73
Advice Service Knowledge Tel: + 61 (0)8 9759 1418 [email protected] www.askwm.com REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Project No. 1308 Nov 2013 This project is supported by the Waste Authority through the Waste Avoidance and Resource Recovery Account.

REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

AdviceServiceKnowledge

Tel: + 61 (0)8 9759 1418 [email protected] www.askwm.com

REGIONAL WASTE MANAGEMENT PLAN 2013Kimberley Region

Shires of Broome, Derby West Kimberley, Halls Creekand Wyndham East Kimberley

Project No. 1308Nov 2013

This project is supported by the Waste Authoritythrough the Waste Avoidance and ResourceRecovery Account.

Page 2: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page iRegional Waste Management Plan 2013

Acknowledgements

ASK Waste Management gratefully acknowledge the cooperationof Shire staff that provided information and assistance in thedevelopment of this report.

This project is supported by the Waste Authority through the WasteAvoidance and Resource Recovery Account.

Disclaimer

Information in this document is current as of Nov 2013. While allprofessional care has been undertaken in preparing thedocument, ASK Waste Management accepts no liability for loss ordamages incurred as a result of reliance placed on its content.

The mention of any company, product or process in this reportdoes not constitute or imply endorsement by ASK WasteManagement.

Document Control

Version Date Description Initials

1C <draft> 1 Nov 2013 Internal draft version of report for QA

2B <draft> 4 Nov 2013 Draft for Shire review

3A <final> 12 Nov 2013 Final version

3B <final> 12 Nov 2013 Final version with Waste Authorityacknowledgement

3C <final> 27 Feb 2014 Corrected paragraph numbering

ASK Waste Management prints all reports on 100% recycled paper and is a carbon neutral company.

Report produced by:GILES PERRYMAN BSc, DMSSAMUEL GREEN B.envSc (Hons)

33 Windlemere DriveDunsborough, 6281Western AustraliaAUSTRALIA

+ 61 (0)8 9759 1418

[email protected]

www.askwm.com

Page 3: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page iiRegional Waste Management Plan 2013

TABLE OF CONTENTS

1 INTRODUCTION..................................................................................................................................................1

1.1 Purpose of the Regional Strategic Plan .................................................................................................. 11.2 Objectives .................................................................................................................................................... 11.3 State Waste Strategy .................................................................................................................................. 3

1.3.1 Implication for the Kimberley..................................................................................................... 3

2 EXISTING SERVICES AND INFRASTRUCTURE .....................................................................................................4

2.1 Regional profile............................................................................................................................................ 42.1.1 Shire of Broome ............................................................................................................................ 52.1.2 Shire of Derby / West Kimberley ................................................................................................ 52.1.3 Shire of Halls Creek ...................................................................................................................... 52.1.4 Shire of Wyndham East Kimberley ............................................................................................ 5

2.2 Waste quantities.......................................................................................................................................... 52.2.1 Data availability ........................................................................................................................... 62.2.2 Total waste generation............................................................................................................... 62.2.3 Waste recycling ........................................................................................................................... 82.2.4 Waste generation projections ................................................................................................... 92.2.5 Priority waste streams ................................................................................................................ 102.2.6 Observations............................................................................................................................... 12

2.3 Collection services .................................................................................................................................... 122.3.1 Domestic services ...................................................................................................................... 132.3.2 Commercial and Industrial (C&I) collection services.......................................................... 142.3.3 Observations............................................................................................................................... 15

2.4 Infrastructure .............................................................................................................................................. 152.4.1 Observations............................................................................................................................... 16

2.5 Resource recovery.................................................................................................................................... 192.5.1 Kerbside collection of recyclables ......................................................................................... 192.5.2 Drop-off facilities ........................................................................................................................ 192.5.3 Observations............................................................................................................................... 19

3 IMPLEMENTATION OF 2009 RWMP..................................................................................................................21

3.1 Summary of progress ................................................................................................................................ 213.1.1 Community Awareness............................................................................................................. 213.1.2 Waste Data ................................................................................................................................. 213.1.3 Best Practice Operations.......................................................................................................... 233.1.4 Waste Minimisation.................................................................................................................... 243.1.5 Local Government Waste Management.............................................................................. 25

3.2 Observations .............................................................................................................................................. 26

4 FINDINGS, ISSUES AND RECOMMENDATIONS............................................................................................... 27

4.1 Organisational Capacity ......................................................................................................................... 284.1.1 Regional cooperation............................................................................................................... 284.1.2 Regional funding........................................................................................................................ 294.1.3 Regional Waste Management Coordinator......................................................................... 30

Page 4: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page iiiRegional Waste Management Plan 2013

4.1.4 Continuity planning ................................................................................................................... 314.2 Economic Viability..................................................................................................................................... 32

4.2.1 Economy of scale (regional procurement) .......................................................................... 324.2.2 Private sector competition....................................................................................................... 334.2.3 Transport logistics ....................................................................................................................... 334.2.4 Whole of life costing and gate fee price structure.............................................................. 34

4.3 Waste Data ................................................................................................................................................ 354.3.1 Data collection and monitoring ............................................................................................. 354.3.2 Waste tonnage data ................................................................................................................ 364.3.3 Landfill cell location and site surveys ..................................................................................... 37

4.4 Community Awareness ............................................................................................................................ 384.4.1 Community attitudes ................................................................................................................ 384.4.2 Community knowledge............................................................................................................ 394.4.3 Communication to commercial customers.......................................................................... 404.4.4 Decision maker (Councillors) understanding of the waste industry ................................. 40

4.5 Best Practice Operations ......................................................................................................................... 414.5.1 Operational planning ............................................................................................................... 414.5.2 Knowledge and skills ................................................................................................................. 424.5.3 Identification of new sites......................................................................................................... 42

4.6 Waste Minimisation ................................................................................................................................... 434.6.1 Scrap metal ................................................................................................................................ 434.6.2 Source separation of C&D waste ........................................................................................... 444.6.3 Additional waste processing ................................................................................................... 454.6.4 Waste tyres.................................................................................................................................. 454.6.5 Greenwaste processing............................................................................................................ 464.6.6 Packaging materials ................................................................................................................. 474.6.7 Low volume highly polluting (LVHP) waste ........................................................................... 48

5 IMPACTS OF THE REGIONAL WASTE MANAGEMENT PLAN ...........................................................................49

5.1 Organisational Capacity ......................................................................................................................... 495.2 Economic Viability..................................................................................................................................... 495.3 Waste Data ................................................................................................................................................ 495.4 Community Awareness ............................................................................................................................ 495.5 Best Practice Operations ......................................................................................................................... 495.6 Waste Minimisation ................................................................................................................................... 49

6 IMPLEMENTATION BUDGET AND SCHEDULE...................................................................................................50

6.1 Monitoring and Review............................................................................................................................ 50

APPENDIX A - Waste Projections......................................................................................................................... 57APPENDIX B – 2009 RWMP Progress review....................................................................................................... 58APPENDIX C – Implementation schedule in A3 format .................................................................................. 62

Page 5: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page ivRegional Waste Management Plan 2013

LIST OF FIGURESFigure 2.1 A map of the region showing the Shire boundaries and locations......................................................... 4

Figure 2.2 Estimated waste generation rate, (tonnes per capita, 2012-13)............................................................. 7

Figure 2.3 Estimated recycling rate (tonnes per capita, 2012-13) ............................................................................. 9

Figure 2.4 Waste generation projections (20 year)..................................................................................................... 10

Figure 2.5 Map of waste facility locations and associated tonnages received and recycled ......................... 16

Figure 6.1: Basic Implementation Schedule for the Shires (Gantt chart split over two pages) .......................... 51

LIST OF TABLES

Table 2.1 Estimated quantity of waste (by stream) generated for each shire (2012-13) ...................................... 7

Table 2.2 Percentage breakdown by waste stream (2012-13) .................................................................................. 7

Table 2.3 Estimated tonnes of waste recycled by shire and waste stream (2012-13)............................................ 8

Table 2.4 Recycling as a percentage of waste generated (2012-13)...................................................................... 8

Table 2.5 Recycling by material type (2012-13) ............................................................................................................ 9

Table 2.6 Breakdown by material type......................................................................................................................... 11

Table 2.7 Summary of shire waste collection services 2012/13 ................................................................................ 13

Table 2.8 Local government waste management infrastructure in the Kimberley region ................................. 17

Table 2.9 Resource recovery services provided by each Shire / Facility................................................................ 20

Table 3.1 Summary of recommendations (actions) completed.............................................................................. 21

Table 3.2 Assessment of progress against ‘Community Awareness’ recommendations .................................... 22

Table 3.3 Assessment of progress against ‘Waste Data’ recommendations......................................................... 22

Table 3.4 Assessment of progress against ‘Best Practice Operations’ recommendations ................................. 23

Table 3.5 Assessment of progress against ‘Waste Minimisation’ recommendations............................................ 24

Table 3.6 Assessment of progress against ‘LG Waste Management’ recommendations .................................. 25

Table 6.1: Estimated budget for the implementation of the RWMP........................................................................ 53

Page 6: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page vRegional Waste Management Plan 2013

EXECUTIVE SUMMARY

ASK Waste Management (ASK) was engaged by the Shire’s of Broome, Derby / West Kimberley and HallsCreek in 2009 to produce a Regional Waste Management Plan (RWMP). Since then the Shire of Wyndham EastKimberley (SWEK) has been cooperating with the three Shires on regional waste management initiatives, inaddition the policy environment has shifted with the introduction of the Western Australian Waste Strategy,therefore ASK were engaged to update the RWMP, incorporate SWEK and reflect the policy changes.

The four Shires cover a geographical area of approximately 421,440 square kilometres and are bounded bythe Indian Ocean to the west, the Timor Sea to the north, the Shire of East Pilbara to the south and the Stateborder (with the Northern Territory) to the east. Seven of the region’s landfills were visited and reviewed as partof the development of the RWMP. The map shown in Figure E.1 indicates the location of the facilities (withorange circles providing a comparison of the estimated waste tonnages received and green circles for theestimated tonnage recycled).

While significant progress has been made by the individual Shires with regards to their waste managementservices and landfill regulatory compliance; until very recently there has been little regional collaborationbetween the four Shires. This can be attributed to a range of factors; however the primary issues were:

the lack of formalised procedures for inter-shire communication, cooperation and collaboration;

the lack of a regional funding mechanism; and,

no dedicated ‘regional’ staff, while shire staff were (understandably) pre-occupied with tasks andissues specific to their Shire.

Fitzroy CrossingLandfill

4,500 TPA(2009, 3000t)

Halls Creek Landfill7,600 TPA

(2009, 6,500)

Kununurra Landfill12,250 TPA(2009, N.A.)

1,430t recycled

Wyndham Landfill(1,400 TPA)

Broome Landfill42,000 TPA

(2009, 30,000t)4,260t recycled

Region (wastegeneration)82,000 TPA

(2009, 50,000t excSWEK)

Region wasterecycled

7,000 TPA. 8%(2009, 4,750t exc

SWEK)

Camballin Landfill(500 TPA)

Derby Landfill15,000 TPA

(2009,10,000t)1,220t recycled

Figure E.1 Map of waste facility locations and associated tonnages received and recycled

Page 7: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page viRegional Waste Management Plan 2013

Therefore, considerable effort has been made during the updating of the RWMP to provide actions that willovercome these issues and maximise collaboration within the region. Despite the barriers faced such as pooreconomies of scale, the tyranny of distance between regional towns and the distance to Perth or otherrecyclate markets / reprocessors; there are many opportunities for regional collaboration to reduce costs andhelp provide best practice waste management services in the region.

A number of key findings have been identified during the review of the waste management practices; theseprovided the basis for the development of the implementation plan which has been divided into fivecategories. The successful implementation of Section 4 of the Regional Waste Management Plan will providethe following outcomes for the Shires:

Organisational Capacity Improved regional communication and cooperation on waste management initiatives; Enhanced capacity to implement regional projects. Suitably skilled staff available to implement projects. Measures in place to ensure critical organisational knowledge is retained when key staff leave.

Economic Viability Cost savings with new private sector waste contracts, services and projects. Improved economic management of council operated waste facilities and services. The ability to implement otherwise unviable resource recovery projects.

Waste Data Improved data collection practices. Stronger understanding of waste generation characteristics. Development of a regional waste database to utilise for the planning of new waste management

initiatives. Reduced time demands on Shire staff to comply with external reporting requirements (DER Local

Government Census etc.).Community Awareness

Shires to have an in-depth understanding of community attitudes on waste management issues. Local community more aware of waste management issues and why Shire’s are implementing new

initiatives and waste management practices. The private sector to be aware of proposed waste management changes that will affect their

operations prior to implementation. Community support for the implementation of new initiatives.

Best Practice Operations Extended lifespan of existing facilities. Reduced operating costs over the full life cycle of a facility. Improved operational performance and compliance with environmental requirements. Identification of new sites in accordance with best practice recommendations.

Waste Minimisation Reduced waste to landfill; Reduced environmental impacts from waste disposal; Additional employment and economic opportunities for the region.

The measures suggested in the implementation plan are listed as a series of tables in Section 4; three of the keymeasures that need to be prioritised to ensure the success of the plan are provided below. The establishmentof the processes, structures and appointment of a regional coordinator will require a significant effort from theexisting Shire’s officers. These tasks are outside their usual remit and will therefore need the support of theirmanagers; however, once this has been completed the resources and systems required to implement theremainder of the plan will have been established.

Page 8: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page viiRegional Waste Management Plan 2013

4.1.2 Regional funding (page 29)Findings Issues Recommendations Implementation Cost Priority

The Shires lack amechanism tofund regionalwaste initiatives.

The lack of a regionalfunding mechanismwas a barrier to theimplementation ofregional initiatives andwas partly responsiblefor the poor progressof the 2009 RWMP.

Establishment and funding of aRegional Waste ManagementAccount (potentially through theWALGA Zone) to administer fundsprovided by regional grants suchas the Regional InvestmentScheme and membercontributions.Member contributions could bebased on the number ofratepayers as taken from theprevious year’s WALGA directory.

Such a mechanism would require the development of anagreement between the shires that outlines: Required member contributions The scope of projects/actions to be funded by the

account. Actions outside the Account’s funding scopewould require the development of detailed ProjectPlans and Memorandum of Understanding (or otheragreement) from all Councils before utilisation of fundsin the Account.

Authorisation for the use of the funds. Reporting requirements (preferably monthly reports to

each Council).

The cost to operatethe account would beinternal (possibly viaZone budget).The contributionsmade by each Shirewould need to beagreed for generalfunding andseparately for eachspecific project /action.

High

WhomAll Shires

OutcomeTo have agreedgeneral fundingmodel andestablishedaccount by 1July2014.

Page 9: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page viiiRegional Waste Management Plan 2013

4.1.3 Regional Waste Management Coordinator (page 30)Findings Issues Recommendations Implementation Cost Priority

Most of the officersresponsible for wastemanagement in theregion are notdedicated to wastemanagement and arealso responsible for awide range of otherduties.Existing Shire staff arealready very busy andattracting staff can beproblematic in someareas of the region.Very few regionalactions from the 2009RWMP wereimplemented as Shirestaff prioritised theirindividual actions(especially focussingon environmentalcompliance issues)over the regionalinitiatives

The variety of duties most wasteofficers are required to performmeans that they can only dedicate arelatively small fraction of their worktime to waste management.This is problematic considering theindustry’s tightening environmentalregulation and increasing communityexpectations for waste management.Demands on staff time for wastemanagement activities will continueto grow as populations increase, andlocal government authorities areexpected to provide a wider range ofenvironmentally responsible wastemanagement solutions.The 2009 RWMP highlighted that therewas a significant risk that itsrecommendations would not beimplemented if there were not staffdedicated to its implementation; thisrisk eventuated with only 25% of therecommendations being completed.Most recommendations in this RWMPwill be more efficiently and effectivelyimplemented on a regional basis.

Engage a Regional Waste ManagementCoordinator to coordinate theimplementation of this plan and otherregional initiatives funded by the RegionalWaste Management Account.Duties should involve: Management of regional initiatives and

implementation of the RWMP Provide technical advice and

guidance Presenting regional initiatives to the

individual Councils Maintaining agendas and minutes for

Waste TAG. Acting as a representative of Waste

TAG at WALGA Zone meetings. Undertaking funding applications. Development of project plans (and

associated MOUs). Data collection and analysis

Following an extended initial ‘field trip’ toget a feel for the region the position couldbe FIFO based to attract a greater rangeof candidates and remove perceived intercouncil bias.

Development of aposition description

Ensure the role is for atleast three years

Determine the mostappropriateconditions ofengagement

Development anagreement ormemorandum ofunderstanding tounderpin the fundingof the position

Engage appropriateperson

Once employed, theofficer will be able toco-ordinate,implement and assistthe Shire’s with actionsfrom the RWMPthroughout the region

The role could start asa part-time position

To fund a full timeposition includingsalary, transport, IT,office and fund forsmall tasks / specialistsupport a cost of$250k per annumwould be incurred bythe Shires.

The Shire’s could seekand apply for fundingto cover the cost forthe first 12 months,stating that the Shire’swould fund theposition for at least afurther two years,Part of the role wouldinclude applying forfunding for projects /infrastructure.

High

WhomAll Shires

OutcomeTo havedeveloped thepositiondescription and (ifrequired), soughtfunding by 1 April2014.Start date of 1July 2014 (to alignwith regionalfunding account).

Page 10: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page ixRegional Waste Management Plan 2013

4.3.1 Data collection and monitoring (page 35)Findings Issues Recommendations Implementation Cost Priority

Waste data collection isinconsistent across theregion and inconsistentwith industry standards.It also does not fullymeet reportingrequirements (such asannual LocalGovernment WasteCensus).

The inconsistent data recordingmakes completion of reportingrequirements more timeconsuming for Shires.It also makes the comparison ofthe region's data with otherdatasets problematic andcreates difficulty in analysing thedata needed to underpinregional initiatives.

All Shires shouldimplement standardisedrecording proceduresbased on the classificationsystem utilised in theWaste Data Study for thePilbara Region (Talis,2013).

The Shire's should engage aconsultant (on a regional basis) toreview current reportingrequirements and develop a wastedata recording system for eachlocal government.The system should be based onrecording waste data into atemplate on-site utilising the WasteData Study classification system.

Nil cost to adoptsame classificationsystem.Internal costs to setup excel basedrecording system.$20k capex plus $15kpa cost for electronicdata managementsystem.

High

WhomAll Shires

OutcomeTo adopt and implement auniform definition of wastes tobe used for gatehouse wasterecording for 1 July 2014.Shire to be collecting data byexcel or other electronic systemby 1 Jan 2015.

Page 11: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 1Regional Waste Management Plan 2013

1 INTRODUCTION

ASK Waste Management (ASK) was engaged by the Shire’s of Broome, Derby / West Kimberley and HallsCreek in 2009 to produce a Regional Waste Management Plan (RWMP) in alignment with the WasteAuthority of Western Australia’s (WAWA) Zero Waste Plan Development Scheme. The purpose of the Planwas to provide strategies and actions to guide the Shires and their communities to improve wastemanagement practices consistent with the State’s vision of Towards Zero Waste.

Since the original RMWP (ASK, 2009) the Shire of Wyndham East Kimberley (SWEK) has begun cooperatingwith the original three Shires on regional waste management initiatives. The policy environmentunderpinning waste management has also shifted since the original RWMP was completed with theintroduction of the Western Australian Waste Strategy (WAWA, 2012) and the annual Business Plans (WAWA,2013) that drive it. In line with the objectives and direction of the new WA Waste Strategy, the StateGovernment funding mechanisms that support local government’s waste management initiatives haschanged with a greater emphasis on projects that involve regional cooperation and demonstrablereductions in waste to landfill.

The four councils have therefore requested ASK to update the previous RWMP in order to account for theinclusion of SWEK into the regional group and the altered policy environment. This updated RWMP placesparticular emphasis on assessing the progress made on the previous RWMP, identification of any barriers toits implementation, and recommending actions that can be taken to ensure progress continues into thefuture.

1.1 PURPOSE OF THE REGIONAL STRATEGIC PLAN

The purpose of this Regional Waste Management Plan is to:

Confirm current waste infrastructure and levels of service;

Assess progress against the previous RWMP (2009);

Identify priority actions to strengthen regional collaboration and cooperation in the delivery ofwaste management services and initiatives;

Identify priority actions to improve waste management operations across the region and increasethe rate of resource recovery;

Increase community awareness, appreciation and responsiveness to waste related issues; and

Assign actions, responsibilities, costs and timelines for the implementation of the strategy’s actionsand objectives.

This RWMP does not include Aboriginal communities located throughout the region as the wastemanagement issues they experience are unique and under the jurisdiction of the CommonwealthGovernment.

1.2 OBJECTIVES

The overarching goals of the RWMP are:

Facilitate collaboration between the four Shire in the Kimberly with regards to waste management;

Minimisation of the region’s direct and indirect environmental impact of waste and itsmanagement over the next five years;

Waste managed in a sustainable manner; and

Increased community awareness of the impact of waste issues on the environment.

Page 12: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 2Regional Waste Management Plan 2013

The goals and objectives for each Shire for the next five years include:

Shire of Broome

Identification of future landfill sites.

Improved data collection and data management

Divert concrete and inert waste from landfill by separating, storing, processing and reusing it withinthe Shire’s own operations.

Implement source separation of the commercial and industrial skip bins (including the developmentof a basic sorting facility) to increase recycling in line with the regional centre targets set by the WAWaste Strategy.

Development of more sustainable management practices for waste tyres.

Introduction of regional approach to scrap metal collection and recycling to ensure all centres andsmaller communities are included.

Joint regional approach by the Kimberley Councils to address Waste Management and theallocation of regional resources (staff and funding) to coordinate this.

Shire of Derby/West Kimberley

To significantly reduce the amount of waste going into landfill through recycling and reuse.

Extension of the Fitzroy Crossing landfill and improvements in operational practices (includingstaffing the site).

Identification of remaining operational life and if required, future landfill sites for Derby and FitzroyCrossing.

Shire of Halls Creek

Legal compliance: Maintain full compliance with DEC requirements and all applicable legislation.

Domestic waste: Implement waste minimisation and reduction strategies to increase wastediversion rates.

Used vehicles: Implement a used car collection, crushing, baling and recycling programme.

Tyres & batteries: Determine a viable service for the transport of stored tyres and used batteries torecyclers.

Recyclable packaging material: Establish a system for the collection, storage and recycling ofcans, glass and paper packaging.

Shire of Wyndham East Kimberley

Improving operational management practices at all waste sites to achieve environmentalcompliance.

Identification of future landfill sites.

Implementation of cost effective waste services through regional procurement initiatives;

Improving the financial viability of waste services by undertaking economic reviews and introducinguser pays fee structures.

Increasing the rate of resource recovery and landfill diversion.

Educating the community and business on waste management issues.

Page 13: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 3Regional Waste Management Plan 2013

1.3 STATE WASTE STRATEGY

The Hon. Bill Marmion, MLA, Minister for Environment, launched the Waste Strategy on 6 March 2012. Titled“Creating the Right Environment” it has five strategic objectives within which strategies relating toknowledge, infrastructure and incentives have been developed to support a coordinated approach tochanging the behaviours of individuals, groups and organisations:

Strategy objective 1 – Initiate and maintain long-term planning for waste and recycling processing,and enable access to suitably located land with buffers sufficient to cater for the State’s wastemanagement needs;

Strategy objective 2 - Enhance regulatory services to ensure consistent performance is achieved atlandfills, transfer stations and processing facilities;

Strategy objective 3 - Develop best practice guidelines, measures and reporting frameworks andpromote their adoption;

Strategy objective 4 - Use existing economic instruments to support the financial viability of actionsthat divert waste from landfill and recover it as a resource;

Strategy objective 5 - Communicate messages for behaviour change and promote its adoptionand acknowledge the success of individuals and organisations that act in accordance with theaims and principles in the Strategy and assist in its implementation.

1.3.1 Implication for the KimberleyThe Strategy to this point has not confirmed the major regional centres; however, the proposal at this stageis that the regional targets would apply to Avon, Greater Bunbury, Albany, Geraldton, Kalgoorlie, Karratha,Peel and Busselton.

Therefore, as none of the towns in the Kimberley are considered as major regional centres by the Strategy,the region will not be subject to any specific targets, but will contribute towards the State-wide targets. Thekey targets for the metropolitan, key regional centres and State are summarised below.

Municipal Solid Waste (MSW): 30% diversion from landfill of material presented for collection in major regional centres by 30 June

2015 (non-metropolitan region recovery in 2009/10 was 15%);

50% diversion from landfill of material presented for collection in major regional centres by 30 June2020.

Construction and Demolition Waste 60% diversion from landfill of material presented for collection across the State by 30 June 2015

State-wide recovery in 2009/10 was 29%);

75% diversion from landfill of material presented for collection across the State by 30 June 2020.

Commercial and Industrial Waste 55% diversion from landfill of material presented for collection across the State by 30 June 2015

(State-wide recovery in 2009/10 was 46%);

70% diversion from landfill of material presented for collection across the State by 30 June 2020.

Page 14: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 4Regional Waste Management Plan 2013

2 EXISTING SERVICES AND INFRASTRUCTURE

2.1 REGIONAL PROFILE

Four local government authorities (LGAs) from the Kimberley region have agreed to collaborate for thisupdate of the original (2009) Regional Waste Management Plan (RWMP). The group includes the Shires ofBroome, Derby/West Kimberley, Halls Creek and Wyndham East Kimberley (the area covered by the fourShires is referred to as ‘the region’ for the remainder of this report).

The Kimberley is the most northern of Western Australia's nine non-metropolitan regions. It occupies thewestern part of the Australian 'top end', and is strategically located on the southern margins of SoutheastAsia. The four Shires cover a geographical area of approximately 421,440 square kilometres and arebounded by the Indian Ocean to the west, the Timor Sea to the north, the Shire of East Pilbara to the southand the State border (with the Northern Territory) to the east.

The region has a diverse regional economy with one of the fastest rates of growth in Western Australia.Mining, tourism, retail, agriculture and aquaculture are major contributors to the region's economic output.

Figure 2.1 A map of the region showing the Shire boundaries and locations

Page 15: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 5Regional Waste Management Plan 2013

2.1.1 Shire of Broome

The Shire of Broome is located in the south-west Kimberley in the far north of Western Australia and coversapproximately 56,000 square kilometres with a population of approximately 16,500. Broome hasexperienced rapid and continued growth over the last decade to become one of the fastest growingtowns in the State. Broome’s major industries include tourism, pearling, fishing, aquaculture, pastoral andhorticulture. In recent years Broome has become a high profile tourism destination. This trend has emergedon the back of improved and expanded air access, with an outcome of this trend being increased roomavailability due to the completion of new accommodation developments.

2.1.2 Shire of Derby / West Kimberley

The Shire of Derby/West Kimberley (SDWK) covers an area of 118,560 square kilometres and containsnumerous Aboriginal communities and two main towns – Derby and Fitzroy Crossing being the mainpopulation centres.

Derby is located on the King Sound near the mouth of the Fitzroy River, 2366 kilometres by road from Perth. Itis the major centre of the Shire and services the pastoral, mining and tourism industries and AboriginalCommunities with a population of around 4,200. Derby remains a supply point for an important part of theKimberley's pastoral, mining, oil and tourist industries and is the western terminus of the Gibb River Road. Theport is now a key facility designed for the export of zinc and lead from the mines of nearby Fitzroy Crossing.

Fitzroy Crossing is located on the banks of the Fitzroy River some 2524 kilometres from Perth via the GreatNorthern Highway. It is surrounded by pastoral country, with other interests being mining and tourism.

2.1.3 Shire of Halls Creek

Halls Creek town is a busy service town for surrounding pastoralists, Aboriginal communities and travellersexploring northern Western Australia. Halls Creek is also the fourth fastest growing shire within WesternAustralia. The Shire covers 142,908 square kilometres of predominantly desert and pastoral country,supporting a population of approximately 4,000. Situated in the heart of the Kimberley, Halls Creek is thegateway to a range of world renowned natural attractions, including the World Heritage listed BungleBungle ranges of Purnululu National Park.

2.1.4 Shire of Wyndham East Kimberley

The Shire of Wyndham East Kimberley (SWEK) is WA’s northern most local government area, locatedapproximately 3,200 kilometres northeast of Perth. It covers a 121,189 square kilometre area bordering theNorthern Territory to the east. The Shire has a population of approximately 8,000 people of which it isestimated that 35-45% are of Aboriginal descent. The majority of the Shire’s population lives in the towncentres of Kununurra (around 5700 people) and Wyndham (around 800 people). Major industries in theregion include agriculture, mining and tourism.

2.2 WASTE QUANTITIES

The region contains a range of industries, but there are no individual companies that dispose of a significantvolume of waste within the Shires landfill facilities. However, there are some private waste collectioncompanies that dispose of the waste they handle at the Shires landfill facilities. Waste stream data hasbeen compiled into the following categories:

Municipal Solid Waste (MSW) - Classified as household domestic waste that is set aside for kerbsidecollection or delivered to a waste facility through a drop-off programme. MSW also includes othertypes of waste such as bulky household waste (e.g. appliances, furniture and residential garden

Page 16: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 6Regional Waste Management Plan 2013

waste), household hazardous waste or Local LGA generated waste (e.g. waste from streetsweeping, litter bins and parks).

Commercial and Industrial Waste (C&I) - Solid waste arising from the activities within commercialand industrial sites, including but not limited to offices, retail outlets, restaurants, factories, andinstitutions.

Construction and Demolitions Waste (C&D) - Solid waste that is created through activitiesassociated with the construction, repair and demolition of buildings, structures and pavements orhighways. Including, but not limited to sand, aggregates, plasterboard, asphalt, timber, bricks,concrete, tiles, roofing materials, electrical wiring and the packaging for these materials.

2.2.1 Data availability

The available data relating to waste volumes disposed of at the Shire’s landfill facilities has improved sincethe previous RWMP with the staffed facilities (Broome, Derby, Halls Creek and Kununurra) now collectingsome data. Unfortunately this data is still limited due to significant gaps and inconsistency between sites.

The waste quantity estimates utilised in this report were therefore based on a range of data sourcesincluding:

Gatehouse volumetric estimates;

2012-13 Local Government Waste Census data;

Per capita extrapolations; and

Best guess estimates from Shire Staff.

Due to the limitations of the waste data, all values have been rounded to the nearest 10 tonnes.

2.2.2 Total waste generation

The estimated total quantity of waste generated by each Shire in the region is shown in Table 2.1. The tableshows that an estimated 82,750 tonnes of waste was generated in the region; however, this value does notinclude any wastes that were generated and managed directly by industry (i.e. Resources industries withtheir own landfill sites.) The Shire of Broome accounted for approximately 50% of the waste generated in theregion with over 40,000 tonnes generated in 2012/13.

Table 2.2 displays the same data broken down into percentage contributions by shire and waste stream.MSW, C&I and C&D waste streams comprised 32%, 49% and 19% respectively of the total waste generatedin the region. Although the SDWK figures state that C&D waste comprised only a small 5% of total wastegenerated, this is considered to be a result of data recording procedures at the Derby landfill classifyingsignificant quantities as C&I.

Page 17: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 7Regional Waste Management Plan 2013

Table 2.1 Estimated quantity of waste (by stream) generated for each shire (2012-13)

ShireEstimated population Estimated tonnes of waste generated

Permanent Total(inc. tourists) MSW C&I C&D Total

Broome 16,543 19,995 13,710 19,010 8,940 41,660

Derby WestKimberley 9,252 9,977 4,270 14,630 1,030 19,930

Halls Creek 3,987 3,987 2,430 3,690 1,440 7,560

Wyndham EastKimberley 8,451 9,666 6,180 3,090 4,330 13,600

Regional Total 38,234 43,627 26,590 40,420 15,740 82,750

Table 2.2 Percentage breakdown by waste stream (2012-13)

Shire MSW C&I C&D

Broome 33% 46% 21%

Derby West Kimberley 21% 73% 5%

Halls Creek 32% 49% 19%

Wyndham East Kimberley 45% 23% 32%

Regional Total 32% 49% 19%

MSW and total waste generation estimates for each shire were divided by the estimated total populationequivalent (including tourist numbers) for 2012-13 to provide per capita waste generation figures. As isshown in Figure 2.2, the average per capita MSW and total waste generated in the region was 0.61 and 1.9tonnes per person respectively. The Shire of Broome had the highest per capita waste generation of 2.08tonnes per person while SWEK had the lowest at 1.41 tonnes per person. It is hypothesised that Broomevalues are higher due to the large proportion of C&D and C&I waste.

Figure 2.2 Estimated waste generation rate, (tonnes per capita, 2012-13)

2.08

2.00

1.90

1.41

1.90

0.69

0.43

0.61

0.64

0.61

0.00 0.50 1.00 1.50 2.00

Broome

Derby West Kimberley

Halls Creek

Wyndham East Kimberley

Regional average

Tonnes of waste per capita (2012-13)

MSW Total

Page 18: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 8Regional Waste Management Plan 2013

2.2.3 Waste recycling

Table 2.3 outlines the tonnes of waste estimated to have been recycled 2012-13. As can be seen the totalvolume recycled in the region was estimated to be almost 7,000 tonnes. On a regional basis, MSW had thehighest quantity of materials recycled while C&D had none (although these figures may omit C&D recyclingthat is occurring in SDWK for which data is not available). The Shire of Broome recycled the greatestquantity of waste (4,260 tonnes), followed by SWEK (1,430 tonnes) and then SDWK (1,220). No recycling wasundertaken in the Shire of Halls Creek.

Table 2.3 Estimated tonnes of waste recycled by shire and waste stream (2012-13)

ShireEstimated tonnes of waste recycled

MSW C&I C&D Total

Broome 3,310 950 0 4,260

Derby West Kimberley 450 770 0 1,220

Halls Creek 0 0 0 0

Wyndham East Kimberley 810 620 0 1,430

Regional Total 4,570 2,340 0 6,910

Recycling rates as a percentage of waste generated are shown in Table 2.4 below. The total recycling ratefor the region was estimated to be 8% of all waste generated. Of the three waste streams, MSW had thehighest recycling rate with 17% of the generated waste being recycled. SWEK had the highest totalrecycling rate in the region (11%), closely followed by Broome with 10%.

Table 2.4 Recycling as a percentage of waste generated (2012-13)

ShirePercentage of generated waste recycled

MSW C&I C&D Total

Broome 24% 5% 0% 10%

Derby West Kimberley 11% 5% 0% 6%

Halls Creek 0% 0% 0% 0%

Wyndham East Kimberley 13% 20% 0% 11%

Regional Total 17% 6% 0% 8%

MSW and total waste recycling estimates for each shire were divided by the estimated total populationequivalent (including tourist numbers) for 2012-13 to provide per capita waste generation figures. As isshown in Figure 2.3 the average per capita MSW and total waste recycled in the region was 0.1 and 0.16tonnes per person respectively. The Shire of Broome had the highest per capita waste generation of 0.21tonnes per person while Halls Creek had the lowest at 0.0 tonnes per person. The Shire of Halls Creek doeshave large stockpiles of separated steel, white goods, batteries and cars; however, the Shire has beenunable to encourage recycling companies to visit the Shire due to its remote location from regional centres.

Page 19: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 9Regional Waste Management Plan 2013

Figure 2.3 Estimated recycling rate (tonnes per capita, 2012-13)

A breakdown of recycling quantities by material type is shown in Table 2.5. Greenwaste and metalrecycling accounted for the vast majority of all recycling activity in the region.

Table 2.5 Recycling by material type (2012-13)

Material TypeTonnes of waste recycled

Broome SDWK Halls Creek SWEK RegionalTotal

Waste oil 14 3 0 80 97

Greenwaste 2,539 300 0 980 3,819

Metal 937 900 0 370 2,207

Batteries (vehicle) 0 13 0 0 13

Co-mingled Recyclables 762 6 0 0 768

2.2.4 Waste generation projections

Figure 2.4 depicts the projection for total annual waste generation for the Shires and the region. It does notprovide a waste stream breakdown as it is anticipated that the proportions of waste are likely to remain thesame. The waste quantity projections are based on the calculated waste generation per capita values for2012-13, which are multiplied by the projected population growth for the Shires over the next 20 years. Theprojected population is based on ABS data for 2011-12 with equivalent tourist population added fromTourism WA data. The total population figures for 2011-12 were then linked to the Western AustralianPlanning Commission’s projected annual growth rates (median) for each Shire. The calculations used toproduce the waste generation projections are shown in Appendix A.

The combined waste value estimates for the region show that in 20 years, it is likely that in excess of 100,000tonnes of waste per year will be generated. The Shire of Broome drives the predicted growth in wastegeneration in the region as the other three shires are predicted to have stable or small declines in annualwaste quantities due to declining population. These predictions are based on the assumption that the percapita waste generation does not change significantly in the future.

0.21

0.12

0.00

0.15

0.16

0.17

0.05

0.00

0.08

0.10

0.00 0.05 0.10 0.15 0.20 0.25

Broome

Derby West Kimberley

Halls Creek

Wyndham East Kimberley

Regional average

Tonnes of waste recycled per capita (2012-13)

MSW Total

Page 20: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 10Regional Waste Management Plan 2013

Figure 2.4 Waste generation projections (20 year)

2.2.5 Priority waste streams

The Shires identified the following waste types as priority waste streams:

Green waste

Scrap metal

Tyres

Construction and demolition

Commercial and industrial waste

Non-conforming wastes

Packaging recyclables

Liquid wastes (waste oils and grease trap waste)

Where data was available, detailed breakdowns of these waste streams have been provided inTable 2.6 below.

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

100,000

2012/13 2017/18 2022/23 2027/28 2032/33

Was

te g

ener

ated

(ton

nes p

er a

nnum

)

Broome Derby / West Kimberley Halls Creek Wyndham East Kimberley Regional Total

Page 21: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 11Regional Waste Management Plan 2013

Table 2.6 Breakdown by material type

Material Type

Broome (tonnes) Derby (tonnes) Halls Creek (tonnes) SWEK (tonnes) Regional Total (tonnes)

Genera

ted

Land

filled

Recycled

Genera

ted

Land

filled

Recycled

Genera

ted

Land

filled

Recycled

Genera

ted

Land

filled

Recycled

Genera

ted

Land

filled

Recycled

C&D - Mixed building rubble 8,938 8,938 0 1,029 1,029 0 1,400 1,400 0 2,950 2,950 0 14,317 14,317 0

C&D - Mixed building rubble (skips only) 0 0 0 990 990 0 990 990 0

C&D - Total mixed building rubble 8,940 8,940 0 1,030 1,030 0 1,400 1,400 0 3,940 3,940 0 15,310 15,310 0

Tyres 32 32 0 21 21 0 0 140 140 0 193 193 0

Waste oil 14 3 0 80 97

Greenwaste (C&I) 0 2,420 2,420 0 0 510 0 510 2,930 2,420 510

Greenwaste (MSW) 2,666 0 2,539 727 427 300 306 306 0 470 0 470 4,169 733 3,309

Total Greenwaste 2,666 0 2,539 3,147 2,847 300 306 306 0 980 0 980 7,099 3,153 3,819

Metal (C&I) 937 0 937 765 0 765 0 30 0 30 1,732 0 1,732

Metal (MSW) 0 135 0 135 0 340 0 340 475 0 475

Total Metal 937 0 937 900 0 900 0 0 0 370 0 370 2,207 0 2,207

C&I - Mixed refuse 13,431 13,431 0 9,709 9,709 0 697 697 0 1,380 1,380 0 25,217 25,217 0

C&I - Mixed refuse (in skips) 4,500 4,500 0 0 0 570 570 0 5,070 5,070 0

C&I - Total mixed refuse 19,010 18,060 950 14,630 13,860 770 3,670 3,670 0 2,820 2,200 620 40,130 37,790 2,340

Page 22: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 12Regional Waste Management Plan 2013

2.2.6 Observations Although waste data collection has improved across the region since the original RWMP many

issues still remain, these include:o Inconsistent data collection between sites and shires;o Data collection and collation generally fails to meet reporting requirements;o The way data is collated makes analysis and comparison difficult.

The effective planning of strategies is limited by the lack of complete waste data;

The impact of implemented strategies cannot be monitored / measured accurately due to lack ofeffective waste data collection;

Significant quantities of C&I and C&D waste are being received in skip bins.

Recycling rates are low for all waste streams and shires.

Waste quantities are not expected to grow significantly for most of the Shires.

2.3 COLLECTION SERVICES

Local Governments provide waste collection services for their ratepayers and some commercial propertiesusing day labour or through the use of private contractors. LGA’s also provide collection services forlitterbins located in public areas and for wastes generated from their own operations.

Collection services for the Shires have been divided into the following categories:

Domestic;

LGA Works / Town Services; and

Commercial and Industrial.

The services provided by each Shire are summarised, by service, in the following sections.

Table 2.7 summarises the collection services offered by each Shire during the 2012/13 financial year.

Page 23: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 13Regional Waste Management Plan 2013

Table 2.7 Summary of shire waste collection services 2012/13

Broome SDWK Halls Creek SWEK

Towns supported BroomeDerby, Camballin,

Fitzroy CrossingHalls Creek

Kununurra,Wyndham

Dom

estic

Refuse240L MGB

(weekly collection)

240L MGB (twiceweekly collection

between 1 Nov – 1April, otherwise once

weekly collection)

240L MGB (twiceweekly collection)

240L MGB(weekly collection)

Recyclable240L MGB (fortnightly

collection)None None None

Bulk waste(Cyclone clean-

up)

Annual Collection(pre-cyclone

season)

Four collections perannum

(Greenwaste isseparated for

mulching)

Annual Collection(November bulkwaste collection)

Annual Collection(pre-cyclone

season)

LGA

Works / Tow

n Services

Greenwastefrom LGA Works

Recycle 75% ofpruning’s and

dispose ofverticuttings

Some greenwaste isseparated and

chipped at Derby.

Greenwaste isburied at Fitzroy

Crossing

Burnt in a dedicatedarea at the landfill.

Mulched atKununurra Facility.

Inert Waste fromLGA Works

No data No data No data No data

Public Litterbins120L MGB,as required

240L MGB(six days per week)

210L bins (twiceweekly collection

240L MGB, twice perweek.

Com

mercia

l & Ind

ustrial

Refuse240L MGB (up to five

collections perweek)

240L MGB asrequired

240L MGB four timesa week

240L MGB as part ofthe domestic

collection.

Recyclable240L MGB (fortnightly

collection)None None None

Bulk waste None

As required(Greenwasteseparated for

recycling

None None

2.3.1 Domestic services

Domestic property waste collection services are solely the responsibility of the Shires within the region, withthe exception of some Aboriginal Communities that have their own waste collection services. The Shirewaste collection services are currently provided by the same private contractor for three of the Shires, whilethe Shire of Halls Creek has an in-house refuse collection service. Domestic waste collection services costsare recovered via a ‘bin charge’ on the householders rates notice and a waste charge for aboriginalcommunities that use the Shire’s landfills.

2.3.1.1 Domestic refuse collection

Residents located in towns are provided with a minimum of one 240L MGB per household for a weekly ortwice weekly kerbside collection.

Page 24: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 14Regional Waste Management Plan 2013

A ‘recyclables’ collection service is provided by the Shire of Broome (a 240L MGB with a yellow lid) thatprovides households with a two-bin (recyclables and refuse) collection system. The two-bin system includesa ‘recyclables’ bin for the collection of source separated recyclable packaging materials. The recyclablesbin is collected on a fortnightly basis.

2.3.1.2 Bulk bin collection

Town residents located in the Shires of Broome, Halls Creek and Wyndham East Kimberley are offered oneannual bulk waste collection service, which also acts as the pre-cyclone season clean up collection.Residents located in the townsite of Derby (Shire of Derby / West Kimberley) are offered four bulk wastecollections per annum (this service is not offered in Fitzroy Crossing).

2.3.1.3 Self-hauled trailer waste

Residents have access to landfills located close to most population centres and can self-haul their waste tolandfill sites. This system can be used by any resident, but is particularly common for residents in remoteareas that do not receive kerbside collection services. The waste management practices of these residentshave not been investigated as part of this project. However, it is likely that these residents may use burning,or illegal dumping to dispose of some wastes generated.

Residents within the Shires can dispose of all self-hauled household waste either using the vouchers providedby the Shire (6 x 1m3 voucher per household) or at a gate fee of $9.00 per m3.

2.3.1.4 Waste from Shire works

All Shires collect wastes generated from their operations on an ad-hoc basis. This may include greenwastefrom street tree pruning, maintenance of parks / gardens and inert waste from road and pavementconstruction or maintenance.

2.3.1.5 Public litterbins

Councils provide public litterbins within town centres and along some highways. The frequency of thecollections varies throughout the region. This service is provided by LGAs and funded by general rates.

2.3.2 Commercial and Industrial (C&I) collection services

Generally, commercial and industrial wastes are collected by private service providers and are not theresponsibility of Local Governments. However, the Shires do offer waste collection services to businesseswithin light industrial areas.

2.3.2.1 240L Refuse Collection

The Shires all offer a 240L MGB collection service to light industrial properties. The frequency of collectionsvaries throughout the region and depends on the amount of waste the businesses produce.

2.3.2.2 Bulk Bin Collection

The Shire of Derby / West Kimberley provides a bulk bin collection to commercial properties. The frequencyof collections varies and depends on the amount of waste the businesses produce.

Page 25: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 15Regional Waste Management Plan 2013

2.3.3 Observations

The information about collection services provided by the Shires in the region has drawn out a number ofobservations:

There is no collection of wastes from a number of Roadhouses, instead waste is disposed of in‘illegal’ dumps;

Each Shire has a separate contract for its waste collection services, despite the fact that three ofthe Shires use the same contractor. There may be economic advantages to group the three Shires’waste collections within one contract.

There are no kerbside recycling collections in the Shires of Derby / West Kimberley, Halls Creek andWyndham East Kimberley;

Very little source separated commercial and industrial (C&I) and construction and demolition(C&D) waste is delivered to the region’s waste facilities and this makes the recycling of thesematerials unviable.

Shires lack formalised policy or strategy in regards to the collection of commercial and industrialwaste.

2.4 INFRASTRUCTURE

Seven of the region’s landfills were visited and reviewed as part of the development of the RWMP. The mapshown in Figure 2.5 indicates the location of the facilities (with orange circles providing a comparison of theestimated waste tonnages received and green circles for the estimated tonnage recycled) and a summaryof each facility is provided in Table 2.8. Since the previous RWMP the Shire of Halls Creek has closed theWarmun Landfill and undertaken rehabilitation works, this landfill has therefore been removed from thisdocument.

Page 26: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 16Regional Waste Management Plan 2013

2.4.1 Observations

The information about waste facilities provided by the Shires has drawn out a number of genericobservations that are applicable to the region’s waste facilities:

Lack of compliance with some regulations and licence conditions – presenting an environmentalrisk from the landfill;

Some of the waste facilities are unmanned – unquantified environmental risk;

Lack of recording / planning: i.e. where the waste has been buried, where the future cells will go;

Poor collection and recording of waste quantity data and type of waste streams;

Seasonal fluctuations in waste volumes due to tourist population;

Lack of Household Hazardous Waste (HHW) drop-off facilities;

Lack of e-waste collection facilities;

Disposal of potentially recyclable wastes;

No operational or post closure management plans for a number of sites, therefore no plans to workwith for operations and closure.

Retention of experienced staff

A lack of skills collaboration and knowledge between facilities.

Figure 2.5 Map of waste facility locations and associated tonnages received and recycled

Fitzroy CrossingLandfill

4,500 TPA(2009, 3000t)

Halls Creek Landfill7,600 TPA

(2009, 6,500)

Kununurra Landfill12,250 TPA(2009, N.A.)

1,430t recycled

Wyndham Landfill(1,400 TPA)

Broome Landfill42,000 TPA

(2009, 30,000t)4,260t recycled

Region (wastegeneration)82,000 TPA

(2009, 50,000t excSWEK)

Region wasterecycled

7,000 TPA. 8%(2009, 4,750t exc

SWEK)

Camballin Landfill(500 TPA)

Derby Landfill15,000 TPA

(2009,10,000t)1,220t recycled

Page 27: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 17Regional Waste Management Plan 2013

Table 2.8 Local government waste management infrastructure in the Kimberley regionShire Broome SDWK Halls Creek SWEK

Facility Broome Derby Camballin Fitzroy Crossing Halls Creek Kununurra Wyndham

Licence # L6912/1997/11 L8602/2011/1 Not registered 7173/5 L7142/1997/11 L7315/1998/8 1427

Facility AddressReserve 40813, Lot 228,

Buckley Rd, Broome,WA 6725

Crown Reserve 31045Steel Street. DERBY WA

6728

Camballin, Derby /West Kimberley, WA

Reserve 41105 Lot 224& 451 Mangkurla Rd

Lot 59 (Reserve No.39097), Gt Northern

Hwy, Halls Creek, WA.6770

Lots 2464 & 2465,Reserve 28875,Victoria Hwy,

Kununurra WA 6743

Lot 1263, GreatNorthern Highway,

Wyndham WA 6740.

Operator Shire of Broome Kimberley Waste SDWK Kimberley Waste Shire of Halls Creek SWEK SWEK

Class type

Cat 64 – Class IIputrescible landfill site

Cat 61 – Liquid wastefacility

Cat 64 - Class 2putrescible landfill site.

Category 62 - Solidwaste depot.

Not registered.

A registered site - willpotentially be a Cat64 once the works

approval granted forthe extension.

Cat 64 – Class IIPutrescible Landfill Site

Cat 64 – Class IIputrescibles landfillsite; Cat 61 – Liquid

waste facility; Cat. 57– Used tyre storage

Rural RegisteredLandfill

Established 1989Registered in 2001.Licenced in 2013.

Unknown Registered in 2001. Unknown Approximately 1987 At least 40 years.

Yearsremaining

Less than 5 years. More than 10 years1 Unknown Less than 5 years1 More than 20 years Less than 10 years Approx. 10 years

Site size 15ha 10.2 ha Estimated at 6ha 8.8ha 144ha 63.2ha 10ha

StaffingStaffed during opening

hoursStaffed during opening

hoursNot staffed

Not staffed currently,but will be soon

Staffed during openinghours

Staffed duringopening hours

Not staffed currentlybut will be soon

Changes sinceoriginal RWMP

LCMP completed.Layout of recycling

area improved.

New landfill compactorpurchased.

Boom gate and full timecustomer service officer

provided

Drop off comingledrecycling program has

been implemented

Infrastructure workshave been

completed includinga stock fence, securityfence and fire break

In the process ofextending andstaffing the site

Site is manned. Layoutimproved and resource

recovery occurring

Data is now beingcollected at the

gatehouse.

EIP and LCMPcompleted. New

liquid waste facilitybeing constructed.Extension to active

area beingundertaken

LCMP completed,stormwater controls

installed, Shire movingtowards staffing theSite by end of 2013

1 Estimated remaining operational life

Page 28: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 18Regional Waste Management Plan 2013

Shire Broome SDWK Halls Creek SWEK

Facility Broome Derby Camballin Fitzroy Crossing Halls Creek Kununurra Wyndham

Observations

Tidy well maintainedsite.

Excessive covermaterial application

and insufficientcompaction is causing

an over consumption ofvoidspace. Cover

material beingimported.

Site has safety andoperational issues withnearby LNG storage

tanks.

Little C&D and C&Irecycling on site.

Public access to tippingface – OH&S issue.

Liquid waste lagoonsexceeding

recommended freeboard.

No reuse shop, e-wasteor household hazardous

facilities.

Well maintained site.

Needs LCMP and/orupdated OMP to guideit through its future years

of operation.

The Shire does not havea sound understandingof the Site’s remaining

operational life oroptions that could be

taken to extend it.

No landfill compactoror compaction occurs

on site.

Lack of on-site covermaterial.

No householdhazardous facilities.

Appears to be quitetidy and well

maintained for anunsupervised facility.

There is no recyclingor waste diversion

occurring at the site.

No waste oil, e-wasteor household

hazardous facilities.

There are no Shirestaff or plant based at

Camballin, so worksare only completedannually on the site.

Lack of compliancefor a significant

number of licenceconditions.

The site had multipleexposed faces of

waste, some emptytrenches

No recycling, otherthan car bodies.

No compactionoccurs on site

Public have access totipping face – OH&S

issue.

No waste oil, e-wasteor household

hazardous facilities.

Tidy well maintainedsite.

Large stockpiles ofseparated material

developing which willsoon require processingor removal (i.e. metals,

fridges, air cons)

Large quantity ofuncovered C&D wastein a separate cell which

needs addressing.

No waste oil, e-waste orhousehold hazardous

facilities.

Tidy well maintainedsite.

Compliance issueswith old (current)

liquid waste lagoons.

No e-waste orhousehold hazardous

facilities.

Shortage of on-sitecover material.

No C&D or C&Irecycling.

Site users often use thesite inappropriately

because it is notstaffed.

No waste oil, e-wasteor household

hazardous facilities.

Page 29: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 19Regional Waste Management Plan 2013

2.5 RESOURCE RECOVERY

The Shires undertake a number of recycling activities ranging from kerbside collections to the re-use ofCouncil generated wastes. Table 2.9 summarises the current resource recovery operations for each Shireand waste facility.

2.5.1 Kerbside collection of recyclables

The Shire of Broome is the only Shire in the region that provides a kerbside collection of recyclables to itstown based residents. The kerbside collection and sorting of the materials has been contracted out to aprivate waste management company.

2.5.2 Drop-off facilities

Whilst SDWK does not provide kerbside recycling like Broome, it has recently introduced a co-mingledrecycling drop-off service for Derby residents. The service is proving very successful with a high uptake rateamongst the local community.

Other resource recovery drop-off facilities throughout the region include:

Scrap metal recycling - Metals, particularly car bodies, are collected by all of the Shires before theyare periodically collected by a metal recycling company for processing. Some fridges, other whitegoods and gas bottles are collected, but this varies throughout the region.

Batteries - Batteries are collected at the majority of the region’s facilities.

Used oil is collected at Broome, Derby and Kununurra.

Greenwaste is currently separated and mulched at the Broome, Derby, Halls Creek and Kununurrawaste facilities.

‘Triple rinsed’ chemical drums are collected as part of the Drum Muster program at Broome, HallsCreek and Kununurra.

E-waste is being collected for the first time at the Broome, Derby, Kununurra and Wyndham landfillsas a special collection event funded by the National Television and Computer Recycling SchemeBroome is researching the options to provide a permanent collection point.

Re-use shop/areas at the Kununurra and Halls Creek facilities.

2.5.3 Observations

The information about the region’s resource recovery services has drawn out a number of observations:

The quantity per person per annum, of recyclable material collected from the kerbside is lower thansome other Western Australian regions, there is potential to increase the yields;

Drop-off infrastructure at the waste facilities could be improved and the range of materialscollected expanded;

The economic viability of many recycling activities is limited by the region’s transport logistics andsmall economies of scale.

There is little or no commercial and industrial waste recycled at the Shires’ waste facilities (exc.Greenwaste);

Greenwaste recycling is not being undertaken in accordance with best practice guidelines.

Greenwaste production may be outstripping local market demand.

There is no construction and demolition waste recycling at the waste facilities.

Page 30: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 20Regional Waste Management Plan 2013

Table 2.9 Resource recovery services provided by each Shire / Facility

Shire / Facility BroomeDerby / West Kimberley

Halls CreekWyndham East Kimberley

Derby Camballin Fitzroy Crossing Kununurra WyndhamCo-mingled recycling

Paper

Metal

Glass

Plastic

Clothing

Greenwaste

Timber

Motor Oil (L)

Batteries

Gas Cylinders

Tyres

Paint

Reuse Junk

C & D

Drum muster

E-waste

1 The Shire of Halls Creek has established a collection point for computer cartridges. A container for depositing computer cartridges and tonners is availableat the Shire offices. These are shipped to ‘Close the Loop’ in Melbourne.

1

Page 31: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 21Regional Waste Management Plan 2013

3 IMPLEMENTATION OF 2009 RWMP

The findings, issues and recommendations from the 2009 RWMP were divided into five categories thatincluded ‘Community Awareness’, ’Waste Data’, ‘Best Practice Operations’, ‘Waste Minimisation’, and‘Local Government Waste Management’. As part of this update, ASK has assessed the Shires’ progress atimplementing the recommendations outlined in the five categories (Section 3.1). Progress was assessedfrom Shire survey responses, site inspections and interviews with shire staff. A full assessment of the progressagainst the original RWMP is provided in Appendix B.

3.1 SUMMARY OF PROGRESS

In general, progress on implementing the original RWMP has been poor with only 23% of therecommendations being fully implemented (Table 3.1). Some notable exceptions were the improvements inoperational procedures at waste facilities across the region (including the manning of the Halls CreekFacility), improved data collection, and efforts to encourage greater levels of resource recovery such as theintroduction of a drop off facility for dry recycling at Derby.

Table 3.1 Summary of recommendations (actions) completedBroome SDWK Halls Creek Regional Total

Number of Actions 29 31 31 91

Actions completed 7 8 6 21

% Completed 24% 26% 19% 23%

3.1.1 Community Awareness

Of the five community awareness actions outlined in the original RWMP, none have yet been completed(Table 3.2 on the following page).

3.1.2 Waste Data

Although there have been some significant improvements to waste data collection across the region theShire of Broome was the only Shire to have fully completed one of the four recommendations (Table 3.3 onthe following page). The waste data that is now being collected does not fully meet the reportingconditions required for local government. The data collected is also inconsistent across the region.Furthermore, with the exception of Broome, all Shires are failing to regularly survey their waste sites.

Page 32: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 22Regional Waste Management Plan 2013

Table 3.2 Assessment of progress against ‘Community Awareness’ recommendations

Recommendation Description Broome SDWK HallsCreek

4.2.1CommunityAttitudes

Develop and implement a market researchprogramme to establish and monitor communityattitudes about the current services they receive andhow the future services and activities should bedeveloped. Complete the survey on an annual basisto monitor any changes.

MinorProgress

NoProgress

NoProgress

4.2.2Community

Knowledge

To develop a communication and educationprogramme for the Shire.

NoProgress

NoProgress

NoProgress

An education levy added to all gate fees to providea specific fund for education and awarenessactivities.

NoProgress

NoProgress

NoProgress

4.2.3Communication toCommercialCustomers

A brief bi-annual newsletter should be produced (asrequired), that could be included with customerinvoices (once charging is introduced). Thenewsletter would summarise any changes planned forthe waste facilities, together with longer - termstrategies. The rationale behind any changes wouldbe explained.

MinorProgress

NoProgress

MinorProgress

4.2.4 Regionalwaste awarenessand RWMP co-ordinator

A state funded regional waste awareness and co-ordination officer should be employed, with thespecific role to co-ordinate, develop and implementthe actions of the RWMP throughout the region.

NoProgress

NoProgress

NoProgress

Number of actions 5 5 5

Actions completed 0 0 0

Table 3.3 Assessment of progress against ‘Waste Data’ recommendations

Recommendation Description Broome SDWK HallsCreek

4.3.1Data Collectionand Monitoring

The Shires need to collect and maintain waste relateddata, and in a form that can be aggregated andused within subsequent monitoring and analyses toevaluate the strategies and measures implementedby the Shires.

SignificantProgress

SignificantProgress

SignificantProgress

Once the volumes of generic waste streams (i.e. MSW,C&I and C&D) have been quantified, specific auditsof each waste stream can be completed to providecompositional information, thereby providing moredetailed information to develop future strategies.

PartialProgress

PartialProgress

PartialProgress

4.3.2Landfill celllocation andwaste tonnagerecords

Complete periodic surveys of waste tonnages usingmobile weigh cells. This would enable the Shire tomore accurately quantify the tonnage of self-hauledwaste received at the landfill sites.

NoProgress

NoProgress

NoProgress

Regular surveys of the sites should be completed toproduce site plans (including levels) with wastedisposal areas marked.

Completed NoProgress

PartialProgress

Number of actions 4 4 4

Actions completed 1 0 0

Page 33: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 23Regional Waste Management Plan 2013

3.1.3 Best Practice Operations

Of the five categories, the greatest progress has been made in the implementation of ‘Best PracticeOperations’ recommendations (Table 3.4). Standout improvements include the manning of the Halls Creekwaste site and closure of the Warmun landfill site. The Shire of Derby is also in the process of extending theFitzroy Crossing facility, which is soon to be staffed during all opening hours.

Table 3.4 Assessment of progress against ‘Best Practice Operations’ recommendations

Recommendation Description Broome SDWK Halls Creek

4.4.1Compliance withsite licenseconditions,unsuitableconditions andprivate landfillestablishmentpolicy

The Shires (staff and Councillors) need to commit towork to the regulatory processes in place and ensureall regulations are complied with.

Completed PartialProgress

PartialProgress

The license conditions for each site should bereviewed to ensure they are appropriate.

SignificantProgress

SignificantProgress

SignificantProgress

Each Shire should decide on a policy relating to theestablishment of private landfills within a certaindistance (e.g. 100km) of existing Shire landfills.

NoProgress

NoProgress

NoProgress

4.4.2Knowledge andskills

Staff should be included in planning and developingthe sites operations. The senior staff and / oroperational staff should visit other similar sized wastefacilities facing similar issues to observe best practiceoperations in person and recognise practices thatthey can implement at the Shire’s facilities.

Completed PartialProgress

PartialProgress

All current (and future) operational staff shouldundergo basic training about their role and duties forthe management of the Shire’s wastes. For the sitesutilising private contractors, training could beincluded as a condition of the contract.

Completed Completed Completed

Staff training could include enrolment of keyoperational and management staff to relevantcourses such as the TAFE Asset Maintenance (WasteManagement) course.

NoProgress

NoProgress

NoProgress

The Shire should join the Waste ManagementAssociation of Australia. Members receive a bi-monthly magazine relating to waste managementand particularly local government issues. Themagazine should be circulated around theCouncillors (& staff) to provide backgroundknowledge.

SignificantProgress Completed Significant

Progress

4.4.3Manning of Sites

The Fitzroy Crossing and Halls Creek facilities shouldbe manned.

NotApplicable

Soon to becompleted Completed

4.4.4OperationalManagementPlans

The Shires (or a consultant) should review the currentoperations and produce optimal operational plansfor each site’s waste management operations

SignificantProgress

NoProgress Completed

4.4.5AboriginalCommunities

Monitor the progress of the APY Waste ManagementStrategy and Implementation Plan Project andregister interest in the project.

NoProgress

Partialprogress

NoProgress

The Shire need to work with the DEC and Warmuncommunity to identify an alternative site with moresuitable characteristics.

NotApplicable

NotApplicable Completed

Page 34: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 24Regional Waste Management Plan 2013

Recommendation Description Broome SDWK Halls Creek

4.4.6Regional ServiceContract

The Shires should aim to ‘line up’ their currentindividual contracts to end at a specific date. Thiswould enable the Shires to issue a tender for allwaste and recycling services in the Kimberley as onecontract.

Completed Completed Completed

Number of actions 10 11 12

Actions completed 4 3 5

3.1.4 Waste Minimisation

Although only a few ‘Waste Minimisation’ recommendations have been fully implemented (Table 3.5) therehas been some good progress made. This includes the introduction of a drop off recycling scheme forDerby residents, increased greenwaste mulching across the region and most sites now separating andstockpiling various waste streams to facilitate future processing and recycling.

Table 3.5 Assessment of progress against ‘Waste Minimisation’ recommendations

Recommendation Description Broome SDWK Halls Creek

4.5.1Facility recyclingareas / TransferStations

The Shires should improve the layout or establishrecycling areas and gatehouse, at manned sites. Therecycling ‘drop-off’ points should be visible from thegatehouse to monitor operations.

SignificantProgress Completed Completed

4.5.2Public spacerecycling &holiday accom.Recycling

Shire of Broome -Recycling stations should beconstructed at ‘high traffic’ areas that also havetakeaway cafes etc. MGB’s with uniform colours(yellow lids) and restricted openings will assist inminimising contamination.

NoProgress

NotApplicable

NotApplicable

4.5.3Domestic WasteRecycling

The Shires should implement a recycling drop-offservice for residents at the Derby landfill and FitzroyCrossing and Halls Creek as these sites becomemanned. The service can be offered to commercialbusiness at cost. The use of such a baler would avoidthe inefficient transfer of uncompacted material.

NotApplicable Completed No

Progress

The purchase of a mobile glass crusher that can beused by the Shires to produce a material that can beused in local markets.

NoProgress

NoProgress

NoProgress

The Shires should seek funding to implement aneducation programme relating to home compostingand to purchase compost bins that can be providedto residents (at minimal cost).

NoProgress

NoProgress

NoProgress

The Shires should choose an existing website (e.g.freecycle.org) and develop a section for the regionto encourage reuse of materials in the community.Once the initial pages have been set up the sitesrequire 1-2hr of input a week to maintain andmoderate the site.

NoProgress

NoProgress

NoProgress

Page 35: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 25Regional Waste Management Plan 2013

Recommendation Description Broome SDWK Halls Creek

4.5.4Whole of life andgate fee pricestructure.

The Shires should aim to ensure all wastemanagement costs relating to commercial wastesare received from gate fees or any shortfall isquantified. A waste reserve fund should beestablished (based on a levy of $3 - $5 per m3 ofwaste disposed). This can be used to purchasestrategic capital items and for the rehabilitation ofthe sites.

Completed NoProgress

PartialProgress

A new gate fee pricing structure should bedeveloped to encourage the delivery of separatedwastes to the landfill. Ultimately the gate fees shouldprovide income to recover all costs associated withcommercial wastes.

PartialProgress Completed In progress

4.5.5Commercialwaste recycling

The Shires should continue to separate theirgreenwaste and investigate the option to mulch thematerial, prior to on-selling to local mulch retailers. Ifthere is no local market for the mulched greenwaste,the Shire should continue to burn the material

Completed Completed SignificantProgress

Peter Tapsell (DEC) should be invited to a workshopinvolving the local stakeholders (Shires, developers,builders and bulk waste companies) to inform thelocal stakeholders of the programmes and measuresthat could be implemented to maximise recycling.

NoProgress

NoProgress

NoProgress

The Shires should introduce the requirement of WMPswith any building approval. This would require thebuilder / developer to separate waste materials forrecycling. Concrete, bricks and tiles can be stored atthe facilities, until sufficient volumes are stored tojustify hiring a crusher to process the materials, thiscan be completed on a regional basis.

NoProgress Completed No

Progress

Number of actions 9 10 9

Actions completed 2 5 1

3.1.5 Local Government Waste Management

None of the Shires have introduced a sustainable procurement policy to ensure the use of products withrecycled content (Table 3.6).

Table 3.6 Assessment of progress against ‘LG Waste Management’ recommendations

Recommendation Description Broome SDWK HallsCreek

4.6.1 Sustainableprocurement

The Shires need to develop a procurement policy toensure the use of recycled content products by theirstaff and contractors.

NoProgress

NoProgress

NoProgress

Number of actions 1 1 1

Actions completed 0 0 0

Page 36: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 26Regional Waste Management Plan 2013

3.2 OBSERVATIONS

In reviewing the progress made implementing the 2009 RWMP it was apparent that there were a number ofcommon issues inhibiting its implementation:

The greatest inhibitor to regional initiatives was the lack of formalised procedures for inter-shirecommunication, cooperation and collaboration. Further barriers were the lack of a regionalfunding mechanism and shire staff being pre-occupied with tasks and issues specific to their Shire.

Whilst initiatives that could be undertaken on individual basis experienced higher levels ofimplementation, the success was limited by insufficient organisational capacity caused by a lack ofstaff dedicated to waste management, high staff turnover, and insufficient training anddevelopment.

Waste minimisation initiatives were most greatly inhibited by the poor economic viability of resourcerecovery in the Kimberley region.

At a basic level, it appears that many actions that should have been easily implemented were notas the shires had failed to frequently refer to the RWMP document and fully integrate it into theirmanagement processes.

Page 37: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 27Regional Waste Management Plan 2013

4 FINDINGS, ISSUES AND RECOMMENDATIONS

A number of key findings have been identified during the review of the waste management practiceswithin the Shires. The key findings aim to address the issues highlighted in the previous sections of the reportand the site visits. These findings have been divided into five categories:

Organisational Capacity: at the individual council and regional level must be sufficient tosuccessfully implement new waste management initiatives such as those recommended in thisdocument. This includes implementing mechanisms to improve inter-council collaboration onregional initiatives and ensuring that staff changes do not critically damage ongoing projects.

Economic Viability: of waste management projects and services must be optimised to reduce theburden on shires and enable new initiatives to be implemented.

Waste Data: the collection of waste related data, such as tonnages, landfill cell locations and siteplans is essential to effectively manage and monitor the operations of the Shire’s waste facilities.The data allows the Shires to monitor progress against targets, quantify the impact of any strategiesimplemented and effectively plan future activities and operations.

Community Awareness: understanding and meeting the community’s expectations is an importantelement of the Strategy, together with ensuring the community (including commercial wasteproducers) are aware of the issues faced and strategies to be implemented by the Shires.

Best Practice Operations: the use of best practice for the waste management activities would assistin minimising the risk of environmental damage or pollution, extending the life of the Shire’s wastefacilities and reducing the operational and maintenance costs associated with the facilities.

Waste Minimisation: the minimisation of waste will assist in extending the operational life of thelandfill facilities, maximising the recycling of resources and minimising the risk of environmentaldamage or pollution.

The key findings listed in this section have been addressed in the following tables by waste managementstrategies that have been formulated by ASK Waste Management and the Shires of Broome, Derby / WestKimberley, Halls Creek and Wyndham East Kimberley. Each strategy is shown in the following tables andcomprises of these columns:

Findings: A brief description of the findings discovered during the development ofthe report.

Issues: The implications that are brought about by the findings.

Recommendations: Recommended actions, which are formulated through innovation,imagination and/or improvisation.

Implementation: Actions required implementing the strategy.

Cost: Estimated cost to implement the strategy and potential funding sources.

Priority: The priority of the strategy’s implementation, the entity responsible and ameasurable time bound outcome for the recommendation.

Page 38: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 28Regional Waste Management Plan 2013

4.1 ORGANISATIONAL CAPACITY

It was apparent from the review of progress against the 2009 RWMP that many actions were not implemented due to insufficient organisational capacity, especially atthe regional level. Organisational capacity was found to be lacking in regards to regional cooperation, funding for regional projects, staff knowledge and skills, and theavailability of staff to implement new initiatives.

4.1.1 Regional cooperation

Findings Issues Recommendations Implementation Cost Priority

The greatestinhibitor to theimplementationof regionalinitiatives from the2009 RWMP wasthe lack offormalisedprocedures forinter-shirecommunication,cooperation andcollaboration

The currentapproach toregionalcooperation(Waste TAG andWALGA Zone) isinadequate fortheimplementationof complexregional wastemanagementinitiatives.

Formalisation andexpansion of theexisting regionalcooperation (WasteTAG and WALGAZone).

Waste TAG teleconferences to be undertaken bi-monthly (and on amonthly basis for the first six month to build momentum and thenwhen required to develop specific projects) with a set scheduleand with agendas particularly focussing on the following issues: Progress on this RWMP (both regionally and Council specific) Environmental compliance issues with waste sites - share

experiences and solutions Planned waste management goods and services procurement Identification of areas/issues for regional cooperation.

Minutes from the monthly Waste TAGs should be forwarded to allCouncillors and executive staff and presented/discussed at theWALGA Zone meetings by a TAG representative. Outcomes fromthe WALGA Zone meeting should then be presented at thefollowing TAG meeting by the representative.

The TAG group alreadymeet bi-monthly, thereforethe costs relate to internalShire resources and theadditional time spentpreparing, disseminatinginformation and holdingadditional monthlymeetings.Once a regionalcoordinator is engaged,their role can include thepreparation and running ofthese meeting.

High

WhomAll Shires

OutcomeTo maintain atleast bi-monthlymeetings for theduration of theRWMP.

Page 39: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 29Regional Waste Management Plan 2013

4.1.2 Regional funding

Findings Issues Recommendations Implementation Cost Priority

The Shires lack amechanism tofund regionalwaste initiatives.

The lack of a regionalfunding mechanismwas a barrier to theimplementation ofregional initiatives andwas partly responsiblefor the poor progressof the 2009 RWMP.

Establishment and funding of aRegional Waste ManagementAccount (potentially through theWALGA Zone) to administer fundsprovided by regional grants suchas the Regional InvestmentScheme and membercontributions.Member contributions could bebased on the number ofratepayers as taken from theprevious year’s WALGA directory.

Such a mechanism would require the development of anagreement between the shires that outlines: Required member contributions The scope of projects/actions to be funded by the

account. Actions outside the Account’s funding scopewould require the development of detailed ProjectPlans and Memorandum of Understanding (or otheragreement) from all Councils before utilisation of fundsin the Account.

Authorisation for the use of the funds. Reporting requirements (preferably monthly reports to

each Council).

The cost to operatethe account would beinternal (possibly viaZone budget).The contributionsmade by each Shirewould need to beagreed for generalfunding andseparately for eachspecific project /action.

High

WhomAll Shires

OutcomeTo have agreedgeneral fundingmodel andestablishedaccount by 1July2014.

Page 40: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 30Regional Waste Management Plan 2013

4.1.3 Regional Waste Management Coordinator

Findings Issues Recommendations Implementation Cost Priority

Most of the officersresponsible for wastemanagement in theregion are notdedicated to wastemanagement and arealso responsible for awide range of otherduties.Existing Shire staff arealready very busy andattracting staff can beproblematic in someareas of the region.Very few regionalactions from the 2009RWMP wereimplemented as Shirestaff prioritised theirindividual actions(especially focussingon environmentalcompliance issues)over the regionalinitiatives

The variety of duties most wasteofficers are required to performmeans that they can only dedicate arelatively small fraction of their worktime to waste management.This is problematic considering theindustry’s tightening environmentalregulation and increasing communityexpectations for waste management.Demands on staff time for wastemanagement activities will continueto grow as populations increase, andlocal government authorities areexpected to provide a wider range ofenvironmentally responsible wastemanagement solutions.The 2009 RWMP highlighted that therewas a significant risk that itsrecommendations would not beimplemented if there were not staffdedicated to its implementation; thisrisk eventuated with only 25% of therecommendations being completed.Most recommendations in this RWMPwill be more efficiently and effectivelyimplemented on a regional basis.

Engage a Regional Waste ManagementCoordinator to coordinate theimplementation of this plan and otherregional initiatives funded by the RegionalWaste Management Account.Duties should involve: Management of regional initiatives and

implementation of the RWMP Provide technical advice and

guidance Presenting regional initiatives to the

individual Councils Maintaining agendas and minutes for

Waste TAG. Acting as a representative of Waste

TAG at WALGA Zone meetings. Undertaking funding applications. Development of project plans (and

associated MOUs). Data collection and analysis

Following an extended initial ‘field trip’ toget a feel for the region the position couldbe FIFO based to attract a greater rangeof candidates and remove perceived intercouncil bias.

Development of aposition description

Ensure the role is for atleast three years

Determine the mostappropriateconditions ofengagement

Development anagreement ormemorandum ofunderstanding tounderpin the fundingof the position

Engage appropriateperson

Once employed, theofficer will be able toco-ordinate,implement and assistthe Shire’s with actionsfrom the RWMPthroughout the region

The role could start asa part-time position

To fund a full timeposition includingsalary, transport, IT,office and fund forsmall tasks / specialistsupport a cost of$250k per annumwould be incurred bythe Shires.

The Shire’s could seekand apply for fundingto cover the cost forthe first 12 months,stating that the Shire’swould fund theposition for at least afurther two years,Part of the role wouldinclude applying forfunding for projects /infrastructure.

High

WhomAll Shires

OutcomeTo havedeveloped thepositiondescription and (ifrequired), soughtfunding by 1 April2014.Start date of 1July 2014 (to alignwith regionalfunding account).

Page 41: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 31Regional Waste Management Plan 2013

4.1.4 Continuity planning

Findings Issues Recommendations Implementation Cost Priority

The Shires canexperience highstaff turnover.There is limitedplanning toensure continuitythrough staffchanges.

High staff turnover rates make itdifficult to implement andmaintain projects and actionsover the long-term.This has a more significant impactfor small waste managementteams, thus not such an issue forBroome.Significant organisationalknowledge can be lost when keystaff members resign.

Implement managementsystems to retainorganisational knowledgeand facilitate continuity ofproject implementation.TAG group and regionalcoordinator will provide‘brains trust’ to assist newstaff to ‘come up to speed’.

Link position descriptions and performanceassessment to strategic and operation plans.

Waste officers could maintain wastemanagement implementation plans thatoutline actions taken and any issues arising.

Distribute these reports to other staff andprovide an archive of the reports to newlyemployed staff with waste managementresponsibilities.

TAG group to provide introduction briefing tonew key staff members, as required.

The cost would beinternal relating tomaintaining actionsplans; however, thisshould be more thanoffset by a smoothertransition for new staffand reduced loss oforganisationalknowledge.

High

WhomAll Shires

OutcomeTo have linkedposition descriptionsby 1July 2014.TAG group supportimmediate.

Page 42: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 32Regional Waste Management Plan 2013

4.2 ECONOMIC VIABILITY

The review of progress against the original RWMP also identified that many of the recommended actions were not implemented because they were not economicallyviable or Shires lacked the necessary funds. This issue was particularly apparent in regards to the implementation (or lack thereof) of resource recovery initiatives. Toensure that advances to waste management are achieved, it is essential that the economic viability and efficiency of all waste services and projects be optimised.

4.2.1 Economy of scale (regional procurement)

Findings Issues Recommendations Implementation Cost Priority

The smallpopulation sizeand remotenessof communitiesthroughout theregion make thecost of manyinitiativesprohibitive.

Individualcouncils lackthe economy ofscale necessaryto make manywastemanagementinitiatives viable.

The Shires should implement actions to takeadvantage of the economy of scale offered byregional procurement. Regional procurementdoes not require a single contract to be signedby all Councils, rather it involves similar servicesbeing advertised for tender/quotation as part ofthe same package with a request made totender applicants that they also provide pricingbased on being awarded contracts for allCouncils.Services that can potentially be procured on aregional basis include: Bin collection Waste site infrastructure Landfill management Groundwater monitoring reports Scrap metal collection Concrete reprocessing Training and professional development Technical and specialist advice.

Implementation of an ongoing regionalprocurement process should include the followingelements: TAG and WALGA zone agendas focussing on

regional waste management procurement. Utilisation of the Regional Waste Management

Account for funding regional initiatives. Aligning contract commencement and

completion dates across the region (this shouldcommence by developing a document that liststhe start and completion dates of all wastemanagement related contracts across theregion).

Utilising the Regional Waste ManagementCoordinator to manage the procurementprocess and help with the development ofcontract specifications.

Utilising the Regional Waste Account to engagespecialists to assist with the development ofcontract specifications to ensure best practiceoutcomes are achieved.

The majority of theinitial costs wouldrelate to internaladministration andliaison via the TAGgroup,However; the on-going savingsrelating to cost andefficiency fromprocuring servicesand materials at aregional level will besignificant.

Medium - High

WhomAll Shires

OutcomeTAG groupsupport viaagendas andregionalprocurementfocus immediateSee above forregional accountand coordinator.

Page 43: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 33Regional Waste Management Plan 2013

4.2.2 Private sector competition

Findings Issues Recommendations Implementation Cost Priority

Private sectorcompetition forwastemanagementservices is notstrong in the regionand contributes tohigher costs forShires than isexperiencedelsewhere in thestate.

The higher cost of wasteservices makes someinitiatives not viable andreduces the regions abilityto reform wastemanagement practices.

Encourage private sector competition for allwaste related goods and services by: Developing tenders to maximise economy

of scales; Structuring tenders and managing the

procurement process to provide a levelplaying field and encourage private sectorcompetition;

Where appropriate, Councils to acceptreasonable risks and develop internalmitigation strategies rather than transferringall risks to the private sector (i.e. Binownership and maintenance).

Discuss all waste relatedprocurement at Waste TAGmeetings (Section 4.1.1).Engage specialists to assist withtender development andprocurement management.

While seeking specialistassistance will initiallyincur costs in theregion of $10k – 30k fora tender or contract,given the long termcontract values arefrequently in excess of$1m, potential savingsare significant.

Medium

WhomAll Shires

OutcomeTAG group todiscuss tendersand engagespecialist adviceas required.

4.2.3 Transport logistics

Findings Issues Recommendations Implementation Cost Priority

The cost oftransport in theregion is very highdue to thedistancesinvolved.

The economicviability of manyresource recoveryinitiatives isdependent ontransport logisticsdue to the extremedistance from majorcentres.

The Shires should workcollaboratively with eachother and the privatesector to identify potentialways of maximisingtransport efficiencies inthe region.

Host a Waste TAG meeting focussing on transport logisticswith a goal of identifying solutions to maximise transportefficiencies for recyclable materials (i.e. e-waste, metals,household hazardous waste and recyclable packagingmaterials).Consult with transport companies to identify potentialefficiencies.Determine the potential for back loading of LGA recyclablestogether with existing recyclables already collected fromlocal super markets.Use the information collected to assist in the development ofcost effective packaging recycling options for the region(see Section 4.6 on page 47).

Internal cost tocomplete assessmentof transport options.By providing acollection service inline with transportindustry requirementsand ultimately havingagreed rates shouldlead to more costeffective transport forrecyclables,

Medium - High

WhomAll Shires

OutcomeTo determine likelytransport costs andoptimal infrastructure &process for collectionby 1 Jan 2015.

Page 44: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 34Regional Waste Management Plan 2013

4.2.4 Whole of life costing and gate fee price structure

Findings Issues Recommendations Implementation Cost Priority

The Shire's lack afull understandingof the whole of lifecosts associatedwith landfillingwaste.The actual cost ofwaste disposal maybe significantlyhigher than thegate fees charged.Gate fees are notcharged for mostself-hauled wastesat unmanned sites.It is difficult toassess the feasibilityof resourcerecovery initiativeswhen the true costof waste disposal isunknown.

Operation of some waste sites isundertaken without consideration of thelong-term financial impacts which, canlead to significant avoidable costsbeing incurred.If the whole of life costs (previouslycalculated for other small landfills at$50-$90 per tonne), are not covered bythe gate fees and without a wastereserve fund established, it is likely thatrates are subsidising commercial wastedisposal and that the Shires will incur asignificant financial burden when thesites require rehabilitation.

The Shires should aimto ensure all wastemanagement costsrelating tocommercial wastesare received fromgate fees or anyshortfall is quantified.

Engage a consultant to undertake whole of lifecosting for all waste sites in the region.The income from gate fees should cover the wholeof life costs, however, for social or political reasonsalternative funding sources (e.g. additional rates)can be used to subsidise the facilities. Landfill feesshould be determined for the next five years andcommunicated to customers, allowing them time toadapt their waste management practices.The waste reserve fund should be established(based on a levy per m3 of waste disposed). Thiscan be used to purchase strategic capital itemsand for the rehabilitation of the sites.

Approximately$5k – $10k perlandfill todetermine thewhole of lifecost (includingan estimate ofclosure costs).

Medium

WhomAll Shires

OutcomeAll Shire gate fees arebased on whole of lifecosting, or alternativerevenue sourced forany shortfall by 1 July2016.

One of the main barriers to recycling isthe separation of recyclable materialsinto separate waste streams, (e.g.greenwaste, concrete, metals, organics,etc.).While there is no economic incentive forwaste producers to bring separatedloads of waste to the waste facilities, theShires will have to bear the cost ofseparating the potentially recyclablematerials or continue to landfill them.

The gate fees needto be structured tomaximise thefinancial drivers.This means structuringprices so that mixedwastes are chargedhigher fees thanseparatedrecyclable wastes.

A new gate fee pricing structure should bedeveloped to encourage the delivery of separatedwastes to the landfill. Ultimately, the gate feesshould provide income to recover all costsassociated with commercial wastes.The structure of the gate fees needs to allow for: The free or very low cost drop-off of hazardous

or recyclable material. Full cost recovery for all disposal and recycling

operations relating to commercial wastes fromgate fees charged.

Higher than cost recovery fees for problematicwastes requiring specific processing prior todisposal.

Process can becompleted in-house, so costsrelate to timerequired by staffto develop feestructure.

Medium

WhomAll Shires

OutcomeAll Shire gate feestructures to bedeveloped tomaximise potential forsource separation ofmaterials that can bediverted from landfillby 1 July 2016.

Page 45: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 35Regional Waste Management Plan 2013

4.3 WASTE DATA

The collection of waste related data, such as tonnages, landfill cell locations and site plans, is essential to effectively manage and monitor the operations of the Shires’waste facilities. The data allows the Shires to monitor progress against targets, quantify the impact of any strategies implemented and effectively plan future activitiesand operations.

4.3.1 Data collection and monitoring

Findings Issues Recommendations Implementation Cost Priority

Waste data collection isinconsistent across theregion and inconsistentwith industry standards.It also does not fullymeet reportingrequirements (such asannual LocalGovernment WasteCensus).

The inconsistent data recordingmakes completion of reportingrequirements more timeconsuming for Shires.It also makes the comparison ofthe region's data with otherdatasets problematic andcreates difficulty in analysing thedata needed to underpinregional initiatives.

All Shires shouldimplement standardisedrecording proceduresbased on the classificationsystem utilised in theWaste Data Study for thePilbara Region (Talis,2013).

The Shire's should engage aconsultant (on a regional basis) toreview current reportingrequirements and develop a wastedata recording system for eachlocal government.The system should be based onrecording waste data into atemplate on-site utilising the WasteData Study classification system.

Nil cost to adoptsame classificationsystem.Internal costs to setup excel basedrecording system.$20k capex plus $15kpa cost for electronicdata managementsystem.

High

WhomAll Shires

OutcomeTo adopt and implement auniform definition of wastes tobe used for gatehouse wasterecording for 1 July 2014.Shire to be collecting data byexcel or other electronic systemby 1 Jan 2015.

Page 46: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 36Regional Waste Management Plan 2013

4.3.2 Waste tonnage data

Findings Issues Recommendations Implementation Cost Priority

At best, thewaste data forthe region isbased onvolumetricestimates atfacilitygatehouses.

Volumetricestimates ofwaste areinherentlyinaccurate.Charging disposalfees based onvolumetricestimates allowscommercialcustomers toreduce gate feespayable byheavilycompactingloads.

Complete periodic surveysof waste tonnages usingmobile weigh cells. Thiswould enable the Shire tomore accurately quantifythe tonnage of self-hauledwaste received at thelandfill sites.

The Shires could collaborate to purchase a set ofmobile weigh cells to complete periodic surveys ofthe tonnages received at each site.Once the weigh cells have been used to gatherwaste tonnage data, the survey and tonnage datacan be combined to record the quantities disposedof in each cell.The weigh cells will enable the Shires to determineaverage weights of kerbside collection trunks, skipbins etc. Therefore, provided the number oftruckloads arriving at each site are recorded, annualtonnages can be calculated with reasonableaccuracy.

The cost of the mobileweigh cells isapproximately $15,000for a single axle set (i.e.two pads). This couldbe funded by DECgrants.

Each landfill site surveywould requireapproximately 10 staffdays, this wouldinclude set up,monitoring andcollating the results.

Medium

WhomAll Shires

OutcomeComplete first audit of keysites by 1 Jan 2016.

Shires should ensure thatwaste quantities can beconsistently andaccurately measured atlarger sites and at least bemeasured periodically forsmaller sites.

There is a range of weighing options from portablesingle wheel weigh cells to full weighbridges. The Shireshould determine the optimal system for each site(based on operational life, throughout, etc) andpurchase / install that system.

The assessment ofweighing systems canbe completed in-house by Shire staff orout sourced.Weighing systemsrange from $15k -$150k.

Medium

WhomAll Shires

OutcomeInstall weighing system by 1July 2017.

Page 47: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 37Regional Waste Management Plan 2013

4.3.3 Landfill cell location and site surveys

Findings Issues Recommendations Implementation Cost Priority

Record keeping andplanning at the siteswas inconsistent.There was littlerecorded dataabout the location ofhistoric waste cells,other than asbestosand clinical waste.Regular surveys arenot beingundertaken at all thelandfill sites.

The keeping of records relating to asbestosand clinical waste cell locations is a regulatoryrequirement.Regular surveys of landfill sites are needed todetermine voidspace utilisation and makeestimates of a site's remaining lifespan.They are also needed to ensure that the landfillcells are being developed in accordance withthe contour plans outlined in operational andpost closure management plans (See Section4.5.1)Historic records about previous landfill celllocations and waste types will prove usefulduring future planning and development ofthe sites for their operational and non-operational life.

Records must be kept oflandfill cell locations forasbestos and clinicalwaste (a licencecondition) and it isrecommended thatrecords are kept of allcell locations and wastetypes disposed of ineach cell /area.Have all landfills in theregion (excludingCamballin) surveyed onan annual basis.

Regular surveys of the sites should becompleted to produce site plans(including levels) with waste disposalareas marked.A new plan should be producedevery 12 months as this will eventuallyproduce a three dimensional recordof waste disposal at the sites over theirremaining operational life.The Shires should try to have thesurveys undertaken on a regional basis(see Section 4.3.3) to ensure that allsites are captured and competitiverates achieved.

$3 - $6k per site for anannual survey.The maintenance ofcell locations andwaste types can becompleted by existingstaff.

Medium

WhomAll Shires

OutcomeTender regionalcontract for the2014-15 year.

Page 48: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 38Regional Waste Management Plan 2013

4.4 COMMUNITY AWARENESS

Education and awareness of waste management and recycling throughout the community (i.e. residents, organisations, business, schools and industry) must beincluded as a ‘horizontal’ strategy throughout the entire implementation strategy and is integral to its success or failure. The wider community need to understand theissues and reasons why the waste management and recycling programmes are being introduced, how they will be affected, what is required from them and thebenefits that the community and the Shires will gain.

4.4.1 Community attitudes

Findings Issues Recommendations Implementation Cost Priority

There is littleinformationabout thecommunity’sattitude oropinions abouthow they wanttheir wastemanaged withinthe Shires.

The attitudes of thecommunity (commercialand residential) relating tocurrent and future wastemanagement services needto be determined.The information should beconsidered for thedevelopment of wastemanagement strategiesand plans for the Shires.With regular surveys,changes in attitudes can betracked.

Develop and implement (ona regional basis) a marketresearch programme toestablish and monitorcommunity attitudes aboutthe current services theyreceive and how the futureservices and activities shouldbe developed.Complete the survey on anannual basis to monitor anychanges. Additional one-offquestions can be added fortopical issues.

Develop a simple survey that can be completedvia telephone, the Shires’ websites, one-to onesurveys or post.

Areas to be covered include satisfaction ofcurrent services, attitude to recycling, desire toincrease / introduce recycling, cost of services,use of landfill, etc.

Once the questions have been established, arepresentative cross-section of the region’scommunity should be surveyed annually.

This can be included as a section within existingor planned Shire surveys about other services.

Face to face surveys could be completed byvoluntary groups (e.g. Rotary) at communitymarkets or public events, also at the aboriginalhealth units to ensure all the communities’opinions are gathered.

$15k - $20k to developsurvey and analysethe responses.Internal staff time tosend and collectsurveys.

Medium - high

WhomAll Shires

OutcomeComplete firstsurvey by 1 April2015.

Page 49: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 39Regional Waste Management Plan 2013

4.4.2 Community knowledge

Findings Issues Recommendations Implementation Cost Priority

There appears tobe a variedrange ofknowledge aboutwastemanagementand recyclingissues andactivities withinthe community.There are nospecific funds forcommunityeducation andawarenessprogrammes.

There is a need to educate and involve thecommunity (residential and commercial)throughout the region about the wastemanagement issues and programmes.The Shires must focus on effectivelycommunicating why it is important to act inmore sustainable ways and this must besupported with measures of success.If the community understand the reasons fortheir actions, and can see genuine andattainable results, this is a great motivatorand reinforcer for changes in behaviour.Reporting feedback on performance to thecommunity can assist in improvingcommunity awareness.Sometimes community education is notprioritised or funded by LGAs.The success of this plan is dependent uponcommunity involvement and participation(residents, businesses and tourists

To develop a communication andeducation programme for the Shire.Additional activities, such as radio‘sound-bites’ will assist in increasingawareness, particularly for residentswith lower levels of literacy.An education levy is added to allgate fees to provide a specific fundfor education and awarenessactivities.It cannot be stressed enough, thateducation and awareness arecrucial activities to ensure thesuccess of the future wastestrategies.The levy could be paid into a fundfor regional education activities toachieve greater economies of scale.If the Shire of Wyndham / EastKimberley joined the fund, allcampaigns could be ‘Kimberley’branded.

There are many wasteeducation and awarenessprogrammes already being runby local government, these willprovide a useful starting point.e.g. Shire of Esperance.The programme should beimplemented regionally by theregional co-ordinator (seeSection 4.1.3)A method of funding (such asan additional $1 per m3 addedto all gate fees) should beagreed and paid into theregional account. This willprovide a source of funding forwaste and recycling educationthat is directly linked to thewaste generated.

Waste generatorscould pay theeducation fund.Regional educationcould demand a fulltime role and wouldneed to produceeducational material,etc. Thus the taskcould cost $200k peryear.There would potentialto draw down WAWAfunding to supportwaste education, but itwould be unlikely thatthe position would befunded.

Medium - high

WhomAll Shires

OutcomeImplementationof a wasteeducationprogram startedby 1 July 2015.

Page 50: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 40Regional Waste Management Plan 2013

4.4.3 Communication to commercial customers

Findings Issues Recommendations Implementation Cost Priority

Any significantchanges inpricing oroperations willimpact on wastegenerators.Therefore theyrequire priornotice tomanage thepotential impacton theiroperations.

Any significantchanges inpricing oroperations willimpact on wastegenerators.Therefore theyrequire priornotice tomanage thepotential impacton theiroperations.

Any significant changes to gate fees andservices should be communicated to allcommercial customers of the Shire’s facilities atleast six months prior to the change occurring.The communications should include therationale behind the changes (e.g. meetingState guidelines and targets, etc) and thewider benefits that will be produced (e.g.increased recycling, preserving voidspace,etc). However it does need to be brief.Prior communication will minimise the risk ofmisunderstanding or confusion at the facilitiesonce the changes are implemented.

A brief newsletter should be produced (asrequired, but at least every 12 months), thatcould be included with customer invoices.The newsletter would summarise any changesplanned for the waste facilities, together withlonger-term strategies. The rationale behind anychanges would be explained.The newsletter could also communicate anytopical issues or targets for the facilities. Forexample, materials recycled in the previous 12months, issues with deliveries such as uncoveredloads, recording procedures required at thegate-house for specific wastes, etc.

Newsletter can beproduced by staff andmailed with invoices.

Low - medium

WhomAll Shires

OutcomeNewsletterprovided asrequired from 1July 2015.

4.4.4 Decision maker (Councillors) understanding of the waste industry

Findings Issues Recommendations Implementation Cost Priority

The waste managementbudget for the Shires isapproximately 10% ofthe whole Shire budget.New Councillorsfrequently have littleknowledge orunderstanding of thewaste industry.

A lack ofunderstanding ofwastemanagement inthe Shire’sCouncils canlead to mis-informed decisionmaking.

Councillors need tounderstand the factors thatdrive the management ofwaste in each Shire, thisincludes; the whole of lifeeconomics of a landfill,environmental risk, regulatoryrequirements, key operationalissues, Strategic plans, etc.

After each Council election the (new and existing)Councillors should be provided with an introductionto waste management and an overview of thecurrent issues and strategic plans.A presentation by waste management officersshould summarise current costs, revenues, volumesdisposed and recycled.The introduction should include a visit and tour ofthe waste facilities.

2 – 3 days ofstaff time toprepare andcomplete theintroduction.

High - Medium

WhomAll Shires

OutcomeFirst introduction by 1 Oct2014 and then within 3 monthsof every LGA election.

Page 51: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 41Regional Waste Management Plan 2013

4.5 BEST PRACTICE OPERATIONS

A number of findings showed that current waste management operations in the Shires were not to ‘best practice’ standards, and in some cases not compliant withlicence conditions. The best practice environmental management document provides guidelines relating to the siting, design, operation and rehabilitation of landfills.Some of the issues dealt with in this section are DEC regulatory requirements, and others are only DEC guidelines. However, the use of best practice for the wastemanagement activities would assist in minimising the risk of environmental damage or pollution, extending the life of the Shire’s waste facilities and reducing theoperational and maintenance costs associated with the facilities.

4.5.1 Operational planning

Findings Issues Recommendations Implementation Cost Priority

Many of theregion's wastesites lackedsuitableOperationalManagementPlans,EnvironmentalManagementPlans and LandfillClosureManagementPlans.

The unstructured planningand development of someof the facilities has led toinefficient operations inrelation to time and costs.Lack of planning may resultsin large capital items orrehabilitation costs beingrequired prior to funds beingaccumulated or reserved.The operational staff (orcontractors) require a clearplan to work towardsrelating to waste celllocations, excavation, fillingand final heights andcontours.

All sites should have operational plans (that are less thanfive years old). Any site without up to date operationalplans should produce these important plans. The detailrequired in each plan should be appropriate to the sizeand complexity of the site.The plans would include areas such as: Staffing Infrastructure Site layout Cell locations Waste placement (compaction) Recycling measures Projected tonnages Operational life Staged rehabilitation of site.

The plans would indicate when significant expenditure islikely to be required as annual tonnages increase. Thiswould enable the Shires to plan for the purchase of capitalitems and ensure landfill whole-of life costs are covered.

Any Shire facilities withoutup to date operationalplans should undergo areview of the currentoperations and produceoptimal operational plansfor each site’s wastemanagement operations.This can be completed bythe Shire or outsourced to aconsultant.The report would build onthis RWMP to provide anoperational roadmap forthe future requirements thatwill enable the Shires to pro-actively manage the siteeffectively and efficiently.Operational plans should beupdated every five years toreflect changes in the site,legislation, environmentaland social factors.

The production ofan OperationalManagement Planwould take 12 – 15days to completeby Shire staff.Alternatively thecost for the plan tobe produced by aconsultant wouldbe in the range of$15k - $20k.

High

WhomAll Shires withoutexisting up todate OperationalPlans.

OutcomeAll facilities tohave up to dateoperational plansby 1 Jan 2015.

Page 52: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 42Regional Waste Management Plan 2013

4.5.2 Knowledge and skills

Findings Issues Recommendations Implementation Cost Priority

Some siteoperators werenot fully awareof theirresponsibilities inrelation to bestpracticeoperations (finalcontour slopesfor the landfillsite etc.)

The site operators needto be aware of theirresponsibilities, bestpractice operations andto be motivated in orderto ensure the sites arecorrectly and efficientlymanaged.Without this in place, siteoperations are at risk ofbecoming inefficient,hazardous and toincreasingly be inbreach of licenceconditions.

The current (and all future) staffneeds to be aware of theiroperational duties and the sitelicense conditions, together withthe wider issues of wastemanagement and recycling.With this in place staff shouldbecome more motivated, resultingin operational efficiencies.In addition, investment in staffthrough training programmes mayassist in reducing staff turnover anddeveloping the skills of currentstaff.

Staff should be included in planning and developingthe sites operations. The senior staff and / oroperational staff should visit other similar sized wastefacilities facing similar issues to observe best practiceoperations in person and recognise practices that theycan implement at the Shire’s facilities.Some staff could occasionally attend appropriateindustry conferences to improve their knowledge aboutwaste management issues.All current (and future) operational staff should undergobasic training about their role and duties for themanagement of the Shire’s wastes. For the sites utilisingprivate contractors, training could be included as acondition of the contract.

Training / visiting otherfacilities andconferences wouldrequire 2 -3 days andapproximately $3k perstaff member.

Medium - Low

WhomAll Shires

OutcomeTraining programimplementationto start by 1 July2015.

4.5.3 Identification of new sites

Findings Issues Recommendations Implementation Cost Priority

Some of the landfills areapproaching the end oftheir operational lives.Alternative sites for newlandfill facilities need tobe identified.

Regulatory requirements fornew landfill sites mean that itcan take 4 - 8 years to identifya site and develop a newfacility. If councils do notbegin the process ofidentifying and developingnew sites they may findthemselves in a situationwithout an operationallandfill.

Accurately quantify theremaining operational life atexisting facilities.If remaining operational life isless than 10 years - start theprocess to identify anddevelop a new site inaccordance with BPEMlandfill siting guidelines.

If not already completed, produce alandfill closure plan to defineremaining voidspace at each facility.Using annual site survey data (Section4.3.3) monitoring the utilisation of theavailable voidspace.Once operational life is less than 10years start the process to identify anddevelop a new site. This is a complexprocess and specialist advice shouldbe sought.

Landfill Closure Plan:$12k - $20k.Identification andassessment of a newsite: $250k - $500k.Purchase anddevelopment of a newlandfill: $3m - $10m(depending upon size,location, cost of site,etc).

High

WhomBroome, SDWK, SWEK

OutcomeAll facilities operational lifeestimated by 1 Jan 2015.Site identification started10 years before end of life,as required.

Page 53: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 43Regional Waste Management Plan 2013

4.6 WASTE MINIMISATION

The minimisation of waste disposal provides a number of benefits for the Shires and the community. Reducing the quantity of waste landfilled preserves voidspace andincreases the operational life of the landfills, it reduces the pollution risk from the facilities and the recycling of materials preserves resources and a product’s ‘embodiedenergy’. However, given the region’s distance from material collectors and reprocessors, recycling activities in the region should focus on materials that demonstrateone or more of the various qualities:

have a local market demand (crushed inert waste, greenwaste)

are of high value (metals)

are hazardous in landfills (HHW, car batteries, e-waste etc.)

consume significant quantities of voidspace (tyres etc.)

4.6.1 Scrap metal

Findings Issues Recommendations Implementation Cost Priority

Shire's areexperiencing difficultyat having scrap metalcollected from somesites (especially smallerones such as HallsCreek and FitzroyCrossing,).

Excessive stockpiles of scrapmetal are developing atsome sites, which mayaffect operations. Scrapmetal is also a valuablematerial for recycling andshould be recoveredwherever possible.

The Shires work together todevelop a regional solutionthat ensures scrap metal iscollected from all facilities forrecycling.This could provide an ‘easy’pilot regional contract to bedeveloped by the TAG group.

Development and awarding of acontract for the collection of scrapmetal in the region on at least anannual basis.TAG group to develop and tendercontract as a pilot. Complete a‘wash-up’ review afterwards toidentify any ‘lessons learned’

Staff time to develop a projectMemorandum ofUnderstanding (MOU) andcontract (Section 4.2.1).Likely cost saving for project(scrap collection cost) andensuring collection from allfacilities.

High

WhomAll Shires

OutcomeAll facilitiesoperational

Page 54: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 44Regional Waste Management Plan 2013

4.6.2 Source separation of C&D waste

Findings Issues Recommendations Implementation Cost Priority

Very littlesourceseparatedC&D waste isdelivered tothe Shires’wastefacilities,therefore themajority islandfilled.No accuratedata aboutthe actualvolumes ofC&D wastedisposed ateach facility.

It is noteconomicallyviable or practical(with unmannedsites) to separatemixed loads ofC&D waste forrecycling.Therefore themixed loadsbrought to thefacilities arelandfilled, when alarge proportioncould be recycled.C&D waste maymake be up to 50%of the wastedisposed of in theShires, a proportionof this waste streamcan be easilyrecycled; however,without accuratedata the viability ofC&D recyclingcannot beassessed.

Assess the viability of concrete and brickrecycling in the region, considering: New C&D recycling asbestos

guidelines2

Volumes, Markets Capital and operational costs Funding options Operational delivery options, etc.

The available information should be reviewed inrelation to local economics, regulations for managingasbestos risks and other factors to determine theviability of C&D (concrete, brick and tile crushing) inthe region. Facility waste audits using mobile weighcells (Section 4.3.2) would provide data aboutquantities.Given the capital cost for a crusher could be in excessof $1m with operational costs of $200k - $500k pa; it isvery important to invest the time and money requiredto accurately determine the quantities (to define thesize of crusher), delivery model and costs for thispotential recycling option.

Quantify waste streamat each key facility;$20k - $100k(depending uponmethodology)

Viability assessment:$15k - $30kConcrete & brickcrushing project: yet tobe determined

High (especiallyfor sites withlimitedvoidspace)

WhomAll Shires

OutcomeTo determineviability by 1 Oct2014.

If the recycling of C&D waste is found to beviable, the delivery of separated C&Dshould be encouraged.The Shires encourage source separation byintroducing Waste Management Plans(WMP) as part of building approvals, usinggate fee pricing structures (low cost forseparated loads) and community / industryeducation.The local building industry involves only afew businesses in each town, which couldassist in the development / adoption of ‘on-site’ waste management practices that willmaximise recycling.The separated “clean” concrete, bricksand tiles should be stored separately at thefacilities, prior to reprocessing.

If the recycling of C&D waste is found to be viable;the Shires should introduce the requirement of WMPswith any building approval. This would require thebuilder / developer to separate waste materials forrecycling.WAWA has completed significant work in this areaand should be able to provide practical solutions andadvice to develop C&D recycling operations, as wellas the use of the material within Shire operations.Concrete, bricks and tiles can be stored at thefacilities, until sufficient volumes are stored to processthe materials, this can be completed on a regionalbasis, with a number of facilities visited during thesame tour.The resulting recycled aggregates can be used forinfill material, road-base or as aggregatereplacement. Separated steel and metals can berecycled.

Staff time to reviewWMP’s and liaise withlocal building /demolition industry

Prioritydependent onoutcomes ofviability project

WhomAll Shires

OutcomeImplementedwithin 6 monthsof C&D wasterecycling projectdetermined asviable.

2 Guidelines for managing asbestos at construction and demolition waste recycling facilities (DER, 2012)

Page 55: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 45Regional Waste Management Plan 2013

4.6.3 Additional waste processing

Findings Issues Recommendations Implementation Cost Priority

The facilities receivemany waste streamsthat could potentiallybe recycled ordiverted fromdisposal.However, due tolocal factors eachwaste stream wouldrequire assessment.

Processing / diverting waste on anindividual council basis is costprohibitive.Processing / diverting waste wouldcontribute to the WAWA recycling /diversion targets.Processing waste can save significantvolumes of valuable voidspace.The economics of recycling / divertingwastes are different for the Kimberleyand currently unknown.

That the Shires work together to identifywaste streams that could be assessedfor recycling / diversion.The waste streams targeted could bebased on: Problematic wastes (e.g. gas

bottles) Local markets (e.g. reuse shops) Significant volumes (e.g. organic

waste)

Complete a detailed FeasibilityStudy for the processing /diversion of targeted wastestreams.Assessment of economics,markets, technical andoperational factors wouldprovide a solution or identify ifthe specific waste streamwaste unviable to recycle /divert at this time.

Depending upon thewaste stream identifiedand complexity ofassessment: $10k - $30kper waste stream /material.

Medium

WhomAll Shires

OutcomeAt least oneassessmentcompleted by 1July 2015.

4.6.4 Waste tyres

Findings Issues Recommendations Implementation Cost Priority

Significantquantities of tyresare received atthe region's wastesites.

Due to their shape, relatively lowtonnages of waste tyres consume largevolumes of valuable voidspace.Waste tyres pose a significant fire risk if notburied regularly.

That the Shires work together toinvestigate possible solutions to process orrecycle tyres in a cost effective manner.Some tyre repair companies are returningtyres to Perth for recycling as part of anindustry scheme, this should be exploredfurther.

Complete a detailedFeasibility Study for theprocessing or backloading of waste tyres.

10-15 days of staff timeor $12 - $20k if outsourced to aconsultant.

Medium

WhomAll Shires

OutcomeAssessmentcompleted by 1Jan 2015.

Page 56: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 46Regional Waste Management Plan 2013

4.6.5 Greenwaste processing

Findings Issues Recommendations Implementation Cost Priority

The DER has prohibited theburning of greenwaste at mostwaste facilities across the State.The Shires are mulching wasteat significant expense toratepayers.Markets for processedgreenwaste (mulch) are notwell developed in the regionand mulch appears to beproduced in excess ofdemand.The mulch is not pasteurised,which is against BPEMguidelines and the mulch doesnot meet AS4454 standard.

Mulching greenwaste isextremely expensive in theregion (up to 10 tims moreexpensive than in Perth).Producing mulch when thereis no identifiable market is awaste of money.Due to lack of demand forthe mulch the facilities canhave significant stockpiles,resulting in a fire risk.There are environmental andhealth and safety risksassociated with producingmulch that is not compliantwith relevant productstandards.

That the Shires worktogether to develop aregional solution that: Minimises processing

costs across the region. Provides opportunities to

utilise external fundingopportunities.

Assesses local marketsfor recycledgreenwaste.

Ensures recycledgreenwaste productsmeet the relevantproduct standards.

Complete an assessment of greenwasteprocessing that considers options suchas: Quantifying local market demand

for mulch Consider greenwaste management

options (i.e. controlled burning ofexcess greenwaste and mulchingvolume s that match local demand)

A regional greenwaste -processingcontract.

Purchase options for processingequipment.

Operational delivery options forprocessing

The assessment wouldtake 15 – 25 staff daysor if out-sourced to aconsultant $20k - $30k(depending uponavailability of data ofcomplexity of options).

Medium - Low

WhomAll Shires

OutcomeCompletedassessment by 1July 2016.

Page 57: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 47Regional Waste Management Plan 2013

4.6.6 Packaging materials

Findings Issues Recommendations Implementation Cost Priority

Drop-off or kerbsidecollection of packagingrecyclables is not offeredto the residents andbusinesses of Kununurra,Wyndham, Halls Creekand Fitzroy Crossing.Recyclable packagingmakes up approximately20% of domestic kerbsidewaste (thus approx. 5% oftotal waste stream).Perth (location of mostrecyclate buyers) isapproximately 2,800kmfrom Halls Creek and3,200km from Kununurra,(Adelaide is 3,220km fromKununurra).

Recyclable packaging materialis being disposed of to landfill,as a collection or drop-offservice is not offered at alltowns.Resources are lost and landfillvoid space is unnecessarilyfilled.There is one MRF at Broome;there are no other sorting orbaling facilities in the region.Transport costs would besignificant to move thematerials to Perth ($150 -$500/t). Therefore, based oncurrent prices, the cost tocollect and transport mostmaterials (e.g. glass, paper)would be uneconomic.

The Shires should not introduce akerbside collection of recyclablematerials (Recommendation fromKimberley Zone report. MRA, 2013)However, drop-off facilities could beestablished at manned facilities forhigher value materials such asmetals and plastics.Drop-off facilities avoid the cost ofsorting co-mingled packagingmaterials and thus a lower costalternative to introduce somerecycling of these materials in theShires.Once the materials are baled,transportation options need to assessto identify the most efficient system.

The Shires should assess theviability and cost ofimplementing a recycling drop-off service for residents at theKununurra, Wyndham, FitzroyCrossing and Halls Creek as thesesites become manned.The service can be offered tocommercial business at cost.The Shires should identify anappropriate infrastructure andseek funding for its purchase. Itwould need to bale a range ofmaterial (inc. aluminium cans,plastics, paper, card and possiblytyres).The use of a baler would avoidthe inefficient transfer ofuncompacted material.

Viability assessment: 15– 20 days of staff timeor $15k - $25k if outsourced to aconsultant.Establishment andoperation of a drop-offrecycling facility: yet tobe determined.

Medium

WhomSDWK, Halls Creekand SWEK

OutcomeDefine viability by1 Apr 2015. Ifviable, implementservice by 1 July2016

Page 58: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 48Regional Waste Management Plan 2013

4.6.7 Low volume highly polluting (LVHP) waste

Findings Issues Recommendations Implementation Cost Priority

The majority of e-wasteand householdhazardous wastereceived at the region'ssites is landfilled as thereare not appropriatedrop-off facilitiesprovided.None of the landfills inthe region have linedcells (either geo-textileor engineered clay) orleachate managementsystems.

Low volume, highlypolluting (LVHP) waste isproblematic for landfills asit can havedisproportionately highenvironmental, health andsafety impacts whenmanaged inappropriately.Such wastes includeasbestos, householdhazardous waste (HHW),agricultural chemicals andelectronic waste.

The Shire’s investigatesolutions to reduce thevolume of HHW and e-waste being disposedof to landfill by takingadvantage of theNational Television andComputer RecyclingScheme (NTCRS), andthe various WasteAuthority initiatives.

The Councils should look to establish an e-wastecollection project across the region. This could involvecollecting e-waste at all manned waste facilities. Thecollected e-waste could then be transported toBroome and Kununurra for final collection by DHL oranother NTCRS ‘Co-regulatory Arrangement’.E-waste types not covered by the NTCRS (only a small%) may be able to be processed in Perth withassistance from the Waste Authority.The Shires may also be able to receive Waste Authorityfunding to subsidise the collection and processing ofHHW from manned facilities. The Shire's should consultwith the Waste Authority to determine whether theregion is eligible to receive such support.

Assessment ofoptions for eachLVHP waste stream:10- 15 staff days or$12k - $20k ifoutsourced to aconsultant.Cost of collection /diversion options:yet to be defined,but target fundedschemes.

High – Low(depending upon

enviro risk at each site)

WhomAll Shires

OutcomeAssessed options by 1July 2015Implementrecommendations by 1July 2016

Page 59: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 49Regional Waste Management Plan 2013

5 IMPACTS OF THE REGIONAL WASTE MANAGEMENT PLAN

The successful implementation of Section 4 of the Regional Waste Management Plan will provide thefollowing outcomes to Shires within the Kimberley Region.

5.1 ORGANISATIONAL CAPACITY

Improved regional communication and cooperation on waste management initiatives;

Enhanced capacity to implement regional projects.

Suitably skilled staff available to implement projects.

Measures in place to ensure critical organisational knowledge is retained when key staff leave.

5.2 ECONOMIC VIABILITY

Cost savings with new private sector waste contracts, services and projects.

Improved economic management of council operated waste facilities and services.

The ability to implement otherwise unviable resource recovery projects.

5.3 WASTE DATA

Improved data collection practices.

Stronger understanding of waste generation characteristics.

Development of a regional waste database to utilise for the planning of new wastemanagement initiatives.

Reduced time demands on Shire staff to comply with external reporting requirements (DERLocal Government Census etc.).

5.4 COMMUNITY AWARENESS

Shires to have an in-depth understanding of community attitudes on waste managementissues.

Local community more aware of waste management issues and why Shire’s are implementingnew initiatives and waste management practices.

The private sector to be aware of proposed waste management changes that will affect theiroperations prior to implementation.

Community support for the implementation of new initiatives.

5.5 BEST PRACTICE OPERATIONS

Extended lifespan of existing facilities.

Reduced operating costs over the full life cycle of a facility.

Improved operational performance and compliance with environmental requirements.

Identification of new sites in accordance with best practice recommendations.

5.6 WASTE MINIMISATION

Reduced waste to landfill;

Reduced environmental impacts from waste disposal;

Additional employment and economic opportunities for the region.

Page 60: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 50Regional Waste Management Plan 2013

6 IMPLEMENTATION BUDGET AND SCHEDULE

The RWMP implementation strategy is focused on the next five years, with the initial focus to developan environment that will maximise efficient collaboration with the Shires, therefore reaping the benefitsas soon as possible. A basic schedule, shown as a Gantt chart in Figure 6.1, outlines the order andduration for actions to be completed. The Gantt chart is also provided in Appendix C in A3 format forease of reading and can be provided as a MS Project file for updating (please contact ASK to requesta copy).

6.1 MONITORING AND REVIEW

The basic schedule shown below should be expanded and modified by the Shires and the regionalcoordinator (Section 4.1.3), particularly as the more complex recommendations will require individualschedules. The implementation of the recommendations needs to be monitored and reported on abi-annual basis.

In addition to monitoring the outcome deadlines and key milestones, the RWMP must be treated as adynamic document that is reviewed and amended periodically to ensure that it remainscontemporary and relevant to emerging waste management issues and legislation. The Shire’s shouldcomplete updates of the RWMP on a five yearly basis, or more frequently if required.

Page 61: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 51Regional Waste Management Plan 2013

Figure 6.1: Basic Implementation Schedule for the Shires (Gantt chart split over two pages)

- Chart continues -

Page 62: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 52Regional Waste Management Plan 2013

Page 63: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 53Regional Waste Management Plan 2013

Table 6.1: Estimated budget for the implementation of the RWMP

Task Title Start Finish External CostShiretime

(days)Notes

Organisational Capacity

Regional cooperation (TAG meetings) Thu 2/01/14 Wed 5/12/18

TAG meetings Thu 2/01/14 Wed 5/12/18 8-12 per shire per year

Regional funding Thu 2/01/14 Wed 16/07/14

Agree baseline funding arrangement Thu 2/01/14 Wed 7/05/14 2 per shire

Establish funding account Thu 8/05/14 Wed 2/07/14 1 per shire

Make initial funding contribution Thu 3/07/14 Wed 16/07/14 to be decided

Regional coordinator Wed 5/02/14 Mon 14/05/18

Define position role / description Wed 5/02/14 Tue 1/04/14 1 per shire

Recruitment of coordinator Wed 2/04/14 Tue 10/06/14 1 per shire

Coordinator start date Tue 1/07/14 Tue 1/07/14

Initial training & site visits Tue 1/07/14 Mon 14/07/14 3 per shire

On going coordination Tue 15/07/14 Mon 14/05/18 $250k estimate of total cost

Continuity planning Thu 2/01/14 Wed 21/03/18 3 per shire

Economic Viability

Economy of scale Thu 2/01/14 Wed 21/03/18 2 per shire

Private sector competition Mon 10/02/14 Wed 18/04/18 3 per shire

Engage specialist advice (as required) Mon 10/02/14 Wed 18/04/18 $15k

Transport logistics Fri 15/08/14 Thu 1/01/15 15 by Coordinator

Costing and gate fees Mon 4/01/16 Fri 1/07/16

Whole of life modelling Mon 4/01/16 Fri 8/04/16 $7.5k

Gate fee structure defined Mon 11/04/16 Fri 1/07/16 5 by Coordinator

Waste Data

Data collection and monitoring Wed 9/04/14 Thu 1/01/15

Adopt uniform waste classifications Wed 9/04/14 Tue 1/07/14 2 per shire

Implement electronic data collection Fri 15/08/14 Thu 1/01/15 $25k per shire for data management system, or $2k for excel andtablet

Page 64: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 54Regional Waste Management Plan 2013

Task Title Start Finish External CostShiretime

(days)Notes

Waste tonnage infrastructure Mon 8/06/15 Fri 30/06/17

Weigh cell tonnage audit Mon 8/06/15 Fri 1/01/16 $15k 20 To purchase cells and 20 days per site for a 11 day audit; ifoutsourced approx $20k per site

Research and install weighing systems Mon 26/09/16 Fri 30/06/17 $15k - $150k 10 10 days to research and purchase system, capex variabledepending upon system and site

Cell locations and site surveys Mon 10/03/14 Tue 21/08/18

Prepare and tender for a regional contract Mon 10/03/14 Fri 30/05/14 1 per shire

Annual site surveys Wed 9/07/14 Tue 21/08/18 $3k - $6k

Community Awareness

Community attitudes Mon 2/02/15 Fri 30/03/18 $20k To develop survey and analyse responses

Annual attitude survey Mon 2/02/15 Fri 30/03/18 4 per shire for implementation

Community knowledge Mon 16/02/15 Fri 27/07/18

Develop awareness programme Mon 16/02/15 Fri 3/07/15 $20k

Implement programme Mon 6/07/15 Fri 27/07/18 $20k 100 for region

Communication to commercial customers Wed 2/09/15 Tue 2/10/18

Customer newsletter Wed 2/09/15 Tue 2/10/18 2 per shire

Decision maker understanding Thu 2/01/14 Thu 2/01/14

Councillor info session Tue 18/11/14 Mon 4/12/17 2 per shire

Best Practice Operations

Operational planning Fri 18/07/14 Thu 1/01/15 $15k-$20k 15 per shire (cost for if outsourced to consultant)

Knowledge and skills Wed 1/07/15 Tue 24/07/18 $3k 2 per key waste team member

Identification of new sites Fri 12/09/14 Thu 25/01/18

Accurately estimate operational life Fri 12/09/14 Thu 1/01/15 $12k - $20k

Start site selection process, as required Fri 2/01/15 Thu 25/01/18 $250k - $500k 250 Both external cost and shire time would be required

Waste Minimisation

Scrap metal Thu 2/01/14 Wed 21/05/14

Define regional contract and MOU Thu 2/01/14 Wed 23/04/14 2 per shire

Tender and award contract Thu 2/01/14 Wed 26/03/14 2 per shire

Page 65: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 55Regional Waste Management Plan 2013

Task Title Start Finish External CostShiretime

(days)Notes

First scrap tour implementation Thu 2/01/14 Wed 21/05/14 to be defined Value of scrap and economy of scale should result in betterfinancial outcome

C&D waste (concrete & bricks) Thu 10/07/14 Wed 8/07/15

Quantify waste stream Mon 3/03/14 Thu 10/7/14 $20k - $100k 3 per shire (both external cost and shire time required)

Determine viability Thu 10/07/14 Wed 1/10/14 $15k - $30k

Start to stockpile concrete & bricks Thu 2/10/14 Wed 12/11/14 4 per shire

Develop & imp source separation initiatives Thu 2/10/14 Wed 8/07/15 20 coordinator for the region

Seek funding and/or tender preparation Thu 2/10/14 Wed 18/03/15 10 coordinator for the region

Award tender (if contracted out) Thu 19/03/15 Wed 29/04/15 10 coordinator for the region

Start re-processing of waste Thu 30/04/15 Wed 8/07/15 to be defined 10 coordinator for the region

Additional waste processing assessments Thu 2/04/15 Wed 6/12/17 $10k - $30k 20 either external cost for consultant or in-house by coordinator

Waste tyres (feasibility assessment) Fri 10/10/14 Thu 1/01/15 $12k - $20k 15 either external cost for consultant or in-house by coordinator

Greenwaste processing (assessment) Mon 12/10/15 Fri 1/01/16 $20k - $30k 20 either external cost for consultant or in-house by coordinator

Packaging materials Fri 10/10/14 Thu 30/06/16

Define viability Fri 10/10/14 Thu 1/01/15 $15k - $25k 20 either external cost for consultant or in-house by coordinator

Implement agreed recommendations Fri 25/09/15 Thu 30/06/16 to be defined

Low volume - highly polluting wastes Thu 8/01/15 Fri 1/07/16

Determine viability & best options Thu 8/01/15 Wed 1/04/15 $12k - $20k 20 either external cost for consultant or in-house by coordinator

Implement recommendations Mon 18/01/16 Fri 1/07/16 to be defined

Page 66: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley Page 56Regional Waste Management Plan 2013

REFERENCES

ASK Waste Management (2009). Regional Waste Management Plan for the Shires of Broome, Derby/WestKimberley and Halls Creek.

Department of Environment Regulations (2012). Guidelines for managing asbestos at construction anddemolition waste recycling facilities.

Talis Consultants Pty Ltd (2013). Waste Data Study for the Pilbara Region and Shire of Broome. Prepared forthe WA Waste Authority.

Tourism Western Australia (2013a). Broome Overnight Visitor Fact Sheet – Years Ending December2010/11/12.

Tourism Western Australia (2013b). Kununurra Overnight Visitor Fact Sheet – Years Ending December2010/11/12.

Tourism Western Australia (2013c). Derby West Kimberley Overnight Visitor Fact Sheet – Years EndingDecember 2010/11/12.

WA Planning Commission (2012a). Western Australia Tomorrow – Population Report No.7, 2006-2026. ForecastProfile for Broome Local Government Area. Department of Planning.

WA Planning Commission (2012b). Western Australia Tomorrow – Population Report No.7, 2006-2026. ForecastProfile for Derby West Kimberley Local Government Area. Department of Planning.

WA Planning Commission (2012c). Western Australia Tomorrow – Population Report No.7, 2006-2026. ForecastProfile for Halls Creek Local Government Area. Department of Planning.

WA Planning Commission (2012d). Western Australia Tomorrow – Population Report No.7, 2006-2026. ForecastProfile for Wyndham East Kimberley Local Government Area. Department of Planning.

WA Waste Authority (2012a). Western Australian Waste Strategy – Creating the Right Environment. Availableonline at http://www.wasteauthority.wa.gov.au/

WA Waste Authority (2012b). 2011-12 Local Government Waste and Recycling Census Report. Departmentof Environment Regulation.

WA Waste Authority (2013). Business Plan 2013/14 and Projections to 2017/18. Available online athttp://www.wasteauthority.wa.gov.au/

Page 67: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley AppendicesRegional Waste Management Plan 2013

APPENDIX A - WASTE PROJECTIONS

Generated Landfilled Recycled Generated Landfilled Recycled Generated Landfilled Recycled Generated Landfilled Recycled Generated Landfilled RecycledC&D 9. Other/Mixed Mixed building rubble 601 0.77 8,938 8,938 0 1,029 1,029 0 0 0 0 3,245 3,245 0 13,212 13,212 0C&D 9. Other/Mixed Mixed building rubble (skips only) 601 0.15 0 0 0 0 0 0 0 0 0 1,089 1,089 0 1,089 1,089 0C&D 9. Other/Mixed 8,940 8,940 0 1,030 1,030 0 1,440 1,440 4,330 4,330 0 15,740 15,740 0C&I - 9. Other/Mixed Tyres 183 0.009 32 32 0 21 21 0 0 0 0 154 154 0 207 207 0C&I - 9. Other/Mixed Medical waste 207 0.17 17 17 0 10 10 0 0 0 0 20 20 0 47 47 0C&I - 9. Other/Mixed Asbestos 208 0.5 75 75 0 1,700 1,700 0 0 0 0 99 99 0 1,874 1,874 0C&I - 9. Other/Mixed Waste oil 215 0.0009 14 0 14 3 0 3 0 0 0 80 0 80 97 0 97C&I - 9. Other/Mixed Greenwaste 402 0.15 0 0 0 2,420 2,420 0 0 0 0 561 0 510 2,981 2,420 510C&I - 9. Other/Mixed Metal 619 0.8 937 0 937 765 0 765 0 0 0 33 0 33 1,735 0 1,735C&I - 9. Other/Mixed Mixed refuse (C&I waste) 801 0.3 13,431 13,431 0 9,709 9,709 0 697 697 0 1,518 1,518 0 25,355 25,355 0C&I - 9. Other/Mixed Mixed refuse (C&I waste) (in skips) 801 0.3 4,500 4,500 0 0 0 0 0 0 0 627 627 0 5,127 5,127 0C&I - 9. Other/Mixed 19,010 18,060 950 14,630 13,860 770 3,690 3,690 3,090 2,420 620 40,420 38,030 2,340MSW - 1. Domestic Batteries (vehicle) 203 0.0125 0 0 0 13 0 13 0 0 0 0 0 0 13 0 13MSW - 1. Domestic Kerbside comingled recycling 301 777 53 723 0 0 0 0 0 0 0 0 0 777 53 723MSW - 1. Domestic Kerbside refuse 302 0.424 4,250 4,250 0 1,384 1,384 0 386 386 0 1,930 1,930 0 7,950 7,950 0MSW - 1. Domestic Vergeside hardwaste 307 1,487 1,477 10 660 480 0 18 18 0 0 0 0 2,165 1,975 10MSW - 1. Domestic Public place refuse 308 657 657 0 531 531 0 228 228 0 350 350 0 1,766 1,766 0MSW - 1. Domestic Greenwaste 402 0.15 2,666 0 2,539 727 427 300 306 306 0 517 0 470 4,216 733 3,309MSW - 1. Domestic Metal 619 0.8 0 0 0 135 0 135 0 0 0 340 0 340 475 0 475MSW - 1. Domestic General refuse (drop off) 801 0.3 3,835 3,835 0 815 815 0 248 248 0 3,047 3,047 0 7,945 7,945 0MSW - 1. Domestic Comingled Recyclables 802 0.3 39 0 39 6 0 6 0 0 0 0 0 0 45 0 45MSW - 1. Domestic 13,710 10,270 3,310 4,270 3,640 450 2,430 2,430 0 6,180 5,330 810 26,590 21,670 4,570

41,660 37,270 4,260 19,930 18,530 1,220 7,560 7,560 0 13,600 12,080 1,430 82,750 75,440 6,910

Sector Material Type CodeConversion factor

Broome (tonnes) Derby (tonnes) Halls Creek (tonnes) SWEK (tonnes) Regional Total (tonnes)

Subtotal

Subtotal

SubtotalTotal

Broome Derby Halls Creek SWEK REGIONAL TOTAL

43627Permament population 2012/13 16543 9252 3987 8451 38234

Population including tourist nights 2012/13 19995 9977 3987 96660.93

Per capita C&D 0.45 0.10 0.36 0.45Per capita C&I 0.95 1.47 0.93 0.32

0.61Per capita Total 2.08 2.00

0.36Per capita MSW 0.69 0.43 0.61 0.64

1.90 1.41 1.90

Page 68: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley AppendicesRegional Waste Management Plan 2013

APPENDIX B – 2009 RWMP PROGRESS REVIEW

Issue Description Outcomes Broome SDWK Halls Creek ASK Comments

4.2.

1 C

omm

unity

Att

itude

s Develop and implement a market research programme to establish andmonitor community attitudes about the current services they receive andhow the future services and activities should be developed. Complete thesurvey on an annual basis to monitor any changes. Additional one-offquestions can be added for topical issues.

To develop the survey by June2010.

Minor Progress:Did some consultation in June 2011(with Kadar Pearson & Partners Pty Ltd)on a new waste facility and what thepublic would expect

No Progress

No Progress:Market research programme was notdeveloped due to staff turnover of keypersons in waste management.

Shire's lacked the internal staffresources to undertake theprogramme.

4.2.

2 C

omm

unity

Know

led

ge

To develop a communication and education programme for the Shire. Begin coordinating with the DECby December 2009

No progress:We do no education in thecommunity. It is only reactive if we finda resident or business doing somethingwrong.

No Progress:Some school presentations have beenundertaken; however no formalprogram has been put in place.

No Progress:Communication and educationprogramme is not specific to wastemanagement, but is part of the overallhealth promotion strategy.

Shire's lacked the internal staffresources to undertake theprogramme.

An education levy is added to all gate fees to provide a specific fund foreducation and awareness activities. Introduced from July 2010 No progress

No Progress:An increase in gate fees has led toincrease in revenue for the Shire.

No Progress:An operational gate fee structure hasbeen put in place, yielding positiveresults. Some of these funds are utilisedfor community education.

Any education costs are funded outof gate fees and rates. May firstrequire a full understanding of allwaste associated costs and revenues.

4.2.

3 C

omm

unic

atio

nto

Com

mer

cia

lC

usto

mer

s A brief bi-annual newsletter should be produced (as required), that couldbe included with customer invoices (once charging is introduced). Thenewsletter would summarise any changes planned for the waste facilities,together with longer-term strategies. The rationale behind any changeswould be explained.

First communication provided byMarch 2010 summarising theRWMP strategies that impact oncommercial customers

Minor Progress: Developed a small flyerwhen we introduced the gatehouse.This was a one off, as it was neverfollowed up.

No Progress

Minor Progress:The Shire does not have the resourcesto do a specific newsletter related towaste management. Articles are donefor the Halls Creek Herald andKimberley Echo as and when there is aneed.

Current communication initiatives aregenerally reactive to changes inoperations.

4.2.

4Re

gion

al

wa

ste

awa

rene

ssa

nd R

WM

P co

-or

din

ato

r

A state funded regional waste awareness and co-ordination officer shouldbe employed, with the specific role to co-ordinate, develop andimplement the actions of the RWMP throughout the region.

To have developed the jobdescription and applied forfunding by Dec 2009.

No Progress

No Progress:SDWK does not really support this. Itwould be extremely difficult for oneperson to cover the whole of theKimberley.

No Progress:Issue discussed and the ShireManagement requested a positiondescription. None was available.There wasn't enough evidence tosupport the recruitment of a co-ordinator.

No progress due to a lack of regionalcooperation and resourcing.

4.3.

1 D

ata

Col

lect

ion

and

Mon

itorin

g

The Shires need to collect and maintain waste related data, and in a formthat can be aggregated and used within subsequent monitoring andanalyses to evaluate the strategies and measures implemented by theShires.

Establish current annual wastevolume by June 2011

Significant Progress:We have data on annual volumes butnot any detail on the specific wastestreams. Assumptions have been madeto get the specific volumes/weights.

Significant Progress:Being done successfully in Derbythrough the Annual DEC Waste audit.SDWK is still in the process of extendingthe Fitzroy Crossing landfill and this willbegin once the new site is active.

Significant Progress:Data is manually recorded on weeklyrecord books at the tip, and thenentered onto a data analysisprogramme in the office. There isdouble handling which needs to beaddressed.

Although some Shire's reported this asbeing completed ASK has identifiedthat there a number of issues withdata collection that still need to beaddressed.

Once the volumes of generic waste streams (i.e. MSW, C&I and C&D)have been quantified, specific audits of each waste stream can becompleted to provide compositional information, thereby providing moredetailed information to develop future strategies.

Seek funding to Complete aregional waste audit by 2014

Partial Progress: A waste audit wascompleted, we have some annualdata and we have some assumptionstoo.

Partial ProgressPartial Progress:Consultant engaged.

4.3.

2 La

ndfil

l cel

l loca

tion

and

wa

ste

tonn

age

reco

rds Complete periodic surveys of waste tonnages using mobile weigh cells.

This would enable the Shire to more accurately quantify the tonnage ofself-hauled waste received at the landfill sites.

Apply for funding to purchase ofweigh cells by March 2010. No Progress No Progress No Progress Lack of regional cooperation to

apply for funding.

Regular surveys of the sites should be completed to produce site plans(including levels) with waste disposal areas marked.

Surveys to be completed at allkey sites by June of 2011

Completed:Up until Dec 2012 we had beencompleting annual surveys howeverwe now do it quarterly

No ProgressPartial Progress:Site plan is not to scale and does notinclude levels.

Page 69: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley AppendicesRegional Waste Management Plan 2013

Issue Description Outcomes Broome SDWK Halls Creek ASK Comments

4.4.

1 C

omp

lianc

e w

ith si

te lic

ense

con

diti

ons,

unsu

itab

le c

ond

ition

s and

priv

ate

land

fill

esta

blis

hmen

t pol

icy

The Shires (staff and Councillors) need to commit to work to the regulatoryprocesses in place and ensure all regulations are complied with.

Action plan developed and fullcompliance by June 2012 forBroome and Derby and by 2014for Fitzroy and Halls Creek.

Completed:We are achieving good complianceand have improved our relationshipwith the Kimberley DER employees.

No ProgressPartial Progress:Shire staff need training on ControlledWaste Tracking System.

The license conditions for each site should be reviewed to ensure they areappropriate for each site. Licences amended by Dec 2010

Significant Progress:Latest licence is Dec 2012

Significant Progress:Derby has recently become a licensedsite, Fitzroy Crossing is still coveredunder a registration however willpossibly be transferred to a licenseonce the extension of the site iscomplete.

Significant ProgressLicences of have been reissued but itdoes not appear that an internalreview process has been undertaken.

Each Shire should decide on a policy relating to the establishment ofprivate landfills within a certain distance (e.g. 100km) of existing Shirelandfills.

Letters sent by Dec 2009

No Progress:We don’t have a policy but we are inthe process of establishing a new sitewithin 100km of Broome. This willreplace our current landfill and be theonly landfill within 100km of Broome.

No ProgressNo Progress:Issue never discussed in Council.

4.4.

2 Kn

owle

dge

and

skills

Staff should be included in planning and developing the sites operations.The senior staff and / or operational staff should visit other similar sizedwaste facilities facing similar issues to observe best practice operations inperson and recognise practices that they can implement at the Shire’sfacilities. A potential example to visit would be the Shire of Ashburton’sTom Price landfill due to the relatively small tonnage of throughput yetgood landfill management.

First site visited by end of 2010Completed:Visited Derby, Karratha and some sitesin Qld and NSW.

No ProgressPartial Progress:Some staff visited other Broome andKununurra Sites.

All current (and future) operational staff should undergo basic trainingabout their role and duties for the management of the Shire’s wastes. Forthe sites utilising private contractors, training could be included as acondition of the contract.

Letter sent by Shires to MWAC byNov 09 Completed

Completed:Addressed by contractor Tox Free

Completed:Staff turnover is high, necessitatingconstant training of new staff.

Although basic training of operationalstaff is being undertaken formalisedtraining procedures are not in place.

Staff training could include enrolment of key operational andmanagement staff to relevant courses such as the TAFE AssetMaintenance (Waste Management) course.

Key staff enrolled by Dec 2010

No Progress:No formal training undertaken. Is thisTAFE course even delivered in WAanymore?

No Progress

No Progress:Management staff haveenvironmental health training whichincludes waste management.

TAFE course no longer offered.

The Shire should join the Waste Management Association of Australia.Members receive a bi-monthly magazine relating to waste managementand particularly local government issues. The magazine should becirculated around the Councillors (& staff) to provide backgroundknowledge.

WMAA members info circulatedaround staff and Councillors byDec 09

Significant Progress:We are not members (I am joining for2013/2014) but we have been gettingthe correspondence and magazines.

Completed

Significant Progress:Magazine is received regularly.Circulation of the magazine could beimproved.

4.4.

3M

anni

ng o

fSi

tes

The Fitzroy Crossing and Halls Creek facilities should be manned. Both sites manned, with gate feecollection by June 2011. Not Applicable

Significant Progress:Once the Fitzroy Crossing site isextended it will be manned. AnticipateNovember/December 2013

Completed:Tip Supervisor employed, who mansand at time operates landfill plant.

4.4.

4 O

pera

tiona

lM

ana

gem

ent

Pla

ns The Shires (or a consultant) should review the current operations andproduce optimal operational plans for each site’s waste managementoperations

Operational plans produced forall sites by Dec 2010

Significant Progress:Landfill Closure Management Plandeveloped and we are looking toreview this in 2013/2014

No Progress:No operational plan for Fitzroy as yet.

Completed:ASK Consultants were engaged toproduce the plan.

OMPs, EMPs, and LCMPs still requiredfor many of the sites.

4.4.

5 A

bor

igin

al

Com

mun

ities

Monitor the progress of the APY Waste Management Strategy andImplementation Plan Project and register interest in the project.

To have contacted projectstakeholders by Dec 2009 No Progress No Progress

No Progress :Staff turnover issues.

The Shire need to work with the DEC and Warmun community to identifyan alternative site with more suitable characteristics (e.g. deep enoughsoil for trench excavations, no surface water within 100m, etc.

Meeting by Nov 2009. Aim tohave new site opened and oldlicense ended by June 2011

Not Applicable Not ApplicableCompleted:Old site rehabilitated during the last 6months of 2012.

Page 70: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley AppendicesRegional Waste Management Plan 2013

Issue Description Outcomes Broome SDWK Halls Creek ASK Comments

4.4.

6 Re

gion

al

Serv

ice

Con

tract

The Shires should aim to ‘line up’ their current individual contracts to endat a specific date. This would enable the Shires to issue a tender for allwaste and recycling services in the Kimberley as one contract.

All future contracts to end on 30June 2014. Decision made by Aug2013 regarding aggregation ofcontracts.

Completed:Finish date for contracts now alignedbut if a regional approach is taken isyet to be confirmed.

Completed:Shire's are aligning tenders but theywon't be one joint tender.

Completed:Waste collection and managementcurrently done in-house, notcontracted out.

Although contracts have beenaligned, there is not a consensus onhow to progress regionalprocurement.

4.5.

1 Fa

cilit

yre

cycl

ing

are

as /

Tra

nsfe

r Sta

tions

The Shires should improve the layout or establish recycling areas andgatehouse, at manned sites. The recycling ‘drop-off’ points should bevisible from the gatehouse to monitor operations.

Broome and Derby recyclingareas redesigned and improvedby Dec 2010

Significant Progress:We have implemented a gatehouse(May 2012) and we have recyclingoccurring near that gatehouse. It islimited and can be improved ifpossible.

CompletedCompleted:More space required for recycling sites.

All Sites have improved layouts andrecycling areas.

4.5.

2 Pu

blic

spa

cere

cycl

ing

faci

litie

s and

holid

ay

acc

omm

odat

ion

recy

clin

g. Shire of Broome -Recycling stations should be constructed at ‘high traffic’areas that also have takeaway cafes etc. MGB’s with uniform colours(yellow lids) and restricted openings will assist in minimising contamination.

Recycling stations established byMarch 2012

No Progress:No public place recycling.

Not Applicable Not Applicable

Recycling of packaging materials isnot cost effective (viable) especiallywith contamination associated withpublic place facilities.

4.5.

3 D

omes

tic W

ast

e Re

cycl

ing

The Shires should implement a recycling drop-off service for residents atthe Derby landfill and Fitzroy Crossing and Halls Creek as these sitesbecome manned. The service can be offered to commercial business atcost. The use of such a baler would avoid the inefficient transfer ofuncompacted material.

Funding application for balersubmitted by May 2010 Not Applicable

Completed:Derby landfill has a drop off recyclingfacility. Materials are transported toBroome for sorting. Offered tocommercial business through Tox Freenot the Shire.

No Progress:The Shire is struggling to get recycledmaterials collected from its tip.Recycling companies are reluctant tocollect from Halls Creek due todistances involved.

The purchase of a mobile glass crusher that can be used by the Shires toproduce a material that can be used in local markets.

Funding to be applied for by June2011

No Progress:Not followed up. Not sure if thevolumes would warrant the investment.May be better to target other areas?

No ProgressNo Progress

Volumes too low to be viableGlass crushing not considered viable.

The Shires should seek funding to implement an education programmerelating to home composting and to purchase compost bins that can beprovided to residents (at minimal cost).

Funding to be applied for by Dec2011

No Progress:We used to sell compost bins but it hasfallen off and is non-existent.

No Progress No Progress Lack of internal and regionalresources.

The Shires should choose an existing website (eg. freecycle.org) anddevelop a section for the region to encourage reuse of materials in thecommunity. Once the initial pages have been set up the sites require 1-2hr of input a week to maintain and moderate the site.

Site established and promoted byJune 2010 No Progress No Progress No Progress Lack of internal and regional

resources.

4.5.

4 W

hole

of l

ife a

nd g

ate

fee

pric

e st

ruct

ure.

The Shires should aim to ensure all waste management costs relating tocommercial wastes are received from gate fees or any shortfall isquantified. A waste reserve fund should be established (based on a levy of$3 - $5 per m3 of waste disposed). This can be used to purchase strategiccapital items and for the rehabilitation of the sites.

Waste reserve established by July2010

Completed:Considerable work has been done withincreasing our reserve and performingLong Term Financial Planning.

No Progress:Gate fees have been increasedsignificantly. A levy has not yet beenimplemented.

Partial Progress:Reserve fund established, but nomonies deposited into it.Due to staff turnover the Shire lacks anaccountant, once this position is filledthe matter will be progressed further.

A new gate fee pricing structure should be developed to encourage thedelivery of separated wastes to the landfill. Ultimately the gate fees shouldprovide income to recover all costs associated with commercial wastes.

Revised gate fees structureintroduced by June 2010 or whensites are manned.

Partial Progress:We encourage some separation butneed to go further when weimplement other programmes likesource separation of skip and bulk bins

Completed

Partial Progress:Gate fee structure to encouragesource separation. E.g. gate fee formixed C&D waste is double the fee forseparated C&D waste.

Page 71: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley AppendicesRegional Waste Management Plan 2013

Issue Description Outcomes Broome SDWK Halls Creek ASK Comments

4.5.

5 C

omm

erci

al w

ast

e re

cycl

ing

The Shires should continue to separate their greenwaste and investigatethe option to mulch the material, prior to on selling to local mulch retailers.If there is no local market for the mulched greenwaste, the Shire shouldcontinue to burn the material

Assess local markets by Dec 2011

Completed:We divert and mulch all greenwasteentering our site. We give this back tothe residents and businesses and evenload it.

Completed:Last financial year the Shire trialled thesale of mulch to commercialbusinesses. There was no local marketand therefore the fee for the comingfinancial year will be free toencourage contractors to take thematerial.

Significant Progress:Shire will purchase a mulcher as a trialfor 2013-14.

Peter Tapsell (DEC) should be invited to a workshop involving the localstakeholders (Shires, developers, builders and bulk waste companies) toinform the local stakeholders of the programmes and measures that couldbe implemented to maximise recycling.

To have contacted Peter Tapselland held a workshop withstakeholders by Oct 2010.

No Progress No ProgressNo Progress:Staff turnover issues.

The Shires should introduce the requirement of WMPs with any buildingapproval. This would require the builder / developer to separate wastematerials for recycling. Concrete, bricks and tiles can be stored at thefacilities, until sufficient volumes are stored to justify hiring a crusher toprocess the materials, this can be completed on a regional basis, with thecontractor visiting a number of Shires during the same tour.

Stockpiling clean C&D waste thatcan be crushed from Jan 2010.

No Progress:This needs to be developed, as it willallow us to get source separation atthese sites and increase diversion fromlandfill.

Completed:This has been quite well implementedin Derby, as Tox Free who supply theskip bins have been very active inpromoting waste separation. Three binsare supplied to contractors - Steel,green waste and general waste.

No Progress:Issue has been discussed but notimplemented. The new gate chargessystem encouraging waste separationshould enable the storage of differentconstruction waste materials.

4.6.

1Su

sta

ina

ble

pro

cure

men

t

The Shires need to develop a procurement policy to ensure the use ofrecycled content products by their staff and contractors. Review started by June 2010 No Progress No Progress No Progress

Page 72: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

www.askwm.com

Shires of Broome, Derby West Kimberley, Halls Creek and Wyndham East Kimberley AppendicesRegional Waste Management Plan 2013

APPENDIX C – IMPLEMENTATION SCHEDULE IN A3 FORMAT

Page 73: REGIONAL WASTE MANAGEMENT PLAN 2013 Kimberley Region · Regional Waste Management Plan 2013 Acknowledgements ASK Waste Management gratefully acknowledge the cooperation of Shire staff

ID Task Name Duration Start Finish

1 Organisational Capacity 1285 days Thu 2/01/14 Wed 5/12/18

2 Regional cooperation (TAG meetings) 1285 days Thu 2/01/14 Wed 5/12/18

3 TAG meetings 1285 days Thu 2/01/14 Wed 5/12/18

64 Regional funding 140 days Thu 2/01/14 Wed 16/07/14

65 Agree baseline funding arrangement 90 days Thu 2/01/14 Wed 7/05/14

66 Establish funding account 40 days Thu 8/05/14 Wed 2/07/14

67 Make initial funding contribution 10 days Thu 3/07/14 Wed 16/07/14

68 Regional coordinator 1114 days Wed 5/02/14 Mon 14/05/18

69 Define position role / description 40 days Wed 5/02/14 Tue 1/04/14

70 Recruitment of coordinator 50 days Wed 2/04/14 Tue 10/06/14

71 Coordinator start date 0 days Tue 1/07/14 Tue 1/07/14

72 Initial training & site visits 10 days Tue 1/07/14 Mon 14/07/14

73 On going coordination 1000 days Tue 15/07/14 Mon 14/05/18

74 Continuity planning 1100 days Thu 2/01/14 Wed 21/03/18

75 Economic Viability 1120 days Thu 2/01/14 Wed 18/04/18

76 Economy of scale 1100 days Thu 2/01/14 Wed 21/03/18

77 Private sector competition 1093 days Mon 10/02/14 Wed 18/04/18

78 Engage specialist advice (as required) 150 days Mon 10/02/14 Wed 18/04/18

79 Transport logistics 100 days Fri 15/08/14 Thu 1/01/15

80 Costing and gate fees 130 days Mon 4/01/16 Fri 1/07/16

81 Whole of life modelling 70 days Mon 4/01/16 Fri 8/04/16

82 Gate fee structure defined 60 days Mon 11/04/16 Fri 1/07/16

83 Waste Data 1162 days Mon 10/03/14 Tue 21/08/18

84 Data collection and monitoring 192 days Wed 9/04/14 Thu 1/01/15

85 Adopt uniform waste classifications 60 days Wed 9/04/14 Tue 1/07/14

86 Implement electronic data collection 100 days Fri 15/08/14 Thu 1/01/15

87 Waste tonnage infrastructure 540 days Mon 8/06/15 Fri 30/06/17

88 Weigh cell tonnage audit 150 days Mon 8/06/15 Fri 1/01/16

89 Research and install weighing systems 200 days Mon 26/09/16 Fri 30/06/17

90 Cell locations and site surveys 1162 days Mon 10/03/14 Tue 21/08/18

91 Prepare and tender for a regional contract 60 days Mon 10/03/14 Fri 30/05/14

92 Annual site surveys 1075 days Wed 9/07/14 Tue 21/08/18

98 Community Awareness 1239 days? Thu 2/01/14 Tue 2/10/18

99 Community attitudes 825 days Mon 2/02/15 Fri 30/03/18

100 Annual attitude survey 825 days Mon 2/02/15 Fri 30/03/18

105 Community knowledge 900 days Mon 16/02/15 Fri 27/07/18

106 Develop awareness programme 100 days Mon 16/02/15 Fri 3/07/15

107 Implement programme 800 days Mon 6/07/15 Fri 27/07/18

108 Communication to commercial customers 805 days Wed 2/09/15 Tue 2/10/18

109 Customer newsletter 805 days Wed 2/09/15 Tue 2/10/18

114 Decision maker understanding 1 day? Thu 2/01/14 Thu 2/01/14

115 Councillor info session 795 days Tue 18/11/14 Mon 4/12/17

119 Best Practice Operations 1048 days Fri 18/07/14 Tue 24/07/18

120 Operational planning 120 days Fri 18/07/14 Thu 1/01/15

121 Knowledge and skills 800 days Wed 1/07/15 Tue 24/07/18

122 Identification of new sites 880 days Fri 12/09/14 Thu 25/01/18

123 Accurately estimate operational life 80 days Fri 12/09/14 Thu 1/01/15

124 Start site selection process, as required 800 days Fri 2/01/15 Thu 25/01/18

125 Waste Minimisation 1025 days Thu 2/01/14 Wed 6/12/17

126 Scrap metal 100 days Thu 2/01/14 Wed 21/05/14

127 Define regional contract and MOU 80 days Thu 2/01/14 Wed 23/04/14

128 Tender and award contract 60 days Thu 2/01/14 Wed 26/03/14

129 First scrap tour implementation 100 days Thu 2/01/14 Wed 21/05/14

130 C&D waste (concrete & bricks) 260 days Thu 10/07/14 Wed 8/07/15

131 Determine viability 60 days Thu 10/07/14 Wed 1/10/14

132 Start to stockpile concrete & bricks 30 days Thu 2/10/14 Wed 12/11/14

133 Develop & Implement source separation initiatives 200 days Thu 2/10/14 Wed 8/07/15

134 Seek funding and/or tender preparation 120 days Thu 2/10/14 Wed 18/03/15

135 Award tender (if contracted out) 30 days Thu 19/03/15 Wed 29/04/15

136 Start re-processing of waste 50 days Thu 30/04/15 Wed 8/07/15

137 Additional waste processing assessments 700 days Thu 2/04/15 Wed 6/12/17

138 Waste tyres (feasibility assessment) 60 days Fri 10/10/14 Thu 1/01/15

139 Greenwaste processing (assessment) 60 days Mon 12/10/15 Fri 1/01/16

140 Packaging materials 450 days Fri 10/10/14 Thu 30/06/16

141 Define viability 60 days Fri 10/10/14 Thu 1/01/15

142 Implement agreed recommendations 200 days Fri 25/09/15 Thu 30/06/16

143 Low volume - highly polluting wastes 387 days Thu 8/01/15 Fri 1/07/16

144 Determine viability & best options 60 days Thu 8/01/15 Wed 1/04/15

145 Implement recommendations 120 days Mon 18/01/16 Fri 1/07/16

0%0%0%0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0%0%

0%0%

0%0%

0%1/070%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0% 0% 0% 0% 0%

0%0%

0% 0% 0% 0%0%

0%0%

0%0% 0% 0% 0%

0%0% 0% 0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%

0%0%0%

0%0%

Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 12014 2015 2016 2017 2018

1308 - RWMP implementation plan 0A

Page 1