Upload
sureshknit03
View
225
Download
0
Embed Size (px)
Citation preview
8/10/2019 Rollout CDR Project040608
1/43
CDR Based Customer
Care and Convergent
Billing
Greetings to
All Participants
8/10/2019 Rollout CDR Project040608
2/43
Inventory
Cu
stomerCare
Customer Care
Billing
Rating
Payments
Report
Generation
DATABASE
Printing System/
Print Vendor
Payment Interfaces
Cr Card/Banks/Chq etc
.
Web Self Care
Claearing House
or
Other Sources
Network
Self CareAAA
Security
8/10/2019 Rollout CDR Project040608
3/43
4 data centres (Hyderabad, Pune,
Chandigarh, Kolkata)
Proof Of Concept : 9 months
Roll out phase; 9 months
Two System Integrators
2 yrs warranty; 5 yrs. AMC
South & East CSG Kenan for billing and
mediation.
All the operational and business
processes are to be integrated to manage
entire business of BSNL.
8/10/2019 Rollout CDR Project040608
4/43
Tender divided into two
Set of two tenders for servers and
software M/s TCS and M/s HCL
The second tender exclusively for
STORAGE.
One vendor selected for all the zones -
WIPRO
8/10/2019 Rollout CDR Project040608
5/43
Requirements
Switches support 100% CDR generation
have storage of 7 days CDRs On-Line data transfer from switches a
must.
Same billing solution will also supportmeter based billing
Provision of X.25 accessories, software,cable on NT Switches
All 256P RAX/512P SBM has to beconverted into AN-RAX
8/10/2019 Rollout CDR Project040608
6/43
Requirements
Magnetic Tape Emulator (MTE) required for
E-10B switches; is part of the tender.
75% of the CSR equipment through reallocation
MPLS based NIB-II network shall be utilised.
Setting up call center not part of project
Responsibility of setting up of customer care
center with SSA
Anti virus for existing PCs and new PCs
(procured by SSAs) to be purchased by
circles/SSAs
8/10/2019 Rollout CDR Project040608
7/43
Requirements
SSA will form the basic unit for roll out
Data center operational responsibility withBSNL CGM IT circle.
Infrastructure responsibility with respective
circles.
Centralized Data Center wise IVRS planned.
Adequate training for BSNL personnel
8/10/2019 Rollout CDR Project040608
8/43
Benefitsofproposedsolution
Move from telephone based system to Customer
based system Accurate and timely invoicing of call details to
generate error free bills
Supports different tariffs, different Billing
cycles, different discounting schemes fordifferent category of subscribers.
Pre-paid and Post Paid integration possible
Easy implementation of change in business
policies and rules. Host of online services, online query and prompt
customer response
f f
8/10/2019 Rollout CDR Project040608
9/43
Benefitsofproposedsolution
Advanced Rating Capability peak rate, off-
peak rate, special days, tiered rating No Need of charge-configuration at switch
level
On demand itemized call detail
Advance Discounting Capability CUG,F&F, Cross product, double set discount(e.g.10% off on rentals if STD calls exceed
500mins.) High Usage monitoring
Flexible bill cycle
Accounting
8/10/2019 Rollout CDR Project040608
10/43
CDR Sub
Project
Data Center CDR Project POC Phase Roll out
Phase
1.1 South CDR Project 1 4 SSA (Hyderabad, Bangalore,
Thiruananthpuram, Chennai,
66 SSAs
1.2 East CDR Project 1 8 SSA (Kolkata, Patna ,Kamrup, Ranchi,
Raipur, Agartala, Bhuvaneshwar,
Kharagpur)
64 SSAs
2.1 North CDR Project 2 7 SSAs ( Chandigarh, Ambala, Lucknow ,
Meerut, Shimla, Dehradun, Jammu )*
79
2.2 West CDR Project 2 4 SSAs (Kalyan, Ahmedabad, Bhopal,
Jaipur)
101
Implementationintwophases
8/10/2019 Rollout CDR Project040608
11/43
Whatwearebuyinginthisproject
DC class servers
Edge class servers
Network IVRS, CTI, ACD, IP-EPABX, IP Phones
PCs, printers
Laptops (for Data centre alone) Physical security (for Data centre alone)
UPS(for data centre alone)
8/10/2019 Rollout CDR Project040608
12/43
Whatwearebuyinginthisproject
Billing, Accounting, Mediation, Provisioning,
Bill formatter, RA, CRM, (FRS), IM, DQ,
WSC, EMS, EAI, RDBMS, Security systems(Logical), IOBAS and FMS.
Services
Data centre operation during wty and AMC.
8/10/2019 Rollout CDR Project040608
13/43
SOUTH ZONE
/CENTRALPOINT
NORTH ZONE
WEST ZONE
EAST ZONE
Invoice for child
account1 to South Zone.
Invoice for child
account2 to South
Zone.
Invoice for child
account3 to South
Zone.
CorporateBillingCustom integration to synchronize
data across zones
Regular bill runs for corporate
accounts in their respective zones
Transfer of invoice data to
centralized South zone
Application of bulk discounts and
single bill for corporates
Update different zones with
proportional data.
Transfer of payments/adjustments
from/to zones
Other
Billing
Systems
8/10/2019 Rollout CDR Project040608
14/43
SummarizedSchedule
of Requirement NorthWestApplication Software Server Type Network Component
Billing Solution(Convergys) DC Class Servers Exchange Router
Mediation (Intec)Blade/Midrange Server Managed Exchange Ethernet
Switch
Provisioning (Clarity) Stand-Alone Servers Ethernet Extender
EAI (Oracle Fusion ware) Security Component Remote Router
EMS (HPOV) Data Center Firewall (Nortel) Ethernet Hub
CRM (SAP) Intrusion Detection System Aggregation Router
Web Self Care (SAP) Network IDS, Host Based IDS Central Router
DQ (BTS Logic) Anti-Virus System Backbone Router
Oracle RDBMSVulnerability Assessment & Policy
Compliance System
Data Center Ethernet Switch
Type I
IVRS (Nortel)
Server Access Control System
(ACS)
Data Center Ethernet Switch
Type 2
Enterprise Reporting Software
(Fortune IT)
User Management System Internet Router
Electronic Stapling (TCS) Security Device Management
System
Remote Access Server (RAS)
IOBAS (Intec) & FMS (Neural)
RA(Connectiva)
Access control System, Door
Controller, Smart Card Reader,Rodent Management System
Data Center Router
8/10/2019 Rollout CDR Project040608
15/43
CollectionMethodologyofCDRs
BackboneRouter Backbone
Router
E3/STM-1E3/STM-1
Data Center
FirewallEthS
WITCH
NIDS
MediationSystem
SSA
E1
AggregationRouter
(Optional)
NIB MPLS VPN
Network
Edge Rtr
E1
Edge Rtr
Edge Rtr
Edge RtrEdge Rtr
Edge Rtr
AggregationRouter
(Optional)
E1
PSTNSwt.
LE Router
LocalExchangeE1
LE Router
PSTN
Swt.
Call
Made
Call
Received
Call
Complete
d
CDR
Generate
d
MTE
CDOT
CES
8/10/2019 Rollout CDR Project040608
16/43
CDR
Collector
RAS AAA
Ethernet Switch Type 2
NIB-II MPLS
Network
InternetInternet Router
Firewall
Ethernet Switch Type 2
Internet/Web Servers
Ethernet
Switch Type 2
Workstations
IDSData Center Router
Ethernet
Switch Type 1
Firewall
Backbone Router
Server Farm
DC Class and Blades
DataCenterNetworkOverview
8/10/2019 Rollout CDR Project040608
17/43
DataCenterNetworkOverview
Exchange routertwo connections to exchange
for CDR collection and service provisioningtwo WAN connections.
Aggregation routers in case of star topology.
LAN extender/Remote routerfor extending LAN
from LE to CSR and RLUs
Aggregation routers connected to Edge routers of
MPLS VPN.
Central routers (optional)between Aggregation
routers/LE routers and Edge routers.
Backbone Routers(two in each DC) for connecting
DC to MPLS VPN
8/10/2019 Rollout CDR Project040608
18/43
DataCenterNetworkOverview
Data Centre routers termination of all data
traffic in the billing network. X.25 serialconnectivity to CDR collectors; connected tothe Backbone routers.
Managed ethernet switch, CSR ethernetswitch, Data centre ethernet switches (Type I
and Type II), Work station ethernet switch atDC.
Internet Routerat DC for internetconnectivity to the DC.
RASfor connectivity for remote CSRs.
T i l E h R t
8/10/2019 Rollout CDR Project040608
19/43
Typical Exchange Router
Connectivity
BA
NIB-2 Edge Router
Exchange Router
E1 link
Aggregation Router
Exchange Level Connectivity (through Aggregation Router)
8/10/2019 Rollout CDR Project040608
20/43
8/10/2019 Rollout CDR Project040608
21/43
Zone-wise Exchange Router
NIB-2Connectivity
Exchange
Ethernet Switch
Ethernet
Extender
Ethernet
Extender
EthernetHub
E1 Link
Exchange
RouterPSTN
SWITCH
Serial link for CDR
Serial link for Service
Provisioning
CSRs
CSRs
LOCAL EXCHANGE
Remote Station
Local Exchange ConnectivityE1 Links
8/10/2019 Rollout CDR Project040608
22/43
Zone-wise Exchange Router
NIB-2 Connectivity
Exchange
Ethernet Switch
Ethernet
Extender
Ethernet
Extender
EthernetHub
E1 Link
Exchange
RouterPSTN
SWITCH
Serial link for CDR
Serial link for Service
Provisioning
CSRs
CSRs
LOCAL EXCHANGE
Remote Station
Local Exchange ConnectivityE1 Links
RemoteRouter
8/10/2019 Rollout CDR Project040608
23/43
ReuseofexistingCSRnetwork
Existing network
Central
routerTo MPLS
Network
Local exchange
router
To MPLS
Network
8/10/2019 Rollout CDR Project040608
24/43
DataCenterNetworkArchitecture
S
8/10/2019 Rollout CDR Project040608
25/43
Servers
Data centre class servers Billing and Accounting (Including Rating, OM (if part of
Billing) and all other related functionalities). Revenue assurance
Mediation
Provisioning
EAI
CRM (Including CHS, WSC, OM and all otherrelated functionalities)
Directory Enquiry
EMS
IOBAS FMS
Backup
High availability
S
8/10/2019 Rollout CDR Project040608
26/43
Servers
Edge class servers
EMS Gateways
HTTP servers
SMTP servers
Print Servers
AAA Servers
Logical Security Elements
Network Device Management Servers DNS Servers
IVRS
Proxies, etc
Data centre Servers
8/10/2019 Rollout CDR Project040608
27/43
DatacentreServers Sizing as per ISV recommendation
All applications shall fail over on to High
availability Server in separate partitions inN+1 configuration
Shall be 64 Bit multiprocessing UNIX Servers
With minimum 64 cores having at least 1.5GHz Processing speed.
Support multiple partitions with 4 GB DDR2memory per core
At least two numbers of 4 Gbps FiberChannel adapter.
Database partitions shall have minimum of 4fibre channel adapter per partition.
Edge class Servers
8/10/2019 Rollout CDR Project040608
28/43
EdgeclassServers 32/ 64 Bit processor of 3.2/ 1.6 GHz
based with multiprocessing capabilities
Min 2 processors
Min 4 GB DDR2 ECC SDRAM
2 x 72 GB internal SCSI Hard Disk
Dual Fibre Channel Ports per shelf forpublic interconnect to SAN with 1+1redundancy.
PC based Management Consoles for DCclass servers and Edge servers will beconnected to the servers using dedicatedEthernet switched network
IVRS
8/10/2019 Rollout CDR Project040608
29/43
IVRS Automatic Telephone Fault Booking &
Clearance Service
Automatic Bill Enquiry & PaymentReminder Service
Automatic Changed Number Information
& Bulk Changed NumberAnnouncement Service
Automatic Trunk Call Booking Service
Interactive Commercial Inquiry & SpecialServices Inquiry
Interactive Telephone ConnectionBooking And Status Enquiry Service
8/10/2019 Rollout CDR Project040608
30/43
BSNL PSTN Cloud
E1R2/E1PRI
IPEP
AB
X
Call Center 1Call Center 2
WAN
IV
RS
E1R
2/E1
PRI
Data Center LAN
CR
M
CT
I
Ser
ver
Call Transfer To Agent
Web Self Care (WSC)
8/10/2019 Rollout CDR Project040608
31/43
Web Self Care (WSC) A one-stop facility (web access) to the individual
subscribers as well as corporate customers
Post a request for activation or deactivation of aservice
Electronic Bill presentment and payment
Trouble Ticketing
Integration with CRM, existing web portal, GSMCRM etc.
Data encryption, Authentication, Authorisation,
Account access management, Logging andmonitoring all system access, Resourceallocation management, User access privilegesmanagement etc.
Electronic Stapling
8/10/2019 Rollout CDR Project040608
32/43
ElectronicStapling Single bill for corporate customers as
well as individual customers covering
multiple services provided acrossdifferent geographic locations in India.
Creation of one bill for corporate
customers with bulk discounting Process one payment against the single
corporate bill and do end to endaccounting for all electronically stapledbills taken from other billing systems.
Work in conjunction with other Billingsystems.
Disaster Recovery
8/10/2019 Rollout CDR Project040608
33/43
DisasterRecovery An event that makes the continuation of
normal functions of a data centre impossible.
North DC will be DR for West DC and viceversa
South DC will be DR for East DC and viceversa
The degradation of performance for theapplications failing over to the DR site ispermitted up to 50%
Collection servers of mediation system shallhave 100% redundancy to take care of bothsites
Possible to update the secondary by thePrimary on line or at configurable intervals insteps of at least 15 minutes.
CRM Features
8/10/2019 Rollout CDR Project040608
34/43
CRMFeatures
Single Platform for all CRM related activities like Marketing,Sales, Orders, Service Requests and Analysis for all product
lines like LL,BB, Leased Lines etc. Facility for Customers to manage their accounts/services thru
various Channels like Phone, Web, Mail, CSR.
Application offers operations/control/visibility at Zonal levelwith flexibility to manage even at SSA level.
Unified Database model which avoids redundancy of tablesin multiple Databases, there by improving over allPerformance.
Sophisticated End-to-end integrated solution incorporating
Industry standard Best Practices with customer/employeeappealing GUI for Ease of use which enhances CustomerExperience & Satisfaction
360Customer View to proactively plan campaigns, cross-sell/up-sell and serve better
CRM Features
8/10/2019 Rollout CDR Project040608
35/43
CRMFeatures Integrated view for Customer Care and Bill
View/Payment which gives complete account profile.E2E functionality for Corporate Customers.
Minimal effort to configure/revert back products andpackages
Knowledge base to maintain Customers Complainthistory and resolutions.
Automated and well-structured workflow processes(provisioning/escalations/ complaints) reducingmanual interventions there by avoiding delays/errorswith time/event triggered Alerts.
Closed-loop Marketing Processes by optimizingresources/budget and integrated with executingpoints.
Aiding business decisions with predictive as well ashistorical analysis for managing Churn and planning
Retention Campaigns
Billing Features
8/10/2019 Rollout CDR Project040608
36/43
BillingFeatures
Convergent billing
Ease of configuring plans Integration with other systems like
CRM, Bill formatter etc;
CDR based billing Near real time rating
Support for complex discounts Aggregate usage rating
Complex tax requirements
Provisioning Features
8/10/2019 Rollout CDR Project040608
37/43
ProvisioningFeatures Customer related services can be activated
instantaneously on different network elements.
Switch activation is fully automatic
Line testing is completely automatic
Offers a uniform interface to the service order
management application. Physical and logical network inventory details
are maintained in centralized database.
Flexible in defining new provisioning workflows
Highly scalable system
Optimized performance
Data Migration
8/10/2019 Rollout CDR Project040608
38/43
DataMigration Finalization of all closed cases
Thorough review of outstanding write off
fictitious outstandings; Recon between billing systems, switches wrt
working, closed and DNP connections.
Verification of data related to serviceconnections, TAC members, MP, VIPconnections, PCOs.
Deposits recon between amount available vscategory code, plan code;
Customer inventory wrt Outdoor details, MDFparticulars, NE and customer address.
Present Status of West D C
8/10/2019 Rollout CDR Project040608
39/43
Present Status of West D.C. Civil and Electrical works are completed
except for BMS room
All Hardware has been received (except forCES and MTE)
All Software have been received (except forDQ)
Servers and storage equipments arephysically installed
UPS and Batteries are physically installed
One set of UPS and batteries shall be readyfor A/T by 7th June.
SRS documents are being finalised by C.O.
8/10/2019 Rollout CDR Project040608
40/43
ConnectivityofDC
C i i R i f POC h
8/10/2019 Rollout CDR Project040608
41/43
IVRS
Backbone
Router
Backbone
Router
Internet
Router
InternetRouter
Chandigarh
Data Centre
DataCentre
Pune
NIB MKR
Mumbai Via
MHS(WTR)
NIB MKRSTM 1 Link
STM 1 Link
TAX
Chinchwad
STM 1 Link
STM 1 Link
STM 1 Link for CDR
STM 1 Link for DC
Via MPLS
STM 1 Link for CDR
STM 1 Link for DC
ConnectivityRequirementforPOCphase
Summary of Requirement
A) 4 STM-1 Links to
MKR i.e., 2 Nos for
Internet, 1 No for CDR
collection and 1 No for
DR
B) 2 STM-1 Links to
Mumbai via MHS i.e., 1No for CDR collection and
1 No for DR
C) 2 STM 1 Links to
Chinchwad Tax for IVRS
CDR
DR
8/10/2019 Rollout CDR Project040608
42/43
Chandigarh
Data Centre
IVRS
Backbone
Router
Backbone
Router
Internet
Router
InternetRouter
DataCentre
Pune
NIB MKR
NIB MKR
STM 1 Link
TAX
Chinchwad
STM 1 Link
STM 1 Link for DC
STM 1 Link for DR
Via MPLS
ImmediateRequirementforDataCentre
Summary of Immediate
Requirement
A) 3 STM-1 Links toMKR i.e., 1 No for
Internet, 1 No for
CDR collection and
1 No for DR
B) 1 STM-1 Link to
Chinchwad Tax for
IVRS
8/10/2019 Rollout CDR Project040608
43/43