National Nuclear Safety Administration, P. R. China 1 Regulatory Oversight of New Build Project ZHANG ZhiGang Director General of Nuclear and Radiation Safety Center, Ministry of Environmental Protection, P.R.China Pretoria, South Africa Oct.5-7, 2016

Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 1

Regulatory Oversight of New

Build Project

ZHANG ZhiGang

Director General of Nuclear and Radiation Safety Center,

Ministry of Environmental Protection, P.R.China

Pretoria, South Africa

Oct.5-7, 2016

Page 2: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 2

Content Outlines

I Organizational Structure of National Nuclear Safety

Administration(NNSA)

II Chinese Legislative Framework for Nuclear and Radiation

Safety Regulation

III The Policy Requirements for New Projects

IV Distribution of Nuclear Power Plants in China

V Regulation of New NPP Projects

VI Regulation of Nuclear Safety Equipment

VII Regulation of Personnel Qualifications

Page 3: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 3

Content Outlines

I Organizational Structure of National Nuclear Safety

Administration(NNSA)

II Chinese Legislative Framework for Nuclear and Radiation

Safety Regulation

III The Policy Requirements for New Projects

IV Distribution of Nuclear Power Plants in China

V Regulation of New NPP Projects

VI Regulation of Nuclear Safety Equipment

VII Regulation of Personnel Qualifications

Page 4: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 4

I. Organizational Structure of National Nuclear Safety Administration(NNSA)

4

National Nuclear Safety Administration(NNSA) The nuclear and radiation safety regulator of China, undertakes overall regulation and management of national nuclear safety, radiation safety and radiation environmental protection, and independently regulates national civil nuclear facilities and nuclear technologies in a centralized manner.

Department of Nuclear Power Safety Regulation: Undertake regulation of NPPs, including administrative licensing and inspection of new projects.

6 regional offices of nuclear and radiation safety: The affiliated agencies of the NNSA and are respectively responsible for nuclear and radiation safety inspection in their regions

Nuclear and Radiation Safety Center: A directly affiliated unit and the most important internal technical support organization of the NNSA. It provides a full range of regulatory technical support and guarantee for the NNSA

Nuclear Safety and Environment Committee of Experts of MEP (NNSA): Consulting body of the NNSA, provides independent advisory opinions on major issues.

Page 5: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 5

Related functional departments of the MEP

Technical support organizations

Agencies Department of Radiation

Source Safety Regulation

Department of Nuclear Power

Safety Regulation

Department of Nuclear Facility

Safety Regulation

Department of International Cooperation

International Cooperation Division of

Nuclear Safety

General Office General

Office

Division of

Policy and

Technology

Nuclear Power

Division I Division of

Radiation

Monitoring and

Emergency

Nuclear Power

Division II

Division of

Personnel

Qualification

Management

Nuclear Power

Division III

General

Office

Division of

Nuclear Fuel

and

Transportation

Division of

Radioactive

Waste

Management

Division of

Nuclear

Technology

Utilization

Northern Regional Office

of Nuclear and Radiation

Safety

Reactor Division

Division of

Electromagneti

c Radiation and

Mining &

Metallurgy

Division of

Nuclear Safety

Equipment

Nuclear and

Radiation Safety

Center

Radiation

Monitoring

Technical Center

Vice-minister of the MEP/

Administrator of NNSA

Nuclear Safety Chief Engineer/

Deputy Administrator of NNSA

Nuclear Safety and Environment

Committee of Experts

General Office

Department of Education

and Communicatio

ns

Department of Science,

Technology and Standards

Department of Human Resources Management and Institutional Arrangement

Department of Policies, Laws and

Regulations

Department of Planning and Finance

Graph of Organizational Structure of NNSA

Northwestern Regional

Office of Nuclear and

Radiation Safety

Eastern Regional Office of

Nuclear and Radiation

Safety

Southwestern Regional

Office of Nuclear and

Radiation Safety

Southern Regional Office

of Nuclear and Radiation

Safety

Northeastern Regional

Office of Nuclear and

Radiation Safety

Page 6: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 6

6

Nuclear safety regulatory system of NNSA

Northern

Office

Eastern

Office

Southern

Office

Northwester

n Office

Southwester

n Office

Northeastern Office

Regional Offices of Nuclear and Radiation Safety

Nuclear and Radiation Safety Center

Suzhou

Nuclear

Safety Center

Technical Research Center for Nuclear Equipment Safety and Reliability

Radiation Monitoring Technical Center

Beijing Nuclea

r Safety Review Center

Technical support organizations

Department of Nuclear Facility Safety Regulation

Department of Nuclear Power Safety Regulation

Department of Agencies Radiation Source Safety

Regulation

Three Departments in NNSA

Nuclear Safety and Environment

Committee of Experts

Ministry of Environmental Protection(MEP) / Administrator of National Nuclear Safety

Administration(NNSA)

Consult

Page 7: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 7

Content Outlines

I Organizational Structure of National Nuclear Safety

Administration(NNSA)

II Chinese Legislative Framework for Nuclear and Radiation

Safety Regulation

III The Policy Requirements for New Projects

IV Distribution of Nuclear Power Plants in China

V Regulation of New NPP Projects

VI Regulation of Nuclear Safety Equipment

VII Regulation of Personnel Qualifications

Page 8: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 8

II. Chinese Legislative Framework for Nuclear and Radiation Safety Regulation

8

8

China has established a perfected system of national nuclear and radiation safety laws, regulations, and standards, and provides the legal basis for the regulation of new projects.

Chinese Legislative Framework for Nuclear and Radiation Safety Regulation is pyramid-shaped.

Laws, e.g.:Law of the People's Republic of China on Prevention and

Control of Radioactive Pollution, The Law of the People's Republic of China on Environmental Protection, etc.

Regulations, e.g.: Regulations of the People's Republic of China on Safety Supervision and Management of Civil Nuclear Facilities, Regulations on Supervision and Management of Civil Nuclear Safety Equipment, etc.

Departmental rules, e.g.: HAF101 “Provisions on Siting Safety of Nuclear Power Plants”, HAF102 “Provisions on Design Safety of Nuclear Power Plants”, etc.

Guidelines, technical documents, e.g.: HAD102/06 “Design of Reactor Containment System in Nuclear Power Plants”, etc.

Page 9: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 9

Laws

Regulations by the State Council

Rules for Implementation of

Regulations and their Appendixes

Departmental Rules

Technology Management

Nuclear Safety Guidelines, Standards, Normative Documents

“Pyramid-shaped” Legislative Framework

Nuclear safety regulators

Rules for Implementation of

Regulations by the State

Council and their

Appendixes

The administrative

regulations of technical

requirements of nuclear

safety

Nuclear Safety

Guidelines

Normative

Documents

Approved and issued by the State Council,

e.g.: Regulations of the People's Republic of

China on Safety Supervision and Management

of Civil Nuclear Facilities

Approved by the National People's Congress,

promulgated by Presidential Decree, e.g.: Law of the

People's Republic of China on Prevention and

Control of Radioactive Pollution

Page 10: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 10

Content Outlines

I Organizational Structure of National Nuclear Safety

Administration(NNSA)

II Chinese Legislative Framework for Nuclear and Radiation

Safety Regulation

III The Policy Requirements for New Projects

IV Distribution of Nuclear Power Plants in China

V Regulation of New NPP Projects

VI Regulation of Nuclear Safety Equipment

VII Regulation of Personnel Qualifications

Page 11: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China

11

Ⅲ.Policy Requirements for New Build Projects

11

After the Fukushima nuclear accident, NNSA in conjunction with relevant ministries issued the "12th Five-Year" Plan and Prospective Targets of 2020 on Nuclear Safety and Radioactive Pollution Prevention and Control(Nuclear Safety Plan), which put forward the further policy requirements for nuclear safety regulation of new NPPs.

Safety Goal

• Practically eliminates the possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan.

Safety level

• New NPPs should have comprehensive

and effective measures to prevent and

mitigate severe accidents.

• The probability of severe core damage

per reactor every year shall be lower

than 1/100,000, and the probability of

large release of radioactive substance

per reactor every year shall be lower

than 1/1,000,000.

Page 12: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China

Ⅲ.Policy Requirements for New Build Projects

12

The experience feedback and the requirements of improvement are considered in the safety design of new build projects, and the latest international safety requirements are met.

Meet General Technical Requirements for Nuclear Power Plant Improvement Actions after

Fukushima Nuclear Accident issued by NNSA

General Technical Requirements includes improvement requirements in 8 factors, such as Flood Defense Capability Improvement Technical Requirements, Technical Requirements of Emergency Water-Injection and Related Equipment, and so on.

Meet the IAEA latest safety requirement document of No.

SSR-2/1(Rev.1)

NNSA is updating the regulation document of HAF102-2004 Provisions on Design Safety of Nuclear Power Plants referring to the IAEA document of No.SSR-2/1(Rev.1) and considering the latest safety requirements.

Page 13: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 13

Content Outlines

I Organizational Structure of National Nuclear Safety

Administration(NNSA)

II Chinese Legislative Framework for Nuclear and Radiation

Safety Regulation

III The Policy Requirements for New Projects

IV Distribution of Nuclear Power Plants in China

V Regulation of New NPP Projects

VI Regulation of Nuclear Safety Equipment

VII Regulation of Personnel Qualifications

Page 14: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 14

IV. Distribution of NPPs in China

1 Units in operation:27

2 Units under construction:25

3 Units to be constructed : ~ 20

Page 15: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 15

15

新疆

西藏

青海

甘肃 内蒙古

四川

云南

贵州

山西

重庆

陕西

湖北

湖南

广西 广东

江西

安徽

河南

山东

河北

北京

辽宁

吉林

黑龙江

江苏

浙江

福建

台湾

海南

上海

天津

宁夏

红沿河核电厂

徐大堡核电站

海阳核电厂

石岛湾核电厂

田湾核电站

秦山核电厂

秦山第二核电厂

秦山第三核电厂

三门核电厂

宁德核电厂

福清核电厂

大亚湾核电厂

岭澳核电厂

台山核电厂

阳江核电厂

防城港核电厂

昌江核电厂

Units in operation

Units under construction

Units to be constructed

Units under construction

陆丰核电厂

漳州核电厂

The Distribution of NPPs in China

Units in operation

Page 16: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 16

Content Outlines

I Organizational Structure of National Nuclear Safety

Administration(NNSA)

II Chinese Legislative Framework for Nuclear and Radiation

Safety Regulation

III The Policy Requirements for New Projects

IV Distribution of Nuclear Power Plants in China

V Regulation of New NPP Projects

VI Regulation of Nuclear Safety Equipment

VII Regulation of Personnel Qualifications

Page 17: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 17

V. Regulation of New NPP Projects

General Introduction Different stages of Regulation

1 Siting Review of Siting and Environmental Impact Assessment (EIA) Report

2 Application for Construction Permit Review of PSAR

3

4 Application for First Fuel Loading Permit Review of FSAR

5 Construction Review and Inspection

Application for Operation License

6

Page 18: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 18

1.General Introduction

• The NNSA is responsible for the enactment, approval and granting of safety licenses.

• The NNSA or its regional offices may assign regional inspection groups (inspectors) to the manufacturing, construction and operation sites of nuclear installations.

According to relevant regulations, China adopts a safety licensing system for nuclear installations.

• The licenses include: Review Comment on Siting, Construction Permit, First Fuel Loading Permit, Operation License, etc.

• The main inspections:Daily Inspection,Routine Inspection and Non-routine Inspection

NNSA regulatory actions over the new NPPs items include safety review and inspection.

Page 19: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 19

19

01

Siting

03

Construction

05

Application for Operation License

02

Application for Construction

Permit(PSAR)

04

Application for First Fuel Loading

Permit(FSAR)

Stage Division for Regulation of New NPPs Items

Commercial Operation

Note: The regulations of decommissioning are does not fall into the scope of new NPPs regulation. However , requirements are included in the safety review for NPP design which aim to facilitate decommissioning ,and the design details convenient for decommissioning are compiled as an independent chapter (chapter 20 in SAR) in the PSAR and FSAR.

Page 20: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 20

20

2.Siting

The regulation for new NPPs start from the siting stage .

NNSA must determine the suitability of the NPP and the selected site from the safety perspective, including two aspects of review:

Site Safety Analysis Report(Siting Phase)

Siting and Environmental Impact Report (Siting Phase)

The Review Comments on Siting will be issued by NNSA after reviewing the reports above. Inspection:site survey.

Page 21: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 21

3.Application for Construction Permit(PSAR)

License review Technical review of supporting

documents for CP including:

Preliminary safety analysis report (PSAR)

Environment Impact Assessment Report

(during construction)

Quality Assurance Program(during design

and construction)

Supervisory inspection

On-site inspection, routine and non-routine inspection by NNSA and regional offices:

Daily inspection

Routine inspection of control points (e.g foundation subsoil in foundation ditch, first concrete casting)

Non-routine inspection or special inspection

Page 22: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 22

NN

SA

issue co

nstru

ction

perm

it to

new

bu

ild N

PP

pro

ject

Review 3 reports

including PSAR:

preparation of

PSER and review

comments

Inspections

performed by

NNSA and

reginal offices:

On-site

inspection/routine

inspection /non-

routine inspection

Examined by

Nuclear Safety

and Environment

Advisory

Committee:

Deliberate the

process of review

and inspection

Internal approval

process of NNSA:

Meetings of

DGs/Administrator

s/ Ministers

Review and Approval of Construction Permit

Page 23: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 23

Process Schematic for Various

Administrative Examination

and Approval Of NNSA

Ministry of Environmental Protection (NNSA) Applicants for matters to be licensed

Acceptance of application / format examination /reply / announcement

Clarifying review organization assigning missions and establishing project team

Review organization A

Technical review of written document / technical inspection on site

Questionnaire / reply, review dialogue, and supplement for documentation

For important technical matters of review, the regulated organizations being reviewed is required to carry out special studies, organize experts for consulting and deliberation, and perform independent computation or demonstration tests

Administrative approval and deliberation of Category A

Deliberation in Administrator’s office meeting

Deliberation in Administrator’s office meeting / Minister's topical meeting

Deliberation of ministerial standing committee

Approval / review of document issuance, announcement and updating, sorting and filing of relevant document recording

Submitting applications /relevant documents

Review organization B (for important projects)

Technical review of written document / technical inspection on site

Administrative approval and deliberation of Category B

Deliberation in DG’s affairs meeting

Minister's topical meeting

Administrative approval and deliberation of Category C

Deliberation in DG’s affairs meeting

Deliberation in Administrator’s office meeting

Administrative approval and deliberation of Category D

Deliberation in DG’s affairs meeting

Administrative approval and deliberation of Category D

Deliberation in DG’s affairs meeting

Page 24: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 24

Annual Plan for Nuclear and Radiation Safety Inspection (Regional offices and Headquarter)

Preparation and on-site Implementation

Preparation and Issuance of Inspection Report

Law Enforcement (when necessary)

Problems Tracking and Verification

Collection, Sorting and Filing of Inspection Documents

Investigation of and Response to Safety Incidents

Nuclear and Radiation Safety Inspection Program and Implementation Procedures

Single Inspection Plan

Flowchart of Safety Inspection Process

Page 25: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 25

25

SAR including PSAR and FSAR, which overall describes the safety

design of NPPS

Format and content of SAR are based on USNRC RG 1.70

(1978) and SRP

Added section 18 “Human factors engineering”, section 19 “PSA and severe accident” and section 20 “ Decommissioning”

Format and content of Safety Analysis Report, Technique review

NNSA perform the technical review for SAR and develop SER and give independent and objective evaluation of NPP’s safety design.

Page 26: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 26

26

4.Construction

Review and Approval Technical review of detail design and construction including:

Modification of document approved or agreed by NNSA

Important issue unsolved and CP conditions during the PSAR review.

Safety important design changes

Construction events report

Major non-conformances and special permit application…

Supervisory inspection On-site inspection of construction and installation by NNSA and regional offices:

Routine inspection of construction

Supervision of construction regarding Important design changes , major non-conformances and quality issues

Non-routine inspection and special inspection

Page 27: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 27

27

5.Application for first fuel loading permit(FSAR)

License review Approval of first fuel loading application is based on technical review of 13 supporting documents

6 reports should be in advance so that the NNSA has enough time for review, they include FSAR/Environment impact assessment report(during operation)/Commissioning Program, and have enough time for review

7 reports including Construction Progress Report/Maintenance program and operator qualification report should be submitted。

Supervisory inspection On-site inspection/routine and non-routine inspection/special inspection during construction, installation and commissioning

Non-routine inspection, special inspection and environment protection related inspection, E.g. Inspections are performed to check if the design, construction and operation of waste facilities were completed at the same time with those of the main parts of installation.

On-site inspection, routine inspection of selected control points during cold/hot function tests.

Page 28: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 28

Review 13

reports

including FSAR:

preparation of

PSER and review

comments

Supervisory

Inspection :

On-site inspection

routine and non-

routine inspection,

special inspection.

Such as waste

facilities inspection

Examined by

Nuclear Safety

and Environment

Expert

Committee:

Examination of the

process of review

and inspection

Internal approval

process of NNSA:

Meetings of

DGs/Administrators/

Ministers

Review and Approval of first fuel loading permit

NN

SA

issue first fu

el lo

ad

ing

perm

it to

new

bu

ild N

PP

pro

ject

Page 29: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 29

29

6. Application for operation license

License permit Final phase of the technical review for new build NPP project, after which the NPP will transfer to operation.

6 reports should be reviewed, including FSAR(revised edition), Report on Commissioning and Pre-operation after Fuel Loading of Nuclear Facilities, Quality Assurance Program(during operating)

Approval Letter for Environmental Impact Report on Nuclear Facilities and documents related to environmental protection acceptance

Supervisory inspection inspections should be conducted at the selected control points during fuel loading, criticality, tests and pre-operation.

routine and non-routine inspection/special inspections of control points during fuel loading/Criticality, power ascension(e.g 10%FP ,90%FP)

On-site inspection

Page 30: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 30

NN

SA

issue o

pera

tion

licen

se to

th

e n

ew

bu

ild N

PP

pro

ject

Review 4 reports

including FSAR

(revised edition):

Preparation of review comments

supervisory inspection:

Routine inspection and other inspection of control points at fuel loading, criticality, power ascension (e.g 10%FP ,90%FP)

Examined by

Nuclear Safety

and Environment

Expert Committee:

Examination of the

process of review

and inspection

Internal approval

process of NNSA:

Meetings of

DGs/Administrators/

Ministers

Review and approval of operation license

Page 31: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 31

Content Outlines

I Organizational Structure of National Nuclear Safety

Administration(NNSA)

II Chinese Legislative Framework for Nuclear and Radiation

Safety Regulation

III The Policy Requirements for New Projects

IV Distribution of Nuclear Power Plants in China

V Regulation of New NPP Projects

VI Regulation of Nuclear Safety Equipment

VII Regulation of Personnel Qualifications

Page 32: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 32

03 02

01

Review and license: A licensing system is adopted for the regulation of corporations/organizations responsible for the design, manufacturing, installation and non-destructive testing of civil nuclear safety equipment . As for overseas corporations, NNSA adopts a registration system.

Safety examination: conducting safety examination of imported civil nuclear safety equipment

supervisory inspection: nuclear safety equipment routine and non-routine nuclear safety inspections for nuclear safety equipment of licensees and overseas registered corporations. Resident inspectors are sent in case of important nuclear safety equipment.

The Regulation of nuclear safety equipment is another important part of NNSA’s regulatory activities. The Department of Nuclear Facility Safety Regulation, Northern Regional Office and Nuclear and Radiation Safety Center carry out regulatory activities together in the following 3 aspects:

VI. Regulatory of nuclear safety equipment

Page 33: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 33

Review and license of nuclear safety equipment

Review of License Applicants

• qualification of legal person;

• work performance related or similar to activities to be performed;

• professional technical personnel adapted to activities to be performed and qualified after examination;

• workplaces, facilities and equipment adapted to activities to be performed.

Review of Registered (foreign)Corporations

• Compliance with relevant laws, regulations and provisions;

• Possession of licenses/ qualifications required by nuclear safety regulatory body in home country.

Page 34: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 34

Daily inspections, routine and non-routine inspections and resident inspections pay special attention to:

Fulfillment of license conditions, Personnel

Qualification

Implementation of quality assurance

program, Compliance of relevant

technical documents

Design, manufacture, Installation of nuclear

safety equipment , Implementation, acceptance and

evaluation of non-destructive test

Investigation and solution for significant

quality problems, implementation of

modification requirements

Page 35: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 35

Examination at

customs checkpoint

Checking of

Declaration document

Witness inspection of

safety

performance

Witness inspection

Activities conducted by the NNSA and its subsidiary safety inspection agencies for imported civil nuclear safety equipment :

Page 36: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 36

Ge

ne

ral Pro

cess Flo

w D

iagram fo

r Re

gulatio

n o

f C

ivil Nu

clear Safety Eq

uip

me

nt

Page 37: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 37

Content Outlines

I Organizational Structure of National Nuclear Safety

Administration(NNSA)

II Chinese Legislative Framework for Nuclear and Radiation

Safety Regulation

III The Policy Requirements for New Projects

IV Distribution of Nuclear Power Plants in China

V Regulation of New NPP Projects

VI Regulation of Nuclear Safety Equipment

VII Regulation of Personnel Qualifications

Page 38: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 38

VII. Qualification management

NPP operators: operators , senior operators

Welders of nuclear safety equipment and personnel for

non-destructive test

Qualification of professional

technicians holding key positions in nuclear safety

The NNSA is responsible for implementing qualification management of employees of new build projects

Nuclear Safety Inspector

Page 39: Regulatory Oversight of New Build Project...2016/10/01  · possibility of large radioactive release in design of new build projects during and after the 13th Five-Year Plan. Safety

National Nuclear Safety Administration, P. R. China 39

Any questions or comments

Thank for your patience!