Overview
Project Survey Process
Project Environment Survey Guide
RNC Project Survey Guide
Quality Control of Project Survey
Content
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
3/49
Overview
Project survey is the initial stage of the whole project. Well begun is half done.
It has direct influence on every link of the project
afterwards.
Introduction Purpose: To provide normalized instructions on the
process, item and method of the project survey; to
offer a uniform survey standard to ensure good
preparation; and to make sure the project survey
plays its due role
Contents: Process, steps, methods, and filling in
forms
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
4/49
Overview
Project survey:
Ensures accurate production scheduling and timely deliveryaccording to contract.
Is the original basis for data configuration and debugging ofproduction lines.
Is the basis of project design.
Is the original material for the completion report.
Is part of normalized project management.
Conducting no project survey, or wrong project survey, will result in:
Delay in scheduling and production, and error in dataconfiguration.
Delay in delivery, with excesses, shortages and omissions.
Project suspension and material supply delay, so that theinstallation personnel can do nothing but wait, and there is noinstallation solution confirmed by both parties, possibly causingchanges of customer requirements, reworking, and refusal ofacceptance.
Lack of original materials in the completion report.
Lack of links in normalized project management.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
5/49
Overview
Project Survey Process
Project Environment Survey Guide
RNC Project Survey Guide
Quality Control of Project Survey
Content
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
6/49
Project Survey Flowchart
Project Survey
Plan
Start
Preparing forproject survey
Making project surveyplan
Conducting field project survey and
first environmental acceptance
Producing surveydocuments
Reviewingthe survey
Qualified?
Handling
documents
End
Project Survey
Guide
Contract ProblemFeedback
Project SurveyReport
Environmental
Acceptance Report
Review Form ofProject Survey
Report
Guide for Project
Survey Report ReviewNo
Yes
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
7/49
Description of Project Survey Process
Preparing for Project Survey Purpose: To ensure smooth project survey
Person in Charge: Project survey engineer
Responsibilities:
1. Accepting tasks, receiving materials, and
understanding requirements 2. Taking charge of consultation, understanding, and
communication
3. Keeping in touch with the customer to know on-sitesituations and identify conditions
Actions to take under poor survey conditions Actions to take under good survey conditions
4. Drafting a Project Survey Plan
5Making survey tools and meters ready
6. Carrying survey documents
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
8/49
Project Survey Process
Making Project Survey Plan Purpose: To conduct planned project survey
Person in Charge: Project survey engineer
Output document: Project Survey Plan
Responsibilities: Holding a project survey briefing
Making a Project Survey Plan
Being ready for carrying out the project survey
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
9/49
Project Survey Process
Conducting Field Project Survey and FirstEnvironmental Acceptance
Purpose: To ensure that the field survey meet
specifications
Person in Charge: Project survey engineer
Input Document: Project Survey Guide
Responsibilities:
Conducting field survey, with the customer involved, to
record on-site information and data
Conducting first check of equipment operatingenvironment
Defining installation environment requirements
Knowing preparations of both parties for the project
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
10/49
Project Survey Process
Producing Survey Documents
Purpose: To ensure production debugging and accurate delivery, and to guideproject construction and commissioning, serving as the basis of producingproject design documents
Person in Charge: Project survey engineer
Output document: Project Survey Report (Scheduling & Delivery Data), ProjectSurvey Report (Project Design Information), Project Survey Report(Commissioning Data), Environmental Acceptance Report, and ContractProblem Feedback
Responsibilities: Collating and filling in survey data according to the requirements specified in
Project Survey Guide; signing in the Project Survey Report and in the FirstEnvironmental Acceptance column of the Project Survey Report after both thecustomer and ZTE reach an agreement on the results of the survey andenvironment acceptance
Communicating and negotiating with the customer, asking them for advice toreach an agreement, and listing important things into the project surveymemorandum
Providing the customer with a copy of the documents
Filling in the Contract Problem Feedback to help the business manager and thecustomer solve problems upon discussion if the result of the survey does notconform to the contract
Submitting the Project Survey Report
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
11/49
Project Survey Process
Reviewing the Survey
Purpose: To ensure the integrity, compliance, andcorrectness of the project survey data
Person in Charge: Project survey assessment engineer
Input Document: Guide for Project Survey Report Review
Output document: Review Form of Project Survey Report
Responsibilities:
Assessing the integrity, compliance, and correctness of theProject Survey Report
Filling in the Review Form of Project Survey Report
Revising the survey documents in any unqualified Project
Survey Report, and repeating field survey if necessary until itmeets the requirements
Submitting the qualified Project Survey Report to projectsurvey engineer for filing
Submitting the Review Form of Project Survey Report toproject survey engineer for filing
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
12/49
Project Survey Process
Handling Documents
Purpose: To file the survey results and provide them to thedepartments that need them
Person in Charge: Project survey engineer/document controller
Responsibilities:
SendingProject Survey Tasks,Project Survey Plan,Project SurveyReport (Scheduling & Delivery Data), Project Survey Report
(Project Design Information), Project Survey Report(Commissioning Data), Environmental Acceptance Report, SurveyProblem Feedback,and Review Form of Project Survey Report todocument controller for filing
Submitting Project Survey Report (Scheduling & Delivery Data) tothe involved Planning Department of the Product Division
Submitting Project Survey Report (Project Design Information) to
project design manager Submitting Project Survey Report (Commissioning Data) to
commissioning engineer
Submitting Environmental Acceptance Report to projectsupervisor for a second environmental acceptance
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
13/49
Overview
Project Survey Process
Project Environment Survey Guide
RNC Project Survey Guide
Quality Control of Project Survey
Table of Contents
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
14/49
Requirements for Equipment Room Environment
Basic Environment of Equipment Room
High temperature, heavy dust, harmful gases, explosives, low air pressure,strong vibration or noise, and high-voltage electrical equipment
The equipment room must be built at the location that meet the engineeringdesign requirements of the communication equipment. A long-term view shouldbe taken before construction. Do not relocate the equipment room unlessnecessary. Durability should be considered to avoid frequent renovations. Theequipment room must be fireproof and shockproof.
Construction, structure, heating, ventilation, power supply, lighting and fire
protection are required. MPT specifications must be followed.
The equipment room should be designed for the convenience of the cablingand daily maintenance of the signal cable and power cable, to reduce cablingcost and communcation failure and improve working efficiency.
General Information of Equipment Room Location of equipment room
Type of equipment room
Route for equipment to enter the equipment room
Equipment unloading area
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
15/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
16/49
Project Environment Survey
Equipment Room Floor and Fire Protection
The bearing capacity of the equipment room floor should be higher than450kg/m2.
The bearing capacity of the floor outside the equipment room should be nolower than 300kg/m2.
The equipment room must be equipped with appropriate fire fighting devices,such as several dry powder fire extinguishers.
Antistatic raised floorboards or antistatic terrazzo should be laid in theequipment room. Conductive floorboards should be used instead if raised
floorboards are unavailable. Static grounding must be performed for conductiveor raised floorboards, which should be connected to a grounding devicethrough a current-limiting resistor and a connecting wire.The resistance of thecurrent-limiting resistor should be 1M.
Survey Description:
If antistatic floorboards are used in the equipment room, the floor height shouldbe checked.
Doors/Windows/Walls of Equipment Room The door should be over 2.2 m high and over 1.2 m wide, and should be a
sealed single leaf door.
The walls and the ceiling should be free from pulverization, dust and peeling.Decorative materials applied on the walls should be fire-retardant.
Survey Description:
There should be some space on the walls because wall-mounting DDFs orODFs are requied sometimes.
Attention!
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
17/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
18/49
Project Environment Survey
Equipment Room Air Conditioning
An air conditioning system should be installed in the equipment room. The heat radiation in the equipment room and the refrigerating output of the air conditioning
can be calculated as follows: 1. Heat radiation of the equipment: Q1=0.82VA (kcal/h)
Where:
Q1 is the head radiation of the equipment.
V is the DC power supply voltage (V).
A is the average power consumption current (A).
The value 0.82 is the product of 0.86 (the scaling factor for converting every watt of electrical energy intoheat energy) and 0.95 (the scaling factor for converting electrical energy to heat energy in the equipmentroom).
2. The refrigerating output of the equipment room: Q2=S150 (kcal/h) Q2: The refrigerating output of the switching room
S: The area of the switching room (M2)
150: The parameter for converting room area to refrigerating output (Kcal/hM2
3. The refrigerating output of the air conditioning (actual capacity): Q=Q1+Q2
Survey Description:
Different models of equipment has different requirements on ambient temperature andhumidity. For detailed information, refer to the corresponding equipment technical manuals.Generally, it is required to install an air conditioning system in the equipment room. If an air
conditioning system exists, the power of the air conditioning and the heat radiation of theexisting equipment should be noted during survey. If the existing air conditioning systemcannot meet the requirements of the new equipment, additional air conditioners arerequired. The air conditioners should run automatically once powered.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
19/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
20/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
21/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
22/49
Equipment Installation Information
Area of Equipment Room Enough space should be reserved for the main
equipment, auxiliary equipment, and capacity
exapnsion.
Antistatic Floor and Cabinet Base
The height of the antistatic floor should be measured
accurately.
Height-adjustable base
Fixed-height base
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
23/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
24/49
RNC Auxiliary Facilities
DC Power Cabinet
The power consumption of each ZXWR RNC rack in fullconfiguration is less than 3100 W.
If the DC power supply equipment is provided by ZTE, ZTEshould check it during survey. The template of the powersupply survey report is provided by the Mobile Business
Department. The survey should focus on the placement ofthe power supply equipment and the batteries, and thespecification and length of the AC power cable from the ACpower supply system to the DC power supply system.
ZXDU300 DC power supply cabinet is used in generalequipment rooms. AC 3-phase 380V input and single-
phase 200V input are optional. The AC power cable is 16mm2 four-core copper cable. The cabinet model should bespecified by support engineer from the power supplyproduct line of the Mobile Business Department.
ZXWR RNC requires a DC voltage range of -57V~ -40V.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
25/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
26/49
RNC Auxiliary Facilities
Digital Distribution Frame (DDF) and Optical Distribution Frame
(ODF) If the DDF is provided by ZTE according to the project
interface, ZTE should survey the DDF.
Placement
DDF specifications - ZTE specially provides a reference listfor model selection. Generally, rack-type or cabinet-type isselected.
The length of the grounding cable of the DDF
75 ohms or 120 ohms.
If the ODF is provided by ZTE according to the projectinterface, ZTE should survey the ODF.
Placement ODF specifications - ZTE specially provides a reference list
for model selection. Generally, rack-type or cabinet-type isselected.
The length of the grounding cable of the ODF
Type of the Optical connector (optical ring flange)
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
27/49
RNC Auxiliary Facilities
Transmission Equipment ZXWR RNC supports multiple transmission modes:
Direct optical fiber connection
Direct 2M cable connection
SDH transmission-based connection ZXWR RNC provides two transmission interfaces:
STM-1 and E1.
ZXWR RNC supports 75-ohm and 120-ohm
interfaces.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
28/49
Survey of RNC Cables and Materials
Make sure the installation positions and cabling routes of
the related equipment.
General principles for cabling routes:
It should facilitate the wiring of signal cables and
power cables and routine maintenance.
It should make the lines as short as possible to avoid
detours. It should help reduce wiring costs and
communication failures.
All cables must be kept intact, and any joint or transition
point is unacceptable.
A 10% surplus length should be reserved for all cables.
Attention!
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
29/49
Survey of RNC Cables and Materials
Grounding Cables
Position of the grounding bar: Generally, the grounding bar is installed on thelower part of the wall in the equipment room.
The protective grounding cable of the ZXWR RNC indoor grounding bar: 35mm2 multi-strand soft copper wire; the cable length should be the focus duringthe survey.
The protective grounding cable from cabling rack to grounding bar: 35 mm2multi-strand soft copper wire; the cable length should be the focus during thesurvey.
The protective grounding cable from DDF/ODF to grounding bar: 35 mm2 multi-strand soft copper wire; the cable length should be the focus during the survey.
The protective grounding cable from power supply equipment to grounding bar:35 mm2 multi-strand soft copper wire; the cable length should be the focusduring the survey.
The protective grounding cable from transmission equipment to grounding bar:35 mm2 multi-strand soft copper wire; the cable length should be the focusduring the survey.
The grounding downlead from the grounding bar to the grounding body in theequipment room: 95 mm2 multi-strand soft copper wire; or 40 mm 4 mmzinc-plated flat steel; the cable length should be the focus during the survey.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
30/49
Survey of RNC Cables and Materials
DC Power Cables 48VDC racks
There are two types of DC power cables:48V working grounding cable (GND) and 48V power cable (48V).
Focus during survey: diameter, specification, and length of power cables.
The cable diameter can be calculated as follows: S=I2L/U S: Cross section of power cables (mm2)
I: Total current
L: Effective length of the feeder (M)
U: Permissible voltage of the feeder (v)
: Conductivity of the feeder
For copper core cables, =54.4,
For aluminum core cables, =34 Value range ofU:
From battery to DC power supply: U0.2V
DC power supply: U0.2V
From DC power supply to DC power distribution cabinet:U0.8V
From DC power distribution cabinet to switch rack:U0.4V
Power cable specifications: 1, 1.5, 2.5, 4, 6, 10, 16, 25, 35, 50, 70, 95, 120, and 185 (unit: mm2)
Generally, 25 mm2 cables are used as DC power cables for the racks; 35 mm2 cables are used asprotective grounding cables for the equipment. Fire-retardant cables should be used.
A back-up power supply should be provided if there are two ways of separate DC power inputs. -48V power cable: 25 mm2 multi-strand soft copper core power cable; fire-retardant; blue
-48V working grounding cable: 25 mm2 multi-strand soft copper core power cable; fire-retardant; black
The length of the power cables should be the focus during the survey.
If the length exceeds 100 m, 35 mm2 fire-retardant, multi-strand soft copper core power cables should beused instead.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
31/49
Survey of RNC Cables and Materials
AC Power Cables
Server rack and primary power supply equipment
Survey items: The length of the AC power cable from the
primary power supply equipment to the AC power
distribution box.
Power supply for the server rack. The server rack should bepowered through 16 mm2 four-core fire-retardant cable.
The cable length should be the focus during the survey.
Placement of the AC power cables. A distance of 150 mm
should be kept between any two AC power cables.
Shielding tube. The length of the shielding tube should alsobe checked during the survey.
The survey report provided by the supplier of the primary
power supply equipment.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
32/49
Survey of RNC Cables and Materials
Transmission Cables
Transmission cables: Tail fibers, digital trunk cables (E1), and network cables. Different transmission modes require different transmission cables.
Transmission cables should be selected according to the applications. Refer tothe Technical Proposal.
Survey Description
Optical fibers: Single-mode tail fibers The number and length of tail fibers, and connector types
Tail fiber connector type: LC/PCLC/PC.
Digital trunk cables: Supporting 75-ohm and 120-ohm interfaces coaxial cables (75 ohms), number and length of 2M cables, and connector types
Trunk cables (120 ohms), number of 2M cables, length of trunk cables, and thenumber of 2M cables included in a 120-ohm trunk cable
Network cables: Full-IP Architecture. Newwork cables are used for internalcommunication.
Length, type of network cables, and number of connectors
Network cables are delivered as a whole in a box. The total length andconnectors of the network cables should be checked during the survey.
Surplus length; network cable testing.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
33/49
Filling in Survey Forms
Purposes
To identify the environmental conditions, equipment installation,
cabling, and project tasks & responsibilities; to know all related
details; to make preparations for scheduling, delivery and field
installation.
Tasks
Completing the survey on environmental conditions, floor plan
of the equipment room, cabling, original debugging data, and
hardware installation interface.
Requirements
The environment conditions should be fully described. Theinstallation position of each equipment should be identified.
The number, length, and cabling route of every kind of cable
should be checked. The installation interfaces for both parties
should be identified.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
34/49
Filling in Survey Forms-First Environmental ConditionSurvey
1. Conduct the first environmental acceptance according to the items specified in
the Environmental Acceptance Report
2For compulsory items, specified conditions must be provided by the customer.
For the conditions that are currently not provided, a deadline should be negotiated
by both parties.
3. For general items, it is unnecessary to "force" the customer to meet the
environmental conditions, but it is necessary to explain the
advantages/disadvantages to the customer. A deadline should be negotiated by
both parties if the customer is capable of meeting such requirements.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
35/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
36/49
Filling in Survey Forms-Scheduling and DeliveryData
Collect scheduling and delivery data; fill in the Project Survey Report(Scheduling & Delivery Data)
The report should include such information as site name, configuration, floor
height, number of racks, and length of digital trunk cable, fire-retardant powercable, grounding cable, optical fiber, and cabling rack.
Where:
There are two types of optical fiber interfaces: LC/PC - LC/PC and LC/PC - FC/PC.Fill the selected type(s) in the report according to the survey results.
A 10% surplus length should be reserved for all cables.
All power cables must be fire-retardant, with 25 mm2 (for power cables) and 35mm2 (for protective grounding cables) in cross section. If the length of a powercable exceeds 100 m, a 35 mm2 power cable should be used instead. The lengthof the grounding cable should be the total length of all grounding cables.
The Project Survey Report (Scheduling & Delivery Data) must be sent back to
the Planning Department of the Mobile Division.
Attention!
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
37/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
38/49
Filling in Survey Forms-Project Design Information
Collect information about equipment installation &
commissioning; fill in the Project Survey Report (Project Design
Information)
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
39/49
Filling in Survey Forms-Project DesignInformation
Description of Equipment Layout Drawing1. The layout describes the planimetric position of the equipment in all equipment rooms.
2. The dimensions and positions of all equipment, the distances between them, and the reservedpositions should be measured, marked and recorded carefully and accurately.
3. Unnecessary changes must not be made once the equipment positions are
confirmed by both parties!4. The customer must send a prior written notice to ZTE for any necessary
changes.
Drawing Requirements: The size of the equipment should be marked in the layout.
The positions of ODF, DDF, transmission equipment, switching equipment and access equipmentshould be provided in the layout.
Old and new equipment should be drawn differently (described by text, or marked by bold or fineline).
The rack front, storey height, ceiling, and floor height should be marked.
The position and size of holes, doors and windows should be marked.
If the description is not clear by using a planar top view, a detail view can be usedinstead.
Both sketch and formal VISIO diagram should be produced.
Copying this diagram is permitted.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
40/49
Filling in Survey Forms-Project DesignInformation
Description of Cable Route Drawing
It describes all cabling routes in the equipment room.
It shows all cabling routes and modes, as well as detailed cabling facilities.
Unnecessary changes must not be made once the cabling routes are confirmed by both
parties!
If cabling facilities are not in position, their installation locations should be identified, and then
marked and noted in a sketch.
Drawing Requirements:
The cabling route from the digital trunk cable to the DDF should be marked.
Different types of cables should be marked differently.
Both sketch and formal VISIO diagram should be produced.
Copying this diagram is permitted.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
41/49
Filling in Survey Forms-Project DesignInformation
Description of Power Distribution Connection
Drawing
1. This diagram mainly describes the power cable connections from the power supply
in the equpment room to the equipment used at the current stage.
2Drawing Requirements:
1. The existing power loops of the power cabinet should be drawn.
2. The planned power loops of the equipment used at the current stage should be drawn.
3. Both sketch and formal VISIO diagram should be produced.
4Copying this diagram is permitted.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
42/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
43/49
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
44/49
Filling in Survey Forms-Project Memorandum
Every report includes a memorandum.
Communication engineering is rather complicated, with many issues being involved.
Extra, special, or unexpected problems or situations will possibly happen.
All these issues should be recorded into the Project Survey Memorandum.
Any special installation materials that are not recorded in the Project Survey Report
(Scheduling & Delivery Data) should be included into the memorandum.
The memorandum is very important. Forgetting to fill in it will
probably result in serious consequences.
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
45/49
Table of Contents
Overview
Project Survey Process
Project Environment Survey Guide
RNC Project Survey Guide
Quality Control of Project Survey
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
46/49
Quality Control of Project Survey
Quality is the center of any work.
The quality of the survey must be ensured.
The quality of the project survey should be ensured in two
ways:
Process quality
Document quality
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
47/49
Process Quality Control
Every step must be carried out according to the project survey process.
Project-related information should be collected carefully. Project
requirements, including general and key tasks, should be understood
thoroughly.
The project survey process must be strictly followed. The survey should be
scheduled and planned reasonably to ensure high efficiency.
The survey should be conducted together with the customer to obtain
accurate original information about the site and understand special
requirements and situations. Countermeasures should be planned to avoid
emergencies during the survey.
Every possible resource should be fully used during the survey based on a
good cooperation with the local ZTE office.
Site-related data should be measured and reorded accurately. All sites
should be designed accurately to avoid delay or waiting due to
7/27/2019 RNC Equipment Survey Process and Environmental Acceptance
48/49
Document Quality Control
Document reflects the quality of your work.
Integrity: Ensure the integrity of the documents.
Accuracy: Ensure the accuracy of the documents.
Timeliness: Ensure the timeliness of the documents.