RFI Data Gap Work Plan Boeing RFI Subarea 1A North
B-1, IEL, AILF, and Unaffiliated Areas
Santa Susana Field Laboratory (SSFL) Technical Meeting
9:00 AM to Noon June 7, 2013
Department of Toxic Substances Control 6/7/2013 1
Today’s Agenda Introductions Ground Rules Recap: Boeing RCRA Facility Investigation (RFI)
Data Gap Characterization Process B-1 RFI Site Instrument and Equipment Laboratory (IEL) RFI Site Area I Landfill (AILF) RFI Site Areas Unaffiliated with an RFI Site Schedule Wrap Up/Questions Site Visit
6/7/2013 2
Recap: Boeing RFI Data Gap Characterization Process
RCRA Facility Investigation Goal: To obtain sufficient information on the nature and extent of contamination
so that the need for a Corrective Measures Study can be determined.
Data Gap Characterization Process Purpose: To collect and evaluate data to fill Data Gaps ID’d after submittal of the
Draft Group RFI Reports
Data Gap Site Characterization Process Timeline: • Work Plan Approval -10 weeks after submittal
• Includes Public Meeting, input • Sampling and Data Evaluation, 1st Round – 20 weeks
• Field Sampling and Analysis • Data Evaluation • DQO Evaluation, ID Data Gaps
• Sampling and Data Evaluation, 2nd Round – 8-9 weeks • If Data Gaps are ID’d
• Data Summary Report 5/9/2013 3
Recap: Boeing RFI Data Gap Characterization Process
5/9/2013 4
Status: • Subarea 5/9 South
• STL-IV • Work Plan Approved, Sampling Complete, Data Evaluation
in Progress • EEL, STP-3, Compound A and Unaffiliated Areas
• Work Plan Approved, Field Work to Start June 17 • Subarea 1A North - B-1, IEL, Area 1 Landfill and
Unaffiliated Areas • Work Plan Submitted, Approval in Progress (this meeting)
• Subarea 5/9 North - Silvernale Pond, ECL and Unaffiliated Areas
• Work Plan Submitted May 10, Review in Progress • Subarea 10 - Southern Buffer Zone
• Work Plan Submitted May 30, Review in Progress
Recap: Boeing RFI Data Gap Characterization Process
Subarea 1A North
6/7/2013 5
Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization
Process B-1 RFI Site IEL RFI Site AILF RFI Site Unaffiliated Areas Schedule Wrap Up/Questions Site Visit
6/7/2013 6
B-1 RFI Site – Overview
B-1 RFI Site • Approximately 8 acres
6/7/2013 7
N
6/7/2013 8
Historical Operations: 1950s to 1970s:
B-1 Bomber Jet engine testing at four test stands
1970s to 1991: Mostly inactive, but
several buildings used as office spaces and storage facilities.
Three fuel USTs removed in 1984
B-1 RFI Site – Overview B1-CC-6
B-1 RFI Site – Overview
STP-3 (View southwest)
6/7/2013 9
1985
GN2 Pump House
Test Stand 4 Test Stand 3
Test Stands 1 and 2
Building 1435
B-1 RFI Site – Overview
STP-3 (View southwest)
6/7/2013 10
1980
B-1 RFI Site
GN2 Pump House
Test Stands 1 to 4
B1-CC-6
B1-CC-6
B-1 RFI Site – Overview
B1-CC-6
6/7/2013 11
1980
2009: Draft B-1 Site Report submitted to DTSC 4 Corrective Measures
Study (CMS) areas identified VOCs in soil vapor (2),
metals in soil (2)
2009-2010: Interim Soil Removal Action (ISRA) Excavated 6,000 cubic
yards of soil for dioxins, mercury, lead, cadmium, and copper
1984-2011: Previous Sampling Efforts 556 Soil Samples 64 Soil Vapor Samples
Current Status: Buildings have been
demolished and infrastructure (pipelines, tanks, etc.) removed
B-1 RFI Site – Overview
N
6/7/2013 12
Soil Vapor Sample Location Soil Sample Location 2009 Chemical Use Areas
Excavated Area 2009 Soil CMS Area 2009 Soil Vapor CMS Area
Chemical Use Areas: 30 Chemical Use Areas
(CUAs) (areas of known or potential chemical use, storage, handling, or disposal)
6 CUA clusters (one or more CUAs combined based on similarities in operational history, proximity, lithological features, etc.)
Corrective Measure Study Areas 2 Interim Soil Vapor
Corrective Measure Study (CMS) Areas
B-1 Work Plan Addendum Findings
6/7/2013 13
B1-CC-6
N
Additional Sampling:
411 Soil Samples
139 locations
86 Soil Vapor Samples
32 locations
Groundwater Samples from 13 wells
B-1 Work Plan Addendum Findings
6/7/2013 14
N
Deep Monitoring Well Shallow Monitoring Well Proposed Soil Vapor Sample Location Proposed Soil Sample Location
B1-CC-6
Vadose Zone Evaluation
B-1 Work Plan Addendum Findings
6/7/2013 15
B-1 Work Plan Addendum Findings
5/9/2013 16
Vadose Zone Evaluation
• Goal – Identify if any chemicals found in vadose zone pose a threat to groundwater or if chemicals found in groundwater pose a threat to surface receptors through vapor migration • Soil, soil vapor, rock core, and groundwater data were evaluated
• Summary of evaluation to date:
• CMS for Groundwater Protection: • 1 CUA cluster – (1)
• VOCs • Collect Additional Groundwater Data:
• 5 CUA clusters – (1, 2, 3, 4, 6) • Conduct Vadose Zone Mass Flux to Groundwater Modeling:
• 2 CUA clusters • Hydrocarbons, VOCs – (1) • VOCs, Pthalates, Hydrocarbons – (4)
• Vadose Zone Evaluation will be re-visited after sample collection and
data evaluation
B-1 Work Plan Addendum Findings
5/9/2013 17
Groundwater Evaluation
•Goal – Evaluate Groundwater data gaps, extent, and impacts on plume scale
•Summary of evaluation to date: • Groundwater sampling to evaluate nature and extent of
groundwater impacts • 13 wells
• Plume stability will be evaluated after collection of additional groundwater data
•Groundwater evaluation will not be complete until
• Proposed groundwater sampling is complete • Vadose zone evaluations are complete
Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization
Process B-1 RFI Site IEL RFI Site AILF RFI Site Areas Unaffiliated with an RFI Site Schedule Wrap Up/Questions Site Visit
6/7/2013 18
IEL RFI Site – Overview
IEL RFI Site • Approx 25 acres
6/7/2013 19
IEL RFI Site – Overview
6/7/2013 20
IEL Main Operations
Northern Drainage
Eastern Drainage
1980
Former Natural Gas Pipeline
N
6/7/2013 21
IEL RFI Site – Overview
IEL Main Operations Area
Historical Operations: 1940s to 2006:
Equipment laboratory Chemical research
laboratory and logistics warehouse
Instrument laboratory
Acid Bay where acids and solvents were used for cleaning and etching metallic parts
1950s to 1960s: AI Tower area used
as part of Tower Experiment (1952) in support of Sodium Reactor Experiment development in Area IV.
Historical Operations: 1972 to 1991:
Former Rockwell Employee Shooting Range active in the Sage Ranch property, north of the IEL operational area.
N
6/7/2013 22
IEL RFI Site – Overview Northern Drainage Area
N
6/7/2013 23
IEL RFI Site – Overview
Eastern Drainage Area
Historical Operations: 1947 to 1970:
Former leased area along Woolsey Canyon Road, transite pipeline
IEL RFI Site – Overview
STP-3 (View southwest)
6/7/2013 24
1985
Warehouse
SHEA Machine Shop Chem
Lab AI Tower
IEL RFI Site – Overview
STP-3 (View southwest)
6/7/2013 25
IEL RFI Site
1980
IEL RFI Site – Overview
N
6/7/2013 26
2010-2013: Interim Soil Removal Action (ISRA) Excavated 1,500 cubic yards of soil
for mercury, lead, cadmium, and copper
Current Status: Buildings have been demolished
(except 1436) and infrastructure removed
1986-2012: Previous Sampling Efforts 373 Soil Samples 121 Soil Vapor Samples
2009: Draft IEL Site Report submitted to DTSC 8 Corrective Measures Study (CMS) areas
identified VOCs in soil vapor, metals in soil
2007-2010: Northern Drainage Removals 10,500 cubic yards of soil/debris
Soil Vapor Sample Location Soil Sample Location 2009 Chemical Use Areas Excavated Area 2009 Soil CMS Area 2009 Soil Vapor CMS Area
Chemical Use Areas: 93 Chemical Use Areas (CUAs)
(areas of known or potential chemical use, storage, handling, or disposal)
16 CUA clusters (one or more CUAs combined based on similarities in operational history, proximity, lithological features, etc.)
IEL Work Plan Addendum Findings
6/7/2013 27
Corrective Measure Study Areas 4 Interim Soil Vapor
Corrective Measure Study (CMS) Areas
3 Interim Soil CMS Areas
Deep Monitoring Well Shallow Monitoring Well Proposed Soil Vapor Sample Location Proposed Soil Sample Location
Additional Sampling:
938 Soil Samples 389 locations
133 Soil Vapor Samples 47 locations
1 New Well, Groundwater Samples from 17 wells
IEL Work Plan Addendum Findings
6/7/2013 28
N
GIS Presentation of Sampling Locations
IEL Work Plan Addendum Findings
6/7/2013 29
Vadose Zone Evaluation
• Soil, soil vapor, rock core, and groundwater data were evaluated
• Summary of evaluation to date: • CMS for Groundwater Protection:
• 5 CUA clusters – (1, 2, 3, 4, 5) • VOCs
• Well Installation: • 1 CUA cluster – (12)
• location is being evaluated • Collect Additional Groundwater Data:
• 12 CUA clusters – (1 [including ABSWP], 2, 3, 4, 5, 6, 7, 8, 9, 11, 13, 14)
• Conduct Vadose Zone Mass Flux to Groundwater Modeling: • 10 CUA clusters
• VOCs, Phthalates, Hydrocarbons, Inorganics – (1 [including ABSWP, 14)
• Hydrocarbons – (2, 3, 4, 6, 13) • VOCs – (5) • Phthalates, Metals – (10) • PAHs, Metals – (16)
IEL Work Plan Addendum Findings
6/7/2013 30
Groundwater Evaluation •Summary of evaluation to date:
• Install and sample new well at CUA cluster 12 • Groundwater sampling to evaluate nature and extent of
groundwater impacts • 17 wells
• Plume stability will be evaluated after collection of additional groundwater data
Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization
Process B-1 RFI Site IEL RFI Site AILF RFI Site Areas Unaffiliated with an RFI Site Schedule Wrap Up/Questions Site Visit
6/7/2013 31
AILF RFI Site – Overview
AILF RFI Site • Approximately 2.4 acres
6/7/2013 32
N
6/7/2013 33
Historical Operations: 1949 to 1970s:
Disposal of asphalt, concrete, scrap metal, and operational equipment
1970s to Present: Surface of landfill used
for equipment storage
AILF RFI Site – Overview
AILF RFI Site – Overview
STP-3 (View southwest)
6/7/2013 34
1985
Area I Landfill
AILF RFI Site – Overview
STP-3 (View southwest)
6/7/2013 35
Area I Landfill
1980
1993-2010: Previous Sampling Efforts 212 Soil Samples 24 Soil Vapor Samples
2009: Draft AILF Site Report submitted to DTSC 2 Corrective Measures
Study (CMS) areas identified Metals, PCBs, SVOCs in
soil
2009 Culvert Mod: Excavated ~180 cy soil
Current Status: No structures exist on
surface; occasional equipment storage
AILF RFI Site – Overview
N 6/7/2013 36
Soil Vapor Sample Location Soil Sample Location Excavated Area 2009 Soil CMS Area 2009 Chemical Use Area
Chemical Use Areas:
18 Chemical Use Areas (CUAs) (areas of known or potential chemical use, storage, handling, or disposal)
2 CUA clusters (one or more CUAs combined based on similarities in operational history, proximity, lithological features, etc.)
Corrective Measure Study Areas 1 Interim Soil Vapor
Corrective Measure Study (CMS) Areas
2 Interim Soil CMS Areas
AILF Work Plan Addendum Findings
6/7/2013 37
N
Deep Monitoring Well Shallow Monitoring Well Proposed Soil Sample Location
AILF Work Plan Addendum Findings
6/7/2013 38
N
New Well Proposed (Location under evaluation) Additional Sampling:
29 Soil Samples
12 locations Groundwater Samples from 3 wells
GIS Presentation of Sampling Locations
A1LF Work Plan Addendum Findings
6/7/2013 39
Vadose Zone Evaluation
• Soil, soil vapor, and groundwater data were evaluated
• Summary of evaluation to date: • CMS for Groundwater Protection:
• 1 CUA cluster – (1) • VOCs, Energetics, Hydrocarbons, Metals
• Well Installation: • 1 CUA cluster – (1)
• South of Shear Zone; location is being evaluated • Collect Additional Groundwater Data:
• 2 CUA clusters – (1, 2) • Conduct Vadose Zone Mass Flux to Groundwater Modeling:
• 1 CUA cluster • VOCs, Phthalates, PAHs, Hydrocarbons, PCBs,
Dioxins/Furans, Metals – (1)
A1LF Work Plan Addendum Findings
6/7/2013 40
Groundwater Evaluation •Summary of evaluation to date:
• Install and sample new well at CUA cluster 1 (South of Shear Zone) • Groundwater sampling to evaluate nature and extent of
groundwater impacts • 3 wells
• Plume stability will be evaluated after collection of additional groundwater data
Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization
Process B-1 RFI Site IEL RFI Site AILF RFI Site Unaffiliated Areas Schedule Wrap Up/Questions Site Visit
6/7/2013 41
Boeing RFI Subarea 1A North Areas Unaffiliated With An RFI Site
Unaffiliated Areas • Portions of Boeing RFI Subarea 1A North not
affiliated with site activities or chemical uses 6/7/2013 42
Historical Operations: No known historical operations or chemical uses.
Previous Sampling Efforts 14 Soil Samples collected during previous investigations
Boeing RFI 1A North Unaffiliated Areas
6/7/2013 43
Previous Soil Sample Location N
One Potential CUA: Potential CUA A
Debris area along side of Area II Road
GIS Presentation of Sampling Locations
Unaffiliated Areas Work Plan Addendum Findings
6/7/2013 44
Additional Sampling: 13 Soil Samples
4 Locations 2 Soil Vapor Samples
1 Locations
Proposed Soil Vapor Sample Location Proposed Soil Sample Location
Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization
Process B-1 RFI Site IEL RFI Site AILF RFI Site Unaffiliated Areas Schedule Wrap Up/Questions Site Visit
6/7/2013 45
Schedule
DQO evaluation and data collection efforts continue in an iterative fashion until all data gaps have been addressed
Time Period Activity July – September 2013
Field investigation to implement 1A North Work Plans
September – November 2013
Evaluation of field investigation results, assess remaining data gaps through comprehensive DQO process
November 2013
Additional field investigation as needed to address identified data gaps at 1A North sites
Upcoming Work for Boeing RFI Subarea 1A North Characterization
6/7/2013 46
Data Review & DQO Confirmation
DQOs will be reviewed in iterations and additional field work
performed until all DQOs are achieved.
6/7/2013 47
Schedule
5/9/2013 48
Upcoming Boeing SSFL Public Meetings
June 20 Boeing Groundwater Program - Fault Studies July 11
Data Gap Work Plan – Subarea 5/9 North Silvernale Pond, ECL and Unaffiliated Areas
July 23 Sitewide Groundwater- Flow Model July 30 Data Gap Work Plan – Boeing Subarea 10
Southern Buffer Zone
Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization
Process B-1 RFI Site IEL RFI Site AILF RFI Site Unaffiliated Areas Schedule Wrap Up/Questions Site Visit
6/7/2013 49
Wrap Up/Questions
5/9/2013 50
Upcoming Boeing SSFL Public Meetings
• Questions
• Action Items • Subarea 5/9 South
• Site Map, Drainage Areas and Divides • Sample Location at EEL Sprayfield
• Community Involvement
• Subscribe to the SSFL e-list • Monthly SSFL Progress Report via e-list • Request for Notification of document uploading
For questions regarding SSFL and Community Involvement contact: [email protected]
• Site Tour Safety Briefing
Slide Number 1Today’s AgendaRecap: Boeing RFI Data Gap Characterization ProcessRecap: Boeing RFI Data Gap Characterization ProcessRecap: Boeing RFI Data Gap Characterization Process�Today’s Agenda�B-1 RFI Site – Overview �B-1 RFI Site – Overview B-1 RFI Site – Overview B-1 RFI Site – Overview B-1 RFI Site – Overview B-1 RFI Site – Overview B-1 Work Plan Addendum FindingsB-1 Work Plan Addendum Findings�B-1 Work Plan Addendum Findings��B-1 Work Plan Addendum Findings �B-1 Work Plan Addendum Findings Today’s Agenda�IEL RFI Site – Overview �IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL Work Plan Addendum FindingsIEL Work Plan Addendum Findings��IEL Work Plan Addendum Findings�IEL Work Plan Addendum Findings Today’s Agenda�AILF RFI Site – Overview �AILF RFI Site – Overview AILF RFI Site – Overview AILF RFI Site – Overview AILF RFI Site – Overview AILF Work Plan Addendum FindingsAILF Work Plan Addendum Findings��A1LF Work Plan Addendum Findings�A1LF Work Plan Addendum Findings Today’s Agenda�Boeing RFI Subarea 1A North�Areas Unaffiliated With An RFI Site�Boeing RFI 1A North Unaffiliated AreasUnaffiliated Areas Work Plan Addendum FindingsToday’s AgendaSchedule�Data Review & DQO Confirmation��ScheduleToday’s Agenda�Wrap Up/Questions