9
Retail Market Subcommittee Retail Market Subcommittee Update to TAC Update to TAC Kathy Scott March 27, 2014 1

Retail Market Subcommittee Update to TAC

Embed Size (px)

DESCRIPTION

Retail Market Subcommittee Update to TAC. Kathy Scott. ERCOT’s Unplanned System Outage. ERCOT’s Infrastructure Failure occurred on Tuesday (3/11) beginning at 9:27AM affected numerous market systems. Duration of Outage 1,688 minutes - PowerPoint PPT Presentation

Citation preview

Page 1: Retail Market Subcommittee  Update to TAC

Retail Market Subcommittee Retail Market Subcommittee Update to TACUpdate to TAC

Kathy Scott

March 27, 2014 1

Page 2: Retail Market Subcommittee  Update to TAC

ERCOT’s Unplanned System ERCOT’s Unplanned System OutageOutageERCOT’s Infrastructure Failure occurred on Tuesday (3/11) beginning at 9:27AM affected numerous market systems.  Duration of Outage1,688 minutes◦ The following services were restored at ERCOT’s

alternate data center between 03/12 and 03/14: Retail Transaction Processing Service Requests & Settlement Disputes Market Participant ID Management (MPIM) Market Information System (MIS) Retail ERCOT.com MarkeTrak API MarkeTrak GUI Flight Testing Environment (Market Flight 0214 in

progress)◦ Grid Operations IT systems were not affected

March 27, 2014 RMS Update to TAC 2

Page 3: Retail Market Subcommittee  Update to TAC

Sharyland Transition Sharyland Transition Update:Update:

Potential LCRA Load Zone Issue ◦ ESI IDs in SU’s Brady division (only) will be impacted by this

LCRA Load Zone assignment for those Brady’s ESI IDs settled at ERCOT. Per SU these ESI IDs will still be included in the transition to competition that is scheduled to be effective on May 1, 2014.

◦ 03/18/14- PRS Approved the need for Urgency to meet the SU transition and Board approval timelines. PRS also Approved NPRR602 language.

◦ 03/21/14 - Through a two day e-mail vote, RMS unanimously endorsed PRS’ approval of Urgent Status for NPRR602 and endorsed NPRR602 as it was submitted to PRS on March18, 2014.

Sharyland Utilities Transition Numbers :

March 27, 2014 RMS Update to TAC 3

Microsoft Word 97 - 2003 Document

Microsoft Excel Worksheet

Page 4: Retail Market Subcommittee  Update to TAC

RMGRR Status Report RMGRR Status Report RMGRR120, Sharyland Updates (Vote)

◦ This Retail Market Guide Revision Request (RMGRR) updates Sharyland business processes and contact information to support the Sharyland transition to competition and proposes non-substantive administrative changes to correct title references and acronym usage. 03/04/14: RMS unanimously Approved “Tabling” RMGRR120

RMGRR121, Clarification of Inadvertent Gain Process (Vote) ◦ This Retail Market Guide Revision Request (RMGRR)

adds language to the Retail Market Guide to clarify best business practices when processing inadvertent gain issues in MarkeTrak. 03/04/14: RMS unanimously Approved “Tabling” RMGRR121

March 27, 2014 RMS Update to TAC 4

Page 5: Retail Market Subcommittee  Update to TAC

NPRR Status Report NPRR Status Report NPRR583, Validates CSA Bypass Code in a Move-

Out Request is From Current CSA CR (Vote) ◦ This NPRR requires ERCOT to validate that the CR submitting an

814_24, Move-Out Request containing the Continuous Service Agreement (CSA) bypass code, is also the current CSA CR.

◦ 02/17/14 – TX SET Consensus- Withdraw NPRR583 and draft new RMGRR that creates REP Rule 13 denoting that only CSA CRs can send the CSA By-Pass code in the MVO (814_24). This new RMGRR shouldn’t require system changes or cost by ERCOT once approved.

◦ 03/04/14 – RMS unanimously endorsed Texas SET Working Group’s request for withdrawal of NPRR58. TX SET will develop an RMGRR that places this requirement on the REPs and supports ERCOT ’s CR notification process through “Other Binding Documents”.

◦ 03/18/14 –Withdrawal was unanimously Approved by PRS.

March 27, 2014 RMS Update to TAC 5

Page 6: Retail Market Subcommittee  Update to TAC

TDSP’s AMS Install Status TDSP’s AMS Install Status ReportReport: :

AEP – 99% complete: ◦1,017,845 as of 02.28.2014

TNMP – 58% complete: ◦ 133,937 as of 02.28.2014

Oncor – 100% complete: ◦3,262,864 as of 12.31.2012

CNP – 100% complete: ◦2,283,012 as of 7.31.2012

Total Number of AMS Meters Installed: 6,697,658

March 27, 2014 RMS Update to TAC 6

Page 7: Retail Market Subcommittee  Update to TAC

Additional Updates:Additional Updates:Performance Measures 4th Quarter 2013

◦ 867_02 Historical Usage TX SET transactions- below Protocol

◦ 867_03 Monthly Usage TX SET transactions- below Protocol

Inadvertent Gain Update:

Load Resources in SCED Issues Impacting Retail Market◦ During 3/4/14 RMS, ERCOT made a request for more Retail

participation involvement with LRIS subgroup meetings due to Retail impacts and potential Customer relationship issues surrounding third party and demand response providers. LRIS subgroup meeting held on Monday, March 24, 2014

March 27, 2014 RMS Update to TAC 7

Microsoft Excel 97-2003 Worksheet

Microsoft PowerPoint 97-2003 Presentation

Page 8: Retail Market Subcommittee  Update to TAC

Additional Meeting Additional Meeting UpdatesUpdates

Smart Meter Texas Development Oversight (SMT DO) monthly Web conferences for 2014: ◦ Friday, March 7th 10AM – 11: 00 AM

Discussed the 3rd Party Access project schedule and deliverables:

◦ Friday, April 25th 10AM – 11:00 AM ◦ Friday, May 23rd 10AM – 11:00 AM ◦ Friday, June 20th 10AM – 11:00 AM

March 27, 2014 RMS Update to TAC 8

Microsoft PowerPoint Presentation

Page 9: Retail Market Subcommittee  Update to TAC

Questions?Questions?

9March 27, 2014 RMS Update to TAC