Rosenberger Final

Embed Size (px)

Citation preview

  • 7/22/2019 Rosenberger Final

    1/30

    Dansko Phase III

    West Grove, PA

    David RosenbergerLighting/ElectricalLighting Advisor: Dr. Mistrick

    Electrical Advisor: Ted Dannerth

  • 7/22/2019 Rosenberger Final

    2/30

    Project Team

    Owner: Dansko, Inc.

    Architect: Bernardon Haber Holloway

    MEP/Lighting Design: Brinjac Engineering, Inc.

    Structural: Baker, Ingram & AssociatesCivil: Gilmore & Associates

    Interior: Contract Environments

    Geotech: Advanced GeoServices

    Construction Management: W.S. Cumby & Son, Inc.

    Data/Comm: Tangent Cable

  • 7/22/2019 Rosenberger Final

    3/30

    LIGHTING DEPTHAtrium Lighting Design

    Open Office Lighting Design

    MECHANICAL BREADTH

    Open Office Energy Analysis with

    High Light Reflectance Ceiling

    ELECTRICAL DEPTH

    Emergency GeneratorCu vs. Al Feeder Material

    CONSTRUCTION MANAGEMENT BREADTH

    Integrating Luminaires into Furniture

    Outline

  • 7/22/2019 Rosenberger Final

    4/30

    LIGHTING DEPTHAtrium Lighting Design

    Open Office Lighting Design

    MECHANICAL BREADTH

    Open Office Energy Analysis with

    High Light Reflectance Ceiling

    ELECTRICAL DEPTH

    Emergency GeneratorCu vs. Al Feeder Material

    CONSTRUCTION MANAGEMENT BREADTH

    Integrating Luminaires into Furniture

    Outline

  • 7/22/2019 Rosenberger Final

    5/30

    Atrium Lighting Design

  • 7/22/2019 Rosenberger Final

    6/30

    through the space

    Atrium

    draw attention

    to your feet

    Design IntentDirection

  • 7/22/2019 Rosenberger Final

    7/30

    Atrium

  • 7/22/2019 Rosenberger Final

    8/30

    RecessedPerimeterWallwash

    Ribbons

    of Light

    Diffusing

    Lens

    RecessedBasket

    Style Direct/Indirect

    StriplightsTranslucent

    AcrylicShoebox

  • 7/22/2019 Rosenberger Final

    9/30

    EllipticalReflectorUplight

    SquareDownlight

    Handrail-IntegratedLED Strip

  • 7/22/2019 Rosenberger Final

    10/30

    Atrium

    Average Illuminance:

    16 fc

    Maximum/Minimum

    Illuminance Ratio:

    3.25:1

  • 7/22/2019 Rosenberger Final

    11/30

    Atrium

    Average Illuminance:

    16 fc

    Maximum/Minimum

    Illuminance Ratio:

    1.57:1

  • 7/22/2019 Rosenberger Final

    12/30

    Atrium

    Average Illuminanceon Task Plane:

    31 fc

    Maximum/MinimumIlluminance Ratio:

    2.25:1

  • 7/22/2019 Rosenberger Final

    13/30

    Atrium

  • 7/22/2019 Rosenberger Final

    14/30

    LIGHTING DEPTHAtrium Lighting Design

    Open Office Lighting Design

    MECHANICAL BREADTH

    Open Office Energy Analysis with

    High Light Reflectance Ceiling

    ELECTRICAL DEPTH

    Emergency GeneratorCu vs. Al Feeder Material

    CONSTRUCTION MANAGEMENT BREADTH

    Integrating Luminaires into Furniture

    Outline

  • 7/22/2019 Rosenberger Final

    15/30

    Open Office Lighting Design

  • 7/22/2019 Rosenberger Final

    16/30

    Open Office

    Design IntentFocus

    Production

    Design

    Presentation

  • 7/22/2019 Rosenberger Final

    17/30

    Indirect T5HOLuminaires Integrated

    into Furniture

    Recessed T5Downlights withBlade Louvers

    Recessed AdjustableMR-16 Downlights

  • 7/22/2019 Rosenberger Final

    18/30

    Open Office

    Average Illuminance

    on Task Plane:

    36 fc

    Maximum/Minimum

    Illuminance Ratio:

    1.56:1

  • 7/22/2019 Rosenberger Final

    19/30

    Open Office

    Average Illuminance

    on Ceiling:

    78 fc

    Maximum/MinimumIlluminance Ratio:

    5.42:1

  • 7/22/2019 Rosenberger Final

    20/30

    Open Office

    Average Illuminanceon Task Plane:

    34 fc

    Maximum/MinimumIlluminance Ratio:

    1.19:1

  • 7/22/2019 Rosenberger Final

    21/30

    LIGHTING DEPTHAtrium Lighting Design

    Open Office Lighting Design

    MECHANICAL BREADTH

    Open Office Energy Analysis with

    High Light Reflectance Ceiling

    ELECTRICAL DEPTH

    Emergency GeneratorCu vs. Al Feeder Material

    CONSTRUCTION MANAGEMENT BREADTH

    Integrating Luminaires into Furniture

    Outline

  • 7/22/2019 Rosenberger Final

    22/30

    Open Office

    High Light Reflectance Ceiling

    15% Higher Reflectance thanAverage Lay-in Ceiling Tile

    Allows for a reduction inLighting Power Density

  • 7/22/2019 Rosenberger Final

    23/30

    Component

    New

    Building

    ($)

    Air System Fans 724

    Cooling 1,074

    Heating 3,998

    Pumps 0Cooling Tower Fans 0

    HVAC Sub-Total 5,796

    Lights 1,668

    Electric Equipment 0

    Misc. Electric 0Misc. Fuel Use 0

    Non-HVAC Sub-Total

    1,668

    Grand Total 7,465

    Component

    Original

    Building

    ($)

    Air System Fans 881

    Cooling 1,448

    Heating 1,336

    Pumps 0Cooling Tower Fans 0

    HVAC Sub-Total 3,666

    Lights 3,337

    Electric Equipment 0

    Misc. Electric 0Misc. Fuel Use 0

    Non-HVAC Sub-Total

    3,337

    Grand Total 7,002

    High Light Reflectance Ceiling-Reduced Number of Luminaires

    Exposed Structural Ceiling-Standard Layout of Indirect Pendants

  • 7/22/2019 Rosenberger Final

    24/30

    LIGHTING DEPTHAtrium Lighting Design

    Open Office Lighting Design

    MECHANICAL BREADTH

    Open Office Energy Analysis with

    High Light Reflectance Ceiling

    ELECTRICAL DEPTH

    Emergency GeneratorCu vs. Al Feeder Material

    CONSTRUCTION MANAGEMENT BREADTH

    Integrating Luminaires into Furniture

    Outline

  • 7/22/2019 Rosenberger Final

    25/30

    Emergency Generator vs.

    Battery Ballasts

  • 7/22/2019 Rosenberger Final

    26/30

    LIGHTING DEPTHAtrium Lighting Design

    Open Office Lighting Design

    MECHANICAL BREADTH

    Open Office Energy Analysis with

    High Light Reflectance Ceiling

    ELECTRICAL DEPTH

    Emergency GeneratorCu vs. Al Feeder Material

    CONSTRUCTION MANAGEMENT BREADTH

    Integrating Luminaires into Furniture

    Outline

  • 7/22/2019 Rosenberger Final

    27/30

    Feeder Material:

    Copper vs. Aluminum

  • 7/22/2019 Rosenberger Final

    28/30

    LIGHTING DEPTHAtrium Lighting Design

    Open Office Lighting Design

    MECHANICAL BREADTH

    Open Office Energy Analysis with

    High Light Reflectance Ceiling

    ELECTRICAL DEPTH

    Emergency GeneratorCu vs. Al Feeder Material

    CONSTRUCTION MANAGEMENT BREADTH

    Integrating Luminaires into Furniture

    Outline

  • 7/22/2019 Rosenberger Final

    29/30

    Custom integration of indirectluminaire into officeworkstation

    10-12 week lead time to be UL

    safety certified

    Two Electricians6.5 hours$527

  • 7/22/2019 Rosenberger Final

    30/30

    Thank you!

    Questions?