38
Astrophysics Division 1 Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters Wide Field Surveys, STScI, June 14 2011 Wide-Field Surveys: the NASA Perspective

Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

  • Upload
    adem

  • View
    48

  • Download
    0

Embed Size (px)

DESCRIPTION

Wide-Field Surveys: the NASA Perspective. Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters Wide Field Surveys, STScI, June 14 2011. Space Wide-Field Surveys. Microwave COBE (1989), WMAP (2001) , Planck (ESA - 2009) IR IRAS 1983 , WISE 2009 - PowerPoint PPT Presentation

Citation preview

Page 1: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

1

Richard E Griffiths

Astrophysics Division

Science Mission Directorate

NASA Headquarters

Wide Field Surveys, STScI, June 14 2011

Wide-Field Surveys: the NASA Perspective

Page 2: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision Space Wide-Field Surveys

2

MicrowaveCOBE (1989), WMAP (2001), Planck (ESA - 2009)

IRIRAS 1983, WISE 2009

UVEUVE 1992 , GALEX 2003

X-rayUHURU 1970, Ariel V [UK – 1974], SAS-C 1975, HEAO-1

1977, ROSAT [FRG 1990]

Gamma-rayCOS-B [ESA-1975], CGRO 1991, Integral [ESA – 2002], Swift 2004, Fermi 2008

Visible, NIR ???

Page 3: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

What’s changed:• JWST project was moved to its own Theme within the Science Mission Directorate• The Explorer program is being split into two pieces such that Astrophysics and

Heliophysics will manage their own Explorers resources beginning in 2012 A Future Astrophysics Explorer missions budget was created in response to the

Decadal Survey recommendation to increase the flight rate of astrophysics missions and missions of opportunity.

• Support for concept planning and technology development for decadal survey large mission priorities (WFIRST, LISA, IXO) under supporting research and technology lines

• Augmented budgets for decadal survey medium &small technology and R&A initiatives SOFIA budget increased to restore science and preserve 2nd generation instrument

selection and development• NuSTAR LRD now February 2012 to accommodate launch services availability• ASTRO-H confirmed for implementation; GEMS approved for Phase B and budget re-

phased • Extended support for top ranked missions in the 2010 Senior Review, but support for

RXTE and GALEX extended operations and the INTEGRAL and Suzaku Guest Observer programs will terminate by the end of FY2011

• JDEM &SIM projects have been closed out; not recommended by the Decadal Survey• Reductions to operations and guest observer programs for Chandra, HST, and SwiftWhat’s the same:• Herschel, Kepler, Fermi, and Keck operations

Post-Astro2010 What’s Changed and What’s the Same

3

Page 4: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

NWNH Decadal Recommended Space Activities(Notional Plan)

4$ in millions, does not include civil servant labor

Top line: FY2012 PBRBottom line: augmentation above 2011

Program Scale Recommendation Recommended US

ShareFY 2011

PBR FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 5-year total

Large WFIRST $1,600 Pre-formulation planning and technology development only

Large Explorer Program Augmentation $463

0.0 1.1 5.4 25.5 47.8 76.4 156.3 1.1 5.4 25.5 47.8 76.4 156.3

Large LISA (including ST-7) $1,500 3.2 4.3 7.9 8.7 8.3 10.0 39.3

1.1 4.8 5.5 5.1 6.8 23.3

Large IXO $3,100 2.3 3.0 6.4 7.0 7.0 7.3 30.7

0.7 4.1 4.7 4.7 5.0 19.2

Medium New Worlds Tech Development $100-200

6.2 8.6 19.7 24.0 25.7 28.9 106.9 2.4 13.5 17.9 19.6 22.7 76.1

Medium Inflation Probe Tech Development $60-200

0.0 0.2 3.5 4.1 4.0 5.0 16.8 0.2 3.5 4.1 4.0 5.0 16.8

Small Astrophysics Theory Program Augmentation +$35M over 10 years

11.8 12.7 15.2 15.3 15.8 16.0 74.9 0.9 3.4 3.5 3.9 4.2 15.9

Small Definition of a future UV-optical space capability $40M over 10 years

0.4 0.1 3.0 3.6 3.6 3.7 13.9

-0.3 2.6 3.2 3.2 3.3 11.9

Small Intermediate Tech Dev Augmentation

+$2M/yr, growing to +15M/yr in 2021

20.8 23.0 27.7 27.7 27.2 27.9 133.4 2.2 6.9 6.9 6.4 7.1 29.6

Small Laboratory Astrophysics +$2M/yr3.2 3.5 4.7 4.7 5.0 5.0 22.9

0.4 1.5 1.5 1.8 1.8 6.9 Small SPICA $150M Possible competed opportunity

Small Suborbital Program +15M/yr22.0 25.8 37.6 39.8 40.0 41.0 184.1 3.8 15.6 17.8 18.0 19.0 74.3

Small Theory and Computation Networks +$5M/yr

0.0 0.5 3.0 3.1 3.1 4.0 13.7 0.5 3.0 3.1 3.1 4.0 13.7

Page 5: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivisionCurrent Astrophysics Mission Portfolio

5

Page 6: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivisionProjected portfolio by 2016Projected portfolio by 2016

(potential partnership; selection pending)

One additonal Explorer mission in formulation/development likely

Likely one additional Explorer mission in development and

another in formulation; possible international

collaboration

Under review

Pending confirmation

6

Page 7: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

2001 DOE SNAP Proposal2005-07 NASA Mission Concept Studies - 3 selected 2005 Dark Energy Task Force (theory study)2007 BEPAC Recommendation - JDEM Highest Priority of Einstein Probes

- search for partners2007-08 RFI + TMC reviews of Mission Concept Studies2007 Fall: Joint planning initiated with DOE, under guidance of OSTP2008 Nov. JDEM MoU signed by NASA/DOE2008 Figure-of-Merit Science Working Group (theory)2008-09 Science Coordination Group - Reference Mission defined2008 GSFC Project Office established2008 Pre-A.O. Announcement Oct 152008 NASA/ESA Bilateral meetings July 08, Jan 092009 Studies initiated to combine JDEM and Euclid into one mission 2009 Draft AO planned for Feb/Mar (cancelled)2010 ESA invites NASA to join Euclid as 20% partner2010 Astro-2010 does not endorse Euclid collaboration, proposes WFIRST – expansion of science goals. JDEM study terminated2010 WFIRST SDT formed 2011 WFIRST Design Reference Mission

A Brief History of Dark Energy Mission Studies

Page 8: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

• The Wide-Field Infrared Survey Telescope (WFIRST) is a NASA observatory designed to address essential questions in both exoplanet and dark energy research and to perform an IR survey of the sky.

• Astro2010’s highest priority large space mission. • Update:

– SDT members selected– SDT kickoff telecon on Jan 3, 2011– 4 face-to-face meetings have been held– Subgroups have been formed on focused report

topics and have met via telecons and f2f• Next Steps:

– Delivery to NASA of ad-interim report due June 2011

– Next face-to-face meeting Oct

Members of the Science Definition Team (SDT):

J. Green, CU/CASA, Chair

P. Schechter, MIT, Chair

R. Bean, Cornell University

C. Baltay, Yale

C. Bennett, JHU

D. Bennett, Univ. of Notre Dame

R. Brown, STScI

C. Conselice, Univ. of Nottingham

M. Donahue, Michigan State University

S. Gaudi, Ohio State University

T. Lauer, NOAO

B. Nichol, Univ. of Porthsmouth

S. Perlmutter. Univ. of Berkeley/LBLN

B. Rauscher, GSFC

J. Rhodes, JPL

T. Roellig, Ames

D. Stern, JPL

T. Sumi, Nagoya University

A. Tanner, Georgia State University

Y. Wang, Univ. of Oklahoma

E. Wright, UCLA

WFIRST

8

http://wfirst.gsfc.nasa.gov

Page 9: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision The Budget Cycle

9

Page 10: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

SMD Budget by Theme (RY $M)

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

$3,500

$4,000

$4,500

$5,000

$5,500

FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 FY2016

Heliophysics

Earth Science

Astrophysics

Planetary Science

JWST

Civil Service Labor and Expenses

10

Page 11: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

~$600-800 B/yr shortfall

11

CBO Deficit Analysis and Forecast

Page 12: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

Programmatic Content changes:• Earth Science DESDynI and CLARREO Tier-1 missions significantly delayed; GMI-2 development for GPM LIO cancelled;

non-flight program expansions curtailed• Planetary funding can no longer support all 5 development programs; Decadal Survey will provide priorities to guide

decision-making on which programs will be cancelled, delayed, descoped, or implemented as planned • Astrophysics able to fund the highest decadal priorities, but only technology development for large missions beyond JWST

• JWST budget growth to $375M/year (including Labor); schedule under review• Heliophysics: launch vehicle cost increases may require descope of Solar Orbiter Collaboration

NASA Science Budget Changes

12

Page 13: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

FY 2013-FY 2016

estimatesare notional

Science Program Budget Summary

Page 14: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision NASA FY2012 Budget Request

14

Page 15: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision Astrophysics Program Content

15

• Amounts in $M; JWST is managed separately as its own Theme•FY 2010-2011 amounts include Civil Service Labor and Expenses (CSLE)

•FY 2013-2016 estimates are notional• FY 2012-2016 amounts do not include CSLE

Page 16: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision Research & Analysis Distribution

(notional)

16

($ in thousands, does not include civil servant labor)

FY11 PBR FY12 FY13 FY14 FY15 FY16 Research & Analysis 57,881 64,312 82,836 83,932 85,105 87,995Suborbital payloads 21,964 23,779 29,604 30,803 30,992 31,958Lab Astrophysics 3,193 3,544 4,692 4,692 4,957 5,016Rest of APRA/APRET 20,751 22,966 27,657 27,690 27,152 27,892Astrophysics Theory Program 11,805 12,723 15,178 15,274 15,751 15,982

Theory and Computation Networks 500 3,000 3,077 3,127 4,000Technology Fellows 800 2,705 2,396 3,126 3,147

ADAP 14,132 16,957 18,451 18,937 19,466 19,832

Large Suborbital (MO) 2,000 8,000 9,000 9,000 9,000 R&A Suborbital payloads 21,964 23,779 29,604 30,803 30,992 31,958 Total Suborbital Program 21,964 25,779 37,604 39,803 39,992 40,958

ADAP 14,132 16,957 18,451 18,937 19,466 19,832

Page 17: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision Supporting Research & Technology

(notional)

17

($ in thousands, does not include civil servant labor)

FY11 PBR FY12 FY13 FY14 FY15 FY16 COR SR&T 7,343 9,164 17,341 19,015 19,040 19,915 Technology (core & competed) 813 3,264 8,941 9,002 8,970 9,595 Hubble fellows 5,100 5,100 5,200 6,135 6,220 6,420 Strategic SOFIA Instr Tech 630 450 HST development (de-orbit) 400 250 250 250 250 250 UV/Optical Space Capability 400 100 2,950 3,628 3,600 3,650

FY11 PBR FY12 FY13 FY14 FY15 FY16 PCOS SR&T 9,438 11,442 22,032 24,460 24,096 27,178 Technology (core & competed) 0 0 0 0 0 0 Einstein fellows 3,780 3,970 4,230 4,646 4,758 4,872 LISA tech awards 180 Inflation probe tech 160 3,500 4,095 4,000 5,000 LISA/ST-7 3,185 3,312 7,947 8,700 8,315 10,000 IXO 2,293 3,000 6,355 7,019 7,023 7,306

FY11 PBR FY12 FY13 FY14 FY15 FY16 EXEP SR&T 12,450 17,867 38,652 50,388 50,248 50,438 Technology (core & competed) 6,150 8,569 19,683 24,014 25,737 28,892 Wide Field IR Imaging and Spectroscopy 1,790 10,582 18,217 16,191 13,064 Sagan Fellows 3,360 3,760 4,050 4,700 4,865 4,957 NExSci 720 1,648 2,212 2,480 2,549 2,601 Astrobiology 1,500 1,500 1,500 102 COROT 720 600 625 875 906 924

Page 18: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

• Future implementation of WFIRST, SPICA recommendations• LISA and IXO re-scope activities; LPF/ST-7 timeliness• Usage of advisory structure for future planning • JWST re-baseline• FY12 budget reduction ramifications (terminations: GALEX, Suzaku,

…)

Issues & Concerns

18

Page 19: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivisionAstrophysics Missions

19

(ESA, CSA)

(JAXA)

(ASI, Denmark)

(DLR)

(ESA, UK, Netherlands)

(ASI, CNES, UK)

(DOE, Intl team)

(JAXA)

(ESA)

(ESA)

(ESA)

Next Senior Review in 2012

(ESA)

(ASI, UK)

(South Korea)

Page 20: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

20

Backup

Page 21: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

• WISE decommissioned end/Feb• WFIRST SDT: Face-to-face meeting at JPL, 3/10-11. • April/May Explorers proposal science reviews • Apr 14/15 Herschel Science Team meeting• Apr 26 ExoPAG and COPAG Joint SAG meeting on UV/Vis telescope • May 1-6 NExScI /ExEP conference "Exploring Strange New Worlds: From

Giant Planets to Super Earths" Flagstaff AZ• Astrophysics Archives Senior Review, 5/17-19• Apr 27-29 Institute Visiting Committee• May 9-10 Spitzer Users Panel Meeting• Summer: SOFIA begins Early Science GO observations • Late Spring : SOFIA Instrument AO issued• June : WFIRST Preliminary report from SDT due • July 12-14 Chandra Science Workshop – Structure in Clusters and

Groups of Galaxies • July 25-29 Sagan Summer Workshop, Exploring Exoplanets with

Microlensing

Recent / Upcoming Events

21

Page 22: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

22

Mission Launches etc.

2011 2012

Balloon Campaigns

Opportunities

CY

Astrophysics Mission Events

Antarctica

Sweden

Ft. Sumner (spr)

Ft. Sumner (fall)

Palestine

Australia

D/J

Rocket Program.

Suborbital FUSP1

PICTURE1

Last Updated: February 7, 2011

Feb NuSTAR

J/J

A/S

M/J

D/J

XQC4

ACCESS1

ACCESS2

MicroX

XQC5

A/MJ/J

A/SM/A

D/J

FORTIS1

EXOS2

IMAGER1

FORTIS2

EXOS3

XACT1

ACCESS3

EXOS4

XACT2

ACCESS4

2013

FIRE

SLICE

SepApr AprJan Oct TBDMar OctApr Dec TBDSep TBD TBD TBDr

TBDTBDr

TBD TBD

2014

D/J

A/MJ/J

A/SM/A

Future AOs will depend upon the Agency response to the Astro2010 Decadal Survey

M/A (HERO)

Jul LPF/ST-7

(CREAM VI, BLAST, SPB Test)

SOFIA InstrAO

spring

JunCIBER

1-3

(No astrophysics flights)

(TGF, GRAPE)

2015

Feb Astro-H

Apr GEMS(TBD)

Page 23: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

0

1000

2000

3000

4000

5000

6000

7000

Cons

tant

FY2

011

$MSMD BUDGET

NORMALIZED TO REMOVE DSN AND GROUND NETWORK, AND ADJUST FOR FULL COST

Assumes FY11 at PresBud / Auth Act level of $5.006B.

Assumes FY11 at FY10 CR level of $4.469B.

Page 24: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

Astrophysics Research Program

24

Page 25: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

Accomplishments and Significant Events

25

• Suzaku

− Observatory in good health; JAXA plans to operate mission through launch of ASTRO-H

− NASA GO’s may apply for support under ADAP in Cycle 6 and beyond

− Suzaku observations of the Perseus Cluster have provided the clearest picture to date of the size, mass and chemical content, providing the first direct evidence that million-degree gas is clumped in the cluster's outskirts.

• XMM

− Observatory continues to operate well; Mission extension approved through December 2014

− NASA GO’s (Category A targets) eligible for support under GO Program; Category B target PI’s may apply to ADAP

− Discovery of a “mature” galaxy cluster at z ~ 2 of roughly the mass expected for a progenitor to a modern cluster like Coma, with potential implications for the theory of cosmic structure formation

• ASTRO-H

− Work progressing on NASA hardware contribution (Soft X-ray Spectrometer and 2 Soft X-ray Telescopes)

− NASA Critical Design Review scheduled for late June

− Launch planned for February 2012 on H2A rocket from Kagoshima, Japan

• NuSTAR

− Instrument successfully integrated with Spacecraft at OSC

− Observatory Integration and Test in progress; expected completion in late November

− Launch scheduled for February 3, 2012 aboard a Pegasus LV from Kwajalein Atoll

Page 26: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

26

Under review

Pending confirmation

Page 27: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

One additional Explorer mission in formulation/development likely

Under review

Pending confirmation

27

Likely one additional Explorer mission in development and

another in formulation; possible international collaboration

Page 28: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivisionNational Debt Outlook

Deficit

Debt

Debt approaches WWII level

(when defense was 42% of GDP) but will last

much longer.

Deficit remains at Reagan peak … for

the foreseeable future.

Page 29: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision Moreover …

• By 2021, we approach borrowing primarily to pay interest, which could instigate a debt spiral.

• “Tough” policies (e.g., let Bush tax cuts expire) would lead at best to stagnation; Borrowing remains high, crowding out private investment.

• Global investment could turn away from the United States.

29

Note: Interest will have grown from 1.4% to 3.3% of GDP from 2011 to 2021.

Page 30: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

FY10: Spending and Revenue Composition

30

FY2010 Federal Budget expenditures: $3.5 T

Total Revenues: $2.4 T

Page 31: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

31

Page 32: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

Astrophysics – Operating Missions

Mission Launch End Date Phase -4 -3 -2 -1Jan 2011 Comments

Hubble 1990-04-24 2014-05-31 Ext G G G G GCOS sensitivity loss issue closed with no impact to mission operations plan. G3 G6

RXTE 1995-12-30 2011-09-30 Ext G G G G G

Chandra 1999-07-23 2014-09-30 Ext G G G G G

XMM- Newton

1999-12-10 2014-09-30 ExtG G G G G

WMAP 2001-06-30 2010-10-31 Ext G G G WMAP decommissioned.

INTEGRAL 2002-10-17 2010-09-30 Ext GNASA ended Guest Investigator program support.

GALEX 2003-04-28 2012-09-30 Ext G G G G G

Spitzer 2003-08-25 2013-09-30 Ext G G G G G

Swift 2004-11-20 2014-09-30 Ext G G G G G

Suzaku 2005-07-10 2011-09-30 Ext G G G G G

Fermi 2008-06-11 2013-08-18 Prime G G G G G

Kepler 2009-03-07 2012-11-07 Prime G G G Y G Team working on SOC upgrades.

Herschel 2009-05-14 2013-05-14 Prime G G G G G

Planck 2009-05-14 2012-02-14 Prime G G G G G Catalog release in Jan 12, 2011 – 4 days early.

WISE 2009-12-14 2011-01-31 Ext G G G G G Decommissioning end of Feb.

On plan, adequate margin

Problems, working to resolve within planned margin

Problems, not enough margin to recover 32

Page 33: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

Backup Slides

33

Page 34: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

• Respond to decadal survey recommendations with augmentations to the Explorer program, Balloon program, Astrophysics research program, and technology development, but defer initiating the next large mission beyond JWST

• Support missions in prime operations (Herschel, Planck, Fermi, Kepler, and HST)

• Complete integration of NuSTAR for a Feb 2012 launch

• SOFIA will continue to ramp up science flight hours to achieve full operating capability (FOC) by 2014 and will develop the second generation of instruments

• Continue development/implementation of Astro-H for a Feb 2014 launch

• Continue formulation and development of GEMS for an Apr 2014 launch

• Use Senior Review recommendations to prioritize funding for missions in extended operations

Astrophysics Program/Budget Strategy

34

Innovate, Educate, Build“To reach new heights and reveal the unknown so that what we

do and learn will benefit all humankind.”

Page 35: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

What’s changed:• JWST project was moved to its own Theme within the Science Mission Directorate• The Explorer program is being split into two pieces such that Astrophysics and Heliophysics

will manage their own Explorers resources beginning in 2012 A Future Astrophysics Explorer missions budget was created in response to the

Decadal Survey recommendation to increase the flight rate of astrophysics missions and missions of opportunity.

• Support for concept planning and technology development for decadal survey large mission priorities (WFIRST, LISA, IXO) under supporting research and technology lines

• Augmented budgets for decadal survey medium &small technology and R&A initiatives SOFIA budget increased to restore science and preserve 2nd generation instrument

selection and development• NuSTAR LRD now February 2012 to accommodate launch services availability• ASTRO-H confirmed for implementation; GEMS approved for Phase B and budget re-

phased • Extended support for top ranked missions in the 2010 Senior Review, but support for RXTE

and GALEX extended operations and the INTEGRAL and Suzaku Guest Observer programs will terminate by the end of FY2011

• JDEM &SIM projects have been closed out; not recommended by the Decadal Survey• Reductions to operations and guest observer programs for Chandra, HST, and SwiftWhat’s the same:• Herschel, Kepler, Fermi, and Keck operations

What’s Changed and What’s the Same since Astro-2010 Decadal Review

35

Page 36: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

• New Worlds, New Horizons Decadal Survey science themes well aligned to those of NASA’s Astrophysics Program:

• Cosmic Dawn Cosmic Origins• New Worlds Exoplanet Exploration• Physics of the Universe Physics of the Cosmos

• The survey chose a budget scenario comprising constant FY10 dollars into the future, which is higher than NASA’s guidance and the projected Astrophysics budget

• This was the first NRC decadal survey for NASA that included independent cost analysis of candidate mission concepts

• The survey aimed for an integrated scientific program of space-based and ground-based observation and science.

• Agency Response:

• Support for mission concept planning and technology development relevant to the survey’s highest priority Large space mission: Wide Field Infrared Survey Telescope (WFIRST).

• A Future Astrophysics Explorer missions budget was created to increase the flight rate to achieve the recommended four missions and four missions of opportunity selected by the end of the decade.

• Augmenting investments in core research and technology programs, including the suborbital program (sounding rockets and balloons), theory, laboratory astrophysics, etc.

Astro2010 Decadal Survey Summary

36

Page 37: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

• Respond to decadal survey recommendations with augmentations to the Explorer program, Balloon program, Astrophysics research program, and technology development, but defer initiating the next large mission beyond JWST

• Support missions in prime operations (Herschel, Planck, Fermi, Kepler, and HST)

• Complete integration of NuSTAR (X-ray SMEX) for a Feb 2012 launch

• SOFIA will continue to ramp up science flight hours to achieve full operating capability by 2014 and will develop the second generation of instruments

• Continue development/implementation of Astro-H for a Feb 2014 launch

• Continue formulation and development of GEMS for an Apr 2014 launch

• Use Senior Review recommendations to prioritize funding for missions in extended operations

Post-Astro2010 Astrophysics Program/Budget Strategy

37

Page 38: Richard E Griffiths Astrophysics Division Science Mission Directorate NASA Headquarters

AstrophysicsDivision

38

*JDEM

Redshift Surveys

JDEM

*

NIR Imaging Surveys

JDEM provides a comprehensive data set (100's TB) to JDEM provides a comprehensive data set (100's TB) to world community for ancillary science with factor 100-1000world community for ancillary science with factor 100-1000

step forward in imaging & redshift surveysstep forward in imaging & redshift surveys

JDEM NIR Surveys