www.howden.com Roots TM 827 DVJ gear end drive blower Installation Operation & Maintenance Manual

RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

www.howden.com

RootsTM 827 DVJ gear end drive blowerInstallation Operation & Maintenance Manual

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 1 15/02/2016 12:15:33

Page 2: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

2 GEA30580_Rev_11.15

ContentsInformation Summary ������������������������������������������������2

Warranty and Limitation of Liability �����������������������������2

Safety Precautions �����������������������������������������������������3

Installation ������������������������������������������������������������� 3-5

Lubrication ����������������������������������������������������������������7

Operation �������������������������������������������������������������� 7-8

Vibration Assessment Criteria ������������������������������������8

Troubleshooting �������������������������������������������������������11

• Check shipment for damage� If found, file claim with carrier and notify Howden�

• Unpack shipment carefully and check contents against packing List� Notify Howden if a shortage appears�

• Store in a clean, dry location until ready for installation� Lift by methods discussed under installation to avoid straining or distorting the equipment� Keep covers on all openings� Protect against weather and corrosion if outdoor storage is necessary�

• Read LIMITATIONS and INSTALLATION sections in this manual and complete the installation�

• Provide for adequate safeguards against accidents to persons working on or near the equipment during both installation and operation� SEE SAFETY PRECAUTIONS�

• Install all equipment correctly� Foundation design must be adequate and piping carefully done� Use recommended accessories for operating protection�

• Make sure both driving and driven equipment is correctly lubricated before start-up� See LUBRICATION�

• Read starting checkpoints under OPERATION� Run equipment briefly to check for installation errors and make corrections� Follow with a trial run under normal operating conditions�

• In event of trouble during installation or operation, do not attempt repairs of Roots equipment� Notify nearest Howden Sales Office giving all nameplate information plus an outline of operating conditions and a description of the trouble�

• Unauthorized attempts at equipment repair may void Manufacturer’s warranty� Units out of warranty may be repaired or adjusted by the owner� It is recommended that such work be limited to the operations described this manual, using Factory Parts� Good inspection and maintenance practices should reduce the need for repairs�

Do These Things To Get The Most From Your ROOTS™ Blower

Roots products are sold subject to the current General Terms of Sale, ES104 and Warranty Policy WP-5020.

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 2 15/02/2016 12:15:33

Page 3: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

3GEA30580_Rev_11.15

Foreword A blower is a precision engineering product with very fine clearances between the twin impellers and between the impellers and the casing� As there is no contact between the moving parts internal lubrication is unnecessary� This ensures that relatively oil free air is delivered at all times�

Warning

It is essential that anyone involved in the instal-lation and operation of positive displacement air blowers, must have read and understood these instructions. There is a risk of damage and injury resulting from improper handling and operation.

Safety PrecautionsFor equipment covered specifically or indirectly in this instruction book, it is important that all personnel observe safety precautions to minimize the chance of injury� Among many considerations, the following should particularly be noted�

• Do not use V-belt drive�

• Blower casing and associated piping or acces-sories may become hot enough to cause major skin burns on contact�

• Operate blower only per nameplate ratings and limits listed in this manual�

• Internal and external rotating parts of the blower and driving equipment can produce serious physical injuries� Do not reach into any opening in the blower while it is operating, or while subject to accidental starting� Cover external moving parts with adequate guards�

• Disconnect power per lock out tag out procedure before doing any work and avoid bypassing or rendering inoperative any safety or protective devices�

• If blower is operated with piping disconnected,

place a course screen over the inlet, jet port and discharge� Avoid standing in the path of the air streams� Wear appropriate PPE�

• Stay clear of open piping�• Stay clear of blast from pressure relief valves and

the suction area of vacuum relief valves�• Avoid extended exposure in close proximity to

machinery that exceeds safe noise levels�• Use proper care and good procedures in handling,

lifting, installing, operating and maintaining the equipment�

• Casing pressure must not exceed 25-PSI (172 kPa) gauge� Do not pressure vented cavities from an external source, nor restrict the vents�

• Do not use air blowers on explosive or hazardous gases or liquids�

• If condensate or water can collect in blower casing, must drain prior to start�

• Other potential hazards to safety may also be associated with operation of this equipment� All personnel working in or passing through the area should be warned by signs and trained to exercise adequate general safety precautions�

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 3 15/02/2016 12:15:34

Page 4: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

4 GEA30580_Rev_11.15

InstallationDo not V-belt drive the 827 DVJ which is Gear End driven� The addition of belt forces could cause undesired and uneven gear contact and damage the blower�

A temporary cover is installed on one jet port along with a permanent cover on the other at the factory� A silencer must be installed in place of the temporary cover before operating the blower; however, the permanent cover and silencer locations may be exchanged if required by the installation�

The permanent cover must be removed, both jet plenums inspected and cleaned for foreign material, then the permanent cover and silencer installed in the desired locations before operating the blower� Full size jet and discharge silencers are desirable, however the jet silencer may be reduced one nominal size providing either the vacuum level less than 18�5 “Hg or if the operating speed is below 60% of maximum blower speed� Both jet and discharge silencers may be reduced one nominal size in applications with vacuum levels is less than 18�5 “Hg and speed is less than 60% of maximum blower speed�

Avoid opening blower protective covers until ready to start installation, as protection will be lost quickly by evaporation�

If internal protection is required due to rust or corrosion, removal of the blower from service, or the internal protection furnished by factory at time of shipment has been removed do not use a liquid preservative of any kind on the coated surfaces� Capsules of vapor inhibitor such as ZeRust VC1-1 may be used internally by sealing all machine openings with vapor barrier paper or tape�

Blowers in long storage should be not subject to excessive vibration and the blower drive shaft should be rotated 3 to 4 revolutions every two weeks� Prior to start-up, remove flange covers on both inlet and discharge and inspect internals to insure absence of rust or debris�

This blower has several coats of a fine-grained, natural graphite coating applied to the internal surfaces� The coating is applied after the machine’s internal clear-ances and impeller timing are established� The effect of coating is to close up internal clearances, decrease slip, and increase flow and efficiency at any given speed� Exhaust air may carry some coating particles�

Blowers with internal abradable coating are for use with clean, dry air only�

After coating, it is not practical to try to measure clearances involving these surfaces before or after

running the blower� After coating and before running some coated surfaces may even be touching� After running the coated surfaces may have abraded areas and scratches, due to run-in contact between the surfaces�

Do not attempt to measure clearances involving coated surfaces as a basis of setting impeller in rela-tion to the cylinder bore, head plates, or each other (fronts and backs)� Clearance settings can be made accurately only with uncoated parts�

Where internal inspection indicates a need for cleaning coated surfaces of dirt, dust, etc�, wipe clean only with a clean dry rag� Do not use a solvent or cleaner of any kind or allow solvent or cleaner to reach these surfaces while cleaning uncoated surfaces�

Cleaning, coating & curing procedure for applying abradable coating

General: These procedures are for coating new uncoated repair parts, spot repair of coating, or renewal� If setting clearances and timing are involved, this should be done before the new parts are coated� Subsequent cleaning and coating may involve at least partial disassembly for proper cleaning without damaging the coating of other original parts still coated, and to apply coating properly�

Normally, for new uncoated surfaces, three coats are applied and each coat must cure properly�

Cleaning before coating

For new uncoated surfaces, apply cleaner with a clean, “soaked” rag� Apply the cleaner liberally, allow to set for a minute or two and wipe off� Avoid cleaning surfaces not to be coated�

Spot repair to be done only with a clean dry rag�

Preparation and coating

Please follow the directions on the aerosol graphite lubricant container pertaining to preparation, applica-tion, ventilation, and inflammability� Typically, one coat is applied, but when multiple coats are necessary each coat must be completely cured per the proce-dure described below before the next application�

Each layer of coating should be applied as evenly as possible� The best distance from the spray nozzle to the surface should be 8 to 12 inches� Try to maintain this distance wherever space conditions allow�”

Curing procedure

Note that coated parts may feel dry or “tack free” after few minutes, but the coat will not have the proper cure that is required�

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 4 15/02/2016 12:15:34

Page 5: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

5GEA30580_Rev_11.15

“Two alternative curing methods are acceptable� Let set for 1-1/2 hours minimum at room temperature ≥ 70°F or if coating is applied below 70°F, allow to cure overnight in shop ambient temperatures (not warehouse or outdoors)�”

Check for rotation

Complete blower build if not already assembled� Turn over drive shaft by hand until the rotation is free� Do not try to free up the blower by coupled or belted drive, and do not try to spin the rotors with shop air� Do not attempt to use any kind of solvent or cleaner to partially remove coating, as this could ruin all the coating�

Complete removal of coating

This is for complete removal (to bare metal) of coating and may require some blower disassembly (depend-ing on blower size and accessibility) for access to the coated parts and any overspray� Apply removal fluid liberally with a clean “soaked” rag� Vigorously rubbing with the rag and scraping of the softened coating is required to clean the surfaces down to bare metal� The amount of effort required will vary depending upon the solvent used� Protect uncoated surfaces from rust�

Because of the completely enclosed blower design, location of the installation is generally not a critical matter� A clean, dry and protected indoor location is normally give satisfactory service� Important require-ments are that the correct grade of lubrication oil be provided for expected temperatures, for expected temperatures, and that the blower be located so that routine checking and servicing can be handled conveniently after installation� The effect of the location on driver and accessory equipment must be also be considered�

Supervision of the installation by a Factory Service Engineer is not usually required for these blowers� Workers with experience in installing light-medium weight machinery should be able to produce satisfac-tory results� Handling of the equipment needs to be accomplished with care, and in compliance with safe practices� Blower mounting must be solid, without strain or twist, and air piping mjust be clean, accurately aligned and properly connected�

For handling the blower alone, use lifting lugs bolted into the top of the headplates� Test them first for tightness and fractures by tapping with a hammer� In lifting, keep the direction of cable pull on these bolts as

nearly vertical as possible�

When blower is furnished mounted on a baseplate, with or without a driver, use of lifting slings passing under the base flange is required� Arrange these slings so that no strains are placed on the blower casing, mounting feet, or on any mounted accessory equip-ment� DO NOT use the lifting lugs in the top of the headplates.

Before starting the installation, remove plugs, covers or seals from blower inlet and discharge connections and inspect the interior the interior completely for dirt or foreign material� Anti-rust compound on the connection flanges and drive shaft extension may also be removed by this time with solvent� Then cover the flanges again to keep out dirt until ready to connect the air piping� The corrosion inhibitor used will vaporize and disappear during operation�

Care, plus consideration of all possible problems, will pay dividends when arranging the blower mounting� This is especially true when the blower is a “bare” unit, furnished without a baseplate� The convenient proce-dure may be to mount such a unit directly on a floor or small concrete pad but this generally produces the least satisfactory results� It causes the most problems in leveling and alignment�

Direct use of structural framing members is also not a recommended mounting� If unavoidable, the members must be rigidly reinforced when part of a building, and spring type mountings should not be use� Noise transmission can usually be reduced by use of a cork insulating pad 1 to 2 inches (35 to 50 mm) thick� The pad should be supported by a full steel plate attached to the structure, with a rigid concrete slab on top of the cork to carry the blower and driver�

For a blower without a base, it is recommended that a well-anchored and carefully leveled steel or cast iron mounting plate be provided at the installation point� The plate should be at least 1 inch (925 mm) thick, with its tip surface machined flat, and large enough to provide leveling areas at one side and one end after the blower is mounted� It should have properly sized studs or tapped holes located to match the blower foot drilling� As an alternative, smaller plates at each end of the blower may be used� This is more complicated, usually makes leveling more difficult and can produce twist or strains in the blower� Use of a high quality machinist’s level is important�

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 5 15/02/2016 12:15:34

Page 6: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

6 GEA30580_Rev_11.15

With the mounting plate in place and leveled set the blower on it without bolting and check for rocking� If it is not solid, determine the total thickness of shims required under one foot to stop the rocking� Place half of this under each of the diagonally opposite short feet, and tighten the mounting studs or screws� Rotate the drive shaft to make sure the impellers still turn freely� If the blower is to be direct coupled to a driving motor, consider the height of the motor shaft and the necessity for it to be aligned very accurately with the blower shaft� The best arrangement is for the blower to be bolted directly to the mounting plate while the driver is on shims of at least 1/8-inch (3 mm) thickness� This allows adjustment of motor position in final shaft alignment by varying the shim thickness�

When the blower and driver have been factory mounted on a common baseplate, the assembly will have been properly aligned and is to be treated as a unit for leveling purposes� Satisfactory installation can be obtained by setting the baseplate on a concrete slab that is rigid and free of vibration, and leveling the tops of the base carefully in two directions so that it is free of twist� The slab must be provided with suitable anchor bolts� The use of grouting under and partly inside the base after it has been carefully leveled by shimming, is recommended�

It is possible for a base-mounted assembly to become twisted during shipment, thus disturbing the original alignment� For this reason, make the following checks after the base has been leveled and bolted down� Disconnect the drive and rotate the blower shaft by hand� It should turn freely at all points� Loosen the blower foot hold-down screws and deter-mine whether all feet are evenly in contact with base� If not, insert shims as required and again check for free impeller rotation� Finally, if blower is direct coupled to the driver, check shaft and coupling alignment carefully and make any necessary corrections�

When the unit is to be directly coupled to its driver, the driver RPM must be selected or governed so as not to exceed the maximum speed rating of the blower� Refer to LIMITATIONS for allowable speeds for various blower sizes� A flexible type coupling should always be used to connect the driver and blower shafts� The standard unit IS NOT DESIGNED for use for V-Belt Drive�

Coupling halves must be accurately aligned, and a sufficient gap between shaft ends provided so that side strains and end thrust on either shaft are avoided or minimized This will require considerable care in the mounting of the driver� The two shafts must be in as near perfect alignment in all directions as possible, and

the gap must be established with the motor armature on its electrical center if endplay exists�

The following requirements of a good installation are recommended� Coupling halves must be fitted to the two shafts with a line to line through �001 inch interfer-ence fit� Coupling halves must be warmed up, so that only light tapping is required to install them� Maximum deviation in offset alignment of the shafts should not exceed �005 inches (�13 mm) total indicator reading, taken on the two coupling hubs� Maximum deviation from parallel of the inside coupling faces should not exceed �001 inches (�03 mm) when checked at six points around the coupling�

Operating limitations

To establish and maintain continued satisfac-tory performance, Roots blower must be operated within certain approved limiting conditions� The Manufacturer’s warranty is, of course, contingent on such operation�

The DVJ cannot be used in pressure applications as the pressure build-up discharges air outward through the cylinder slots resulting in high loss in blower efficiency and reduction in discharge flow�

Any unnecessary restrictions of discharge flow or atmospheric air inlet to the cylinder slots reduces the cooling air flow and limits blower operation, as the maximum temperature rise will occur below the normal limits of vacuum level�

Note: One cylinder jet port must have a full size inlet silencer with no valve or other restrictions� The other port must have the metal cover plate installed�

Jet and discharge flow restrictions result in increased blower temperature rise and should be checked as a possible cause if internal metal-to-metal contact occurs� Back pressure limits on discharge and vacuum limits on jet are shown in Table 1A� No valves should be used in the jet or discharge pipe�

Some type of protection, such as a filter or screen (1/4” mesh) is necessary to stop foreign particle entry through the jet port� Outside installations may also require some weather protection to prevent the entry of rain or snow� An elbow or some other configuration is desirable to assist in keeping the screen clear of foreign particles and the direct entry of rain or snow�

All recheck points in this manual should be followed with the following additions:

1� Be certain no rags, bolts, or dirt have been left in the cylinder slot inlet plenums�

2� No valves should be installed in the jet or discharge silencer pipe�

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 6 15/02/2016 12:15:34

Page 7: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

7GEA30580_Rev_11.15

The blower is suitable for vacuum operation only� A water manometer should be used on the jet and discharge to assure that the maximum pressure drop has not occurred�

Table 1A

% Max speed RPM

Max jet pressure limit - IN H20

Max discharge pressure limit - IN H20

50% 6�0 6�0

75% 8�0 8�0

100% 10�0 10�0

NOTE: 827 DVJ maximum operating speed is 2400 RPM.

Maximum vacuum is 27 “Hg and maximum temperature rise is

275°F.

Before connecting PIPING, remove any remaining anti-rust compound from blower connections� Pipe used should be no smaller than these connection, and clean new piping throughout is strongly recommended� In addition, make sure it is free of dirt, scale, cuttings, weld beads or foreign materials or any kind� To further guard against damage to the blower, especially when an inlet against damage to the blower, especially when an inlet filter is not used, install a substantial screen of 16 mesh backed with hardware cloth at or near the inlet and jet port connections�

Make provisions to clean this screen of collected debris after a few hours operation� It should be removed when nits usefulness has ended, as the wire will eventually deteriorate and small pieces going into the blower may cause serious damage�

Piping flanges MUST meet the blower connections accurately and squarely� DO NOT attempt to correct misalignment by springing or cramping the pipe� In most cases this will distort the blower casing and cause impeller rubbing� In severe cases it can prevent operation or result in a broken drive shaft� For similar reasons, piping should be supported near the blower to eliminate dead weight strains� Also, if pipe expansion is likely to occur from temperature change, installation of flexible connectors or expansion joints is advisable�

Figure 1 represents in diagram form a blower instal-lation with all accessory items that might be required under various operating conditions� Inlet piping should be completely free of valves or restrictions�1

Need for an inlet silencer will depend on blower speed and pressure, as well as sound-level requirements in the general surroundings� An inlet filter is normally recommended, especially in dusty or sandy locations for blower protection� A discharge silencer is also normally suggested, even though WHISPAIR™ blowers operate at generally lower noise levels than conven-tional lobe-type units� Specific recommendations on silencing can be obtained from Howden�

After piping is completed, and before applying power, rotate the drive shaft by hand again� If it does not move with uniform freedom, look for uneven mounting, piping strain, or coupling misalignment� DO NOT operate the blower at this time unless it has been lubricated per instructions� Read LUBRICATION section�1 For high altitude applications, inlet relief valve may be required to prevent

blower from overheating�

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 7 15/02/2016 12:15:34

Page 8: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

8 GEA30580_Rev_11.15

Figu

re 1

- S

chem

atic

Dia

gram

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 8 15/02/2016 12:15:34

Page 9: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

9GEA30580_Rev_11.15

LubricationA very simple lubrication system is employed in these blowers� All friction parts—gears, bearings and oil seals—are lubricated by the action of oil slingers which dip into the main oil sumps causing oil to splash directly on gears and bearings� Entrance of lubricating oil into the blower air chamber is prevented by the use of double shaft sealing� Lip type seal, located inboard of the bearings in each headplate, effectively retain oil within the sumps� Small leakage that may occur, should the seals wear, passes into a cavity in each headplate that is vented and drained downward� In addition, sealing rings are provided on both shafts where they pass through the inner walls of the headplates� These serve to reduce air leakage into the air chamber and also minimize oil carryover into the air chamber�

Oil sumps on each end of the blower are filled by removing top vent plugs, Item 37, filling until oil reaches the middle of the oil level sight gauge, Item 87 with the BLOWER NOT OPERATING, in order to obtain the correct oil level� Approximate oil quantities required are listed in Table 1� Use a good grade of industrial type non-detergent, rust inhibiting, anti-foaming oil and of correct viscosity per Table 2� For heavy duty service, a synthetic lubricant, such as Synfillm GT synthetic oil (Roots p/n 813-106-), is highly recommended� This synthetic oil has a life expectancy of 4 times that of petroleum based oils�

The level should never be allowed to fall below the level gauge when the blower is operating� Oil level may rise on the gauge during operation, to an extent depending somewhat on oil temperature and blower speed, but it should not be permitted to rise above the top of the oil level gauge�

During the first week of operation, check the oil levels in the oil sumps about once a day, and watch for leaks� Replenish as necessary� Thereafter, an occasional check should be sufficient� It is recom-mended that the oil be changed after initial 100 hours of operation� Frequent oil changing is not required unless the blower is operated in a very dusty loca-tion� Normal life expectancy of petroleum based oils is about 2000 hours with an oil temperature of about 200° F�

OperationBefore operating a blower under power for the first time, recheck the unit and the installation thoroughly to reduce the likelihood of avoidable troubles� Use the following procedure list as a guide, but consider any other special conditions in the installation�

1� Be certain that no bolts, tools, rags or dirt have been left in the blower air chamber�

2� Be certain that inlet piping is free of any debris� If an outdoor intake without filter is used be sure the opening is located so it cannot pick up dirt and is protected by a strong screen or grille� Use of the temporary protective screen at the blower as described under INSTALLATION is strongly recommended�

3� Recheck blower leveling, drive alignment and tightness of all mounting bolts if installation is not recent�

4� Turn drive shaft by hand to make sure impel-lers still rotate without bumping or rubbing at any point�

5� Make sure oil levels in the main oil sumps are correct�

6� Check lubrication of drive� If it is an electric motor, be sure that power is available and that electrical overload devices are installed and workable�

7� Bump blower a few revolutions with driver to check that direction of rotation agrees with arrow near blower shaft, and that both units coast freely to a stop�

After the preceding points are cleared, blower is ready for trial operation under “no-load” conditions as set up under Item 7� The following procedure is suggested to cover this initial operation test period�

(a) Start the blower, let it accelerate to full speed, then shut off� Listen for knocking sounds, both with power on and as speed slows down�

(b) Repeat above, but let blower run 2 or 3 minutes� Check for noises, such as knocking sounds�

(c) Operate blower for about 10 minutes unloaded� Check oil levels� Feel cylinder and headplate surfaces for development of spots too hot to

Table 1 - Approximate Oil Sump Capacities

Blower Frame Size

Gearbox Blind End Cover

Quarts Liters Quarts Liters

827V 2�1 1�0 1�0 0�5

827H 4�8 2�3 2�0 1�0

Table 2 - Lubricant Recommended

Ambient Temperature Viscosity Range SSU @ 100°F (38°C)

Above 90°F (32°C) 320

32° to 90°F (0 to 32°C) 220

0° to 32°F (-18 to 0°C) 100

Below 0°F (-18°C) 68

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 9 15/02/2016 12:15:34

Page 10: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

10 GEA30580_Rev_11.15

touch, indicating impeller rubs� Be aware of any noticeable increase in vibration�

Assuming that all trials have been satisfactory, or that necessary corrections have been made, the blower should now have a final check run of at least one hour under normal operating conditions� After blower is restarted, gradually close inlet valve to apply working vacuum gauge or manometer be connected into the inlet line if not already provided, and that termometers be in both inlet and discharge lines� Readings from these instruments will show whether vacuum or temperature ratings of the blower are being exceeded�

During the final run, check operating conditions frequently and observe the oil levels at reasonable intervals� If excessive noise or local heating develops, shut down immediately and determine the cause� If either vacuum or temperature rise across the blower exceeds the limit specified din this manual, shut down and investigate conditions in the piping system or in the process to which air is being supplied� Refer to the TROUBLESHOOTING CHECKLIST� For

suggestions on various problems that may appear�

The blower should now be ready for continuous duty operation at full load� During the first new days make periodic checks to determine whether all conditions remain steady, or at least acceptable� This may be particularly important if the blower is connected to a process system where conditions can vary� At the first opportunity, stop the blower and clean the temporary inlet and jet port protective screens� If no appreciable amount of debris has collected, the screen may be removed� See comments under INSTALLATION� At this same time, verify leveling, coupling alignment and mounting bolt tightness�

Vibration Assessment CriteriaWith measurements taken at the bearing locations on the housings, an unfiltered vibration of 1�0 in/sec peak is considered an appropriate assessment guide line for rotary lobe blowers rigidly mounted on stiff foundations�

If the blower is operating above this level then the installation must be fully evaluated to determine the source or cause of the vibration, and the cause corrected�

In general, blower vibration levels should be monitored on a regular basis and the vibration trend observed for progressive or sudden change in level� If such a change occurs, the cause should be determined through spectral analysis�

Table 3 - Maximum Allowable Operating Conditions

FrameInlet Vacuum Temperature Rise

Max RPMInches

Hg Mm Hg °F °C

827 27 684 275 152 2400

Note: Discharge back pressure must not exceed 10" H2O

Table 4 - Blower Internal Clearances

Frame Size

Impeller Ends 1Impeller Strip to Cylinder Impeller Lobes Max. Temp. Rise °F

Gear End Opp. G.E. Inlet Center Discharge Fronts Backs

827 �036/�040 �006/�008 �020/�023 �014/�016 �020/�023 �021/�025 �011/�015 275

1 Impellers have “wear in” strips� Impeller strip to case clearances as shown are expected after running the blower, they will not exist at initial blower assembly� Assembly records need not indicate the strip to case clearance values�

Maximum clearance listed is for reference only�

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 10 15/02/2016 12:15:34

Page 11: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

A A91

2244

3536

90

4045 72 2217 19

6363

820

2623

1144

SE

E N

OTE

#6

SE

E N

OTE

#5

SE

CTI

ON

A-A

21

3 12134

1

440 46

16

7

9091

11

2610

6

88A

6262

A

74 1488

14 88

1

5

1610

1027

27

27

2728

28

2828

5429

30 30 33

5859

5657

4849

38

38

38

38

343416

16

2610

6

19S

EE

NO

TE #

13

SE

E N

OTE

#12

SE

E N

OTE

#10

SE

E N

OTE

#10

SE

E N

OTE

#7

SE

E N

OTE

#7

SE

EN

OTE

#3

SE

EN

OTE

#4

SE

E N

OTE

#4

AR

ELE

AS

ED

NO

TES:

1

. D

RIV

E E

ND

CO

VE

R T

O B

E P

INN

ED

TO

HE

AD

PLA

TE A

FTE

R

ALI

GN

ING

SE

AL

BO

RE

TO

SH

AFT

WIT

HIN

.001

"

2

. U

SE

LO

CTI

TE 5

67 O

N A

LL P

IPE

TH

RE

AD

S

3

. A

PP

LY L

OC

TITE

272

TO

SC

RE

W T

HR

EA

DS

& T

OR

QU

E T

O 3

20 F

T-LB

S (4

4.2K

G.M

)

4

. A

PP

LY L

OC

TITE

272

TO

SC

RE

W T

HR

EA

DS

& T

OR

QU

E T

O 2

3 FT

-LB

S (3

.2K

G.M

)

5

. TO

RQ

UE

TO

31

FT-L

BS

(4.3

KG

.M)

6

. TO

RQ

UE

TO

75

FT-L

BS

(10.

4KG

.M)

7

. IT

EM

S 3

4 &

54

MU

ST

BE

INS

TALL

ED

WIT

H O

IL G

RO

OV

E A

T TO

P.

8

. R

EFE

RE

NC

E R

P-9

1T F

OR

AS

SE

MB

LY C

LEA

RA

NC

ES

9

. G

EA

R T

O B

E IN

STA

LLE

D W

ITH

AS

SE

MB

LY T

OO

L TO

AC

HIE

VE

MIN

IMU

M P

US

H-U

P

OF

.068

". G

EA

R F

IT M

US

T B

E F

RE

E O

F O

IL.

1

0. T

OR

QU

E N

UT

TO 5

00 F

T-LB

S (6

9.1K

G.M

) TO

RQ

UE

LO

CK

ING

SC

RE

W T

O 1

6 FT

-LB

S

(2

.2K

G.M

)

1

1. P

RE

PA

RE

PIS

TON

RIN

G G

RO

OV

ES

WIT

H L

IGH

T C

OA

T O

F S

LIP

PLA

TE F

OR

INIT

IAL

B

RE

AK

IN W

EA

R.

1

2. S

LEE

VE

TO

BE

HE

ATE

D T

O 3

00F

PR

IOR

TO

INS

TALL

ATI

ON

ON

SH

AFT

.

1

3. K

EY

IS T

O B

E G

RO

UN

D W

ITH

.001

INTE

RFE

RE

NC

E IN

SH

AFT

& .0

00 IN

TER

FER

EN

CE

IN H

UB

RE

MO

VE

D #

31, O

GE

CO

VE

R P

LUG

BM

S6/

30/1

516

619B

RD

AB

DS

IZE

EDCBA

16

78

910

11

67

89

1011

A CB FED

GF

52

34

1

23

45

FIN

ISH

INµ

INC

HE

S

PU

RC

HA

SE

OR

DE

R:

PR

OJE

CT:

LO

CA

TIO

N:

EQ

UIP

ME

NT

No.

: C

ER

TIFI

ED

BY

: D

ATE

(M/D

/Y): C

ERTI

FIED

CA

D F

OR

MA

TS

OLI

DW

OR

KS

OR

DE

RN

o.E

NG

INE

ER

CO

: S

PE

C S

EC

TIO

N:

T2:

AN

CH

OR

BO

LT L

OC

AT

ION

S ±

.13

BLO

WE

R IN

LET

& D

ISC

HA

RG

L LO

CA

TIO

NS

±.2

5A

LL O

TH

ER

DIM

EN

SIO

NS

RE

FE

RE

NC

ET1

:

T1

THIR

D A

NG

LEP

RO

JEC

TIO

N

M/D

/Y

MA

T'L.

:

Conn

ersv

ille,

IN U

SAP:

765

-827

-920

0 F:

765

-827

-926

6

SH

EE

T 1

OF

1

5/29

/201

5

5/29

/201

5

5/29

/201

5

4"=1

'-0"JJRD

A

JJ

827

DV

J - V

/H G

E D

RV

B

SE

CTI

ON

AL

AS

SE

MB

LYR

C-2

0520

3023

RE

V

GE

OM

ET

RIC

TO

LER

AN

CE

PE

R: E

P93

8

RE

VIS

ION

SB

YD

AT

EM

/D/Y

CH

AN

GE

NO

TIC

EA

PP

SC

ALE

DB

V.

AP

P.

CH

KD

.

DR

.

DA

TE

CO

NF

IDE

NT

IAL

AN

D P

RO

PR

IET

AR

Y:

DO

NO

T S

CA

LE

FO

R D

IME

NS

ION

SA

LL D

IME

NS

ION

S S

HO

WN

IN B

RA

CK

ET

S [

] AR

E M

ILLI

ME

TE

RS

MFG

. RE

F. :

CA

D F

ILE

/ D

IRE

CTO

RY

RC

-205

203A

23 /

XA

SR

PATT

. No.

:

DIM

EN

SIO

NA

L T

OLE

RA

NC

ES

PE

RU

NLE

SS

OT

HE

RW

ISE

SP

EC

IFIE

D

TW

O P

LAC

E D

EC

IMA

LS (

.XX

)---

±.01

5T

HR

EE

PLA

CE

DE

CIM

ALS

(.X

XX

)--±

.005

FR

AC

TIO

NA

L--±

1/64

CH

KD

GTH

IS D

RA

WIN

G IS

CO

NFI

DE

NTI

AL

AN

D IS

TH

E P

RO

PE

RTY

OF

HO

WD

EN

RO

OTS

, LLC

. TH

E D

RA

WIN

G O

R A

NY

PA

RT

THE

RE

OF

MU

ST

NO

T B

E C

OP

IED

OR

OTH

ER

WIS

E R

EP

RO

DU

CE

D O

R D

IVU

LGE

D T

O A

NY

OTH

ER

PA

RTY

, OR

US

ED

FO

R M

AN

UFA

CTU

RE

OR

OTH

ER

PU

RP

OS

E W

ITH

OU

T TH

E E

XP

RE

SS

PE

RM

ISS

ION

OF

THE

CO

MP

AN

Y.

11GEA30580_Rev_11.15

Figu

re 2

- S

ectio

nal A

ssem

bly

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 11 15/02/2016 12:15:35

Page 12: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

12 GEA30580_Rev_11.15

Table 4 - 827 DVJ Parts List

Item Number Quantity Used Identification

1 2 Headplate

3 1 Gearbox

4 1 set Gear

5 1 Cover

7 2 Gasket covers

8 1 Nameplate

9 1 Installation tag

10 1 Shim set

11 1 Cylinder

12 & 13 1 Impeller

14 4 Bearing

16 4 Dowel pin cylinder

17 2 Spring pin

19 1 Key-coupling

20 1 Self-tappign screw

21 2 Breather

22 6 Pipe plug

23 40 Hex head cap screw

26 44 Hex head cap screw

27 4 Oil seal- Inboard

28 4 Piston ring seal

29 2 Wavy washer spring

30 2 Lock nut bearing

33 1 Oil seal- drive shaft

34 2 Brg clamp plate- OGE

35 2 Foot - R/H

36 2 Foot - L/H

38 4 Sleeve - Inboard

40 2 Sight plug

44 18 Hex head cap screw

45 2 Pipe plug

46 1 Slinger

48 2 Washer

49 2 Button head screw

54 2 Brg clamp plate

56 1 Oil leader - R/S

57 1 Oil leader - L/S

58 1 Oil leader - R/S

59 1 Oil leader - L/S

62 1 Hex head cap screw

62A 1 Washer

63 2 Lifting lug

72 4 Pipe plug

74 1 Spring pin

88 4 Steel ball

88A 1 Slinger

90 1 Cover plate

91 12 Hex head cap screw

106 16 Lock washer

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 12 15/02/2016 12:15:35

Page 13: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

B

K

K

N

C

G

O

V U +.000/-.001

M

R

F

F

D

H -

HO

LES

(4) R

EQ

'D

OIL

LE

VE

L S

IGH

TG

AU

GE

(NE

AR

SID

E)

OIL

DR

AIN

PLU

G

BR

EA

THE

R/F

ILLE

RP

LUG

BR

EA

THE

R/F

ILLE

RP

LUG O

IL D

RA

INP

LUG

P

A

J

J

AA

A

A'

E

E

AX

INLE

TD

ISC

HA

RG

E

JET INLET

OIL

LE

VE

L S

IGH

TG

AU

GE

AR

ELE

AS

ED

800

DV

J D

RY

VA

CU

UM

WH

ISP

AIR

BLO

WE

RA

LL D

IME

NS

ION

S IN

INC

HE

S

INLE

T A

ND

DIS

CH

AR

GE

FLA

NG

ES

TO

MA

TEFL

US

H A

ND

SQ

UA

RE

WIT

H F

LAT

FAC

EFL

AN

GE

S O

NLY

. US

E F

ULL

FA

CE

GA

SK

ETS

FOR

V-B

ELT

DR

IVE

N U

NIT

SM

OTO

R T

O B

E L

OC

ATE

D O

NIN

LET

SID

E O

F B

LOW

ER

W -

INLE

TX

- D

ISC

HA

RG

EA

W -

JET

INLE

T

FRA

ME

SIZE

AB

CD

EF

GH

JK

MN

OP

RU

VK

EYW

AY

WX

AA

AA

'A

WA

XA

PPR

OX.

WEI

GH

T

827

19.0

033

.18

46.5

410

.00

7.50

15.3

4.5

01.

004.

503.

2522

.62

4.80

26.5

025

.25

14.0

02.

625

3.69

.625

x .3

1312

" FLG

14" F

LG9.

5015

.75

12" F

LG5.

5021

00

12" F

LG14

" FLG

OP

EN

ING

12.0

014

.00

BO

LT C

IRC

LE17

.00

18.7

5

FLA

NG

E O

.D.

19.0

021

.00

No.

TA

PP

ED

HO

LES

1212

SIZ

E H

OLE

S7/

8-9

1"-8

TAP

DE

PTH

1.31

1.50

TW

O P

LAC

E D

EC

IMA

LS (

.XX

)---

±.01

5T

HR

EE

PLA

CE

DE

CIM

ALS

(.X

XX

)--±

.005

FR

AC

TIO

NA

L--±

1/64

DIM

EN

SIO

NA

L T

OLE

RA

NC

ES

PE

RU

NLE

SS

OT

HE

RW

ISE

SP

EC

IFIE

D

BS

IZE

PATT

. No.

:

CA

D F

ILE

/ D

IRE

CTO

RY

RC

-204

269A

21 /

XX

AD

MFG

. RE

F. :

7396

2021

ALL

DIM

EN

SIO

NS

SH

OW

N IN

BR

AC

KE

TS

[ ] A

RE

MIL

LIM

ET

ER

SD

O N

OT

SC

AL

E F

OR

DIM

EN

SIO

NS

12

34

56

DCBA

65

43

21

DCBA

CO

NF

IDE

NT

IAL

AN

D P

RO

PR

IET

AR

Y:

DA

TE

DR

.

CH

KD

.

AP

P.

DB

V.

SC

ALE

AP

PC

HA

NG

EN

OT

ICE

DA

TE

M/D

/YB

YR

EV

ISIO

NS

GE

OM

ET

RIC

TO

LER

AN

CE

PE

R: E

P93

8

RE

VR

C-2

0426

9021

AS

SE

MB

LY D

IME

NS

ION

AL

A80

0 D

VJ

UN

ITS

BM

S

RD

A

BM

S

NTS

5/29

/201

5

6/3/

2015

5/29

/201

5

SH

EE

T 1

OF

1

Conn

ersv

ille,

IN U

SAP:

765

-827

-920

0 F:

765

-827

-926

6

MA

T'L.

:

M/D

/Y

THIR

D A

NG

LEP

RO

JEC

TIO

N

T2

T1:

AN

CH

OR

BO

LT L

OC

AT

ION

S ±

.13

BLO

WE

R IN

LET

& D

ISC

HA

RG

L LO

CA

TIO

NS

±.2

5A

LL O

TH

ER

DIM

EN

SIO

NS

RE

FE

RE

NC

ET2

:

SP

EC

SE

CTI

ON

: E

NG

INE

ER

CO

: O

RD

ER

No.

CA

D F

OR

MA

TS

OLI

DW

OR

KSCER

TIFI

EDP

UR

CH

AS

E O

RD

ER

: P

RO

JEC

T:

LOC

ATI

ON

: E

QU

IPM

EN

T N

o. :

CE

RTI

FIE

D B

Y:

DA

TE (M

/D/Y

):

FIN

ISH

INµ

INC

HE

S

CH

KD

THIS

DR

AW

ING

IS C

ON

FID

EN

TIA

L A

ND

IS T

HE

PR

OP

ER

TY O

F H

OW

DE

N R

OO

TS, L

LC. T

HE

DR

AW

ING

OR

AN

Y P

AR

T TH

ER

EO

F M

US

T N

OT

BE

CO

PIE

D O

R O

THE

RW

ISE

RE

PR

OD

UC

ED

OR

DIV

ULG

ED

TO

AN

Y O

THE

R P

AR

TY, O

R U

SE

D F

OR

MA

NU

FAC

TUR

E O

R O

THE

R P

UR

PO

SE

WIT

HO

UT

THE

EX

PR

ES

S P

ER

MIS

SIO

N O

F TH

E C

OM

PA

NY

.

13GEA30580_Rev_11.15

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 13 15/02/2016 12:15:35

Page 14: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

14 GEA30580_Rev_11.15

Trouble Shooting Checklist

Trouble Item Possible Cause Remedy

No flow

1

23

Speed too low

Wrong rotationObstruction in piping

Check by tachometer and compare with speed on Roots Order Acknowledgement�

Compare actual rotation, change driver rotation if wrong�Check piping valve, silencer, to assure open flow path�

Low Capacity

45

67

Speed too slowExcessive pressure rise

Obstruction in pipingExcessive slip

See Item 1�Check inlet vacuum and discharge pressure and compare these figures with specified operation conditions on order�

See Item 3�Check inside of casing for worn or eroded surfaces causing excessive clearances�

Excessive Power

89

10

Speed too highExcessive pressure riseImpeller rubbing

See Item 1�See Item 5�Inspect outside of cylinder for high temperature areas, then check for impeller contact at these points� Look for excessive scale build-up� Correct blower mounting drive alignment�

Overheating of bearings or gears

1112

1314

Inadequate lubricationExcessive lubrication

Excessive pressure riseCoupling misalignment

Check oil sump levels in end covers�Check oil levels� If correct, drain and refill with clean oil or recommended grade

See Item 5�Check carefully� Realign if questionable�

Vibration

151617

18

1920

MisalignmentImpellers rubbingWorn bearings/gears

Unbalanced or rubbing impellers

Driver or blower loosePiping resonance

See Item 14�See Item 10�Check gear backlash and condition of bearings and replace as indicated�

Scale or process material may build up on casing and impellers or inside impellers� Remove build-up to restore original clearances and impeller balance�

Tighten mounting bolts accurately�Determine whether standing wave pressure pulsa-tions are present in the piping� Refer to Sales Office�

Driver stops or will not start

21 Impeller stuck Check for excessive hot spot on headplate or cylin-der� See Item 10� Look for detective shaft, bearing and/or gear teeth�

Excessive breather blowby or

excessive oil leakage to vent area

22 Broken seal Replace seals

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 14 15/02/2016 12:15:35

Page 15: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

15GEA30580_Rev_11�15

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 15 15/02/2016 12:15:36

Page 16: RootsTM 827 DVJ gear end drive blower - JL Components › assets › files › manual_dvj_827.pdf · Roots. TM. 827 DVJ gear end drive blower. Installation Operation & Maintenance

www.howden.com

©Howden Group Limited� All rights reserved� 2015�Howden and the flying H logo are registered trade marks belonging to Howden Group Limited�

At the heart of your operationsHowden people live to improve our products and services and for over 160 years our world has revolved around our customers. This dedication means our air and gas handling equipment adds maximum value to your operations. We have innovation in our hearts and every day we focus on providing you with the best solutions for your vital operations.

Howden Roots

Howden Roots900 W� Mount St�ConnersvilleIndianaUSA47331

Tel: +1 765 827 9200Web: www�howden�com

GEA30580_Rev_11�15

GEA30580 Roots 827 DVJ IOM Manual_rev.02.16.indd 16 15/02/2016 12:15:36