10
RMB Morgan Stanley Big Five Conference Cape Town 27 September 2017

RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

Embed Size (px)

Citation preview

Page 1: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

RMB Morgan StanleyBig Five Conference

Cape Town

27 September 2017

Page 2: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

RMB Morgan Stanley – Big 5 Conference - September 2017 2

Value creation through the Maseve acquisition

• Strategic fit

• Value accretive through operational and commercial

synergies

• Capital efficient

• Enhanced operational flexibility and opportunities

Four pillars of the RBPlat strategy

Page 3: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

RMB Morgan Stanley – Big 5 Conference - September 2017

Geographical synergy with the BRPM JV

MASEVE ACQUISITION

• Adjacent to Styldrift I

• Two declines from surface

• 110ktpm concentrator

• Associated mine infrastructure

3

Page 4: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

RMB Morgan Stanley – Big 5 Conference - September 2017

Maseve plant represents operational synergies and flexibility

Current operating design:

110ktpm capacity

MF1 configuration

Potential inherent spare design capacity

The Maseve plant is based on best practice PGM concentrating design

Potential to upgrade to increase throughput

and improve recoveries

160ktpm capacity

MF2 configuration

Opportunities to consider UG2 treatment

4

Page 5: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

RMB Morgan Stanley – Big 5 Conference - September 2017 5

Proposed ore delivery to Maseve

STYLDRIFT MINE

Overland belt to MaseveMaseve concentrator

Page 6: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

RMB Morgan Stanley – Big 5 Conference - September 2017

North shaft portal

South shaft portal

6

Potential for early access into Frischgewaagd through Maseve decline infrastructure

Page 7: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

RMB Morgan Stanley – Big 5 Conference - September 2017

Opportunities for RBPlat from the Maseve acquisition

7

Immediate access to additional plant capacity

• Increasing Styldrift from 150ktpm to 230ktpm

Extend the life of South shaft

• While Styldrift ramps up, plant can treat South shaft Merensky

• Extends South shaft life by 12-18 months

Improve business case for UG2 in future

• Can consider upgrading plant when market supports UG2

• Potential for longer term chrome extraction

Maseve plant

Early access to Styldrift orebody

• Maseve mine infrastructure close to Frischgewaagd boundary

• Conduct studies to optimise extraction plans

MASEVE PLANTMaseve mine

Page 8: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

RMB Morgan Stanley – Big 5 Conference - September 2017

On the 6th of September RBPlat announced the Maseve transaction

USD70 million

Maseve mine

• North & South shafts and associated

orebody

• Surface rights

• Power and water allocation

• Associated mine infrastructure

+

8

Maseve plant

• Concentrator plant

• Tailings infrastructure

• Surface rights for purposes of operating the

plant

• Power and water allocation

USD58 million– Due diligence

– Competition commission approval

Plant transaction

USD12 million– Section 11 transfer

Share transaction

Page 9: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating

RMB Morgan Stanley – Big 5 Conference - September 2017

Conclusion

The acquisition of the Maseve operation and its associated infrastructure places RBPlat in a position

to:

• Expand Styldrift production to 230ktpm

• Continue mining Merensky reef at South shaft for an additional 12-18 months

• Unlock opportunity for early access to the Frischgewaagd orebody

• The next phase involves:

completing a due diligence

obtaining competition commission approval and

securing section 11 transfer

• Build an overland belt between Styldrift and the Maseve plant

• Review concentrator upgrade requirements

• Conduct studies to optimise extraction plans

9

Page 10: RMB Morgan Stanley - Royal Bafokeng Platinum · RMB Morgan Stanley –Big 5 Conference - September 2017 Maseve plant represents operational synergies and flexibility Current operating