PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER P ALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY Relevant Experience NOVEMBER 14, 2014 1 A RADIOACTIVE WASTE REPOSITORY UAB “Eksortus” UAB “Specialus montažas – NTP” PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY NOVEMBER 14, 2014 2 Feasibility Study for the Management of V1 NPP Primary Circuit Components (2012-2013), Client: JAVYS, Slovak Rep. Objective: Development and comparison the alternative solutions for the management of the Large Components of Primary Circuits of the two Units of V1 NPP to allow their dismantling and subsequent waste management A RADIOACTIVE WASTE REPOSITORY Scope of services: 1) Development and screening of alternatives for dismantling 2) Detailed analysis and selection of best alternative for dismantling 3) Elaboration of the pre-operational Safety Analysis Report upgrade proposal for concerned nuclear installations (National Radwaste Repository Mochovce and Radwaste Treatment Centre Bohunice) for the selected alternatives Components to dismantle: Reactor pressure vessels, reactor internal structures, main circulation pipelines, steam generators, main circulation pumps, main gate valves, pressurizer, pressurizer tank, annular water tank, Mogilnik (storage facility in the reactor hall), reactor shaft protection lid, shielding assemblies

Relevant Experience - A.L.A.R.A ·  · 2015-04-10covered by corrosion resistant multilayer protective engineering barriers. After closure, ... reactors in Europian Union countries)

  • Upload
    ledan

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR

COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND

FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

Relevant Experience

NOVEMBER 14, 2014 1

A RADIOACTIVE WASTE REPOSITORY

UAB “Eksortus”

UAB “Specialus montažas – NTP”

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

NOVEMBER 14, 2014 2

Feasibility Study for the Management of V1 NPP Primary Circuit Components

(2012-2013), Client: JAVYS, Slovak Rep.

Objective: Development and comparison the alternative solutions for the management of the Large Components of Primary Circuits of the two

Units of V1 NPP to allow their dismantling and subsequent waste management

A RADIOACTIVE WASTE REPOSITORY

Scope of services: 1) Development and screening of alternatives for dismantling

2) Detailed analysis and selection of best alternative for dismantling

3) Elaboration of the pre-operational Safety Analysis Report upgrade proposal for

concerned nuclear installations (National Radwaste Repository Mochovce and Radwaste

Treatment Centre Bohunice) for the selected alternatives

Components to dismantle: Reactor pressure vessels, reactor internal structures, main circulation pipelines,

steam generators, main circulation pumps, main gate valves, pressurizer, pressurizer

tank, annular water tank, Mogilnik (storage facility in the reactor hall), reactor shaft

protection lid, shielding assemblies

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

NOVEMBER 14, 2014 3

Feasibility Study for the Management of V1 NPP Primary Circuit Components

(2012-2013), Client: JAVYS, Slovak Rep.

Transport and handling operations for removal of Steam

Generator to transport corridor

Fragmentation of Steam Generator on 68 pieces

A RADIOACTIVE WASTE REPOSITORY

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

NOVEMBER 14, 2014 4

Landfill Disposal Facility for Short-lived Very Low Level Radioactive Waste –

Project B19 (2008 – 2013), Client: Ignalina NPP

Objective: Design and construction of a new Landfill Disposal Facility

for short-lived very low level radwaste arising from INPP decommissioning

Functions of the facility:

● Reception of treated conditioned very low level waste

● Characterization, labeling and keeping characterization records of

waste packages

● Transfer and receipt of data from INPP local network and

Decommissioning Management System and Database

● Interim storage of waste packages in the Buffer Storage

● Transfer of waste packages and final disposal of waste in Landfill

Disposal Units

Scope of work:

● Engineering and geological studies on the Landfill site

● Technical design and detailed design for the Landfill and Buffer Storage

● Environmental impact assessment

● Nuclear safety analysis

● Buffer Storage construction and commissioning

Future Landfill Facility

Buffer Storage Facility

A RADIOACTIVE WASTE REPOSITORY

On the example of Landfill facility at OSKARSHAMN NPP territory, Sweden)

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

NOVEMBER 14, 2014 5

Near-surface Repository for Low- and Intermediate Level Short-lived Radioactive Waste

Project B25-1, (2009 – 2014), Client Ignalina NPP

Scope of work:

● Site Survey including tectonic investigations

● Site Revalidation

● Design Options Study

● Basic Engineering Design

● Technical Design

● Preliminary and Final Safety Assessment

Reports

● Environmental Monitoring Programme

● Support to the Client for Design Licensing

Objective: Design of new Near Surface Repository (NSR) and associated

facilities in order to secure safe decommissioning of Ignalina Nuclear Power

Plant

► Hill-type repository which contains up to 50 cells designed for final disposal of

100 000 m3 of radioactive waste conditioned in concrete containers and

immobilised in a cemented matrix.

► The repository and auxiliary structures will occupy an area of about 40 ha.

► The radioactive waste will be disposed in the NSR till 2030 until the INPP is fully

dismantled.

► Having accepted the radioactive waste, the NSR will be sealed and its surface

covered by corrosion resistant multilayer protective engineering barriers.

► After closure, NSR surveillance will be carried out for at least 300 years. NSR

active surveillance during the first 100 years will ensure its physical protection,

perform the necessary works on repository servicing and monitoring, store the

documentation and, if needed, perform corrective measures. The organisation

operating the repository – Radioactive Waste Management Agency (RATA).

► During the passive surveillance period (at least 200 years), the land utilisation on

the repository site will be limited. If needed, the protective barriers will be topped

up and the surveillance time might be extended.

1 - Disposal vaults; 2 – Administration; 3 - Buffer storage; 4 - Environmental laboratory; 5 - Storm basin; 6 - Access roads

A RADIOACTIVE WASTE REPOSITORY

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

NOVEMBER 14, 2014 6

Evaluation of the Radiological Inventory of KNPP Units 1-4

(2012 – 2014), Client KozloduyNPP

Scope of work:

Services consist of four sections as follows:

Section 1: Evaluation of the induced activity for Units 1 to 4;

Section 2: Calculation of the radioactive contamination for

Units 1 to 4, including Steam Generators;

Section 3: Radiological investigation for Units 3&4;

Section 4: Radiological characterization of RAW back-log

from Units 1-4.

Objective:

The VVER-440 Units 1-4 of the Kozloduy Nuclear Power Plant were

stopped for decommissioning. The objective of this project is the

evaluation of the radiological status of the buildings, systems and

equipment of Units 1-4. The evaluation made by the Consultant will be

used for the design of the dismantling process and the management of

the waste streams generated.

The Consultant used a combination of measured data and historical

operating data both provided by KNPP. Where measured data is missing,

estimated data were obtained using accredited software provided by the

Consultant.

A RADIOACTIVE WASTE REPOSITORY

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

NOVEMBER 14, 2014 7

Design, Manufacturing and Supply of Equipment for Unit 1 Nuclear Fuel Transfer and

Reuse at Unit 2 of Ignalina NPP (2003 – 2006), Client: Ignalina NPP

Objective:

After the shut-down of Ignalina NPP Unit 1 in 2004, approximately 1000 fuel assemblies from Unit 1 were re-used in Unit 2 reactor.

During the project implementation a unique technology and set of equipment for nuclear fuel transportation and reuse at INPP were

developed.

Design

• Technical and detailed design of

modifications and technological

systems

• Technical and detailed design of

equipment installation.

Equipment manufactured

- transporter

- transport container

- mobile biological shield

-guide shielding shafts

- grabs

Safety justification

• Description of technological process,

• Analysis of failures and accidents,

• Safety justification during unloading of

spent fuel assemblies

• Safety assessment of fuel combustion in

Unit 2 reactor

Transportation of nuclear fuel by the on-site transporter from Unit 1 to Unit 2

Installation of the shock absorber inside container

Positioning of the container in vertical position

A RADIOACTIVE WASTE REPOSITORY

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

NOVEMBER 14, 2014 8

2007 – 2009. Research of nuclide composition and development of activity assessment

method for Ignalina NPP solid radioactive waste

2005 – 2007. Design and manufacture of set of equipment for nuclear fuel spillage

collection in Ignalina NPP hot cells

2007 – 2008. Design and supply of fuel element cladding leak-tightness inspection

system for spent nuclear fuel assemblies in hot cells of Ignalina NPP after extended

storage

A RADIOACTIVE WASTE REPOSITORY

2013 – 2015. Support the Bulgarian agency for radioactive waste management

(SERAW) in the frame of the Dismantling program of the Kozloduy Nuclear Power

Plant

2013 – 2015. Assistance to ministries and organizations responsible for radioactive

waste management in Ukraine

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE REACTOR COMPARTMENTS OF THE FORMER PALDISKI MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A RADIOACTIVE WASTE REPOSITORY

NOVEMBER 14, 2014 9

THANK YOU FOR ATTENTION !

A RADIOACTIVE WASTE REPOSITORY

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

PRELIMINARY STUDIES FOR THE DECOMMISSIONING OF THE

REACTOR COMPARTMENTS OF THE FORMER PALDISKI

MILITARY NUCLEAR SITE AND FOR THE ESTABLISHMENT OF A

RADIOACTIVE WASTE REPOSITORY

Experience from

Ignalina NPP

decommissioning

projects

Eugenijus Ušpuras

NOVEMBER 14, 2014 1

Ignalina NPP short overview

Ignalina Nuclear Power Plant was an important part of Lithuania’s Energy Sector since 1983 (Unit 1 - 1983, Unit 2 – 1987, design lifetime was projected out to 2013 and 2017 respectively)

As a result of the political dialogue leading up to EU enlargement, Lithuania agreed to the early decommissioning of its reactors

! Unit 1 shutdown – 2004 (~ 9 years lost operation benefit)

! Unit 2 shutdown - 2009 (~ 7.5 years lost operation benefit)

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

y

Ignalina NPP short overview

Construction and assembling:

! INPP gained and kept unique site- specific experience with regard to RBMK-1500 assembling (only two reactors in Europian Union countries)

Operation:

! INPP fulfilled operational safety requirements

! INPP gained relevant experience to manage Spent Fuels and operational radwaste safely and efficiently

! INPP experienced in the field of safety assessments and maintenance development

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Ignalina NPP decommissioning

Decommissioning works at Ignalina NPP was divided into the separate D&D Engineering projects according to the NPP Buildings:

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

A1

D1

B1

119 G1

117/1V1

117/2

G2

D2

B2V2A2

B9-0

B9-2

B9-1

B9-5

B9-4B9-3(1)

B9-6(1)B9-8

B9-6

B9-7

D&D projects at INPP

! We took participation in two projects devoted for decontamination and dismantling (D&D) of Ignalina NPP equipment:

! Project B9-0 “Ignalina NPP Building 117/1 Decontamination and Dismantling Project Development”,

! Project B9-2 “Ignalina NPP Building V1 equipment Decontamination and Dismantling Design Development”.

! The objective of these Projects was the development of an optimal dismantling and decontamination strategy, basic and detail design with safety justification and environmental impact assessment reports.

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Project B9-0 “Ignalina NPP Building 117/1

Decontamination and Dismantling Project Development

The main systems in building 117/1 (Project B9-0):

! The Emergency Core Cooling System (ECCS) components (e.g. sixteen ECCS Pressure vessels, 14 m height and 47650 kg mass each),

! Helium Facility (part of Reactor Gas Circuit).

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

1

2

3

4

5

6

Project B9-0 “Ignalina NPP Building 117/1

Decontamination and Dismantling Project Development

For the ECCS dismantling special work flow charts was developed:

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

• +

7

.

2

0

0

• -

• +

1

3

.

2

0

0

• Room

01

• +

7

.

2

0

0

• +

7

.

2

0

0

• -• -

••

• +

1

3

.

2

0

0

• +

1

3

.

2

0

0

••

• Room

01

Project B9-0 “Ignalina NPP Building 117/1

Decontamination and Dismantling Project Development

After Project B9-0 completion about 1000 tons of equipment were

decontaminated and dismantled in INPP Building 117/1, the main part

of it are Emergency Core Cooling System pressurized tanks and

pipelines.

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Project B9-0 “Ignalina NPP Building 117/1

Decontamination and Dismantling Project Development

Photos of decommissioning works in Building 117/1

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Project B9-2 “Ignalina NPP Building V1 equipment

Decontamination and Dismantling Design Development”.

The main systems in building V1 (Project B9-2):

! reactor gas circuit,

! exhaust gas cleaning system,

! system of maintenance cooling tanks (part of Main Circulation Circuit),

! different components of ventilation systems,

! part of emergency core cooling system.

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Project B9-2 “Ignalina NPP Building V1 equipment

Decontamination and Dismantling Design Development”.

For the current project two different work approaches was adopted. All D&D works were divided in two phases. During phase one - room by room approach was used and in the phase two – system by system basis was adopted.

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Scope of B9-0 and B9-2 Projects

B9-0 and B9-2 scope includes:

! Strategy development

! Basic Design (incl. radioactive waste classification and characterisation),

! Detailed Design suitable for implementation of D&D works,

! Safety Justification Report (including radioactive waste management and radiological protection issues, analysis of possible accidents caused by drop of heavy items, etc.),

! Environmental Impact Assessment,

! General Data Set for the anticipated radioactive waste for Euratom Article 37 submissions,

! Knowledge transfer and training sessionsproviding Support to Ignalina NPP personnel.

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Stress distribution in the ECCS vessel support in case of mishandling of load during D&Doperations (B9-0)

Scope of B9-0 and B9-2 Projects

Developed safety justification report also includes dose maps for working rooms and calculation of dose rates for each D&D activity

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Scope of B9-0 and B9-2 Projects

Quantities of D&D

Wastes and

necessary packages,

according different

nuclide vectors, was

calculated as well.

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Scope of B9-0 and B9-2 Projects

! Multi-Criteria Optioneering

(MCO) was applied for

identification of the Best-fitted

D&D Strategy

! For the analysis and evaluation

of the identified D&D

alternatives, special

methodology - Hazards and

Operability Assessment

(HAZOP) study was applied

PRELIMINARY!STUDIES!FOR!THE!DECOMMISSIONING!OF!THE!REACTOR!COMPARTMENTS!OF!THE!FORMER!PALDISKI!MILITARY!NUCLEAR!SITE!AND!FOR!THE ESTABLISHMENT!OF!A!

RADIOACTIVE!WASTE!REPOSITORY

Illustration of the HAZOP procedure

Thank You for the attention