Upload
jasminder-sahni
View
219
Download
0
Embed Size (px)
Citation preview
8/4/2019 Resume Lev Shvarzman
1/2
LEV SHVARZMAN
58 Lady Loretta Lane, Maple, Vaughan
Toronto, ON, L6A 4E9Cell: +1-647-296-0475 Home: +1-289-553-0674
WIRELESS ENGINEER
HIGHLIGHTS OF QUALIFICATIONS:
Over 10 years of extensive experience in RF Wireless Communication
Expert in installation, testing and integration of Nokia, Ericsson mobile equipment
Complete knowledge of UMTS/GSM and WCDMA mobile systems
Complete knowledge of Nokia Core network equipment: Trans-coders, GSM BSC, MSCand UMTS RNC (BSC) cabinet
Advanced computer skills: Word, Excel, Outlook
Strong analytical and problem solving skills
PROFESSIONAL EXPERIENCE
NOKIA SIEMENS NETWORKS, Moscow, Russia
RAN Engineer January 2011- July 2011
Sites Exception, Commissioning and Integration 3G Flexi WBTS of Nokia for MTS
TEKSYSTEMS Inc. for PARSONS TELECOM, Windsor, Toronto- Canada
Sites Install Technician for TELUS May 2010-September2009
Installed power plates into HAUWEI equipment ( DCDU )
Solved problems to install power plates
Detected troubleshooting and pointed out possible causes and recommended solution
Installed Nokia Siemens Network Equipment ( MGW, HLR and RNC)
Performed cable racking, iron work, equipment frames, frames grounding
Connected power cables to the equipment and frames
TEKSYSTEMS Inc. for PARSONS TELECOM, Montreal
Switch Install Technician for Bell Mobility, TELUS November 2008-March 2009
Installed Nokia Siemens Network Equipment (MSS, SGSN, MGW, HLR and RNC)
Performed cable racking, iron work, equipment frames, frames grounding
Pulled power cable and connected to the equipment and frames
Connected fiber cable between frames
mailto:[email protected]:[email protected]8/4/2019 Resume Lev Shvarzman
2/2
Installed hardware (carts, servers and racks)
Mer Group, Israel
Install Technician RF-Department with EL-AR Guinea, Africa 2004-2008
Commissioned and integrated UMTS & GSM, WCDMA communication networks for
Nokia, Ericsson and Nortel
Configured and tested hardware and equipment according to customer specifications
Conducted installation, testing and integration RBS cell-sites of Ericsson
communication equipment
Provided installation of equipment as requested by customer and connected powercables from BTS/RBS to power unit, set up battery units and connected cables between
batteries and equipment
Troubleshot and repaired equipment failures in BTS/RBS cell-sites working on the
project involving Alvarion Networks with French Telecom in the Caribbean andFrench Guinea
Leadcom Integration Solution LTD.
Install Technician RF-Department 2001-2004
Supervised teams for integration, commissioning and installation of GSM Cell-Sitesand Microwave Porta, Ecuador
Provided testing and integration Nokia (BTS) mobile communication equipmentComcell, Columbia
Completed installation, commissioning and integration of Nortel TDMA Macro Cell
GT & T, Guyana Proficient with power meters, spectrum analyzers and Site Master
Completed installation and testing for Urban and Macro Cell (TDMA)
Provided integration for BTS Cell-Sites for GSM 900, 1800 communication equipment
EDUCATION
Ericsson RBS Installation and Testing Course 2006Ericsson Branch, Israel
NOKIA Ultra-Site Installation & Commissioning Course
Nokia Technical Centre, Turkey 2001/2005