TOM GREENFIELD PART II PORTFOLIO

Page 2: Repository Port - Masters Portfolio
Page 3: Repository Port - Masters Portfolio
Page 4: Repository Port - Masters Portfolio
Page 5: Repository Port - Masters Portfolio
Page 6: Repository Port - Masters Portfolio
Page 7: Repository Port - Masters Portfolio

POPLAR

ABSTRACT SITE ANALYSIS

ARTICLES VIEWED DURING VISIT:

TWO BLIMPSGASOMETERSLIGHT INDUSTRIAL UNITSRIVERPARKLOW RISE NEW BUILDSLOW RISE GENTRIFIRED HOUSINGBOWLING ALLEYAEROPLANESCITY SKYLINE

Page 8: Repository Port - Masters Portfolio
Page 9: Repository Port - Masters Portfolio
Page 10: Repository Port - Masters Portfolio
Page 11: Repository Port - Masters Portfolio
Page 12: Repository Port - Masters Portfolio
Page 13: Repository Port - Masters Portfolio
Page 14: Repository Port - Masters Portfolio
Page 15: Repository Port - Masters Portfolio
Page 16: Repository Port - Masters Portfolio
Page 17: Repository Port - Masters Portfolio
Page 18: Repository Port - Masters Portfolio
Page 19: Repository Port - Masters Portfolio

POLYCARBONATE OUTER SHELL

WING STRUTS

WING STRUCTURE

ELEVATOR

BATTERY

ELEVATOR MOTOR

CHASSIS

CRANKSHAFT

1:5 FALCON MODEL ASSEMBLY

1

1

2

3

4

5

6

7

8

Page 20: Repository Port - Masters Portfolio

4

Page 21: Repository Port - Masters Portfolio

4 5

Page 22: Repository Port - Masters Portfolio
Page 23: Repository Port - Masters Portfolio
Page 24: Repository Port - Masters Portfolio
Page 25: Repository Port - Masters Portfolio
Page 26: Repository Port - Masters Portfolio
Page 27: Repository Port - Masters Portfolio
Page 28: Repository Port - Masters Portfolio

G R O U N D F L O O R P L A N

1 : 2 0 0

1 BRIDGE OVER DIELECTRIC FLUID

2 ENTRANCE LOBBY

3 BIRD MAINTENANCE TOWER AND STAIRS

4 VISITOR WC AND CHANGING

5 RECEPTION

6 TECHNICIAN WC AND DIVER CHANGING

7 FLOOR TO CEILING OBSERVATION WINDOW

8 DIELECTRIC FLUID CHAMBER

9 TEMPERATURE REGULATING TANKS/FILTERS

10 DIELECTRIC FLUID WITH SERVERS SUBMERGED (38OC)

11 COOLING PIPES

12 COOLING FLUID (24OC)

13 SERVER PREPERATION STATIONS

14 SERVER RECYCLING AND WASTE AREA

15 FLUID DIAGNOSTICS SYSTEM715

715

5580

1

2

34

5

67

89

10

11

12

13

14

15

Page 29: Repository Port - Masters Portfolio
Page 30: Repository Port - Masters Portfolio
Page 31: Repository Port - Masters Portfolio
Page 32: Repository Port - Masters Portfolio
Page 33: Repository Port - Masters Portfolio
Page 34: Repository Port - Masters Portfolio
Page 35: Repository Port - Masters Portfolio
Page 36: Repository Port - Masters Portfolio
Page 37: Repository Port - Masters Portfolio
Page 38: Repository Port - Masters Portfolio
Page 39: Repository Port - Masters Portfolio
Page 40: Repository Port - Masters Portfolio
Page 41: Repository Port - Masters Portfolio
Page 42: Repository Port - Masters Portfolio
Page 43: Repository Port - Masters Portfolio
Page 44: Repository Port - Masters Portfolio
Page 45: Repository Port - Masters Portfolio

FACADE CONCEPT

Page 46: Repository Port - Masters Portfolio
Page 47: Repository Port - Masters Portfolio

1:10 FACADE TO FLOOR CONNECTION1:5 DATA TRANSFER AND FACADE SECTION

1:100 1 FALCON IN UPLOADING POSITION 2 BIRD DOCKING HOUSING3 BEAK DATA TRANSFER

4 FACADE STRUCTURE5 GLAZING WITH THERMAL GAP6 SOLAR DEFLECTORS7 POLYCARBONATE FACADE8 RECYCLED SERVER HEAT

A

A

B

B

1

2

3

5

6

4

8

3

7

Page 48: Repository Port - Masters Portfolio

1 : 1 0 0 F A C A D E A S S E M B LY

1 P O LY C A R B O N AT E B I R D H O U S I N G F A C A D E

2 F A C A D E M O U N T I N G G R I D

3 1 0 M M D I A M E T E R T U B U L A R S T E E L C R O S S - B R A C E

4 G L A S S

5 S T R U C T U R A L E L E M E N T S

6 F L O O R S L A B A N D R O O F

7 D I E L E C T R I C F L U I D

B I R D S U P L O A D I N G D ATA I N B I R D H O U S I N G

1

6

2

4

5

2

2

5

6

6

7

3

Page 49: Repository Port - Masters Portfolio

1:20 FACADE/FLOOR CONNECTION DETAIL

CONCRETE ENCASED RHS BEAMS (600X300)

GLASS PANELS

SUPPORTING GLASS CASEMENTS

GLASS-RAINSCREEN FASTENERS

POLYCARBONATE BIRD HOUSING / RAINSCREEN

CONCRETE TOPPING

REINFORCING BARS

PROFILED STEEL DECKING

I-BEAM SECTION

HEATING PIPES, POWER AND VENT

INSULATION

LIGHT WEIGHT SUSPENDED FIBRE CEMENT SOFFIT

1

1

1

3

3

2

2

3

4

4

5

5

5

6

6

7

7

8

9

9

9

10

10

11

11

12

12

12

Page 50: Repository Port - Masters Portfolio
Page 51: Repository Port - Masters Portfolio

1

13

12

11

10 15

15

9

87

5

6

6

4

4

3

2

1

1 :50 SECTION OF SERVERS AND COOLING SYSTEM

0M 5M

1 DIELECTRIC FLUID VAT2 TEMPERATURE REGULATOR3 ACCESS PIT4 ENTRY PIPE5 COOL FLUID OUT6 SERVER TO BE SERVICED7 SERVERS IN OPERATION8 AIR PUMP FOR HEATING9 PUMP FOR COOLING FLUID 10 PIPES FOR COOLING DI . FLUID11 WATER12 HEAT VENT 13 DIAGNOSTICS PIPE TO MACHINE14 DIAGNOSTICS MACHINE15 SEATS FOR RESTING SWIMMERS

Page 52: Repository Port - Masters Portfolio

SERVER HOUSING ZONES

FLUID CONDITIONING UNITS

COOLING INFLOW AND OUTFLOW PIPES

DIELECTRIC FLUID 38 DEG.

COOLING WATER 28 DEG.

INFLOW FROM DIELECTRIC RESERVOIR STORED IN DISUSED GASOMETERS

COOLING

GROUND FLOOR PLAN

NOT TO SCALE1

1

1

1

2

2

3

3

4

4

4

5

5

56

6

7

8

8

7

DIELECTRIC FLUIDLINE

Page 53: Repository Port - Masters Portfolio
Page 54: Repository Port - Masters Portfolio
Page 55: Repository Port - Masters Portfolio

site analysis

Page 56: Repository Port - Masters Portfolio
Page 57: Repository Port - Masters Portfolio