  • RM Bridge Professional Engineering Software for Bridges of all Types

    RM Bridge V8i

    March 2014

    TRAINING PRESTRESSING BASIC

    ANALYZER PART 2: AASHTO

  • RM Bridge

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO I

    Bentley Systems Austria

    Content

    1 General ................................................................................................................... 1-1

    1.1 Design Code ................................................................................................... 1-1

    1.2 Design Loadings: ........................................................................................... 1-1

    1.2.1 Permanent actions and Creep & Shrinkage ............................................... 1-1

    1.2.2 Live Load ................................................................................................... 1-1

    1.2.3 Braking Loads ............................................................................................ 1-3

    1.2.4 Wind Loads ................................................................................................ 1-3

    1.2.5 Thermal Forces .......................................................................................... 1-4

    1.2.6 Creep and Shrinkage .................................................................................. 1-5

    1.2.7 Pier settlement ............................................................................................ 1-5

    1.3 Load combinations ......................................................................................... 1-6

    1.4 Design checks ................................................................................................ 1-7

    1.4.1 Servicebility limit state .............................................................................. 1-7

    1.4.2 Ultimate limit state ..................................................................................... 1-7

    2 Lesson 13: Definition of Additional Loads ........................................................... 2-1

    2.1 Definition of Settlement Load Cases ............................................................. 2-1

    2.2 Definition of Temperature Load Case ........................................................... 2-2

    2.3 Definition of Wind Load Case ....................................................................... 2-4

    2.4 Definition of Braking Forces ......................................................................... 2-6

    3 Lesson 14: Calculation and Superposition of Additional Loads ........................... 3-1

    3.1 Calculation and superposition of Settlement loads ........................................ 3-1

    3.2 Calculation and superposition of temperature loads ...................................... 3-3

    3.3 Calculation and superposition of wind loads ................................................. 3-4

    3.4 Calculation and superposition of braking loads ............................................. 3-5

    4 Lesson 15: Traffic Loads ....................................................................................... 4-7

    4.1 Traffic Definition ........................................................................................... 4-7

    4.2 Definition of Traffic Lanes .......................................................................... 4-10

    4.3 Traffic Loads ................................................................................................ 4-11

    4.4 Traffic Calculation ....................................................................................... 4-12

    4.4.1 Calculation of influence lines .................................................................. 4-12

  • RM Bridge

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO II

    Bentley Systems Austria

    4.4.2 Combining Influence Lines with Load Trains ......................................... 4-13

    4.5 Traffic Superposition ................................................................................... 4-15

    5 Lesson 16: Load Combinations ............................................................................. 5-1

    5.1 Definition of the Load Combination .............................................................. 5-1

    5.2 Calculation of the load combinations ............................................................ 5-3

    6 Lesson 17: Fiber Stress Check ............................................................................... 6-1

    7 Reinforced concrete checks General ................................................................... 7-3

    8 Lesson 18: Ultimate Load Capacity Check ........................................................... 8-1

    9 Lesson 19: Shear Capacity Check ......................................................................... 9-1

    10 Lesson 20: Fatigue Check .................................................................................... 10-2

    11 Lesson 21: Lists and Plots ................................................................................... 11-4

  • RM Bridge General

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 1-1

    Bentley Systems Austria

    1 General

    1.1 Design Code

    This example is designed in accordance with AASHTO LRFD 2007.

    1.2 Design Loadings:

    1.2.1 Permanent actions and Creep & Shrinkage

    See Prestressing Basic Training Analyzer Part 1; Chapter 1.7.

    1.2.2 Live Load

    Traffic loads will be in accordance with AASHTO 3.6.1 and 3.6.2. Centrifugal force is

    not considered in this example. Three lanes will be considered, and multiple presence

    factors will be applied as required.

    A simplification is made which assumes that the axial load trains stay at a fixed location

    transversely within the notional lane. Varying the load positions in the transverse direc-

    tion would have no effect on the longitudinal bending moment and shear force for cal-

    culations on the global one-beam system*. In order to produce the worst case torsional

    moments, all of the load trains could be shifted to one side of their respective notional

    lanes.

    During the live load superposition, the dynamic impact factor 1.33 will be applied

    where necessary according to AASHTO 3.6.2. Also for the negative bending region, a

    factor of 90% will be applied to the double truck load train.

    The optional live load deflection evaluation is not checked in this example.

    The following figures show the necessary load trains for HL-93 loading. A more de-

    tailed description of how they will be superimposed is presented in Section 4.1.

    *This is not true of a grillage model where position of the load train transversely within the

    notional lane must be considered.

  • RM Bridge General

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 1-2

    Bentley Systems Austria

    1.2.2.1 Load train 1 Truck

    1.2.2.2 Load train 2 Tandem

    1.2.2.3 Load train 3 Lane

  • RM Bridge General

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 1-3

    Bentley Systems Austria

    1.2.2.4 Load train 4 Double Truck

    1.2.2.5 Load train 5 Fatigue Truck

    1.2.3 Braking Loads

    Braking load will be calculated in accordance with AASHTO 3.6.4, and is taken as the

    greater of:

    - 25% of the axle weights of the design truck or tandem

    - 5% of the design truck/tandem plus the lane load

    In this example, 25% of the design truck is the governing condition:

    (142kN + 142kN + 35kN)x0.25 = 79.75k

    It is assumed that all three lanes are loaded and multiple presence factors are applied.

    Because the lanes are symmetric about the centerline of the bridge, the braking load will

    be applied as a single uniform line load located 1.8m above the surface of the deck. The

    load will have the following magnitude:

    79.75 x 3(lanes) x 0.85 (mult. presence) / 140 (length of bridge) = 1.45 kN/m

    1.2.4 Wind Loads

    AASHTO 3.8.1.2 will be used to determine the wind pressure to be applied on the struc-

    ture. In the absence of information about the wind velocity for a bridge taller than

    9.14m (30 ft), design wind velocity is assumed to be 161km/h (100mph). Therefore, the

    wind pressure is as follows:

  • RM Bridge General

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 1-4

    Bentley Systems Austria

    = 2.394 kN/m2

    Wind pressure will be applied to the concrete box, and it is also assumed to act on a

    barrier that is 0.9m tall.

    Wind load on the live load according to AASHTO 3.8.1.3 is also applied.

    Wind on Live Load: 1.459 kN/m (1.83 m above the deck)

    1.2.5 Thermal Forces

    Uniform temperature and temperature gradient loads will be applied to the structure.

    The initial temperature is assumed to be 10oC.

    According to AASHTO 3.12.2.1 the temperature range for uniform temperature diffe-

    rence will be +27.67oC and -17.78

    oC (table 3.12.2.1-1). For an initial temperature of

    10oC this gives:

    - Uniform temperature postitive = 16.67oC - Uniform temperature negative = -27.78oC

    Thermal Coefficient: 10.8 x 10e-6 per C

    The non-linear temperature gradient is done according to AASHTO 3.12.3. The struc-

    ture is assumed to be in temperature zone 3, thus the values for T1 and T2 are given in

    table 3.12.3-1. T3 is assumed to be zero, and the multiplier for negative temperature

    gradient is 0.3. The table and sketch below show the temperature points and their loca-

    tions.

    Temperature Points:

  • RM Bridge General

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 1-5

    Bentley Systems Austria

    Temperature Gradient

    Point Positive (oC) Negative (

    oC)

    T1 23 -6.9

    T2 6.1 -1.8

    T3 0 0

    This information was input in the modeler in the form of reference sets TempPlus and TempMinus which will be called up in the stage actions for calculating the tempera-ture gradient. To review this curve, go to the modeler and double click on the cross

    section for the main girder. Open the Reference Sets dialogue box, highlight either

    TempPlus or TempMinus and click the Curve button.

    1.2.6 Creep and Shrinkage

    Time dependent effects calculated in accordance with LRFD.

    1.2.7 Pier settlement

    1 cm at each abutment and pier axis

  • RM Bridge General

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 1-6

    Bentley Systems Austria

    1.3 Load combinations

    Service Limit States

    Load Case/Envelope

    Perm. Load t=0

    Perm. Load

    t= Service 1a

    Service 1b

    Service 1c

    Service 1d

    Service 3

    Self Weight DC 1.00 1.00 1.00 1.00 1.00 1.00 1.00

    Superimposed Dead Loads DC 1.00 1.00 1.00 1.00 1.00 1.00 1.00

    Prestressing PS 1.00 1.00 1.00 1.00 1.00 1.00 1.00

    Creep and Shrinkage CR+SH 1.00 1.00 1.00 1.00

    1.00 / 1.20

    1.00 / 1.20 1.00

    T= Creep and Shrinkage CR+SH - 1.00 1.00 1.00 1.20 1.20 1.00

    Live Load LL - - 1.00 - 1.00 - 0.80

    Braking BR - - 1.00 - 1.00 - 0.80

    Wind on the Structure WS - - 0.30 0.30 - - -

    Wind on the Live Load WL - - 1.00 1.00 1.00 1.00 -

    Uniform Tempera-ture TU - - 1.00 1.00 1.20 1.20 1.00

    Temperature Gra-dient TG - - 0.50 1.00 0.50 1.00 0.50

    Settlement SE - - 1.00 1.00 1.00 1.00 1.00

    Earthquake EQ - - - - - - -

    Strength Limit States Load Case/Envelope Strength 1 Strength 4

    Self Weight DC 0.90 / 1.25 0.90 / 1.25

    Superimposed Dead Loads DC 0.65 / 1.50 0.65 / 1.50

    Prestressing PS 1.00 1.00

    Creep and Shrinkage CR+SH 1.00 1.00

    T= Creep and Shrink-age CR+SH 0.50 0.50

    Live Load LL 1.75 -

    Braking BR 1.75 -

    Wind on the Structure WS - -

    Wind on the Live Load WL - -

    Uniform Temperature TU 0.50 0.50

    Temperature Gradient TG - -

    Settlement SE 1.00 -

    Earthquake EQ - -

  • RM Bridge General

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 1-7

    Bentley Systems Austria

    1.4 Design checks

    According to AASHTO LRFD 2007 Section 5

    1.4.1 Servicebility limit state

    1.4.1.1 Stresses

    According to AASHTO 5.9.4

    Concrete stresses before losses

    Concrete compressive stresses are limited to:

    |c| 0.6 |fc| = 0.6 x 45MPa = 27MPa

    Concrete tensile stresses are limited to:

    |t| 0.25 |fc| 1.38MPa = 0.25 = 1.67MPa 1.38MPa

    Concrete stresses after losses

    Concrete compressive stresses for prestressing and permanent loads are limited to:

    |c| 0.45 |fc| = 0.45 x 45MPa = 20.25MPa

    Concrete tensile stresses are limited to:

    |t| 0.5 |fc| = 0.5 = 3.35MPa

    According to AASHTO 5.9.3

    Initial stress in the tendons

    p 0.90 fpy = 0.90 x 1674MPa = 1507MPa.

    Stress in tendons at service limit state after losses

    p 0.80 fpy = 0.80 x 1674MPa = 1340 MPa

    1.4.2 Ultimate limit state

    Accordingly to AASHTO LRFD 2007 Section 5.

    Design checks to be made:

    Bending and axial force Shear Torsion

  • RM Bridge Lesson 13: Definition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 2-1

    Bentley Systems Austria

    2 Lesson 13: Definition of Additional Loads

    2.1 Definition of Settlement Load Cases

    The settlement of foundations will be done for each axis. 4 separate load cases will be

    created. Later the superposition of those load cases will be done to get the most unfa-

    vorable case.

    Definition of

    Load Cases

    Schedule Name Settle-A1 Settle-A2 Settle-A3 Settle-A4

    Type Permanent Permanent Permanent Permanent

    Load Definition

    Load

    Manag-

    er

    - - - -

    De-

    scriptio

    n

    Settlement

    of abut-

    ment axis 1

    Settlement

    of abut-

    ment axis 2

    Settlement

    of abut-

    ment axis 3

    Settlement

    of abut-

    ment axis 4

    Load Case

    Top Table

    Definition of

    Settlement

    Load Cases

    Schedule Num-

    ber Settle-A1 Settle-A2 Settle-A3 Settle-A4

    Load-

    ing

    Actions on the

    elements

    ends

    Actions on the

    elements

    ends

    Actions on the

    elements

    ends

    Actions on the

    elements

    ends

    Load Definition Type

    Element

    end dis-

    placements

    Element

    end dis-

    placements

    Element

    end dis-

    placements

    Element

    end dis-

    placements

    From 1100 1200 1300 1400

    Load Case To 1100 1200 1300 1400

    Step 1 1 1 1

    Bottom Table Vx [m] 0 0 0 0

    Vy [m] 0.01 0.01 0.01 0.01

    Vz [m] 0 0 0 0

    Direc-

    tion Global Global Global Global

    Rx

    [Rad] 0 0 0 0

    Ry [m] 0 0 0 0

    Rz [m] 0 0 0 0

    Where Begin Begin Begin Begin

  • RM Bridge Lesson 13: Definition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 2-2

    Bentley Systems Austria

    2.2 Definition of Temperature Load Case

    All temperature loads, the positive and negative uniform and gradients, will be defined

    in separated load cases. To get the most unfavorable case the load cases will be super-

    posed. Temperature gradients only need to have a load set created. Uniform tempera-

    ture loads do not require a load set, but do require more input in the load case.

    Definition of Load

    Sets

    CONSTR.SCHED. Load-

    ing

    Add to load case

    Add to load case

    Name TG-P TG-N

    LOAD

    DEFINIT. LCnr. TG-P TG-N

    Temperature

    gradient - Posi-

    tive

    Temperature

    gradient - neg-

    ative

    LSET

    Top table

    Definition of

    Load Cases

    Schedule Name TU-P TU-N

    Type Non-

    Permanent

    Non-

    Permanent

    Load Definition

    Load

    Manag-

    er

    - -

    De-

    scriptio

    n

    Uniform

    Tempera-

    ture Load -

    Positive

    Uniform

    Tempera-

    ture Load -

    Negative

    Load Case

    Top Table

  • RM Bridge Lesson 13: Definition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 2-3

    Bentley Systems Austria

    Define Load Sets

    for Uniform Tem-

    perature Loads

    CONSTR.SCHED. Name TU-P

    Loading Initial

    stress/strain

    Initial stress/strain

    Initial stress/strain

    LOAD

    DEFINIT. Type

    Tempera-

    ture load

    Tempera-

    ture load

    Tempera-

    ture load

    From 101 1201 1301

    LCASE To 135 1204 1304

    Step 1 1 1

    Bottom table Alfa 1.08e-5 1.08e-5 1.08e-5

    DT-G

    [C] 16.67 16.67 16.67

    DT- Y

    [C] 0 0 0

    H-Y [m] 0 0 0

    DT- Z

    [C] 0 0 0

    H-Z [m] 0 0 0

    Name TU-N

    Loading Initial

    stress/strain

    Initial stress/strain

    Initial stress/strain

    Type Tempera-

    ture load

    Tempera-

    ture load

    Tempera-

    ture load

    From 101 1201 1301

    To 135 1204 1304

    Step 1 1 1

    Alfa 1.08e-5 1.08e-5 1.08e-5

    DT-G

    [C] -27.78 -27.78 -27.78

    DT- Y

    [C] 0 0 0

    H-Y [m] 0 0 0

    DT- Z

    [C] 0 0 0

    H-Z [m] 0 0 0

    * If the input for Alpha is defined as 0, the value for the

    temperature expansion coefficient is taken from the materi-

    al definitions.

    The load sets for the temperature gradient Plus and Minus will automatically be cal-culated by using the Module TEMPVAR.

  • RM Bridge Lesson 13: Definition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 2-4

    Bentley Systems Austria

    2.3 Definition of Wind Load Case

    Insert Load Set

    CONSTR.SCHED. Name WL WS

    Duration Type Non-permanent Non-permanent

    LOAD

    DEFINIT. Const. Factor 1 1

    Description Wind on live

    load

    Wind on struc-

    ture

    LCASE

    Top table

    Define Load Sets

    for Winds on the

    Structure

    CONSTR.SCHED. Name WS

    Loading Uniform load Uniform load

    LOAD

    DEFINIT. Type

    Uniform eccen-

    tric element

    load

    Uniform eccen-

    tric element

    load

    From 101 101

    LCASE To 135 135

    Step 1 1

    Bottom table Qx [kN/m] 0 0

    Qy [kN/m] 0 0

    Qz [kN/m] 2.394 2.155

    Direction Local Local

    Eccentricity Local Local+Y Elem-Ecc

    Ey [m] 0 0.45

    Ez [m] 0 0

    Load applica-

    tion Real length Real length

    Definition Load mult. by CS depth

    Load/Unit length

    The load case for wind on the structure consists of two load definitions. The first one

    defines the wind load directly on superstructure box, and the second one defines the

    wind load on the barrier.

    The variation of the wind load on the superstructure due to the variable height can be

    defined with the option Load multiply with cross-section depth where the wind pres-sure (kN/m

    2) is defined. The program then internally calculates the uniform wind load

    and applies it on the elements (the load is applied to the centre of gravity, and the actual

    application point of the load is neglected).

    For the wind load acting on the barrier, the wind pressure has to be first multiplied with

    the barrier height (assumed 0.9m) and then defined as uniform load. Load application is

    0.45 meters above the road surface and has to be defined accordingly. This can be done

    with local Y element eccentricity (this represents the distance from the element centre

    of gravity to the node) and an additional eccentricity 1 m above the road way relative to

    the node.

  • RM Bridge Lesson 13: Definition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 2-5

    Bentley Systems Austria

    Name WS

    Loading Uniform load Uniform load

    Type

    Uniform eccen-

    tric element

    load

    Uniform eccen-

    tric element

    load

    From 1201 1301

    To 1204 1304

    Step 1 1

    Qx [kN/m] 0 0

    Qy [kN/m] 0 0

    Qz [kN/m] 2.394 2.394

    Direction Local Local Eccentricity Local Local

    Ey [m] 0 0

    Ez [m] 0 0

    Load applica-

    tion Real length Real length

    Definition Load mult. by CS depth

    Load mult. by CS depth

    Wind load is also applied to the substructure.

    Wind on the live load is applied as a uniform load at 1.459m above the surface of the

    deck.

    Define Load Sets

    for Winds on Live

    Loads

    CONSTR.SCHED. Name WL

    Loading Uniform load

    LOAD

    DEFINIT. Type

    Uniform eccen-

    tric element

    load

    From 101

    LCASE To 135

    Step 1

    Bottom table Qx [kN/m] 0

    Qy [kN/m] 0

    Qz [kN/m] 1.459

    Direction Local

    Eccentricity Local+Y Elem-Ecc

    Ey [m] 1.83

    Ez [m] 0

    Load applica-

    tion Real length

    Definition Load/Unit

    length

    To consider wind from both sides it possible to define the same load case with a differ-

    ent sign. Another possibility is to define the loads with load sets and to use these load

    sets for both direction (once with positive and once with negative factor).

  • RM Bridge Lesson 13: Definition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 2-6

    Bentley Systems Austria

    Within this example the third option will be used where this will be achieved with the

    superposition of the above created load cases. This is done with the corresponding su-

    perposition rule (AndX, AddX or OrX) which superposes the effects once with a posi-

    tive sign and once with a negative sign.

    2.4 Definition of Braking Forces

    The braking load will be applied as a uniform load in the longitudinal (x) direction

    along the whole bridge length. Both application directions will be considered using the

    same principle as the wind load by superposing the load case with corresponding su-perposition rule.

    Definition of

    Load Cases

    Schedule Name BR

    Type Non-

    permanent

    Load Definition Load Manager -

    Description Braking forces

    Load Case

    Top Table

    Definition of

    Load Cases for

    Braking Forces

    Schedule Name Braking

    Loading Uniform

    Load

    Load Definition Type

    Uniform eccen-

    tric element

    load

    From 101

    Load Case To 135

    Step 1

    Bottom Table Qx [kN/m] 1.45 [kN/m]

    Qy [kN/m] 0

    Qz [kN/m] 0

    Direction Local X/L 0

    Eccentricity Local+Y Elem-Ecc

    Ey [m] 1.83

    Ez [m] 0

    Load applica-

    tion Real length

    Definition Load/Unit

    length

  • RM Bridge Lesson 14: Calculation and Superposition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 3-1

    Bentley Systems Austria

    3 Lesson 14: Calculation and Superposition of Additional Loads

    The arrangement of the subsequent Construction stages can be made freely. They are actually not real construction stages because there will be no elements activated or time

    dependent calculations made. They will be only recalculation stages. However, it is

    recommended to group them with some logical principle.

    Each type of additional load will be grouped together this means that for each a calcu-lation stage will be generated where the loads will be calculated and superposed into

    one envelope. In this envelope the minimum and maximum results will be saved. The

    same envelope will be used for the load combinations.

    3.1 Calculation and superposition of Settlement loads

    Definition of the

    Required Con-

    struction Stage

    Schedule Name Settlement

    Description

    Calculation and super-

    position of pier settle-

    ment

    Stages

    Schedule Actions

    Top Table

    Insertion of the

    Calculation Ac-

    tions to the Con-

    struction Stage

    Settlement

    Schedule Type

    Calcu-lations

    (Static)

    Calcu-lations

    (Static)

    Calcu-lations

    (Static)

    Calcu-lations

    (Static)

    Action Calc Calc Calc Calc

    Stages Inp1 Settle-A1 Settle-A2 Settle-A1 Settle-A2

    Inp2 - - - -

    Inp3 - - - -

    Schedule Actions Out1 - - - -

    Out2 * * * *

    Bottom Table Delta-

    T 0 0 0 0

    First all settlement load cases are calculated with the Calc action. Only now can these

    load cases be superposed this will be done with following actions.

    If in the output field a star is defined (*) the created list file will have the default name LC Name.lst (e.g.: Settle-A1.lst). The name of the list file can be changed by defining the name of it in the corresponding output window.

  • RM Bridge Lesson 14: Calculation and Superposition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 3-2

    Bentley Systems Austria

    Type LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Action SupInit SupAddLc SupAndLc SupAndLc SupAndLc

    Inp1 - Settle-A1 Settle-A2 Settle-A3 Settle-A4

    Inp2 - - - - -

    Inp3 - - - - -

    Out1 Settle.sup - - - -

    Out2 - - - - -

    Delta-T 0 0 0 0 0

    With the LC/Envelope action SupInit (Superposition file Initialization) an envelope file

    with name defined in Output-1 will be generated. All envelope files have, unlike load

    cases, an extension *.sup.

    In each envelope the maximum and minimum values/results for six internal forces (Nx,

    Qy, Qz, Mx, My, and Mz) and six deformations (Vx, Vy, Vz, Rx, Ry, and Rz) are saved

    for each element (e.g.: MinNx, MaxNx, MinRz, MaxRz). As it can be seen this is a 12*12 result matrix. There is always a leading result component

    (e.g.: Max and Min for Mz MinMz and MaxMz) and other values that are corre-sponding values (MinMz:Qy).

    Therefore, in addition to the result component (e.g.: Qy or Mz), the leading (superposi-

    tion) component (e.g.: MinQy or MaxMz) has to be defined when presenting envelope

    results. If we want to see the maximum or minimum bending moments around the z axis

    of an envelope the definition is as follows: MinMz:Mz for minimum bending moments

    and MaxMz:Mz for maximum bending moments. To see the corresponding shear forces

    the definition is: MinMz:Qy and MaxMz:Qy.

    There are different ways of superposing certain load cases/envelopes superposition rules. Depending on the chosen rule the end results can be different. Therefore the en-

    gineer has to chose with which rule the superposition has to be done. All superposition

    rules are explained in the table below.

    Rule Description Application Example

    LcAdd

    SupAdd

    Unconditional adding/superposing here the val-ues/results are added/superposed without checking if the

    new result is favorable or unfavorable compared to the

    existing result.

    Permanent loads (self weight,

    pre-stressing, etc.)

    Traffic etc.

    SupAnd Conditional adding/superposing here the values are added/superposed only if the new result is unfavorable

    compared to the existing value.

    To get the most unfavorable

    situation.

    Traffic etc.

    SupOr Substitution if unfavorable using this rule the values are compared to each other, and if the value to be added

    is unfavorable it will replace the existing one. In other

    cases the existing value will remain.

    Exclusive loads (different tem-

    perature loads, etc.)

    SupAndX Both have the same functionality as their basic rules Wind loads and Braking loads

  • RM Bridge Lesson 14: Calculation and Superposition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 3-3

    Bentley Systems Austria

    SupOrX (SupAnd and SurOr). The difference is that the values to

    be added are superposed once with positive factor (+1)

    and once time with negative factor (-1).

    which are defined only from one

    side.

    Depending on the file to be added, load case or envelope, there are different actions SupAndLc or SupAndSup.

    For further and more detailed information about the superposition rules see the RM

    Bridge Analysis User Guide, Section 7.2.5.

    In this particular example (Settlement of each axis) the values are conditionally super-

    posed with the actions SupAndLc (to the Settle envelope a load case will be added with

    the rule And conditional adding). This means that individual result components (Nx, Qy, Mz) are added only if the respective maximum or minimum result value be-comes unfavorable.

    Note: By the definition of the envelope file (Output 1) using the SupInit action the extension

    doesnt have to be defined because it will be automatically added. This doesnt apply for all other superposition actions it is necessary to write the extension (or selection from the drop down menu).

    Selecting the envelope from the drop down menu is possible only if the envelope already

    exists (that it was created/initialized). To avoid a complete recalculation, the action for

    creating the envelope can be started separately by clicking the Run Action button on the

    right side between the top and bottom table. By clicking on it a new window opens where

    the Run Action button has to be clicked and the currently selected action will be performed.

    Using this principle the created envelope can be selected from the drop down menu.

    For easier and faster definition the action can be copied and modified. The input can also

    be defined by the copy-paste function.

    3.2 Calculation and superposition of temperature loads

    Definition of the

    Required Con-

    struction Stage

    Schedule Name Temperature

    Description

    Temperature loads

    (Calculation and Su-

    perposition)

    Stages

    Schedule Actions

    Top Table

  • RM Bridge Lesson 14: Calculation and Superposition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 3-4

    Bentley Systems Austria

    Insertion of the

    Calculation Ac-

    tions to the Con-

    struction Stage

    Temperature

    Schedule Type

    Calcu-lations

    (Static)

    Calcu-lations

    (Static)

    Calcu-lations

    (Static)

    Calcu-lations

    (Static)

    Action Calc Calc TempVar Calc

    Stages Inp1 TU-P TU-N TempPlus TG-P

    Inp2 - - - -

    Inp3 - - - -

    Schedule Actions Out1 - - TG-P -

    Out2 * * * *

    Bottom Table Delta-

    T 0 0 0 0

    First the temperature load cases are calculated. This must be done before they can be

    superposed.

    Type

    Calcu-lations

    (Static)

    Calcu-lations

    (Static)

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    Action TempVar Calc SupInit SupORLc SupORLc SupInit SupORLc SupORLc

    Inp1 TempMin

    us TG-N - TU.sup TU.sup - TG.sup TG.sup

    Inp2 - - - TU-P.sup TU-N.sup - TG-P.sup TG-N.sup

    Inp3 - -

    Out1 TG-N - TU.sup TG.sup

    Out2 * * - - - - - -

    Delta-T 0 0 0 0 0 0 0 0

    Both positive and negative load cases for the uniform and gradient temperature load are

    superposed with the Or rule into separated envelopes.

    Using that principle we get two envelopes one for the uniform temperature loads and another one for the gradient temperature loads where the maximum and minimum val-

    ues from each temperature load type are saved.

    3.3 Calculation and superposition of wind loads

    Definition of the

    Required Con-

    struction Stage

    Schedule Name Wind

    Description Wind loads (Calcula-

    tion and Superposition)

    Stages

    Schedule Actions

    Top Table

  • RM Bridge Lesson 14: Calculation and Superposition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 3-5

    Bentley Systems Austria

    Insertion of the

    Calculation Ac-

    tions to the Con-

    struction Stage

    Wind

    Schedule Type Calcula-

    tions (Static)

    Calcula-tions (Static)

    Action Calc Calc

    Stages Inp1 WS WL

    Inp2 - -

    Inp3 - -

    Schedule Actions Out1 - -

    Out2 * *

    Bottom Table Delta-

    T 0 0

    The load cases for wind on the structure and wind on the live load are calculated first.

    Afterwards both wind loads will be superposed into separate envelopes with the AndX

    rule the load case is once added with the positive factor and then with negative factor (-1.0) when it produces unfavorable results.

    Type LC/Envelope

    action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Action SupInit SupAndX

    Lc SupInit

    SupAndX

    Lc

    Inp1 - WS.sup - WL.sup

    Inp2 - WS - WL

    Inp3 -

    Out1 WS.sup - WL.sup -

    Out2 - - - -

    Delta-T 0 0 0 0

    3.4 Calculation and superposition of braking loads

    Definition of the

    Required Con-

    struction Stage

    Schedule Name Braking

    Description

    Braking loads (Calcu-

    lation and Superposi-

    tion)

    Stages

    Schedule Actions

    Top Table

    Insertion of the

    Calculation Ac-

    tions to the Con-

    struction Stage

    Wind

    Schedule Type Calculations

    (Static)

    LC/Envelope action

    LC/Envelope action

    Acion Calc SupInit SupAndXLc

    Stages Inp1 BR - brake.sup

    Inp2 - - BR

    Inp3 - - -

    Schedule Actions Out1 - brake.sup -

    Out2 * - -

    Bottom Table Delta-

    T 0 0 0

  • RM Bridge Lesson 14: Calculation and Superposition of Additional Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 3-6

    Bentley Systems Austria

    The same principle that was used for the wind load applies also for braking load first the load case is calculated and then superposed to an envelope with the AndX rule.

    Note: It would be possible to define the braking load as live load. For that a traffic lane and load

    train (e.g.: concentrated load) have to be defined and calculated. The principle of calcula-

    tion of live load is defined in next section.

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-7

    Bentley Systems Austria

    4 Lesson 15: Traffic Loads

    4.1 Traffic Definition

    The traffic load definition for this simple example is in accordance with AASHTO.

    HL-93 loading will be applied with three lanes. A dynamic impact factor of 1.33 will

    be applied where it is applicable, and multiple lanes loaded will be checked with the

    appropriate dynamic impact factors.

    According to Article 3.6.1.1.1 the number of design lanes should be the integer part of

    w/3.6m, where w is the clear roadway width:

    w = 13m 2(0.4m barriers) = 12.2m number of design lanes = 12.2m/3.6m = 3.39 or 3 design lanes.

    As mentioned in Section 1.2.2 of this document, some simplifications and assumptions

    are made in order to present the fundamentals of defining and calculating live loads in

    RM. The principles presented here can be applied in the same manner on a more pre-

    cise live load scenario. The following assumptions and simplifications have been made:

    The three design lanes will be placed symmetrically about the centerline of the roadway.

    In each design lane the centerline of the truck, tandem, and lane load remain at a fixed

    position transversely. In this example it is assumed that each of the load trains remains

    in the middle of the 3.6m-wide design lane. The following picture shows how the lanes

    and load trains will be set up:

    The first step in setting up the live loading is to define influence lines. In the program

    they are called "lanes" (which is how they will be referred to from here on out), but it is

    more appropriate to think of them as the centerline of a vehicle. Any number of lanes

    can be defined on a bridge.

    The next step is to define the load trains. There are 4 load trains for the HL-93 loading

    used in this example: Truck, Tandem, Double Truck, and Design Lane. They can be

    seen in Section 1.1.2.

    Finally, the load trains need to be combined with the lanes. In RM, the influence lines

    are calculated first without any consideration of a particular load train. Using this ap-

    proach, any load train can be combined with an influence line to create an envelope of

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-8

    Bentley Systems Austria

    results. Then another load train can be combined with that same influence line to create

    another envelope of results.

    The approach taken here is to first determine the worst case loading for each lane indi-

    vidually from the different load trains. According to HL-93, the loading can be either

    the Truck or the Tandem or the Double Truck (in negative flexure), and the Design

    Lane. Worst case loading envelopes for each individual lane are determined. Then en-

    velopes are created for different combinations of multiple lanes loaded. Finally, the

    worst case overall traffic load is determined by checking envelopes of different numbers

    of lanes loaded with multiple presence factors applied. The figure below shows this

    process.

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-9

    Bentley Systems Austria

    Z

    Z

    Z

    Three lanes loaded:

    L1L2L3.sup

    Two lanes loaded:

    L1L2.sup L1L3.sup L2L3.sup

    One lane loaded:

    L1.sup L2.sup L3.sup

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-10

    Bentley Systems Austria

    4.2 Definition of Traffic Lanes

    Traffic lanes are defined under Menu Schedule Load definition Traffic Lanes. Lanes to be defined were explained in section 1.2.2.

    Definition of

    Lanes

    Schedule Number 1 2 3

    Output-

    File - - -

    Load Definition Info-File - - -

    Descrip-

    tion

    ez = +3.6

    m ez = 0.0 m

    ez = -3.6

    m

    Traffic Lanes

    Top Table

    A traffic lane is defined through an element series (normally all elements of the super-

    structure). Information about the load direction and position (eccentricity) is required

    for each element at least at one point. Normally it is done at two points on the ele-ment begin and element end. These points can be generated very easily using different

    macros.

    In this example Macro 2 will be used for generation of all traffic lanes (vertical load

    with eccentricity).

    Note: The basic direction (x,y,z longitudinal, vertical, transversal) of the live load is defined via the lane definition different macros. The load intensity and orientation (positive or negative) is defined via the definition of the load train.

    In case of grillage models the transversal elements can be loaded directly (Macro3) or the

    load is distributed from the transversal to the longitudinal girders (Macro4).

    For more detailed information about traffic lanes please see RM Analysis user guide sec-

    tion 7.2.9.

    The procedure of creation of the Traffic Lanes can be different than shown here the lane can be created (upper table) and immediately defined (bottom table)

    Definition of the

    Lanes by Mac-

    ros

    Schedule Lane 1 2 3

    Macro Macro2 Macro2 Macro2

    Load Definitions Eccentri-

    city Ygl Ygl Ygl

    El-from 101 101 101

    Traffic Lanes El-fo 135 135 135

    El-step 1 1 1

    Bottom Table ey [m] 0 0 0

    ez [m] +3.6 +0.0 -3.6

    Phi 1.00 1.00 1.00

    Ndiv 1 1 1

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-11

    Bentley Systems Austria

    The lane eccentricities are defined in the local coordinate system of the element (EYel

    and EZel). Lane eccentricities (ey and ez) can be referenced to the node by using the

    local vertical and transversal eccentricities. For a vertical load, only the transversal load

    eccentricity has an effect.

    The input sequence is as follows:

    Select the lane to be defined in the upper table and click on the insert after button in the

    bottom table. A window with macros opens and Macro2 has to be chosen. In the newly

    opened window click again on the insert after button and make the input as is shown in

    the table above. With this the definition of one influence line is finished. The same has

    to be repeated for all other lanes also.

    The macro creates the information in the bottom table where for each element there are

    4 definitions two at the element begin (x/l = 0.00001) and two at the element end (x/l = 0.99999). One defines the position of the lane relative to the element (eccentricities),

    and the other defines the load position (which is the same as the lane position) and di-

    rection. This information allows the program to calculate influence lines.

    4.3 Traffic Loads

    Load Trains are defined under menu Schedule Load definition Load Trains. Load trains to be defined were explained in Section 1.1.2.

    Input the Load

    Trains

    CONSTR.SCHED. Name 1 2 3 4 5

    Fact-min 1 1 1 1 1

    LOAD

    DEFINIT. Fact-max 1 1 1 1 1

    Location - - - - -

    LTRAIN Descrip-

    tion

    Design

    Lane Truck Tandem

    Double

    Truck

    Fatigue

    Truck

    Top table

    Definition of

    Load Train

    Properties

    Schedule LTrain 1 2

    Q -9.34 - - -

    Load Definitions Free Length Free - - -

    F - -142 -142 -35

    AASHTO - - - -

    Load Trains l-from - 4.3 4.3 0

    l-to - 9 0 0

    Bottom Table l-step - 1 0 0

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-12

    Bentley Systems Austria

    LTrain 3 4 5

    Q - - - - - - - - - - -

    Free

    Length - - - - - - - - - - -

    F -110 -110 -142 -142 -35 -142 -142 -35 -142 -142 -35

    AASHTO - - - - - - - - -

    l-from 1.2 - 4.3 4.3 15.25 4.3 4.3 0 9 4.3 0

    l-to 0 - 0 0 0 0 0 0 0 0 0

    l-step 0 - 0 0 0 0 0 0 0 0 0

    A certain load train is defined by a load and length to the next load. Therefore the first

    input for load train 2 is defined by a concentrated load F = -142 kN (negative

    y-direction) and a variable length between 4.3m and 9m to the next force. The next in-

    put for the first load train consist only of a concentrated load F = -142 kN.

    Using the same principle, load train numbers 2 and 3 have to be defined.

    The load trains for uniformly distributed loads (load train number 1) are defined as is

    shown in the table above. The length of the uniformly distributed load is set to free the program will automatically calculate the unfavorable position and length and load the

    structure with it.

    The input fields on the right side of the window for the definition of the load trains are

    for two dimensional definitions of the load trains and are irrelevant for the one-beam

    model. This input is generally used for FEM models (it can also be used for grillage

    models).

    Pre-defined load train definitions according to AASHTO can be imported via Extras Traffic Load Macros Live Load Macro for AASHTO (ASD and LRFD).

    4.4 Traffic Calculation

    4.4.1 Calculation of influence lines

    Definition of the

    Required Con-

    struction Stage

    Schedule Name TrafficCalc

    Description Traffic Calculations

    Stages

    Schedule Actions

    Top Table

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-13

    Bentley Systems Austria

    Insertion of the

    Calculation Ac-

    tions to the Con-

    struction Stage

    InflCalc

    Schedule Type

    Calcu-lation

    (Static)

    Calcu-lation

    (Static)

    Calcu-lation

    (Static)

    Action Infl Infl Infl

    Stages Inp1 1 2 3

    Inp2 - - -

    Inp3 - - -

    Schedule Actions Out1 - - -

    Out2 * * *

    Bottom Table Delta-T 0 0 0

    First the influence lines for the defined Traffic Lanes are calculated with the Infl action.

    The results of the calculations are saved to list files and also to binary files which can be

    graphically presented under Results Influence Lines Corresponding influence line.

    Note: The graphical presentation is possible only if the influence lines were actually calculated.

    4.4.2 Combining Influence Lines with Load Trains

    Definition of the

    Required Con-

    struction Stage

    Schedule Name TrafficCalc

    Description Traffic Calculations

    Stages

    Schedule Actions

    Top Table

    The definitions in the bottom table are as follows:

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-14

    Bentley Systems Austria

    Type LC/Envelo

    pe action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Action SupInit SupInit SupInit SupInit SupInit SupInit

    Inp1 - - - - - -

    Inp2 - - - - - -

    Inp3 - - - - - -

    Out1 L1-Truck.sup L1-

    Tandem.sup

    L1-

    Dbl_Truck.su

    p

    L1-Lane.sup L2-Truck.sup L2-

    Tandem.sup

    Out2 - - - - * *

    Delta-T 0 0 0 0 0 0

    Type LC/Envelo

    pe action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Action SupInit SupInit SupInit SupInit SupInit SupInit

    Inp1 - - - - - -

    Inp2 - - - - - -

    Inp3 - - - - - -

    Out1

    L2-

    Dbl_Truck.su

    p

    L2-Lane.sup L3-Truck.sup L3-

    Tandem.sup

    L3-

    Dbl_Truck.su

    p

    L3-Lane.sup

    Out2 - - - - * *

    Delta-T 0 0 0 0 0 0

    Here the envelopes are created/initialized, which is necessary for the evaluation of load

    trains and traffic lanes. It is highly recommended to use a systematic number-

    ing/naming. In this example the envelopes are named with the numbers of the lanes and

    trains that will be combined with each other.

    When the influence lines are calculated and the envelopes initialized the load trains can

    be combined with the traffic lanes.

    Type Calculation

    (Static)

    Calculation (Static)

    Calculation (Static)

    Calculation (Static)

    Calculation (Static)

    Calculation (Static)

    Action LiveL LiveL LiveL LiveL LiveL LiveL

    Inp1 1 1 1 1 2 2

    Inp2 2 3 4 1 2 3

    Inp3 - - - - - -

    Out1 L1-Truck.sup L1-

    Tandem.sup

    L1-

    Dbl_Truck.su

    p

    L1-Lane.sup L2-Truck.sup L2-

    Tandem.sup

    Out2 * * * * * *

    Delta-T 0 0 0 0 0 0

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-15

    Bentley Systems Austria

    Type Calculation

    (Static)

    Calculation (Static)

    Calculation (Static)

    Calculation (Static)

    Calculation (Static)

    Calculation (Static)

    Action LiveL LiveL LiveL LiveL LiveL LiveL

    Inp1 2 2 3 3 3 3

    Inp2 4 1 2 3 4 1

    Inp3 - - - - - -

    Out1

    L2-

    Dbl_Truck.su

    p

    L2-Lane.sup L3-Truck.sup L3-

    Tandem.sup

    L3-

    Dbl_Truck.su

    p

    L3-Lane.sup

    Out2 * * * * * *

    Delta-T 0 0 0 0 0 0

    The action LiveL combines the chosen load train (Input2) with the selected traffic lane

    (Iput1). The results of the calculation are saved not only into the previously generated

    envelope (Output1) file but also to a list file.

    4.5 Traffic Superposition

    Definition of the

    Required Con-

    struction Stage

    Schedule Name TrafficSup

    Description Superposition of

    Traffic Loads

    Stages

    Schedule Actions

    Top Table

    The definitions in the bottom table are as follows:

    Type LC/Envelop

    e action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Action SupInit SupORSup SupORSup SupORSup SupANDSup

    Inp1 - L1.sup L1.sup L1.sup L1.sup

    Inp2 - L1-Truck.sup L1-

    Tandem.sup

    L1-

    Dbl_Truck.su

    p

    L1-Lane.sup

    Inp3 - 1.33 1.33 1.197 1.0

    Out1 L1.sup - - - -

    Out2 - - - - -

    Delta-T 0 0 0 0 0

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-16

    Bentley Systems Austria

    Type LC/Envelop

    e action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Action SupInit SupORSup SupORSup SupORSup SupANDSup

    Inp1 - L2.sup L2.sup L2.sup L2.sup

    Inp2 - L2-Truck.sup L2-

    Tandem.sup

    L2-

    Dbl_Truck.su

    p

    L2-Lane.sup

    Inp3 - 1.33 1.33 1.197 1.0

    Out1 L2.sup - - - -

    Out2 - - - - -

    Delta-T 0 0 0 0 0

    Type LC/Envelop

    e action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Action SupInit SupORSup SupORSup SupORSup SupANDSup

    Inp1 - L3.sup L3.sup L3.sup L3.sup

    Inp2 - L3-Truck.sup L3-

    Tandem.sup

    L3-

    Dbl_Truck.su

    p

    L3-Lane.sup

    Inp3 - 1.33 1.33 1.197 1.0

    Out1 L3.sup - - - -

    Out2 - - - - -

    Delta-T 0 0 0 0 0

    Now there are envelopes file for the worst case load train in each one of the lanes. First,

    the Truck, Tandem or Double Truck was used (whichever produced worst case results

    for each element), and then the Design Lane load was added to that. Dynamic impact

    factors were applied here, and the 90% reduction factor for the Double Truck was taken

    into consideration. The resulting envelopes are L1.sup, L2.sup, and L3.sup.

    The next step is to create envelope files for the condition when more than one lane is

    loaded. There are 3 unique conditions when 2 lanes are loaded and one condition when

    3 lanes are loaded. These conditions along with their envelope file names in RM can be

    seen in Section 4.1.

    Type LC/Envelo

    pe action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Action SupInit SupANDSup SupInit SupANDSup SupInit SupANDSup

    Inp1 L1.sup L1L2.sup L1.sup L1L3.sup L2.sup L2L3.sup

    Inp2 - L2.sup - L3.sup - L3.sup

    Inp3 - - - - - -

    Out1 L1L2.sup - L1L3.sup - L2L3.sup -

    Out2 - - - - - -

    Delta-T 0 0 0 0 0 0

  • RM Bridge Lesson 15: Traffic Loads

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 4-17

    Bentley Systems Austria

    Ac-

    tion

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Type SupInit SupANDSup SupANDSup

    Inp1 L1.sup L1L2L3.sup L1L2L3.sup

    Inp2 - L2.sup L3.sup

    Inp3 - - -

    Out1 L1L2L3.sup - -

    Out2 - - -

    Delta-

    T 0 0 0

    All intermediate envelopes have now been created for different lanes loaded. The last

    step is to check and see which condition of lanes loaded produces the worst case results

    when multiple presence factors are applied. The final envelope for live load results will

    be called live.sup.

    Type

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    LC/Envelope

    action

    Action SupInit SupORSu

    p

    SupORSu

    p

    SupORSu

    p

    SupORSu

    p

    SupORSu

    p

    SupORSu

    p

    SupORSu

    p

    Inp1 - live.sup live.sup live.sup live.sup live.sup live.sup live.sup

    Inp2 - L1.sup L2.sup L3.sup L1L2.sup L1L3.sup L2L3.sup L1L2L3.s

    up

    Inp3 - 1.2 1.2 1.2 1.0 1.0 1.0 0.85

    Out1 live.sup - - - - - - -

    Out2 - - - - - - - -

    Delta-T 0 0 0 0 0 0 0 0

    This completes the definition of the live load.

  • RM Bridge Lesson 16: Load Combinations

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 5-1

    Bentley Systems Austria

    5 Lesson 16: Load Combinations

    5.1 Definition of the Load Combination

    The results of the calculated loads are saved into load cases or envelopes. They can now

    be used for the definition of the Load Combinations. The definition of load combina-

    tions is done under menu Schedule Load definition Combination table.

    It is possible to define up to 48 different combinations. Using the buttons on the top left

    side allows you to change between different pages 6 load combination definitions per page.

    The first column represents the load cases and/or envelopes to be combined into a cer-

    tain combination. In the second column the rule of the superposition for each load case

    and/or envelope is defined. Afterwards there are 2 columns for each combination that

    represent the favorable and unfavorable factors.

    The input of the combinations is not combination oriented but instead is load case ori-

    ented. This means simply that the input is done for each load case separately where

    favorable and unfavorable factors have to be defined for all combinations.

    The load combinations to be defined are explained in section 1.3 and are again dis-

    played in the table below.

    COMBINATION

    LC/Envelope Rule 1 2 3 4 5 6 7 8 9

    SW-SUM AddLc 1.00 1.00 1.00 1.00 1.00 1.00 1.00

    0.90/ 1.25

    .90/ 1.25

    SDL-SUM AddLc 1.00 1.00 1.00 1.00 1.00 1.00 1.00

    0.65/ 1.50

    0.65/ 1.50

    PT-SUM AddLc 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

    CS-SUM AddLc 1.00 1.00 1.00 1.00

    1.00/ 1.20

    1.00/ 1.20

    1.00 1.00 1.00

    CS-INF AndLc - - 1.00 1.00 1.20 1.20 1.00 0.50 0.50

    CS-INF AddLc 1.00 - - - - - - -

    live.sup AndSup - - 1.00 - 1.00 - 0.80 1.75 -

    Brake.sup AndSup - - 1.00 - 1.00 - 0.80 1.75 -

    WS.sup AndSup - - 0.30 0.30 - - - - -

    WL.sup AndSup - - 1.00 1.00 1.00 1.00 - - -

    TU.sup AndSup - - 1.00 1.00 1.20 1.20 1.00 0.50 0.50

    TG.sup AndSup - - 0.50 1.00 0.50 1.00 0.50 - -

    settle.sup AndSup - - 1.00 1.00 1.00 1.00 1.00 1.00 -

    Perm

    . Loads t=

    0

    Perm

    . Load t

    =

    Serv

    ice 1

    a

    Serv

    ice 1

    b

    Serv

    ice 1

    c

    Serv

    ice 1

    d

    Serv

    ice 3

    Str

    ength

    1

    Ste

    ngth

    4

  • RM Bridge Lesson 16: Load Combinations

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 5-2

    Bentley Systems Austria

    Definition of

    Load Case

    Combina-

    tions

    Schedule LC/Envelop

    e SW-SUM SDL-SUM

    Comb SupAddLc SupAddLc

    Load Definitions Type F-fav. F-

    unfav. F-fav.

    F-

    unfav.

    Comb I 1 1 1 1

    Combination Table Comb II 1 1 1 1

    Comb III 1 1 1 1

    Top Table Comb IV 1 1 1 1

    Comb V 1 1 1 1

    Comb VI 1 1 1 1

    Comb VII 1 1 1 1

    Comb VIII 0.9 1.25 0.65 1.50

    Comb IX 0.9 1.25 0.65 1.50

    LC/Envelope PT-SUM CS-SUM CS-INF CS-INF

    Comb SupAddLc SupAddLc SupAndLc SupAddLc

    Type F-fav. F-

    unfav. F-fav.

    F-

    unfav. F-fav.

    F-

    unfav. F-fav.

    F-

    unfav.

    Comb I 1 1 1 1 - - - -

    Comb II 1 1 1 1 - - 1 1

    Comb III 1 1 1 1 1 1 - -

    Comb IV 1 1 1 1 1 1 - -

    Comb V 1 1 1 1.2 1.2 1.2 - -

    Comb VI 1 1 1 1.2 1.2 1.2 - -

    Comb VII 1 1 1 1 1 1 - -

    Comb VIII 1 1 1 1 0.5 0.5 - -

    Comb IX 1 1 1 1 0.5 0.5 - -

    LC/Envelo

    pe live.sup brake.up WS.sup WL.sup TU.sup

    Comb SupAndSup SupAndSup SupAndSup SupAndSup

    Type F-fav. F-

    unfav. F-fav.

    F-

    unfav. F-fav. F-fav. F-fav.

    F-

    unfav.

    F-

    unfav.

    F-

    unfav.

    Comb I - - - - - - - - - -

    Comb II - - - - - - - - - -

    Comb III 1 1 1 1 0.3 0.3 1 1 1 1

    Comb IV - - - - 0.3 0.3 1 1 1 1

    Comb V 1 1 1 1 - - 1 1 1.2 1.2

    Comb VI - - - - - - 1 1 1.2 1.2

    Comb VII 0.8 0.8 0.8 0.8 - - - - 1 1

    Comb VIII 1.75 1.75 1.75 1.75 - - - - 0.5 0.5

    Comb IX - - - - - - - - 0.5 0.5

  • RM Bridge Lesson 16: Load Combinations

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 5-3

    Bentley Systems Austria

    LC/Envelo

    pe TG.sup settle.sup

    Comb SupAndSup SupAndSup

    Type F-fav. F-

    unfav. F-fav.

    F-

    unfav.

    Comb I - - - -

    Comb II - - - -

    Comb III 0.5 0.5 1 1

    Comb IV 1 1 1 1

    Comb V 0.5 0.5 1 1

    Comb VI 1 1 1 1

    Comb VII 0.5 0.5 1 1

    Comb VIII - - 1 1

    Comb IX - - - -

    5.2 Calculation of the load combinations

    Up to now the load combinations have only been defined and have not yet been calcu-

    lated. To calculate them a schedule action has to be defined SupComb. With this ac-tion all defined load cases and envelopes with their corresponding superposition rule

    and defined favorable and unfavorable factors are superposed into the final (combina-

    tion) envelope.

    For a better overview a separated calculation stage will be created where all 9 combi-nations will be calculated.

    Definition of the

    Required Con-

    struction Stage

    Schedule Name Combos

    Description Load Combination

    calculation

    Stages

    Schedule Actions

    Top Table

  • RM Bridge Lesson 16: Load Combinations

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 5-4

    Bentley Systems Austria

    Insertion of the

    Calculation Ac-

    tions to the Con-

    struction Stage

    Combos

    Schedule Type LC/Envelop

    e action

    LC/Envelope action

    LC/Envelope action

    Acion SupComb SupComb SupComb

    Stages Inp1 1 2 3

    Inp2 - - -

    Inp3 - - -

    Schedule Actions Out1 Perm-t-0.sup Perm-t-inf.sup SLS-1a.sup

    Out2 - - -

    Bottom Table Delta-

    T 0 0 0

    Type LC/Envelop

    e action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Acion SupComb SupComb SupComb SupComb SupComb SupComb

    Inp1 4 5 6 7 8 9

    Inp2 - - - - - -

    Inp3 - - - - - -

    Out1 SLS-1b.sup SLS-1c.sup SLS-1d.sup SLS-3.sup ULS-1.sup ULS-4.sup

    Out2 - - - - - -

    Delta-

    T 0 0 0 0 0 0

  • RM Bridge Lesson 17: Fiber Stress Check

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 6-1

    Bentley Systems Austria

    6 Lesson 17: Fiber Stress Check

    Definition of the

    Required Con-

    struction Stage

    Schedule Name SLS

    Description

    SLS-Fibre Stress

    Check

    Stages

    Activation

    Top Table

    Insertion to the construction schedules:

    Definition of

    the Fibre

    Stress Check

    actions

    Schedule Ac-

    tion

    Check

    ac-

    tions(SUP)

    Check

    ac-

    tions(SUP)

    Check

    ac-

    tions(SUP)

    Check

    ac-

    tions(SUP)

    Type FibSup FibSup FibSup FibSup

    Stages Inp1 Perm-t-

    0.sup

    Perm-t-

    inf.sup SLS-1a.sup SLS-1b.sup

    Inp2 1 2 2 2

    Schedule Action Out1 - - - -

    Out2 * * * *

    Bottom Table Delta-

    T 0 0 0 0

    Ac-

    tion

    Check

    ac-

    tions(SUP)

    Check

    ac-

    tions(SUP)

    Check

    ac-

    tions(SUP)

    Type FibSup FibSup FibSup

    Inp1 SLS-1c.sup SLS-1d.sup SLS-3.sup

    Inp2 2 2 2

    Out1 - - -

    Out2 * * *

    Delta-

    T 0 0 0

    The compressive stresses in concrete have to be checked to see if they exceed some

    limit under a certain combination. The compression stresses due to load combination 1

    (Perm-t-0.sup) should not exceed 0.6fc and the compression stresses under load com-binations 2-7 (Perm-t-inf.sup and Serviceability limit states) should not exceed 0.45fc.

    The schedule actions for various checks are separated into different menus for load cas-

    es and for envelopes Check actions (LC) and Check actions (SUP).

  • RM Bridge Lesson 17: Fiber Stress Check

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 6-2

    Bentley Systems Austria

    The schedule action for checking the stresses in predefined fibers is Fib. The suffix de-

    fines for what the check is done for load case (FibLc) or for envelope (FibSup).

    The first input field (Input-1) defines for which load case or for which envelope the

    check will be done.

    Next input field defines the stress limit. The input is a number which references the

    stress limit defined in the material data (Properties Material data Corresponding material; stress limits are defined in the small table in the bottom right corner).

    If the stress limits are not defined the stress check cannot be done. To define the stress

    limits for a material the insert after button has to be chosen (it is on the bottom right

    side above the stress limit table). The stress limit number is automatically assigned (se-

    rial number), and two other inputs represent the maximum (tension-positive) and mini-

    mum (compression-negative) allowed stress limit.

    In this case the stress limits have to be defined defined. The stress limit number 1 corre-

    sponds to 0.6fc, and the stress limit number 2 corresponds to 0.45fc. For stress limit

    1, the tensile stress is limited to 0.25 , which corresponds to a limit of

    1.38MPa. For stress limit 2, the tensile stress is limited to 0.5 = 3.35MPa. After inputting these limits, the material properties should looks as follows:

    The check determines the minimum and maximum stresses under the defined load

    case/envelope in all stress check points defined in the cross-sections and compares them

    with stress limits. Results are saved into a list file (Output-2). Those exceeding the lim-

    its (if there are any) are saved into the list file (values marked with #), and a warning is

    displayed after completion of the calculation.

    The same check can also be done graphically. It can be seen at which places the re-

    quirements are not satisfied. This is done by creating a diagram via RMSet. On this dia-

    gram certain stresses in certain fibers are plotted along with stress limits.

  • RM Bridge Reinforced concrete checks General

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 7-3

    Bentley Systems Austria

    7 Reinforced concrete checks General

    The results of different design check actions are reinforcement areas that are saved into

    their corresponding Attribute-Sets. They can be seen under menu Structure Ele-ments Checks for each element.

    In the upper table the element is selected and in the bottom table the results can be seen

    by selecting one of the corresponding Attribute Set.

    Some Attribute Sets have more than one result component (e.g.: Attribute Set for Shear-

    Longitudinal reinforcement which has two result components one for the top and an-other for the bottom reinforcement).

    The calculated reinforcement areas are stored and displayed under the A2 reinforcement

    area. The A1 reinforcement area represents an input where a predefined reinforcement

    area (e.g.: minimum reinforcement) can be defined (double click on the Attribute Set or

    select it and click on the modify button). It is possible to define that this reinforcement

    area is fixed or variable. If it is set to fixed, then the program will not increase the val-

    ues even if it is necessary according to a certain design check. In the other case the rein-

    forcement area will be increased by the necessary reinforcement area calculated by a

    certain design check.

    The reinforcement areas can be displayed also graphically via RM-Sets. The corre-

    sponding elements and attribute sets have to be defined. In addition the results can be

    presented numerically by creating an excel sheet or a list file.

    It is also possible to specify for which elements certain design checks should not be

    done (double click on an element in the upper table and check the OFF button next to a

    certain design check). By default all design checks are ON for all elements. The pro-

    gram distinguishes between beam elements and other elements (spring elements, stiff-

    ness elements, tendons, etc.). In addition it is also possible to make a detailed list file

    (export) for each design check.

    In principal the reinforcement area calculated by previous design actions (depending on

    the schedule sequence defined in under schedule actions) is taken into account in the

    subsequent design actions.

    The data of the calculated reinforcement area (A2) remains as an existing reinforcement

    area even when a new recalculation of the project is run (it is also exported into TCL

    files). Therefore it is necessary to initialize (delete) the A2 reinforcement areas (calcu-

    lated areas) before the first design action. This is done with the ReinIni action (Rein-

    forcement Initialization) where the A2 reinforcement area of a certain or all Attribute

    sets is set to 0 for all elements.

    For clarification and clear overview a new (calculation) stage will be created:

  • RM Bridge Reinforced concrete checks General

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 7-4

    Bentley Systems Austria

    Definition of the

    Required Con-

    struction Stage

    Schedule Name ReinIni

    Description Reinforcement initiali-

    zation

    Stages

    Schedule Actions

    Top Table

    Initialization of

    the A2 Reinforcement

    areas

    Schedule Action Check

    actions(SUP)

    Type RenIni

    Stages Inp1 -

    Inp2 -

    Schedule Action Out1 -

    Out2 -

    Bottom Table Delta-T 0

    The action ReinIni is located in the menu for load case check actions (Check Actions

    (LC)). It is also found in the envelope check actions (Check Actions (SUP)).

    If the first input (Input-1) remains empty (or a * is defined) all Attribute-Sets will be initialized. To initialize a certain Attribute-Set, it has to be selected from the drop down

    menu at the input field.

  • RM Bridge Lesson 18: Ultimate Load Capacity Check

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 8-1

    Bentley Systems Austria

    8 Lesson 18: Ultimate Load Capacity Check

    Definition of the

    Required Con-

    struction Stage

    Schedule Name Ult-ULS

    Description ULS- Ultimate Load

    Carrying Capacity

    Stages

    Schedule Actions

    Top Table

    Definition of the

    Ultimate Load

    Carrying Capacity

    Schedule Action LC/Envelop

    e action

    LC/Envelope action

    LC/Envelope action

    Type SupInit SupOrSup SupOrSup

    Stages Inp1 - ULS.sup ULS.sup

    Inp2 - ULS-1.sup ULS-4.sup

    Inp3 - - -

    Schedule Actions Out1 ULS.sup - -

    Out2 - - -

    Bottom Table Delta-T 0 0 0

    Action Nachweis-

    Aktionen

    LC/Envelope action

    Check actions (SUP)

    Type UltSup SupInit UltSup

    Inp1 ULS.sup - ULS.sup

    Inp2 Rein * - UltMz *

    Inp3 - - -

    Out1 - Ult-ULS.sup Ult-ULS.sup

    Out2 * - *

    Delta-T 0 0 0

    For the ULS check the unfavorable effects of load combinations 8 and 9 (Strength limit

    states 1 and 4) have to be considered. Therefore these combinations are superposed into

    the final ULS.sup envelope with the Or rule (substitute if unfavorable).

    The first check action performs the design check by selection of the Rein option (Rein-

    forcement design). With this input the necessary reinforcement will be calculated and

    added to the corresponding Attribute-Set. The reinforcement amount can be displayed

    as was already explained (diagram creation via RM-Set). In addition, the results are

    exported/saved also to a list file. Also for this check a detailed list can be made (at same

    principle as already explained).

    In next steps first an envelope file (Ult-ULS.sup) is initialized. Into this envelope the

    results of the following ultimate load capacity check (UltSup check action with option

    Ultimate load check for UltMz) are saved. This action calculates the maximum capacity

  • RM Bridge Lesson 18: Ultimate Load Capacity Check

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 8-2

    Bentley Systems Austria

    of the bending moment Mz of the cross-section (structure respectively). For this calcula-

    tion both other internal force components for the ultimate load check (Nx and My) are

    fixed, and only the bending moment Mz is increased until the maximum capacity of the

    bending moment is reached. The iteration process varies the strain planes which are

    based on the stress-strain diagram of the corresponding element (concrete, reinforce-

    ment steel and pre-stressing steel). These diagrams are defined under material proper-

    ties. Also these results are saved to a list file.

    For pre-stressed structures the initial strain load case has to be defined to correctly con-

    sider the initial strain of the pre-stressing steel caused by the primary state of pre-

    stressing (V*e) when evaluating the stress-strain diagram. This state is saved in the

    summation load case of pre-stressing (PT-SUM).

    To consider the initial strain of creep and shrinkage and relaxation also, the total sum-

    mation load case (STG-SUM) should be defined as the initial strain load case.

    Furthermore, it is possible to consider the initial strain state from the envelope (load

    case respectively) used for the design check. To do so, a * has to be defined, instead of certain load case in the corresponding input field. This option considers also the fac-

    tored initial strain of time effects. However, this is not allowed if the envelope includes

    factored pre-stressing load cases and time effects and is not relevant in this form for

    consideration of initial strain (see combination factors for combination used for crack

    check).

    If no initial strain load case is defined, then the load case defined in the recalc pad is

    used as initial strain load case. If no load case is defined in the recalc pad, then the ini-

    tial strain is not considered.

    For more information about the ultimate load check and design of reinforced concrete

    with or without pre-stressing see RM Analysis User Guide section 15.3 and 15.4.

    A very instructive graphical comparison between demand moments (ULS.sup) and ul-

    timate moments (Ult-SUL.sup) is done in the corresponding example.

  • RM Bridge Lesson 19: Shear Capacity Check

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 9-1

    Bentley Systems Austria

    9 Lesson 19: Shear Capacity Check Definition of the

    Required Con-

    struction Stage

    Schedule Name ULS-Shear

    Description Shear capacity

    check

    Stages

    Schedule Actions

    Top Table

    Definition of the

    Shear Capacity

    Check

    Schedule Action Check actions

    (SUP)

    Type ShearSup

    Stages Inp1 ULS.sup

    Inp2 PT-SUM

    Inp3 -

    Schedule Actions Out1 -

    Out2 *

    Bottom Table Delta-

    T 0

    To perform a check for shear force and torsion (Shear check) for an envelope, the check

    action ShearSup has to be used (ShearLc for load cases). The envelope for the ULS

    checks was already generated and can be used. Also for this check an initial strain load

    case has to be defined.

    The results are, same as for all other checks, saved to the corresponding Attribute-Set as

    well as to a normal or extended list file.

    If the tendon geometry is not defined in a detailed manner (the tendons are grouped to-

    gether into one tendon geometry), the nominal web thickness is not calculated automati-

    cally. Therefore the reduction of the web thickness has to be defined manually. This

    reduction is defined via the parameters b-beg and b-end (reduction at element begin and

    end) under menu Structure Elements Checks. These two parameters are refer-enced to elements and via this to the assigned cross-sections. In case of multiple webs,

    the defined values will be subdivided on the individual webs taking into account the

    number and width of the web (the thinnest web will have the smallest reduction and

    vice versa for thickest web).

    For grouted tendons the reduction of the web thickness according to AASHTO 5.8.2.9

    is defined as 0.25. In our case with arrangements of 3 tendons at same level (paral-lel; side by side) with 8 cm diameter the reduction is (0.25230.08 =) 0.12 m.

    To define the reduction change, go to the top table under Structure Elements Checks and double click (or modify) one of the superstructure elements (elements from 101 to 135). Define as follows: El-from:101; El-to:135; El-step:1; b-beg (m):0.12;

    b-end (m):0.12.

  • RM Bridge Lesson 20: Fatigue Check

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 10-2

    Bentley Systems Austria

    10 Lesson 20: Fatigue Check

    Definition of the

    Required Con-

    struction Stage

    Schedule Name ULS- Fatigue

    Description Fatigue check

    Stages

    Activation

    Top Table

    Definition of the

    Fatigue Check

    Schedule Action

    LC/Envelope

    action

    Calcula-tion (Static)

    Type SupInit LiveL

    Stages Inp1 - 2

    Inp2 - 5

    Inp3 - -

    Schedule Actions Out1 Fatigue.sup Fatigue.sup

    Out2 *

    Bottom Table Delta-T 0 0

    Action LC/Envelope

    action

    LC/Envelope action

    Check actions (SUP)

    Check actions (SUP)

    Type SupInit SupInit FatigSup FatigSup

    Inp1 Fatigue.sup Fatigue.sup FLS-1.sup FLS-2.sup

    Inp2 1.38 0.69 - -

    Inp3 - - - -

    Out1 FLS-1.sup FLS-2.sup - -

    Out2 * *

    Delta-T 0 0 0 0

    For the fatigue limit state, first a live load evaluation is done with the fatigue truck (load

    train number 5). Next, the fatigue limit state combinations FLS-1 and FLS-2 are creat-

    ed by applying factors to the live load envelope. According to AASHTO 3.6.1.4 a fac-

    tor of 0.8 will be applied because there are 3 lanes. According to AASHTO 3.6.2 the

    dynamic impact factor will be 1.15. The factors for FLS-1 and FLS-2 are computed as

    follows:

    - FLS-1: 0.8*1.15*1.5 = 1.38

    - FLS-2: 0.8*1.15*0.75 = 0.69

    The action FatigSup performs a fatigue check only for a superposition file (envelope).

    This is because only envelope can contain the maximum/minimum internal forces for

  • RM Bridge Lesson 20: Fatigue Check

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 10-3

    Bentley Systems Austria

    the traffic loads relevant for fatigue. The difference between maximum and minimum is

    taken as a relevant stress range value f.

    The results are saved to the list file which contains the stress difference for each element

    in all stress check points, longitudinal reinforcement and tendons. These stress ranges

    can then be checked against the limits set forth in AASHTO 5.5.3.

  • RM Bridge Lesson 21: Lists and Plots

    Training Prestressing Basic - ANALYZER - Part 2: AASHTO 11-4

    Bentley Systems Austria

    11 Lesson 21: Lists and Plots

    The different possibilities of post processing (RM-Sets and Plot Conatiners) were

    shown already in section 11 of Part1. In the corresponding example there are multiple

    Rm-Sets and Plots for presentation of internal forces, stresses and reinforcement areas

    defined and created/plotted in schedule actions. This definition can be seen directly in

    the program.

    In addition a new stage is created (last stage) in which additional predefined plot actions

    (Schedule Stages Schedule actins; Bottom table List/Plot actions) are defined for plotting: working diagrams, creep and shrinkage diagrams, cross-sections, tendon

    geometry, tendon scheme, tendon positions in cross-sections, stressing actions, load

    trains, influence lines, etc. Also these definitions can be seen directly in the program.

    1 General1.1 Design Code1.2 Design Loadings:1.2.1 Permanent actions and Creep & Shrinkage1.2.2 Live Load1.2.2.1 Load train 1 Truck1.2.2.2 Load train 2 Tandem1.2.2.3 Load train 3 Lane1.2.2.4 Load train 4 Double Truck1.2.2.5 Load train 5 Fatigue Truck

    1.2.3 Braking Loads1.2.4 Wind Loads1.2.5 Thermal Forces1.2.6 Creep and Shrinkage1.2.7 Pier settlement

    1.3 Load combinations1.4 Design checks1.4.1 Servicebility limit state1.4.1.1 Stresses

    1.4.2 Ultimate limit state

    2 Lesson 13: Definition of Additional Loads2.1 Definition of Settlement Load Cases2.2 Definition of Temperature Load Case2.3 Definition of Wind Load Case2.4 Definition of Braking Forces

    3 Lesson 14: Calculation and Superposition of Additional Loads3.1 Calculation and superposition of Settlement loads3.2 Calculation and superposition of temperature loads3.3 Calculation and superposition of wind loads3.4 Calculation and superposition of braking loads

    4 Lesson 15: Traffic Loads4.1 Traffic Definition4.2 Definition of Traffic Lanes4.3 Traffic Loads4.4 Traffic Calculation4.4.1 Calculation of influence lines4.4.2 Combining Influence Lines with Load Trains

    4.5 Traffic Superposition

    5 Lesson 16: Load Combinations5.1 Definition of the Load Combination5.2 Calculation of the load combinations

    6 Lesson 17: Fiber Stress Check7 Reinforced concrete checks General8 Lesson 18: Ultimate Load Capacity Check9 Lesson 19: Shear Capacity Check10 Lesson 20: Fatigue Check11 Lesson 21: Lists and Plots