March 18, 2014 1 M. Paul Friedberg and Partners / MPFP LLC Waterfront Commission Draft Review Robinson Terminal South

Robinson Terminal South

  • Upload
    lammien

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Robinson Terminal South

March 18, 2014

1

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Robinson Terminal South

Page 2: Robinson Terminal South

March 18, 2014

2

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Development Team

Developer: EYA

Equity Partner: JBG

Architect: Shalom Baranes Associates

Landscape Architect: M. Paul Freidberg Partners

Land Use Counsel: McGuireWoods

Civil Engineer: Bohler

Marine Engineer: Moffat & Nichol

Traffic & Parking: Wells and Associates

Acoustical Engineer: Polysonics

Archeological: Wetlands Studies & Solutions

Historian: History Matters

Page 3: Robinson Terminal South

March 18, 2014

3

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

AERIAL

Page 4: Robinson Terminal South

March 18, 2014

4

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Land Area

Waterfront Plan

Actual/Proposed

Site Area (acres) 3.85 3.08

Development (sqft)

380,529 280,000 ±

FAR 2.32 2.1 ±

Units 115 92

* Parcels being acquired by EYA

* Parcels already transferred to City

* Riparian rights acquired by EYA

*

*

***

Page 5: Robinson Terminal South

March 18, 2014

5

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Public Priorities Identified in Plan

• Provide Active Public Uses Along the Waterfront

• Raise Site Elevation / Floodplain

• Extend Strand South and West to Union St

• Improve Pier

• Redevelop 2 Duke Street

• Contribute $9 / SqFt to Offsite Proffers to Fund the Waterfront Plan

Page 6: Robinson Terminal South

March 18, 2014

6

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Concept Plan Considerations

• Overall Density

• Types of Uses and Locations of Uses

• 50’ Height Limit

• North / South Location of the Strand

• Preservation of 2 Duke St

• Location of Promenade

• Raise the Site and Remap the Floodplain

Page 7: Robinson Terminal South

March 18, 2014

7

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Comparison of EYA Concept Submission and Draft Plan

Page 8: Robinson Terminal South

March 18, 2014

8

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

CONCEPT PLAN GROUND FLOOR USES AND BUILDING ENTRIES

Building Entries

LEGEND

Page 9: Robinson Terminal South

March 18, 2014

9

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Connectivity

• Fluid Pedestrian Connection to

town, through the Strand the

Promenade and Pier

• Pedestrianized Streets as

Programmable Open Space

LEGEND

Pedestrian Circulation

PEDESTRIAN CONNECTIVITY AND MASSING

Page 10: Robinson Terminal South

March 18, 2014

10

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Passive Open Space

Active Open/Commercial Space

Programmable Open

Space

LEGEND

Promenade/Linear Open Space

DIVERSITY OF PUBLIC OPEN SPACES

Page 11: Robinson Terminal South

March 18, 2014

11

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

PROMENADE

Page 12: Robinson Terminal South

March 18, 2014

12

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

PASSIVE OPEN SPACES

Page 13: Robinson Terminal South

March 18, 2014

13

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

ACTIVE OPEN/COMMERCIAL SPACES

Page 14: Robinson Terminal South

March 18, 2014

14

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

PROGRAMMABLE OPEN SPACES

Page 15: Robinson Terminal South

March 18, 2014

15

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

EYA Concept Massing Plan

Page 16: Robinson Terminal South

March 18, 2014

16

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Robinson Terminal South Timeline

Waterfront Commission & Community Outreach* Begin Spring 2014

Board of Architectural Review Work Sessions* Begin April 2014

File DSUP Application Summer/Fall 2014

Planning Commission Hearing Fall /Winter 2014

City Council Hearing Winter 2014/2015

Demolition/Archeology/Flood Plain Process Begin Spring 2015

Construction Begin Spring 2016

First Occupancy Summer 2017

*Ongoing process

Page 17: Robinson Terminal South

March 18, 2014

17

M. Paul Friedberg and Partners / MPFP LLCWaterfront Commission Draft Review

Concept Plan Riverfront Promenade Rendering