50
RFI Data Gap Work Plan Boeing RFI Subarea 1A North B-1, IEL, AILF, and Unaffiliated Areas Santa Susana Field Laboratory (SSFL) Technical Meeting 9:00 AM to Noon June 7, 2013 Department of Toxic Substances Control 6/7/2013 1

RFI Data Gap Work Plan Boeing RFI Subarea 1A North B-1, IEL, … · 2013. 6. 13. · B-1 Bomber Jet engine testing at four test stands 1970s to 1991: Mostly inactive, but several

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • RFI Data Gap Work Plan Boeing RFI Subarea 1A North

    B-1, IEL, AILF, and Unaffiliated Areas

    Santa Susana Field Laboratory (SSFL) Technical Meeting

    9:00 AM to Noon June 7, 2013

    Department of Toxic Substances Control 6/7/2013 1

  • Today’s Agenda Introductions Ground Rules Recap: Boeing RCRA Facility Investigation (RFI)

    Data Gap Characterization Process B-1 RFI Site Instrument and Equipment Laboratory (IEL) RFI Site Area I Landfill (AILF) RFI Site Areas Unaffiliated with an RFI Site Schedule Wrap Up/Questions Site Visit

    6/7/2013 2

  • Recap: Boeing RFI Data Gap Characterization Process

    RCRA Facility Investigation Goal: To obtain sufficient information on the nature and extent of contamination

    so that the need for a Corrective Measures Study can be determined.

    Data Gap Characterization Process Purpose: To collect and evaluate data to fill Data Gaps ID’d after submittal of the

    Draft Group RFI Reports

    Data Gap Site Characterization Process Timeline: • Work Plan Approval -10 weeks after submittal

    • Includes Public Meeting, input • Sampling and Data Evaluation, 1st Round – 20 weeks

    • Field Sampling and Analysis • Data Evaluation • DQO Evaluation, ID Data Gaps

    • Sampling and Data Evaluation, 2nd Round – 8-9 weeks • If Data Gaps are ID’d

    • Data Summary Report 5/9/2013 3

  • Recap: Boeing RFI Data Gap Characterization Process

    5/9/2013 4

    Status: • Subarea 5/9 South

    • STL-IV • Work Plan Approved, Sampling Complete, Data Evaluation

    in Progress • EEL, STP-3, Compound A and Unaffiliated Areas

    • Work Plan Approved, Field Work to Start June 17 • Subarea 1A North - B-1, IEL, Area 1 Landfill and

    Unaffiliated Areas • Work Plan Submitted, Approval in Progress (this meeting)

    • Subarea 5/9 North - Silvernale Pond, ECL and Unaffiliated Areas

    • Work Plan Submitted May 10, Review in Progress • Subarea 10 - Southern Buffer Zone

    • Work Plan Submitted May 30, Review in Progress

  • Recap: Boeing RFI Data Gap Characterization Process

    Subarea 1A North

    6/7/2013 5

  • Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization

    Process B-1 RFI Site IEL RFI Site AILF RFI Site Unaffiliated Areas Schedule Wrap Up/Questions Site Visit

    6/7/2013 6

  • B-1 RFI Site – Overview

    B-1 RFI Site • Approximately 8 acres

    6/7/2013 7

  • N

    6/7/2013 8

    Historical Operations: 1950s to 1970s:

    B-1 Bomber Jet engine testing at four test stands

    1970s to 1991: Mostly inactive, but

    several buildings used as office spaces and storage facilities.

    Three fuel USTs removed in 1984

    B-1 RFI Site – Overview B1-CC-6

  • B-1 RFI Site – Overview

    STP-3 (View southwest)

    6/7/2013 9

    1985

    GN2 Pump House

    Test Stand 4 Test Stand 3

    Test Stands 1 and 2

    Building 1435

  • B-1 RFI Site – Overview

    STP-3 (View southwest)

    6/7/2013 10

    1980

    B-1 RFI Site

    GN2 Pump House

    Test Stands 1 to 4

    B1-CC-6

    B1-CC-6

  • B-1 RFI Site – Overview

    B1-CC-6

    6/7/2013 11

    1980

  • 2009: Draft B-1 Site Report submitted to DTSC 4 Corrective Measures

    Study (CMS) areas identified VOCs in soil vapor (2),

    metals in soil (2)

    2009-2010: Interim Soil Removal Action (ISRA) Excavated 6,000 cubic

    yards of soil for dioxins, mercury, lead, cadmium, and copper

    1984-2011: Previous Sampling Efforts 556 Soil Samples 64 Soil Vapor Samples

    Current Status: Buildings have been

    demolished and infrastructure (pipelines, tanks, etc.) removed

    B-1 RFI Site – Overview

    N

    6/7/2013 12

    Soil Vapor Sample Location Soil Sample Location 2009 Chemical Use Areas

    Excavated Area 2009 Soil CMS Area 2009 Soil Vapor CMS Area

  • Chemical Use Areas: 30 Chemical Use Areas

    (CUAs) (areas of known or potential chemical use, storage, handling, or disposal)

    6 CUA clusters (one or more CUAs combined based on similarities in operational history, proximity, lithological features, etc.)

    Corrective Measure Study Areas 2 Interim Soil Vapor

    Corrective Measure Study (CMS) Areas

    B-1 Work Plan Addendum Findings

    6/7/2013 13

    B1-CC-6

    N

  • Additional Sampling:

    411 Soil Samples

    139 locations

    86 Soil Vapor Samples

    32 locations

    Groundwater Samples from 13 wells

    B-1 Work Plan Addendum Findings

    6/7/2013 14

    N

    Deep Monitoring Well Shallow Monitoring Well Proposed Soil Vapor Sample Location Proposed Soil Sample Location

    B1-CC-6

  • Vadose Zone Evaluation

    B-1 Work Plan Addendum Findings

    6/7/2013 15

  • B-1 Work Plan Addendum Findings

    5/9/2013 16

    Vadose Zone Evaluation

    • Goal – Identify if any chemicals found in vadose zone pose a threat to groundwater or if chemicals found in groundwater pose a threat to surface receptors through vapor migration • Soil, soil vapor, rock core, and groundwater data were evaluated

    • Summary of evaluation to date:

    • CMS for Groundwater Protection: • 1 CUA cluster – (1)

    • VOCs • Collect Additional Groundwater Data:

    • 5 CUA clusters – (1, 2, 3, 4, 6) • Conduct Vadose Zone Mass Flux to Groundwater Modeling:

    • 2 CUA clusters • Hydrocarbons, VOCs – (1) • VOCs, Pthalates, Hydrocarbons – (4)

    • Vadose Zone Evaluation will be re-visited after sample collection and

    data evaluation

  • B-1 Work Plan Addendum Findings

    5/9/2013 17

    Groundwater Evaluation

    •Goal – Evaluate Groundwater data gaps, extent, and impacts on plume scale

    •Summary of evaluation to date: • Groundwater sampling to evaluate nature and extent of

    groundwater impacts • 13 wells

    • Plume stability will be evaluated after collection of additional groundwater data

    •Groundwater evaluation will not be complete until

    • Proposed groundwater sampling is complete • Vadose zone evaluations are complete

  • Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization

    Process B-1 RFI Site IEL RFI Site AILF RFI Site Areas Unaffiliated with an RFI Site Schedule Wrap Up/Questions Site Visit

    6/7/2013 18

  • IEL RFI Site – Overview

    IEL RFI Site • Approx 25 acres

    6/7/2013 19

  • IEL RFI Site – Overview

    6/7/2013 20

    IEL Main Operations

    Northern Drainage

    Eastern Drainage

    1980

    Former Natural Gas Pipeline

  • N

    6/7/2013 21

    IEL RFI Site – Overview

    IEL Main Operations Area

    Historical Operations: 1940s to 2006:

    Equipment laboratory Chemical research

    laboratory and logistics warehouse

    Instrument laboratory

    Acid Bay where acids and solvents were used for cleaning and etching metallic parts

    1950s to 1960s: AI Tower area used

    as part of Tower Experiment (1952) in support of Sodium Reactor Experiment development in Area IV.

  • Historical Operations: 1972 to 1991:

    Former Rockwell Employee Shooting Range active in the Sage Ranch property, north of the IEL operational area.

    N

    6/7/2013 22

    IEL RFI Site – Overview Northern Drainage Area

  • N

    6/7/2013 23

    IEL RFI Site – Overview

    Eastern Drainage Area

    Historical Operations: 1947 to 1970:

    Former leased area along Woolsey Canyon Road, transite pipeline

  • IEL RFI Site – Overview

    STP-3 (View southwest)

    6/7/2013 24

    1985

    Warehouse

    SHEA Machine Shop Chem

    Lab AI Tower

  • IEL RFI Site – Overview

    STP-3 (View southwest)

    6/7/2013 25

    IEL RFI Site

    1980

  • IEL RFI Site – Overview

    N

    6/7/2013 26

    2010-2013: Interim Soil Removal Action (ISRA) Excavated 1,500 cubic yards of soil

    for mercury, lead, cadmium, and copper

    Current Status: Buildings have been demolished

    (except 1436) and infrastructure removed

    1986-2012: Previous Sampling Efforts 373 Soil Samples 121 Soil Vapor Samples

    2009: Draft IEL Site Report submitted to DTSC 8 Corrective Measures Study (CMS) areas

    identified VOCs in soil vapor, metals in soil

    2007-2010: Northern Drainage Removals 10,500 cubic yards of soil/debris

    Soil Vapor Sample Location Soil Sample Location 2009 Chemical Use Areas Excavated Area 2009 Soil CMS Area 2009 Soil Vapor CMS Area

  • Chemical Use Areas: 93 Chemical Use Areas (CUAs)

    (areas of known or potential chemical use, storage, handling, or disposal)

    16 CUA clusters (one or more CUAs combined based on similarities in operational history, proximity, lithological features, etc.)

    IEL Work Plan Addendum Findings

    6/7/2013 27

    Corrective Measure Study Areas 4 Interim Soil Vapor

    Corrective Measure Study (CMS) Areas

    3 Interim Soil CMS Areas

  • Deep Monitoring Well Shallow Monitoring Well Proposed Soil Vapor Sample Location Proposed Soil Sample Location

    Additional Sampling:

    938 Soil Samples 389 locations

    133 Soil Vapor Samples 47 locations

    1 New Well, Groundwater Samples from 17 wells

    IEL Work Plan Addendum Findings

    6/7/2013 28

    N

    GIS Presentation of Sampling Locations

  • IEL Work Plan Addendum Findings

    6/7/2013 29

    Vadose Zone Evaluation

    • Soil, soil vapor, rock core, and groundwater data were evaluated

    • Summary of evaluation to date: • CMS for Groundwater Protection:

    • 5 CUA clusters – (1, 2, 3, 4, 5) • VOCs

    • Well Installation: • 1 CUA cluster – (12)

    • location is being evaluated • Collect Additional Groundwater Data:

    • 12 CUA clusters – (1 [including ABSWP], 2, 3, 4, 5, 6, 7, 8, 9, 11, 13, 14)

    • Conduct Vadose Zone Mass Flux to Groundwater Modeling: • 10 CUA clusters

    • VOCs, Phthalates, Hydrocarbons, Inorganics – (1 [including ABSWP, 14)

    • Hydrocarbons – (2, 3, 4, 6, 13) • VOCs – (5) • Phthalates, Metals – (10) • PAHs, Metals – (16)

  • IEL Work Plan Addendum Findings

    6/7/2013 30

    Groundwater Evaluation •Summary of evaluation to date:

    • Install and sample new well at CUA cluster 12 • Groundwater sampling to evaluate nature and extent of

    groundwater impacts • 17 wells

    • Plume stability will be evaluated after collection of additional groundwater data

  • Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization

    Process B-1 RFI Site IEL RFI Site AILF RFI Site Areas Unaffiliated with an RFI Site Schedule Wrap Up/Questions Site Visit

    6/7/2013 31

  • AILF RFI Site – Overview

    AILF RFI Site • Approximately 2.4 acres

    6/7/2013 32

  • N

    6/7/2013 33

    Historical Operations: 1949 to 1970s:

    Disposal of asphalt, concrete, scrap metal, and operational equipment

    1970s to Present: Surface of landfill used

    for equipment storage

    AILF RFI Site – Overview

  • AILF RFI Site – Overview

    STP-3 (View southwest)

    6/7/2013 34

    1985

    Area I Landfill

  • AILF RFI Site – Overview

    STP-3 (View southwest)

    6/7/2013 35

    Area I Landfill

    1980

  • 1993-2010: Previous Sampling Efforts 212 Soil Samples 24 Soil Vapor Samples

    2009: Draft AILF Site Report submitted to DTSC 2 Corrective Measures

    Study (CMS) areas identified Metals, PCBs, SVOCs in

    soil

    2009 Culvert Mod: Excavated ~180 cy soil

    Current Status: No structures exist on

    surface; occasional equipment storage

    AILF RFI Site – Overview

    N 6/7/2013 36

    Soil Vapor Sample Location Soil Sample Location Excavated Area 2009 Soil CMS Area 2009 Chemical Use Area

  • Chemical Use Areas:

    18 Chemical Use Areas (CUAs) (areas of known or potential chemical use, storage, handling, or disposal)

    2 CUA clusters (one or more CUAs combined based on similarities in operational history, proximity, lithological features, etc.)

    Corrective Measure Study Areas 1 Interim Soil Vapor

    Corrective Measure Study (CMS) Areas

    2 Interim Soil CMS Areas

    AILF Work Plan Addendum Findings

    6/7/2013 37

    N

  • Deep Monitoring Well Shallow Monitoring Well Proposed Soil Sample Location

    AILF Work Plan Addendum Findings

    6/7/2013 38

    N

    New Well Proposed (Location under evaluation) Additional Sampling:

    29 Soil Samples

    12 locations Groundwater Samples from 3 wells

    GIS Presentation of Sampling Locations

  • A1LF Work Plan Addendum Findings

    6/7/2013 39

    Vadose Zone Evaluation

    • Soil, soil vapor, and groundwater data were evaluated

    • Summary of evaluation to date: • CMS for Groundwater Protection:

    • 1 CUA cluster – (1) • VOCs, Energetics, Hydrocarbons, Metals

    • Well Installation: • 1 CUA cluster – (1)

    • South of Shear Zone; location is being evaluated • Collect Additional Groundwater Data:

    • 2 CUA clusters – (1, 2) • Conduct Vadose Zone Mass Flux to Groundwater Modeling:

    • 1 CUA cluster • VOCs, Phthalates, PAHs, Hydrocarbons, PCBs,

    Dioxins/Furans, Metals – (1)

  • A1LF Work Plan Addendum Findings

    6/7/2013 40

    Groundwater Evaluation •Summary of evaluation to date:

    • Install and sample new well at CUA cluster 1 (South of Shear Zone) • Groundwater sampling to evaluate nature and extent of

    groundwater impacts • 3 wells

    • Plume stability will be evaluated after collection of additional groundwater data

  • Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization

    Process B-1 RFI Site IEL RFI Site AILF RFI Site Unaffiliated Areas Schedule Wrap Up/Questions Site Visit

    6/7/2013 41

  • Boeing RFI Subarea 1A North Areas Unaffiliated With An RFI Site

    Unaffiliated Areas • Portions of Boeing RFI Subarea 1A North not

    affiliated with site activities or chemical uses 6/7/2013 42

  • Historical Operations: No known historical operations or chemical uses.

    Previous Sampling Efforts 14 Soil Samples collected during previous investigations

    Boeing RFI 1A North Unaffiliated Areas

    6/7/2013 43

    Previous Soil Sample Location N

  • One Potential CUA: Potential CUA A

    Debris area along side of Area II Road

    GIS Presentation of Sampling Locations

    Unaffiliated Areas Work Plan Addendum Findings

    6/7/2013 44

    Additional Sampling: 13 Soil Samples

    4 Locations 2 Soil Vapor Samples

    1 Locations

    Proposed Soil Vapor Sample Location Proposed Soil Sample Location

  • Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization

    Process B-1 RFI Site IEL RFI Site AILF RFI Site Unaffiliated Areas Schedule Wrap Up/Questions Site Visit

    6/7/2013 45

  • Schedule

    DQO evaluation and data collection efforts continue in an iterative fashion until all data gaps have been addressed

    Time Period Activity July – September 2013

    Field investigation to implement 1A North Work Plans

    September – November 2013

    Evaluation of field investigation results, assess remaining data gaps through comprehensive DQO process

    November 2013

    Additional field investigation as needed to address identified data gaps at 1A North sites

    Upcoming Work for Boeing RFI Subarea 1A North Characterization

    6/7/2013 46

  • Data Review & DQO Confirmation

    DQOs will be reviewed in iterations and additional field work

    performed until all DQOs are achieved.

    6/7/2013 47

  • Schedule

    5/9/2013 48

    Upcoming Boeing SSFL Public Meetings

    June 20 Boeing Groundwater Program - Fault Studies July 11

    Data Gap Work Plan – Subarea 5/9 North Silvernale Pond, ECL and Unaffiliated Areas

    July 23 Sitewide Groundwater- Flow Model July 30 Data Gap Work Plan – Boeing Subarea 10

    Southern Buffer Zone

  • Today’s Agenda Introductions Ground Rules Recap: Boeing RFI Data Gap Characterization

    Process B-1 RFI Site IEL RFI Site AILF RFI Site Unaffiliated Areas Schedule Wrap Up/Questions Site Visit

    6/7/2013 49

  • Wrap Up/Questions

    5/9/2013 50

    Upcoming Boeing SSFL Public Meetings

    • Questions

    • Action Items • Subarea 5/9 South

    • Site Map, Drainage Areas and Divides • Sample Location at EEL Sprayfield

    • Community Involvement

    • Subscribe to the SSFL e-list • Monthly SSFL Progress Report via e-list • Request for Notification of document uploading

    For questions regarding SSFL and Community Involvement contact: [email protected]

    • Site Tour Safety Briefing

    Slide Number 1Today’s AgendaRecap: Boeing RFI Data Gap Characterization ProcessRecap: Boeing RFI Data Gap Characterization ProcessRecap: Boeing RFI Data Gap Characterization Process�Today’s Agenda�B-1 RFI Site – Overview �B-1 RFI Site – Overview B-1 RFI Site – Overview B-1 RFI Site – Overview B-1 RFI Site – Overview B-1 RFI Site – Overview B-1 Work Plan Addendum FindingsB-1 Work Plan Addendum Findings�B-1 Work Plan Addendum Findings��B-1 Work Plan Addendum Findings �B-1 Work Plan Addendum Findings Today’s Agenda�IEL RFI Site – Overview �IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL RFI Site – Overview IEL Work Plan Addendum FindingsIEL Work Plan Addendum Findings��IEL Work Plan Addendum Findings�IEL Work Plan Addendum Findings Today’s Agenda�AILF RFI Site – Overview �AILF RFI Site – Overview AILF RFI Site – Overview AILF RFI Site – Overview AILF RFI Site – Overview AILF Work Plan Addendum FindingsAILF Work Plan Addendum Findings��A1LF Work Plan Addendum Findings�A1LF Work Plan Addendum Findings Today’s Agenda�Boeing RFI Subarea 1A North�Areas Unaffiliated With An RFI Site�Boeing RFI 1A North Unaffiliated AreasUnaffiliated Areas Work Plan Addendum FindingsToday’s AgendaSchedule�Data Review & DQO Confirmation��ScheduleToday’s Agenda�Wrap Up/Questions