Upload
rae-garza
View
17
Download
0
Tags:
Embed Size (px)
DESCRIPTION
RESULTS. RESULTS PROGETTI. “MARCO POLO”. EU Financing instruments No Research/no Infrstructures Collateral assisting measures since 1990 State Aids Easier to co-funding specific actions Possible, motorways of the sea/integrating MP Start-up actions. “MARCO POLO II”. - PowerPoint PPT Presentation
Citation preview
““MARCO POLO”MARCO POLO”
EU Financing instruments
No Research/no Infrstructures
Collateral assisting measures since 1990
State Aids
Easier to co-funding specific actions
Possible, motorways of the sea/integrating MP
Start-up actions
030129_IF_CONTENTS_DRAFT.PPT
Lokomotion/RTC and TX Logistik operated 465 (378 + 87) trains in October 2004
BRENNERBRENNERIn 2004 rail freight traffic maintains but BRC traffic decreased in favor of competition on rail
Although during the summertime of 2004 road traffic increased enormous, volume of rail traffic continued
ROAD & RAILROAD & RAIL