Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Embed Size (px)

Citation preview

Page 1: Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Run10 Preparation Status andIssues

Itaru NakagawaRIKEN/RBRC

Page 2: Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Issues• Baseline Issue• MuID Efficiency Seems Low?• MuTR non-stereo plane efficiency in St-1 low?– HV increase wasn’t enough in Run9

• J/psi reconstruction is 10 ~ 15% fewer in North arm.

• Significant rate dependence of J/psi reconstruction.

• Offline Fake High PT rejection

Page 3: Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Baseline MeasurementPresent Proposed

Failed?Too risky to play around with FEE’s in IR.Need to setup test bench. Ming will cometo PHENIX in Dec to work on this.

Firmware development.Who has the latest firmware?

Page 4: Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Dosimeter Extension

+ 10”

Page 5: Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Dosimeter Extension

Page 6: Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Short Term To Do List (from 10.29 report)

• OASys camera alignment ✓• Swap LV distributor for St.1,Q4 w/ spare due

to offset current ✓• Inspect Thermocouple in St-2, Oct.7 (readout

somewhat low ~ 33 degrees)• North St-3, Oct-1 high fake hit rate issue• BCLK Timing tune ✓– Delay(st1: 15ns, st2:20ns, st3:28ns)

Page 7: Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Near Future Plan

• Clean up test bench• Organize Spare boards bookshelf• Channel Map database• Cosmic data taking from 1st week December• MuTR Operating HV Values for Run10– Need to prove better resolution in Run9

Page 8: Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC

Misc

• Placed Order Conformal Coating and remover• Ran LL1 cables