, 2013 11:06 AM Page 25 of 33
D5010.01.02 Main Electrical Transformers (Utility Owned)*
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
D5010.07.02 Motor Starters and Accessories**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1974
1974
1974
1974
Installed
Installed
Installed
Installed
0
40
30
30
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace 400 Amp 120/208 volt Main Distribution
Replace 6 Branch Circuit Panel Boards
Replace 7 Motor Starters
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2016
$46,328
$18,000
$5,750
Unassigned
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)S5 ELECTRICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Pad mounted transformer owned by ENMAX. S/N 22E-218.
Westinghouse 400 Amp 120/208 Volt 3 Phase 4 Wire CDP. 80% FULL.
Six Westinghouse panels located as required. 80% full.
Seven cutler Hammer starters located in mechanical room.
Report run on: March 15, 2013 11:06 AM Page 26 of 33
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*
D5020.02.02.01 Interior Incandescent Fixtures*
D5020.02.02.02 Interior Fluorescent Fixtures**
D5020.02.02.03 Interior Metal Halide Fixtures*
4 - Acceptable
4 - Acceptable
4 - Acceptable
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1974
1974
1974
1974
1974
Installed
Installed
Installed
Installed
Installed
0
0
0
30
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace Interior Florescent Fixtures for (2,287m²/gfa).
Failure Replacement 2013 $126,272 Medium
Obsolete technology. Lenses are yellowed and brittle. Highmaintenance and energy costs.
Concern:
Replace T12 fixtures with T8 fixtures.Recommendation:
Calgary - St. Mark Elementary School (B2813A)
Event:
Type Year Cost Priority
Updated: MAR-13
AC90 and R90 wiring in EMT conduit as required.
Line voltage switching.
Incandescent fixtures have had the lamps changed out to compact florescent.
Florescent fixtures are utilized throughout the hallways, classrooms and storage rooms and have T-12 lamps throughout.
In the gymnasium there are 12 Metal Halide HID fixtures located throughout the ceiling space.
Consequences of Deferral:High maintenance and operating costs.
Report run on: March 15, 2013 11:06 AM Page 27 of 33
D5020.02.03.02 Emergency Lighting Battery Packs**
D5020.02.03.03 Exit Signs*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
D5030.01 Detection and Fire Alarm**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
2005
2005
1974
1974
1998
Installed
Installed
Installed
Installed
Installed
20
0
0
0
25
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace 10 Emergency Lighting Battery Packs
Replace Fire Alarm System for (2,287 m²/gfa).
Lifecycle Replacement
Lifecycle Replacement
2025
2023
$5,000
$39,400
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Emergency lighting is provided by 12 Volt DC Lumacell battery packs and remote heads located throughout the building.
Lumacell LED exit signs located as required.
Exterior lighting is provided by various HPS HID wall packs located on the east, west and south walls.
Exterior lighting is controlled by a photo cell that controls an Allen Bradley contactor that has an override switch located inthe electrical room.
Edwards 6616 fire alarm panel, 8 zones complete with a graphic annunciator panel located at the front entrance. Bellslocated as required.
Report run on: March 15, 2013 11:06 AM Page 28 of 33
D5030.02.02 Intrusion Detection**
D5030.04.01 Telephone Systems*
D5030.04.05 Local Area Network Systems*
D5030.05 Public Address and Music Systems**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
2000
1998
2012
2005
Installed
Installed
Installed
Installed
25
0
0
20
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace intrusion detection system for (2,287m²/gfa).
Replace Public Address System for (2,287 m²/gfa).
Lifecycle Replacement
Lifecycle Replacement
2025
2025
$23,187
$9,536
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
This building is protected by a Silent Knight security panel and associated devices. Key access only.
Meridian telephone system in office areas.
Two 3COM switches. One AMP hub. WIFI in office area. Supernet in school.
Combination of equipment retrofitted into a Rauland communications system cabinet. speakers and call switches locatedthroughout the school. A Sony CD changer has been added to the system.
Report run on: March 15, 2013 11:06 AM Page 29 of 33
E1090.04 Residential Equipment*
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
E2010.02 Fixed Casework**
E2010.03.01 Blinds**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1974
1974
1974
1974
Installed
Installed
Installed
Installed
0
0
35
30
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Fixed Casework (BOE 900 m2/gfa)
Replace Blinds (BOE 3 sqm.)
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$95,000
$1,100
Unassigned
Unassigned
Calgary - St. Mark Elementary School (B2813A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Residential-style appliances are provided in the staff lounge and kitchen. Appliances generally include a refrigerator,stove, oven, microwave and dishwasher.
The gymnasium is equipped with wall and ceiling hung basketball hoops, climbing equipment, an electric scoreboard andspeakers.
Laminated top with painted wood cabinets in staff lounge and kitchen, laminated top with clear finish wood open shelvesin classrooms, clear finish wood book shelves in library, clear finish open wood shelves in storages and painted woodcoat cubbies in hallways. Delaminated countertops were observed.
Venetian blinds in one classroom.
Report run on: March 15, 2013 11:06 AM Page 30 of 33
E2010.03.06 Curtains and Drapes**
E2020.02.03 Furniture*
4 - Acceptable
4 - Acceptable
Rating
Rating
1974
1974
Installed
Installed
30
0
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Replace Curtains (BOE 20 sqm.)
Lifecycle Replacement 2016 $6,000 Unassigned
Calgary - St. Mark Elementary School (B2813A)
Event:
Type Year Cost Priority
Updated: MAR-13
Black-out curtains in classrooms, library and fabric curtains in general office areas.
Moveable furnishings in the school generally consist of desks and chairs for students and teaching staff.
Report run on: March 15, 2013 11:06 AM Page 31 of 33
K4010.01 Barrier Free Route: Parking to Entrance*
K4010.02 Barrier Free Entrances*
K4010.03 Barrier Free Interior Circulation*
5 - Good
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
2008
2008
1974
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Install Door Operators
Repair Railing
Barrier Free Access Upgrade
Code Repair
2012
2013
$5,633
$2,028
Unassigned
High
Proper railing is not present on ramp.Concern:
Install proper railingRecommendation:
Calgary - St. Mark Elementary School (B2813A)S8 SPECIAL ASSESSMENT
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Paved parking stalls with Handicap markings. Marking is fade. Refer to G2020.06.04 Pavement markings.
Automatic door opener at the main entrance.
Ramp without a proper railing. Cylinder locks on doors.
Consequences of Deferral:Safety hazard for students.
Report run on: March 15, 2013 11:06 AM Page 32 of 33
K4010.04 Barrier Free Washrooms*
K4030.01 Asbestos*
K4030.02 PCBs*
K4030.04 Mould*
K4030.09 Other Hazardous Materials*
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1974
1974
1974
1974
1974
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Install unisex barrier free washroom stall
Barrier Free Access Upgrade 2013 $10,000 Low
There is no barrier free stall in boys washrooms.Concern:
Install unisex barrier free washroom stall.Recommendation:
Calgary - St. Mark Elementary School (B2813A)
Event:
Type Year Cost Priority
Updated: MAR-13
Handicap stall with correct grab bars in one girls wash room. There is no barrier free stall in boys washroom.
Possible asbestos due to age of building. No concerns reported
No PCBs were reported.
No findings at the time of the review.
No hazardous materials found at the time of the review.
Consequences of Deferral:Non-compliance with barrier-free standards and pooraccessibility for handicapped persons.
Report run on: March 15, 2013 11:06 AM Page 33 of 33
K5010.01 Site Documentation*
K5010.02 Building Documentation*
4 - Acceptable
4 - Acceptable
Rating
Rating
2012
2012
Installed
Installed
0
0
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Calgary - St. Mark Elementary School (B2813A)
The prime consultant is ARUP DATTA ARCHITECT LTD. The evaluation date was August 20, 2012 Site description:: The B2813A St. Mark Elementary school is located on 4589 Marbank Drive N.E. with asphalt parking lot to the east. Themain entrance faces north and is accessed form the municipal sidewalk by a concrete entrance walkway. The grassedfields are contained within a chain link fence. Asphalt play field to the the west. Grassed play fields are shared with thecity. The site is relatively flat. Drainage is generally away from the building to the east and south. Three portables andconnecting corridor are located on the south side of the school.
The prime consultant is ARUP DATTA ARCHITECT LTD. The evaluation date was august 20, 2012 The entire building was evaluated B2813A St. Mark Elementary School is located at 4589 Marbank Drive N.E. The school is a 1974 Single storey, slab ongrade, 2287m2. Painted concrete masonry building with open web steel joists supporting metal deck. Individual portable information is provided on separate data files T4748 (previously C98CS12), T4749 (previouslyC80CS22), T4750 (previously C89CS14).
Parking lot
Floor plan