Remediation Section Update and Voluntary Cleanup Program Case Studies Tom Buell Carrie Wiese Environmental Update 2015

Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Remediation Section Update and Voluntary Cleanup Program Case Studies

Tom Buell Carrie Wiese

Environmental Update 2015

Page 2: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Presentation Overview

• Remediation Section Update

• VCP Overview and Update

• VCP Case Studies

2

Page 3: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Remediation Section Update

Superfund

• Pre-Remedial work continues

• NPL Listing Update

• Preparing for O&M

3

Page 4: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

RCRA and Federal Facilities

RCRA – Corrective Action • 6 NDEQ lead sites • Working on Corrective Active authorization • RCRA to VCP Deferral

Federal Facilities

• Active cleanup at 3 active and 13 former DOD sites • Many are PBCs

4

Page 5: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Brownfields

• Phase I and 2 assessments for local governments and non-profits (sites may be privately owned)

• 16 completed in 2014

• Brownfields inventories

• Asbestos cleanup cost-share

5

• Other services include data gap reviews, comfort letters

Page 6: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

VCP Overview

• Fee-based oversight of properties in voluntary cleanup

• Applicant must thoroughly characterize the site, complete approved Remedial Action Plan (RAP), and submit report demonstrating remedial goals met NFA letter

6

Page 7: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

VCP Overview

• 22 sites active, 17 completed

• Variety of sites, including dry cleaners, FMGPs, former grain storage, trap range

• Flexibility of program allows range of remedial activities and encourages use of innovative technologies

• Program shifting to sites entering earlier

7

Page 8: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Case Study – Fremont Trap Range

• Trap range from 1948- 1990s

• City received EPA cleanup grant

• 278,000 lbs of lead removed via sieve

• Resampling post-sieving still indicated significant lead > 400mg/kg

• Cleanup much larger than originally thought

8

Page 9: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Case Study – Fremont Trap Range

• Soil stabilized and disposed of at “Subtitle D” facility

• Cleanup to unrestricted land use (400 ppm)

• Approx. 2 years to receive NFA letter

9

Page 10: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Case Study – former Nebraska Solvents

• Solvent stored and distribution from 1966 to 1988

• Land owned by Union Pacific, leased to NSC

• NDEQ Superfund work in 2004

• UP joins VCP in 2006

10

Page 11: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Case Study – former Nebraska Solvents

• Extensive Private well sampling

• 52 homes on whole-house carbon filtration systems

• Source area and dissolved plume delineation via MIP and DPT, followed by permanent wells

11

Page 12: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Case Study – former Nebraska Solvents

Remedial Actions (RAC-1) • Excavation • Injections (Fenton's and UNL experimental candles) • Monitoring and ICs • Containment well • MNA • Water Line Extension (approx. 154 residences)

12

Page 13: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Case Study – former Nebraska Solvents

Current Status

• Excavation complete

• Ongoing groundwater monitoring

• VI evaluation (near-source businesses)

• Evaluating need for additional injections

13

Page 14: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Former Plattsmouth FMGP

• Operated from 1899 to 1940s

• BHE brought into VCP in 2011

• Approved RAP in 2012

• Excavation in 2012

14

Page 15: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Former Plattsmouth FMGP

Remedial Actions (RAC-2)

• Excavation

• Monitoring and ICs

15

Page 16: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Former Plattsmouth FMGP

Current Status

• New Operations building

• Ongoing groundwater monitoring

• NFA in 2015?

16

Page 17: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

CVS Pharmacy

• Former dry cleaner 1960s – 2004

• Speedway brought into VCP in 2010

• RAP approved in 2011

• NFA letter 2015

17 2010 2014

Page 18: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

CVS Pharmacy

Remedial Actions (RAC-3)

• Excavation (as interim action)

• VI Mitigation (Liquid Boot®)

• SVE

• Monitoring

18

Page 19: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

CVS Pharmacy

Current Status

• NFA, January 2015

19

Page 20: Remediation Section Update and Voluntary Cleanup Program ...deq.ne.gov/Press.nsf/xsp/.ibmmodres/domino... · Remediation Section Update and Voluntary Cleanup Program Case Studies

Questions

Tom Buell, Superfund/VCP Unit Supervisor

[email protected]

402-471-0803

Carrie Wiese, Brownfields and VCP Coordinator

[email protected]

402-471-6411