Planning ManualM-30-1382-en

Issue 16.0

Printed on 15. 07. 2013

Page 2: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

2

Key to symbols

Warning!The warning triangle indicates potential sources of danger which mayconstitute a risk of injury for the user or a health hazard.

Caution:The square indicates situations which may lead to malfunction, defects,collision or damage of the instrument.

Note:The hand indicates hints on the use of the instrument or other tips for theuser.

OPMI® is a registered trademark of Carl Zeiss.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 3: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Contents

New installation of S8 / S 81 ceiling mount 5

On-site preparations 24

On-site preparations 30

Planning the electrical installation 35

Planning the mechanical installation 44

Confirmation of the structural calculation and execution of installation 49

Ordering data 50

Accessory interface 63

Accessory interface 64

Installation position 65

Mount flange and ceiling panel 66

Mount flange (flange plate) 68

Configuration example: mount flange with flange tube 69

Pre-installation set 70

Customer's responsibilities 71

Electrical connections for accessory modules 73

Confirmation of the structural calculation and execution of installation 75

Discipline-specific installation positions 77

Installation positions for ophthalmology and ENT 79

Installation position for P&R, Hand 92

Installation position for Neuro, Spine, Uro and Gyn 95

Installation on an existing substructure 99

Installation options 101

Installation on an intermediate piece of S23 or EMD2 104

Installation on an existing ZDK intermediate piece 112

Ceiling panel extension 300mm (11.8") 116

On-site preparations 117

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 4: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Constructional requirements 119

Confirmation of the structural calculation and execution of installation 120

Ordering data 121

Index 123

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 5: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 5

New installation of S8 / S 81 ceiling mount

S8 ceiling mount, dimensions 7

Ceiling mount S81, dimensions 8

Pre-installation set 10

Installation position in the OR 12

Operating position 16

Operating range of the ceiling mount 20

On-site preparations 24

Customer's responsibilities 24

Notes on building vibrations 26

Ceiling stiffness 28

Customer's preparatory responsibilities, overview 29

On-site preparations 30

Forces and torques 30

Pre-installation set for mounting to ceiling structures with supply-air cei-ling 32

Planning the electrical installation 35

Installing the conduits 36

Mounting the wall socket 38

On-site electrical installation 40

Check connection to power supply 42

Planning the mechanical installation 44

300 mm (11.8") ceiling panel extension 48

Confirmation of the structural calculation and execution of installation 49

Ordering data 50

S8 ceiling mount for ORs with false ceilings, ordering data 50

S8 ceiling mount for ORs without false ceilings, ordering data 53

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 6: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

6 New installation of S8 / S 81 ceiling mount

S81 ceiling mount for ORs with false ceilings, ordering data 56

S81 ceiling mount for ORs without false ceilings, ordering data 59

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 7: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 7

S8 ceiling mount, dimensions

Key

1 False ceiling

1 : 20

620mm / 24.4“

250mm

1

350° ± 90° 270°

950

mm

/37

.4“

950

mm

/ 37

.4“

700

mm

/27

.6“

max. 1000mm / 39.4“ max. 930mm / 36.6“

228

mm

/9“

238

mm

/9.4

9.8“

S8

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 8: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

8 New installation of S8 / S 81 ceiling mount

Ceiling mount S81, dimensions

Legend

1 False ceiling

2 Floor

A Dimension A is defined in respect of the specific project

B Ground clearance

We recommend different ground clearance dimensions depending onthe application.

– ENT 1650mm (65")

– Ophthalmology 1800mm (70.9")

– Reconstructive and plastic surgery 1800mm (70.9")

– Others 1650mm (65")

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 9: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 9

max. 350° ± 90° 270°

600mm / 23.6“ max. 930mm / 36.6“

360

mm

A

B

1

21 : 20

228

mm

/ 9“

238

mm

/ 9.

4“ 620mm / 24.4“

250mm9.8“

14.2

“36

0m

m14

.2“

S81

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 10: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

10 New installation of S8 / S 81 ceiling mount

Pre-installation set

Key

1 Stud bolt

2 Spacers

3 Ceiling anchor plate

4 Floor

5 Ceiling panel

6 Mount flange

7 False ceiling

8 Interface plate

9 Structural ceiling

A is the distance between the structural ceiling and false ceiling.

B is the distance between the floor and false ceiling.

Mount flange (6) and ceiling panel (5) are part of the ceiling mount and areonly shown here for information. They are not included in the pre-installa-tion set.

A dummy cover is available for closing the opening in the false ceiling untilthe ceiling mount is installed. Also see page 50 and page 54.

Caution:When calculating the forces / torques applied to the structural ceiling, themaximum load, i. e. the weight of the ceiling mount itself and the max-imum weight of equipment attached to it, must be taken into account.

Note:The dimension (A)must not exceed 800mm (31.5"). Otherwise, theceiling substructure must be mounted for bridging the oversize. When di-mensioning the substructure, take the resistance to bending vibrationsinto account triggered by the ceiling mount's suspension arms.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 11: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 11

75

150

123

56

7

89

4

A

B

620mm / 24.4“

45m

m /

1.8“

100

mm

/ 3.

9“ 75m

m /

3“

(1393 lbf)

(7007 lbf.ft)

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 12: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

12 New installation of S8 / S 81 ceiling mount

Installation position in the OR

The optimum installation position of the ceiling anchor plate is dependenton the required position of the operating table in the OR. The followingoverview shows the ceiling mounts in their optimum operating positions.

We recommend installing the ceiling anchor plate above the area of thepatients' feet.

Alternatively, the ceiling anchor plate can be installed laterally to the op-erating table. Please see the illustration for the recommended distancesof the ceiling anchor plate from the surgical field.

In unfavorable on-site conditions, it may not be possible to implement theinstallation in the recommended positions. Installation options forcramped conditions are shown from page 16 onwards. OR illuminatorscan only be used with restrictions or not at all in this case.

1 S8 installation above the operating table

2 S81 installation above the operating table

3 S8 installation laterally to the operating table

4 S81 installation laterally to the operating table

5 Area of possible installation positions for the ceiling anchor plate

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 13: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 13

1500 ± 200mm

1 2

3 4

5 5

S8 S81

1 : 50

1250 ± 100mm1500 ± 200mm

59.1 ± 7.9“49.2 ± 3.9“

59.1 ± 7.9“1250 ± 100mm

49.2 ± 3.9“

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 14: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

14 New installation of S8 / S 81 ceiling mount

Ground clearance

1 Ground clearance S8The stand S8 has a ground clearance of 1800mm (70.9")

2 Ground clearance S81We recommend different ground clearance dimensions depending onthe application.

– ENT 1650mm (65")

– Ophthalmology 1800mm (70.9")

– Reconstructive and plastic surgery 1800mm (70.9")

– Others 1650mm (65")

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 15: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 15

2

2800

- 3

300

mm

2650

- 3

500

mm

S8

S81

1 : 50

110.

2 -

129.

9“10

4.3

- 13

7.8“

1

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 16: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

16 New installation of S8 / S 81 ceiling mount

Operating position

The stands are shown in a typical working position. The angle betweenmicroscope arm and support arm is 90°. Under this angle, the surgery mi-croscope can be moved horizontally with minimum effort.

Side view

1 S8 normal installation

2 S81 normal installation

If, due to other installations, the space available on the ceiling is not suf-ficient for normal installation, you can use installation method 3 or 4 as analternative.

3 S8 installation in cramped conditionsThe mount flange is installed in a position rotated through 180°. Alsosee page 18. OR illuminators cannot be mounted in this case. Thesame installation principle can also be used for the S81 ceiling mount(not shown here).

4 S8 installation in cramped conditionsThe brake arm is installed in a position rotated through 180°. Also seepage 18. OR illuminators cannot be mounted in this case. The sameinstallation principle can also be used for the S81 ceiling mount (notshown here).

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 17: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 17

3

1 2

4

1600mm / 63“ 1350mm / 53.1“

1100mm / 43.3“ (S8) 1400mm / 55.1“ (S8)1150mm / 45.3“ (S81)850mm / 33.5“ (S81)250mm / 9.8“

50mm / 2“

S8 S81

1 : 50

S8

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 18: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

18 New installation of S8 / S 81 ceiling mount

Top view

1 S8 normal installation

2 S81 normal installation

If, due to other installations, the space available on the ceiling is not suf-ficient for normal installation, you can use installation method 3 or 4 as analternative.

3 S8 installation in cramped conditionsThe mount flange is installed in a position rotated through 180°. Alsosee page 16. OR illuminators cannot be mounted in this case. Thesame installation principle can also be used for the S81 ceiling mount(not shown here).

4 S8 installation in cramped conditionsThe brake arm is installed in a position rotated through 180°. Also seepage 16. OR illuminators cannot be mounted in this case. The sameinstallation principle can also be used for the S81 ceiling mount (notshown here).

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 19: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 19

1600mm / 63“ 1350mm / 53.1“

1100mm / 43.3“ (S8) 1400mm / 55.1“ (S8)

3

1 2

4

850mm / 33.5“ (S81) 1150mm / 45.3“ (S81)

S8 S81

1 : 50

S8

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 20: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

20 New installation of S8 / S 81 ceiling mount

Operating range of the ceiling mount

S8 ceiling mount

The operating range specified here applies to normal installation.

For installation in cramped conditions, the dimensions shown on page 16and page 18 can be used to determine the operating range of the ceilingmount.

1 Pivot axis 1

2 Pivot axis 2

3 Operating range for the surgical microscope

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 21: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 21

250mm / 9.8“

1250mm ± 500mm / 49.2 ± 19.7“

1

2

3

1 : 20

S8

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 22: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

22 New installation of S8 / S 81 ceiling mount

S81 ceiling mount

The operating range specified here applies to normal installation.

For installation in cramped conditions, the dimensions shown on page 16and page 18 can be used to determine the operating range of the ceilingmount.

1 Pivot axis 1

2 Pivot axis 2

3 Operating range for the surgical microscope

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 23: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 23

250mm / 9.8“

1000mm ± 400mm

1

3

2

1 : 20

39.4 ± 15.7“

S81

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 24: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

24 New installation of S8 / S 81 ceiling mount

On-site preparations

Customer's responsibilities

Note:The Zeiss service department can only install the ceiling mount if all pre-conditions listed in the specification below and applicable in the individualmounting situation on site have been met.

The actual load on the ceiling depends on a large number of different fac-tors which a structural engineer must specify accurately for the individualcase. See “On-site preparations” on page 30.

Important:• It is mandatory that you have the mounting situation checked by a

structural engineer during the planning stage. Structural evidence must be submitted before the stand is mounted.We recommend that you keep the structural evidence with the docu-ments on the ceiling mount.

• Have a structural engineer confirm in writing that the applicable na-tional regulations have been met.

• Enclose a copy of the structural evidence with your order. See “Con-firmation of the structural calculation and execution of installation” onpage 49.

• Should the actual mounting situation differ from the planning docu-ments, consult your contact at Carl Zeiss or the planning engineer be-fore mounting the pre-installation set.

• As installation site, choose a layer that is as flat and as hard as possi-ble, for example a concrete surface. Never embed the pre-installationset into the ceiling but always install it directly on the surface.

• The conditions on site also comprise building vibrations that must betaken into account by your structural engineer already at planningstage, see page 26. Have your structural engineer confirm in writing that he/she has takenpossible building vibrations into account, see page 49.

• Have a structural engineer confirm in writing that he or she has com-plied with the ceiling stiffness values, see page 28.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 25: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 25

Caution!• If an existing ceiling anchor plate or intermediate piece is to be re-

placed, the old dowel anchors must not be re-used. Instead, you mustdrill new holes. When the structural engineer calculates the effective strength of thenew anchors, the reduction of the ceiling strength caused by the olddrill holes must be taken into account.

Planning the installation

• On receipt of delivery, check the assembly components for complete-ness and potential damage.

• Before installing the ceiling mount, always check whether the dataspecified in the dimension sheet comply with the actual installation sit-uation, particularly in respect of room height.

• Ensure that the dowel anchors calculated by your structural engineerare mounted properly, and that the appropriate nuts and washers formounting the ceiling anchor plate are available at the installation sitetogether with information on the maximum tightening torque.

• For a new installation, the pre-installation set must be mounted beforethe false ceiling is mounted.

• A minimum of 2 installers is required for mounting the pre-installationset.

• For installing a ceiling mount in rooms with supply-air ceilings, the sup-ply-air ceiling must be properly prepared, see page 32.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 26: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

26 New installation of S8 / S 81 ceiling mount

Notes on building vibrations

The on-site requirements also include the low-vibration design of theceiling in the OR. This must be taken into account right during the plan-ning phase for the ceiling mount. The following information primarily refers to the ceiling mount, but it canalso be applied to a wall mount or floor stand.

Two types of excitation factors must be distinguished:

Single events which excite short-term vibration

Induced by inadvertent knocks against the suspension system or strongimpact against ceiling, wall or floor. This is the most frequent, but leastcritical type of excitation. The ZEISS ceiling mount features excellentdamping against this type of vibration and displays a short recovery time.In extreme cases, surgery has to be interrupted for a few moments.

Constant excitation causing sustained vibration

The excitation energy of factors such as elevators, air conditioning sys-tems, construction work, traffic does not easily reach the ceiling mount viathe building. This type of excitation is extremely rare, but may lead to per-manent vibration of the ceiling mount in extreme cases. This becomesparticularly visible at high magnifications as used in the surgical micro-scope. The following result of a study is intended to help you understand constantvibration excitation occurring in rare cases in ceiling mounts, eliminate itor prevent it from the outset in new installations.

Like any kinematic system, the Zeiss ceiling mount displays eigenfre-quencies (=resonance frequencies) that range between 2 and 80 Hz de-pending on the position of the system and the accessories attached to it. The ZEISS ceiling mount provides very effective damping in particularagainst higher frequencies above 10 Hz which are typical of buildings withelectrical excitation factors. Nevertheless it may happen in rare cases,when the arms of the ceiling mount are in a specific position, that higherfrequencies which are critical for this particular constellation lead to vibra-tions (e.g.: 17 Hz, ..., 19 Hz, ...).

Such excitation factors can usually be suppressed by the following meas-ures:

– elimination of the excitation source (e.g. repair or damping of the airconditioning system)

– constructional damping measures in the ceiling installation

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 27: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 27

Due to the large number of parameters involved and the variety of poten-tial building/ceiling mount constellations, Carl Zeiss is unable to give anabsolute guarantee for the vibration-free suspension of the ceiling mount,even if the building meets the applicable ISO standards. This also applies to replacement installations for existing, earlier Zeissceiling mounts. However, if building vibrations did not cause any problemsin the old system, problems are generally unlikely to occur in the replace-ment system.It is highly improbable that constant vibrations are transferred to theceiling mount if all requirements regarding vibrations in the OR ceiling aremet.

– Max. vibration velocity (RMS) at the installation points for the ceilingmount.

– Vmax < 0.1 mm / s or Vmax < 4 milli-inches / s or below the curves (di-agram) for the specified frequency range.

Sources: Carl Zeiss (in-house study), ISO 10811, recommendations forORs.

4 5 6,3 8 10 12,5 16 20 25 31,5 40 50 63 90

4 5 6,3 8 10 12,5 16 20 25 31,5 40 50 63 90

1

0,1

0,01

100

10

4

1

RM

S o

f vi

bra

tio

n v

elo

city

(m

m /

sec)

One-third octaveband center frequencles (Hz)

One-third octaveband center frequencles (Hz)

RM

S o

f vi

bra

tio

n v

elo

city

(m

ili-i

nch

/ se

c)

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 28: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

28 New installation of S8 / S 81 ceiling mount

Ceiling stiffness

A sufficient stiffness, or rigidity, of the ceiling is an on-site requirement.This must be taken into consideration during the planning phase of theceiling mount.

The stiffness/rigidity of a concrete ceiling has been calculated as an ex-ample. The stiffness/rigidity should be greater than the specified refer-ence value so that the system is attached with low vibration.

E*J*100/L3 > 150 kN/cm

The load is taken over four load bearing points for a given connectionpanel without reinforcement in the concrete ceiling.

Abb. Load application points

Symbol Description Unit

E E-module kN/cm2

J Moment of inertia cm4

(a 1m wide strip of ceiling)

L Length of the ceiling cm

517mm /20.35"

605

mm

/ 2

3.8

2"

517

mm

/ 2

0.3

5"

605mm / 23.82"

Load application

Ø560

/ Ø22

.05"

4x Ø26points

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 29: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 29

Customer's preparatory responsibilities, overview

– Mounting the pre-installation set

– Install and connect the cable for the electrical supply of the unit at thepre-installation set.

– The supply line of the ceiling mount must be fused with a 1-pole auto-matic circuit breaker 230V: 10A (115V: 20A) or with a 1-pole fuse230V: 10A, slow-blowing (115V: 20A, slow-blowing). The fuse mustbe installed in phase.

– Downstream, install a 2-pole line switch with a permissible minimumcontact load of 230V: 10A (115V: 20A). As an alternative, a lineswitch may be installed at the unit in the frame of the optional instru-ment socket. Also refer to page 50 and page 54.

– Install the wall socket (flush- or surface-mounted).

– Install the ductwork and cables for:

– Power cable, 3 x 1.5mm2 (3 x AWG16)

– Wall socket for foot control panel (optional)

– Potential equalization (optional)

– Video, inner diameter 50mm (2"), optional

– OR illuminators (24V DC with emergency power supply, built onsite) (optional)

– Other OPMI accessories, e.g. BIOM/SDI, additional illumination,AUX output, etc. (optional)

– We recommend that you install additional ductwork for future ex-pansion, e.g. leading to the central OR control panel.

– The maximum permissible cable length for the Speed Focus is10m (394"). If this is insufficient, a signal amplifier must be in-stalled.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 30: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

30 New installation of S8 / S 81 ceiling mount

On-site preparations

The actual load on the ceiling depends on a large number of different fac-tors. The requirements to be met by the ceiling or substructure result fromthe addition of perpendicular forces and torques produced by the suspen-sion system and accessories. These are the forces to be transmitted intothe structural ceiling via the ceiling anchors. The column must be aligned in a vertical position (max. deviation ± 0.5°).

Forces and torques

Caution!Your structural engineer must ensure for the individual case on site thatthe structural ceiling can receive the forces and torques defined below.The structural engineer must take into account any other loads on theceiling, if applicable, and add the required safety margin under observa-tion of the applicable national regulations.

Important:– An additional load of 800N (180lbf) has been included in the perpen-

dicular forces and torques specified below. It is generated by having aperson hang on to the end of the spring arm (i.e. the microscope). Oth-er safety margins are not taken into account.

– The perpendicular forces and torques were dimensioned based on themaximum permissible payload at the spring arm.

For a ceiling mount S8 or S81 on its own (without accessories at the ac-cessory interface), the structural ceiling must be able to take the followingloads:

Ceiling mount S8

– Perpendicular force: no less than 3115N (700lbf)

– Torque: no less than 3245Nm (2393lbf.ft)

Ceiling mount S81

– Perpendicular force: no less than 2717N (611lbf)

– Torque: no less than 2316Nm (1708lbf.ft)

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 31: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 31

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 32: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

32 New installation of S8 / S 81 ceiling mount

Pre-installation set for mounting to ceiling structures with supply-air ceiling

Important:When mounting support arm systems in supply-air ceilings, the type ofceiling mounting must be individually adjusted to the structural character-istics of the make of the respective supply-air ceiling.

To bridge the distance between the structural ceiling and the non-struc-tural false ceiling, install a false ceiling set. The length of the appropriatethreaded rods and spacer tubes will be adapted on site. The necessary planning activities should be carried out in coordinationwith the manufacturers of the supply-air ceiling and with Carl Zeiss.

Please specify in your order dimension (A), the distance between thebottom edge of the structural ceiling and the bottom edge of the falseceiling.

Note:– Dimension (A) is the height of the false ceiling. It must not exceed 800

mm. Otherwise, a ceiling substructure must be mounted for bridgingthe oversize. Dimension (Z) is the height of the supply-air ceiling.

– It is imperative that the false ceiling set (2, 3) and the cables for theelectrical connections are mounted before installing the supply-airceiling. Subsequent installation will be impossible for lack of space.

– An inspection chamber (5) free of compressed air must be providedfor the installation work. The inner dimension of the chamber (S) mustbe greater than the ceiling opening (M).

– A seal (7) provided by the manufacturer of the supply-air ceiling canbe installed to seal the inspection chamber off from the OR theater.

1 Structural ceiling

2 Ceiling board

3 Spacer tubes

4 Supply-air ceiling - top

5 Inspection chamber

6 Interface plate

7 Seal between carrier arm arm system and OR (built on site)

8 Supply-air ceiling - bottom

9 Ceiling liner

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 33: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 33

1

7

6

2

4

5

3

8

1

S

7

5

2

4

6

3

9

8

M

Z

A

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 34: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

34 New installation of S8 / S 81 ceiling mount

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 35: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 35

Planning the electrical installation

The power lines on the site of installation must be run up to the interfaceplate. In addition, the potential equalization lines must be run to the termi-nals on the interface plate.

Warning!– The planning, execution and inspection of the on-site electrical instal-

lations must be performed by expert electrical technicians and official-ly registered electrical firms.

– The electrical installations of the room concerned must comply withthe requirements of the applicable national regulations. In the FederalRepublic of Germany, VDE 0107 applies.

– The number of circuits is dependent on the customer's specific carriersystem configuration.

– If several circuits are required by the customer, appropriate allowancemust be made on the interface plate.

– Multiwire lines must be provided with wire end sleeves.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 36: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

36 New installation of S8 / S 81 ceiling mount

Installing the conduits

The cables may be installed above the false ceiling or in ductwork in thestructural ceiling. When installing cables in the ductwork in the structuralceiling, there are two mounting options:

– The ductwork emerges next to the ceiling anchor plate (8).

– The ductwork emerges in the center of the ceiling anchor plate (9).

The ductwork has an inner diameter of 22 - 50mm (0.9 - 2").

The MediLive video line requires ductwork of an inner diameter of min.35mm (1.4").

Legend

1 Power cable3 x 1.5mm2

2 Wall socket for foot control panelOptional

3 Potential equalizationOptional

4 TV inner diameter 50mm (2")Optional

5 OR illuminators24V DC with emergency power supply, built on site (optional)

6 Other accessory components at the OPMIFor example BIOM/SDI, additional illuminators, AUX output etc. (op-tional)

7 Other ductworkWe recommend that you install additional ductwork for future exten-sions

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 37: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 37

Connection for "Speedfokus AF"

Note:• Determine the exact length between the connection for Speedfokus

AF and the CCU+ monitor.

With a cable length of >10m (394"), the Speedfokus AF requires a signalamplifier. 110 -230V power supply must be provided for the signal ampli-fier.

1 - 7 1 - 78 9

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 38: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

38 New installation of S8 / S 81 ceiling mount

Mounting the wall socket

Note:– We recommend that you mount the wall socket (3) at the wall behind

the surgeon. Height approx. 1.4m (55.1")

– Refer to the chapter "Installing ductwork" on page page 36

Kit 1078-524 comprises the following components for mounting thewall socket:

– Wall socket for flush mounting

– Wall socket for surface mounting

– 10m (394") cable

– Holder for the foot control panel

• Use the wall socket that better matches your application situation.

Legend

1 Wall socket for surface mounting

2 Wall socket for flush mounting

3 Wall socket

4 Central OR control panel (part of the domestic installation)

5 Foot control panel

6 Remote socket for an external signal of maximum 24V / 0.5A

Remote socket (6)

1

2

3

12

3

View ofsocket side

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 39: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 39

1 2

6 6

1400 m

m / 5

5.1

3 4

5

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 40: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

40 New installation of S8 / S 81 ceiling mount

On-site electrical installation

The power lines on the site of installation must be run up to the interfaceplate. In addition, the potential equalization lines must be run to the termi-nals on the interface plate.

Warning!– The planning, execution and inspection of the on-site electrical instal-

lations must be performed by expert electrical technicians and official-ly registered electrical firms.

– The electrical installations of the room concerned must comply withthe requirements of the applicable national regulations. In the FederalRepublic of Germany, VDE 0107 applies.

– The number of circuits is dependent on the customer's specific carriersystem configuration.

– If several circuits are required by the customer, appropriate allowancemust be made on the interface plate.

– Multiwire lines must be provided with wire end sleeves.

Legend

A Connections for accessory assemblies(OR illuminators, monitor stands)

For explanation on the terminals B and C, refer to the chapter "Accessoryinterface", page 73.

D Connections for potential equalizationmaximum cross-section of terminal connectionTerminal 1 - 4 = 16mm2 (AWG 6)Terminal 5 - 8 = 6mm2 (AWG 10)

E Connection at the building

F Connections at the mount

G Power current connectionsmaximum cross-section of terminal connection = 4mm2 (AWG 12)Plug (Cat.No. 6 001 215) with the contacts (H): L1, N1, PE1;L2, N2, PE2 and L3, N3, PE3.

H Terminal numbers

I Circuit numbers

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 41: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 41

H I

E

F

A

D GA

D

G

B

L1

L2PE

C

L1

L2PE

L1

L2PE

L1

L2PE

6 PE5 PE

PE 7PE 8

PE 1

PE 2

4 PE

3 PE

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 42: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

42 New installation of S8 / S 81 ceiling mount

Check connection to power supply

Important:The ceiling mount has two options for setting the voltage to that of thecountry of use:

– Transformer connection terminal at the interface plate.Settings: 100 - 115 - 230 V

– Power pack (supply unit)Settings: 115 - 230 V

During the initial installation, our service technicians will check the factorysetting.

– The connection to the power supply must comply with the applicablenational regulations.

– The main switch (2-pole) is provided.

– Mains fuse230V: min. 10A, slow-blowing C115V: min. 20A, slow-blowing C

– All cables and plugs are in perfect condition.

– Potential equalization: If required, the unit can be comprised in theprotection measure "potential equalization".

– A connection for OR illuminators is provided (option).

We recommend to integrate the main switch into the central OR controldesk.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 43: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 43

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 44: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

44 New installation of S8 / S 81 ceiling mount

Planning the mechanical installation

Mounting the pre-installation set

Note:• Check the mounting situation, in particular the room height.

• Mount the pre-installation set before the false ceiling is installed.

A minimum of 2 installers are required for mounting the pre-installationset. The ceiling anchor plate proper has a weight of approx. 40kg.

The pre-installation set comprises the assemblies:1 Ceiling anchor plate

2 Spacers (8 pcs.)

3 Interface plate

4 Supply connection label(1167-817).

Tools and accessories required:– Two sufficiently long ladders and lifting equipment (lifting table).

– Torque wrench: 0-120Nm (minimum).

– Flat wrench and bits for the torque wrench:24mm and 55mm (0.9" and 2.2") each.

– Dowel anchors as specified by the structural engineer.

– Dimension sheet (supplied with the pre-installation set).

Mounting the ceiling anchor plate

The ceiling anchor plate weighs approx. 40kg. Two installers are requiredto mount it.

• Measure the position in accordance with the plan and ensure that oneside of the ceiling anchor plate lies parallel to the closest wall.

Supply connection label (4The supply connection label (1167-817)marks the supply connection terminals.The label will be installed by the installerwhen he mounts the pre-installation set.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 45: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 45

2

1

3

4

mm Inch

605 23.8

517 20.4

25 1.0

Ø400 Ø15.7

Ø560 Ø22.0

Ø26 Ø1.0

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 46: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

46 New installation of S8 / S 81 ceiling mount

Installing the spacers

• Install the eight spacers (2) in the ceiling anchor plate (1).

• Use a torque wrench with 55mm (2.2") flat wrench bit to tighten thespacers (2), applying a torque of 120Nm.

• Adjust the lengths of the threaded rods (3) so that the distance be-tween the bottom edge of the false ceiling and the bottom end of thethreaded rod is 75mm (3").

Note:The mount flange (4) is only shown here for information. It is not includedin the pre-installation set. The mount flange (4) is part of the ceiling mount.

1

3 4

75mm / 3"2

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 47: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 47

Installing the interface plate

Note:The connection for the potential equalization (1) and the ferrules for thepower supply (2) are fastened on the interface plate (3).

• Check that the interface plate (3) complies with the dimension sheet(job number).

• Remove the nut M16 (SW 24) (5) from each threaded rod.

• Push the interface plate (3) on the threaded rods in such a way thatone side is aligned parallel to the wall closest to it. The ferrules for thepower supply (2) must face down. Screw the nuts M16 (SW 24) (5) onthe threaded rods.

• Tighten the M16 (SW 24) (5) applying a torque of 70Nm (51.6lbf.ft).

Note:The mount flange (4) is only shown here for information. It is not includedin the pre-installation set. The mount flange (4) is part of the ceiling mount.

1

3

2

3

4

5

75mm3"

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 48: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

48 New installation of S8 / S 81 ceiling mount

300 mm (11.8") ceiling panel extension

If the distance between the structural ceiling and the false ceiling (T) issignificantly smaller than 200 mm (7.9"), i.e. smaller than 190 mm (7.5"),you will need the ceiling panel extension (1). Then, the ceiling panel (2)on its own will not be sufficient to fully cover the pre-installation set (3).The ceiling plate extension (1) cannot enclose the interface plate (5). If theinterface plate (5) also projects from the false ceiling, you need to orderthe "Cover for pre-installation set" (Cat.-No. 1139-023).

A ceiling panel extension 300mm (11.8") (1177-632) plus mounting in-structions can be ordered from the Zeiss service department as a sparepart.On site, the installer will cut the 300mm ceiling panel extension to matchthe individual requirements, and mount it in accordance with the mountinginstructions (1177-632).

Legend

1 Ceiling panel extension 300mm (11.8") (1177-632)2 Tandem ceiling panel for ceiling mounts S8 / S81 (1083-804)3 Pre-installation set(1078-181)4 False ceiling5 Interface plate6 Structural ceilingT Distance between structural ceiling and false ceiling

3

4

21

6

5T

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 49: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 49

Confirmation of the structural calculation and execution of installation

Sales order no.: ...........................................................................................

Customer address / Delivery address:

...........................................................................................

...........................................................................................

...........................................................................................

By signing below, the following persons confirm that they have per-formed their work in a proper and orderly way:

The structural engineer for

– the selection and layout of the installation site, taking possible build-ing vibrations into account

– the structural calculation of the ceiling stiffness for the installation lo-cation

– the structural calculation, taking into account the applicable nationalregulations and the planning manual

– the structural checking of an existing substructure

– the structural calculation of a substructure built on site

– the final checking and release of the structural calculations:

Name and address ofthe structural engineer:

...........................................................................................

...........................................................................................

...........................................................................................

.............................. ..................................................................

Date Signature

The installer forthe proper mounting of the pre-installation set or the ceiling or wall flangefrom Carl Zeiss:

Name and address ofthe executing companyand installer’s name:

...........................................................................................

...........................................................................................

...........................................................................................

.............................. ..................................................................

Date Signature

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 50: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

50 New installation of S8 / S 81 ceiling mount

Ordering data

S8 ceiling mount for ORs with false ceilings, ordering data

Note:Please make sure that you enter the appropriate dimensions in thedrawing below for each order.

• Enclose a copy of the drawing with the appropriate dimensions withyour order.

A Distance between structural ceiling and false ceiling(ordered length of pre-installation set)

B Distance between false ceiling and floor

Description Cat.No.

S8 ceiling mount 1176-968

Pre-installation set for new installation 1078-181

Wall socket for S8/S81 CM for foot control panel 1078-524

S8/S81 instrument socket for foot control panel 1141-820

Ceiling panel for S 8 / S81 ceiling mounts 1083-804

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 51: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 51

Order sheet for S8 ceiling mount in ORs with false ceilings

A

mm

Bm

m

min

. 280

0m

mm

ax. 3

300

mm

min

. 200

mm

max

. 800

mm

Alternatively in inch:

A = "

min. 7.9", max. 31.5"

B = "

min. 110.2", max. 129.9"

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 52: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

52 New installation of S8 / S 81 ceiling mount

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 53: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 53

S8 ceiling mount for ORs without false ceilings, ordering data

Only in case of an OR theater without false ceiling, use the order formbelow to order the ceiling mount.For OR theaters without a false ceiling, you will need a cover for the pre-installation set (1078-181). Order the cover for the pre-installation set asa kit (1139-023).

Description Cat.No.

S8 ceiling mount 1176-968

Pre-installation set for new installation 1078-181

Cover for pre-installation set 1139-023

Wall socket for S8/S81 CM for foot control panel 1078-524

S8/S81 instrument socket for foot control panel 1141-820

Ceiling panel for S 8 / S81 ceiling mounts 1083-804

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 54: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

54 New installation of S8 / S 81 ceiling mount

Note:Please make sure that you enter the appropriate dimensions in thedrawing below for each order.

• Enclose a copy of the drawing with the appropriate dimensions withyour order.

H Room heightDistance between floor and structural ceiling.

• Measure this height accurately.

I Desired installation height of the S8 ceiling mountThe installation height of the S8 ceiling mount is the distance betweenthe floor and the lower edge of the mount flange.

• You need to define the installation height.

Note:The mounting height may be between 2800mm (110.2") and 3300mm(129.9"). A mounting height of 3100mm (122") is ideal and offers thebest compromise between working height and headroom.

A Order length of the pre-installation set,defined by way of the measured room height (H) minus the definedmounting height (I) minus 45mm (1.8").

F Cut length of cover (1139-023),defined by way of the measured room height (H) minus the definedmounting height (I) minus 52mm (2").

1 Structural ceiling, lower edge

2 Cover for pre-installation set (1139-023)

3 Ceiling panel(1083-804)

4 Mount flange, lower edge

5 Floor, upper edge

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 55: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 55

Order sheet for S8 ceiling mount in ORs without false ceilings

1

2

4

3

F

mm

H

mm

I

5

Cut length of cover:

F = H - I - 52mm

F =

min 197mm, max 800mm

Order length of the pre-installation set:

A = H - I - 45mm

A =

min 200mm, max 800mm

mm

mm

Alternatively in inch:

H = "

I = "

Order length of the pre-installation set:

A = H - I - 1.8"

A = "

min. 7.9", max. 31.5"

Cut length of cover:

F = H - I - 2"

F = "

min. 7.9", max. 31.5"

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 56: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

56 New installation of S8 / S 81 ceiling mount

S81 ceiling mount for ORs with false ceilings, ordering data

Note:Please make sure that you enter the appropriate dimensions in thedrawing below for each order.

• Enclose a copy of the drawing with the appropriate dimensions withyour order.

A Distance between structural ceiling and false ceiling(order dimension of the pre-installation set)

B Distance between false ceiling and floor

C Ground clearance;we recommend different ground clearance dimensions depending onthe range of application:

– ENT 1650mm (65")

– Ophthalmology 1800mm (70.9")

– Reconstructive and plastic surgery 1800mm (70.9")

– Others 1650mm (65")

D Column length (order dimension)The dimension is calculated pursuant to the formula: D = B - C - 810mm (31.9")

Note: Column length (D) >600mm (>23.6“)Depending on the design of the building, building vibrations becomenoticeable with a column length (D) of >600mm (>23.6“).

• The specification of column lengths of >600mm (>23.6“) should be re-stricted to exceptional cases. The conditions of the building permitting,choose a correspondingly greater height (A) of the pre-installation setto avoid column lengths >600mm (>23.6“) . If the pre-installation setthen protrudes from the false ceiling, use the ceiling panel extension(1177-632) to cover it.

Description Cat. No.

S81 ceiling mount 1176-969

Pre-installation set for new installation 1078-181

Wall socket for S8/S81 CM for foot control panel 1078-524

S8/S81 instrument socket for foot control panel 1141-820

Ceiling panel for S 8 / S81 ceiling mounts 1083-804

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 57: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 57

Order sheet for S81 ceiling mount in ORs with false ceilings

mm

mm

mm

min

. 200

mm

max

. 80

0m

m

Column length (order dimension):

D = B - C - 810mm

D = mmmin. 40mm, max. 800mm*)

*) Recommendation: max. 600mm,see note page 56.

A

B

D

Alternatively in inch:

A = "

min. 7.9 - max. 31.5 bar

B = "

C = "

Column length:

D = B - C - 31.9“

D = "

min. 1.6“, max. 31.5“ *)

*)Recommendation: max. 23.6", see note page56.

C

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 58: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

58 New installation of S8 / S 81 ceiling mount

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 59: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 59

S81 ceiling mount for ORs without false ceilings, ordering data

Only in case of an OR theater without false ceiling, use the order formbelow to order the ceiling mount.For OR theaters without a false ceiling, you will need a cover for the pre-installation set (1078-181). Order the cover for the pre-installation set asa kit (1139-023).

Description Cat.No.

S81 ceiling mount 1176-969

Pre-installation set for new installation 1078-181

Cover for pre-installation set 1139-023

Wall socket for S8/S81 CM for foot control panel 1078-524

S8/S81 instrument socket for foot control panel 1141-820

Ceiling panel for S 8 / S81 ceiling mounts 1083-804

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 60: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

60 New installation of S8 / S 81 ceiling mount

Note:Please make sure that you enter the appropriate dimensions in thedrawing below for each order.

• Enclose a copy of the drawing with the appropriate dimensions withyour order.

Important:Plan the ceiling mount S81 in accordance with the following principle:Keep the order dimension (A) of the pre-installation set as small as pos-sible and choose a correspondingly greater column length (D) if neces-sary.

C Desired ground clearanceWe recommend different ground clearance dimensions depending on the range of application: ENT 1650mm (65"), ophthal-mology 1800mm (70.9"), reconstructive and plastic surgery 1800mm(70.9"), others 1650mm (65").

H Room height (distance between floor and structural ceiling)• Measure this height accurately.

A Order dimension of the pre-installation setProceed from the minimum order dimension of 200mm (7.9").

D Column length (order dimension)Calculate the column length: D = H - A - C - 810mm (31.9"). The column length must be a minimum of 40mm (1.6") and a maxi-mum of 800mm (31.5"). Note: Column lengths >600mm (>23.6“)Depending on the design of the building, building vibrations becomenoticeable with a column length (D) of >600mm (>23.6“).

• The specification of column lengths of >600mm (>23.6“) should be re-stricted to exceptional cases. The conditions of the building permitting,choose a correspondingly greater height (A) of the pre-installation setto avoid column lengths >600mm (>23.6“) . Example: Proceeding from the recommended maximum columnlength (D) of 600 mm (23.6"), calculate the order dimension (A) of thepre-installation set in accordance with the formula: D = B - C - 810mm (31.5").

F Cut length (F) of cover (1139-023)Calculating the cut length (F) of the cover: F = A - 7mm (-0.3").

1 Structural ceiling, lower edge2 Cover for pre-installation set (1139-023)3 Ceiling panel (1083-804)4 Mount flange, lower edge5 Floor, upper edge

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 61: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

New installation of S8 / S 81 ceiling mount 61

Order sheet for S81 ceiling mount in ORs without false ceilings

1

2

43

mm

H

5

Cut length (F) of cover:

F = A - 7mm

F =min 193mm, max 800mm

Pre-installation set, order dimension (A):

A =

min 200mm, max 800mm

mm

C

mm

Column length, order dimension (D):

D = H - A - C - 810mm

D =

Alternatively in inch:

A = "

min. 7.9", max. 31.5"

C = "

H = "

Column length (D):

D = H - A - C - 31.9"

D = "

min. 1.6", max. 31.5" *)

*)Recommendation: max. 23.6",see note page 60.

Cut length (F) ofcover:

F = A - 0.3"

F = "

min. 7.9", max. 31.5"

min. 40mm, max. 800mm*)

*) Recommendation: max. 600mm,see note page 60.

mm

mm

D

A F

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 62: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

62 New installation of S8 / S 81 ceiling mount

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 63: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Accessory interface 63

Accessory interface

Accessory interface 64

Coupling of the Zeiss system with accessories from other manufacturers 64

Installation position 65

Mount flange and ceiling panel 66

Mount flange (flange plate) 68

Configuration example: mount flange with flange tube 69

Pre-installation set 70

Customer's responsibilities 71

Electrical connections for accessory modules 73

Confirmation of the structural calculation and execution of installation 75

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 64: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

64 Accessory interface

Accessory interface

Next to the flange area for the carrier arm of the ceiling mount, the mountflange also features a flange area for an accessory carrier. This is the ac-cessory interface designed as a hole circle, see page 68.

This accessory interface permits you to mount an accessory carrier e.g.for OR illuminators, supports, monitor brackets, trays for video systems orsimilar devices.

Coupling of the Zeiss system with accessories from other manufacturers

Important:Combining a device by Carl Zeiss with accessories (OR illuminators,monitor holders, etc.) by other manufacturers results in a new medicalsystem. The producer of the new system must procure the required pre-conditions for that system (approval, qualification, structural analysis etc.) In this context, please comply with the operating instructions by the man-ufacturers of the accessory assemblies. For more information, contact ourservice department or authorized dealerships.

• Check the feasibility of the installation in detail together with the man-ufacturer of the relevant accessory module (OR illuminator or monitorbracket).

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 65: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Accessory interface 65

Installation position

Important:When defining the positions and motion ranges of the accessory compo-nents, please take the geometry of the ceiling mount into account in re-spect of the risk of collision. For the dimensions, please see:

– the figure on page 7 for ceiling mount S8;

– the figure on page 8 for ceiling mount S81.

Note:By default, the mount flange is mounted 45mm (1.8") below the falseceiling. For the dimensions of the pre-installation set, please refer to thefigure onpage 70.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 66: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

66 Accessory interface

Mount flange and ceiling panel

The S8 or S81 ceiling mount is secured with mount flange (1) on the pre-installation set already installed in the ceiling. In addition to the flangearea for the carrier arm of the ceiling mount, the mount flange also fea-tures a flange area for an accessory carrier e.g. for attaching an OR illu-minator and/or monitor bracket. The mount flange is part of the ceilingmount and is included in its delivery package.

Ceiling panel (2) is used to cover the mount flange and the entire openingin the false ceiling. The opening in the false ceiling must not be larger than600 mm x 600 mm (23.6" x 23.6"). Two openings are provided in theceiling panel, one for the ceiling mount and one for an accessory carrier.

Cover frame (3) closes the remaining space between the square tube ofthe ceiling mount and the ceiling panel. Blind cover (4) is supplied together with the ceiling panel, permitting theopening for the accessory carrier to be completely closed. You can makean opening in blind cover (4) which fits the accessory carrier used.A dummy cover is available for closing the opening in the false ceiling untilthe ceiling mount is installed. Also see page 50 and page 54.

Note:The S8 or S81 ceiling mount is delivered with the following componentsalready mounted: mount flange (1), cover frame (2) and carrier arm of theceiling mount (5), as in the configuration example on page 69.

Legend

1 Mount flange, a part of the ceiling mount.

2 Ceiling panel (1083-804), consisting of two half-shells that are con-nected on installation. With a new unit, the ceiling panel (1083-804) iscomprised in the delivery.

3 Cover frame; covers the remaining aperture between the carrier armof the mount (square pipe) and the ceiling panel.

4 Blind cover; fully closes the aperture for the flange tube in the ceilingpanel. Cut a hole in the blind cover that matches the size of the acces-sory carrier.

5 The top part of the carrier arm of ceiling mounts S8 and S81 is asquare pipe.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 67: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Accessory interface 67

2 2

1

3

4

5

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 68: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

68 Accessory interface

Mount flange (flange plate)

1 Accessory interface (flange area for an accessory carrier)with 6 tapped bores M12 in the Ø270mm (10.6") hole circle.By means of an accessory carrier, for example a flange tube, the ac-cessory components (illumination, monitor holder, etc.) can bemounted here.

2 Hole circle with 8 Ø17mm (0.7") boresThis is the interface to the pre-installation set. At this hole circle, themount flange is mounted to the threaded rods of the pre-installationset.

3 Flange area for the carrier arm of the ceiling mountThe flange area has four bores arranged in a square pattern. On de-livery, the carrier arm of the ceiling mount (square pipe) is mounted tothis flange area.

Mount flange, bottom view

1 2 3 mm Inch

Ø17 Ø0.7

Ø270 Ø10.6

Ø160 Ø6.3

Ø165,5 Ø6.52

123 4.8

150 5.9

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 69: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Accessory interface 69

Configuration example: mount flange with flange tube

1 Mount flange

2 Ceiling panelOnly one piece of the ceiling panel is shown.

3 Flange tube (example)A flange tube of this type can be used for mounting accessories (illu-minators, monitor mount, etc.).

4 Upper part of the carrier armThe upper part of the carrier arm of the S8 and S81 ceiling mountsconsists of a square tube.

Mount flange with flange tube, bottom view

1

2

3 4

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 70: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

70 Accessory interface

Pre-installation set

1 Stud bolt

2 Spacers

3 Ceiling anchor plate

4 Floor

5 Ceiling panel

6 Mount flange

7 False ceiling

8 Interface plate

9 Structural ceiling

10 Dimension Ais the distance between the structural ceiling and false ceiling.

Mount flange (6) and ceiling panel (5) are part of the ceiling mount and areonly shown here for information. They are not included in the pre-installa-tion set.

75

150

123

56

7

89

A

620 mm / 24.4“

45 m

m /

1.8“

100

mm

/ 3

.9“

75 m

m /

3“

10

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 71: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Accessory interface 71

Customer's responsibilities

Note:Zeiss service department can only install the ceiling mount if all precondi-tions listed in the specification below and applicable in the individualmounting situation on site have been met.

The actual load on the ceiling depends on a large number of different fac-tors which must be specified accurately for the individual case by a struc-tural engineer. Refer to page 30, "On-site preparations for ceilingmounts".

Important:• The additional perpendicular force and the additional torque attributa-

ble to the accessory components mounted to the accessory interfacemust be taken into account separately by your structural engineer, i.e.he/she must add these to the perpendicular force and torque appliedto the ceiling by the ceiling mount proper.

• It is mandatory that you have the mounting situation checked by astructural engineer during the planning stage. Structural evidence must be submitted before the stand is mounted.We recommend that you keep the structural evidence with the docu-ments on the ceiling mount.

• Have a structural engineer confirm in writing that the applicable na-tional regulations have been met.

• Enclose a copy of the structural evidence in the form of a "Structuralanalysis certificate" (see page 75) with your order.

• Should the actual mounting situation differ from the planning docu-ments, consult your contact at Carl Zeiss or the planning engineer be-fore mounting the pre-installation set.

• The conditions on site also comprise building vibrations that must betaken into account by your structural engineer already at planningstage, see page 26. Have your structural engineer confirm in writing that he/she has takenpossible building vibrations into account, see page 75.

• Have a structural engineer confirm in writing that he or she has com-plied with the ceiling stiffness values, see page 28.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 72: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

72 Accessory interface

Forces and torques

Caution!Your structural engineer must ensure for the individual case on site thatthe structural ceiling can receive the forces and torques defined below.The structural engineer must take into account any other loads on theceiling, if applicable, and add the required safety margin under observa-tion of the applicable national regulations.

Note:For the accessory interface, the maximum permissible perpendicularforce and the maximum permissible torque follow from the difference be-tween the maximum permissible values for the pre-installation set and thevalues for the ceiling mount; i.e. "pre-installation set minus ceiling mountequals accessory interface".

Pre-installation setAs a maximum, the pre-installation set can receive the following perpen-dicular force and torque:

Ceiling mount S8 or S81For a ceiling mount S8 or S81, the pre-installation set must receive the fol-lowing perpendicular force and torque:The values below comprise an additional load of 800N (180lbf) added asa safety margin.

AccessoriesAccordingly, the pre-installation set has the following perpendicular forceand torque left over for the accessory components: Maximum forces and torques for the accessory components proper.

– Perpendicular force: max. 6200N (max. 1393lbf)

– Torque: max. 9500Nm (max. 7007lbf.ft)

S8 S81

– Perpendicular force: min. 3115N (min. 700lbf)

min. 2717N (min. 611lbf)

– Torque: min. 3245Nm (min. 2393lbf.ft)

min. 2316Nm (in. 1708lbf.ft)

S8 S81

– Perpendicular force: min. 3085N (max. 694lbf)

max. 3483N (max. 783lbf)

– Torque: max. 6255Nm (max. 4614lbf.ft)

min. 7184Nm (max. 5299lbf.ft)

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 73: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Accessory interface 73

Electrical connections for accessory modules

The power supply for the electrical accessory components can be con-nected to connectors "A" on the interface plate (connectors for OR illumi-nators, terminal blocks B and C).

On-site preparations for connection of accessory components

• In the building, the power cables must be installed up to the interfaceplate.

• If required, lay control cables and/or monitor connections up to the in-terface plate.

• In case of flush mounting, provide a sufficient number of ducts of suf-ficient cross-section.

• Additionally, lay cables for the potential equalization to the terminalson the interface plate.

Warning!– The planning, execution and inspection of the on-site electrical instal-

lations must be performed by expert electrical technicians and official-ly registered electrical firms.

– The electrical installations of the room concerned must comply withthe requirements of the applicable national regulations. In the FederalRepublic of Germany, VDE 0107 applies.

– The number of circuits is dependent on the customer's specific carriersystem configuration.

– If several circuits are required by the customer, appropriate allowancemust be made on the interface plate.

– Multiwire lines must be provided with wire end sleeves.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 74: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

74 Accessory interface

Legend

A connections for OR illuminators

B terminal 1 for OR illuminator 1maximum cross-section of terminal connection = 16mm2 (AWG 6)

C terminal 2 for OR illuminator 2maximum cross-section of terminal connection = 16mm2 (AWG 6)

For more details on the other terminals, refer to the chapter "On-site elec-trical installation", page 40.

A

A

B

L1

L2PE

C

L1

L2PE

L1

L2PE

L1

L2PE

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 75: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Accessory interface 75

Confirmation of the structural calculation and execution of installation

Sales order no.: ...........................................................................................

Customer address / Delivery address:

...........................................................................................

...........................................................................................

...........................................................................................

By signing below, the following persons confirm that they have per-formed their work in a proper and orderly way:

The structural engineer for

– the selection and layout of the installation site, taking possible build-ing vibrations into account

– the structural calculation of the ceiling stiffness for the installation lo-cation

– the structural calculation, taking into account the applicable nationalregulations and the planning manual

– the structural checking of an existing substructure

– the structural calculation of a substructure built on site

– the final checking and release of the structural calculations:

Name and address ofthe structural engineer:

...........................................................................................

...........................................................................................

...........................................................................................

.............................. ..................................................................

Date Signature

The installer forthe proper mounting of the pre-installation set or the ceiling or wall flangefrom Carl Zeiss:

Name and address ofthe executing companyand installer’s name:

...........................................................................................

...........................................................................................

...........................................................................................

.............................. ..................................................................

Date Signature

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 76: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

76 Accessory interface

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 77: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 77

Discipline-specific installation positions

Installation positions for ophthalmology and ENT 79

Installation position for P&R, Hand 92

Installation position for Neuro, Spine, Uro and Gyn 95

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 78: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

78 Discipline-specific installation positions

The various surgical disciplines and the respective spatial situations re-quire different installation positions of the ceiling mounts S8 and S81.

This chapter specifies some recommended installation positions of ceilingmounts S8 and S81 for the different surgical disciplines.

Note:In case of unfavorable spatial situations, it may be necessary to deviatefrom the recommended installation positions. As a result, use of OR illu-minators may be impossible in full or in part for lack of space.

Important:The recommended installation positions for the various surgical disci-plines do not replace careful planning on your part. Careful planning is theonly way to ensure smooth, collision-free working processes during sur-gery.

Scale 1:20

All recommended installation positions for the various surgical disciplinesare shown in a scale of 1:20. Usually, they can be taken over directly intothe construction plan.

Transparent sheet

To simplify your planning efforts, you can copy the installation position forthe applicable surgical discipline shown in scale 1:20 on a transparentsheet. Then, put the transparent sheet on the construction plan and moveand turn it to the appropriate position.

Note:In the following drawings, the position of the ceiling mount shown in lightgray, shaded representation of the ceiling mount is the alternative, mirror-inverted mounting option.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 79: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 79

Installation positions for ophthalmology and ENT

The S8 or S81 ceiling mount is used for ophthalmology and ENT.

Recommendations for ophthalmology

Preferred installation position for ophthalmologyThe S8 or S81 ceiling mount is positioned above the patient's foot area(centered relative to the operating table).

Alternative installation position for ophthalmologyThe S8 or S81 ceiling mount is positioned laterally to the patient (centeredrelative to the patient's head).

Recommendation for ENT

GeneralTwo OR illuminators are normally used for ENT. Do not mount these ORilluminators (ceiling lights) on the mount flange of the ceiling mount, buton separate ceiling flanges. Otherwise, collisions are liable to occur if bothceiling lights are pointed at the surgical field at an angle from behind thesurgeon.

Preferred installation position for ENTThe S8 or S81 ceiling mount is centered above the operating table.The OR illuminators are not mounted on the flange of the ceiling mount,but on separate ceiling flanges.

Alternative installation position for ENTThe S8 or S81 ceiling mount is installed in a centered position behind thepatient's head.Again, the OR illuminators are not mounted on the flange of the ceilingmount, but on separate ceiling flanges.

Key for the following drawings

1 Pivot point of the ceiling mount

2 Flange area for an accessory carrier

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 80: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

80 Discipline-specific installation positions

Preferred installation position for ophthalmology and ENT

S8 ceiling mount positioned above the patient's foot area (centered rela-tive to the operating table). Flange area for accessory carrier (2) in out-ward position.

S8

M 1:20

1

2

R 750mmR 29.5“

R 175

0mm

R 68.

9“

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 81: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 81

Preferred installation position for ophthalmology and ENT

S8 ceiling mount positioned above the patient's foot area (centered rela-tive to the operating table). Flange area for accessory carrier (2) in inwardposition.

S8

2

1

R 750mmR 29.5“

R 175

0mm

R 68.

9“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 82: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

82 Discipline-specific installation positions

Preferred installation position for ophthalmology and ENT

S81 ceiling mount positioned above the patient's foot area (centered rel-ative to the operating table). Flange area for accessory carrier (2) in out-ward position.

S81

1

2

R 600 mmR 23.6“

R 1400

mm

R 55.

1“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 83: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 83

Preferred installation position for ophthalmology and ENT

S81 ceiling mount positioned above the patient's foot area (centered rel-ative to the operating table). Flange area for accessory carrier (2) in in-ward position.

S81

2

1

R 600mmR 23.6“

R 140

0mm

R 55.

1“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 84: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

84 Discipline-specific installation positions

Alternative installation position for ophthalmology

S8 ceiling mount positioned laterally to the patient (centered relative to thepatient's head). Flange area for accessory carrier (2) in outward position.

S8

2

1

2

1

R 1

750

mm

R 6

8.9“

R 1

750m

mR

68.

9“

R 7

50m

m

R 2

9.5“

R 7

50m

mR

29.

5“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 85: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 85

Alternative installation position for ophthalmology

S8 ceiling mount positioned laterally to the patient (centered relative to thepatient's head).Flange area for accessory carrier (2) in inward position.

S8

21 12

R 750

mm

R 29.

5“

R 750m

m

R 29.5“

R 1750mm

R 68.9“

R 1750mm

R 68.9“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 86: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

86 Discipline-specific installation positions

Alternative installation position for ophthalmology

S81 ceiling mount positioned laterally to the patient (centered relative tothe patient's head). Flange area for accessory carrier (2) in outward posi-tion.

S81

2 1 21

R 600mm

R 23.6“

R 1400mmR 55.1“

R 1400mmR 55.1“

R 600mm

R 23.6“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 87: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 87

Alternative installation position for ophthalmology

S81 ceiling mount positioned laterally to the patient (centered relative tothe patient's head). Flange area for accessory carrier (2) in inward posi-tion.

S81

21 2 1R 1400mmR 55.1“ R 1400mm

R 55.1“

R 600mm

R 23.6“R 600mmR 23.6“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 88: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

88 Discipline-specific installation positions

Alternative installation position for ENT

S8 ceiling mount positioned behind the patient's head. Flange area for ac-cessory carrier (2) in outward position.

S8

2

1

R 68.9“

R 1750

mm

R 750mm

R 29.5“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 89: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 89

Alternative installation position for ENT

S8 ceiling mount positioned behind the patient's head. Flange area for ac-cessory carrier (2) in inward position.

S8

2

1

R 750mm

R 29.5“

R 1750m

m

R 68.9“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 90: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

90 Discipline-specific installation positions

Alternative installation position for ENT

S81 ceiling mount positioned behind the patient's head. Flange area foraccessory carrier (2) in outward position.

S81

1

2

R 1400 m

m

R 55.1“

R 600 mmR 23.6“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 91: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 91

Alternative installation position for ENT

S81 ceiling mount positioned behind the patient's head. Flange area foraccessory carrier (2) in inward position.

S81

2

1R 1400m

m

R 55.1“

R 600mmR 23.6“

M 1:20

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 92: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

92 Discipline-specific installation positions

Installation position for P&R, Hand

The S8 ceiling mount is used for P&R and hand surgery.

The installation positions recommended in this chapter are also suitablefor the following applications:

– ENT

– Neurology

– Urology

– Oral and maxillofacial

– Spine (limited suitability).

Note:In P&R surgery, one or the other of the patient's hand may sometimes bedifficult to reach. In such cases, there is usually the possibility of turningthe operating table in such a way that the hand concerned is broughtwithin the optimum working range of the ceiling mount.

Key for the following drawings

1 Pivot point of the ceiling mount

2 Flange area for an accessory carrier

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 93: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 93

Recommended installation position for P&R, Hand

S8 ceiling mount positioned laterally to the operating table, approximatelymidway along the table. Flange area for accessory carrier (2) in outwardposition. Preferable if OR illuminators are mounted separately.

S8

12 1 2

M 1:20

R 1750mmR 68.9“R 1750mm

R 68.9“

R 750mm

R 29.5“ R 750mmR 29.5“

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 94: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

94 Discipline-specific installation positions

Recommended installation position for P&R, Hand

S8 ceiling mount positioned laterally to the operating table, approximatelymidway along the table. Flange area for accessory carrier (2) in inwardposition. Preferable if OR illuminators are mounted on the flange tube.

S8

2 11 2

M 1:20

R 1750mm

R 68.9“

R 1750mm

R 68.9“

R 750m

m

R 29.5“

R 750

mm

R 29.

5“

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 95: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 95

Installation position for Neuro, Spine, Uro and Gyn

The S8 ceiling mount is used for the disciplines of neurology, spine, uro-logy and gynecology.

The installation positions recommended in this chapter are also suitablefor ENT, with certain restrictions.

Key for the following drawings

1 Pivot point of the ceiling mount

2 Flange area for an accessory carrier

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 96: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

96 Discipline-specific installation positions

Recommended installation position for Neuro, Spine, Uro and Gyn

S8 ceiling mount positioned laterally to the operating table, approximatelymidway along the table. Flange area for accessory carrier (2) in outwardposition.

S8

2

1

2

1

M 1:20

R 1

750m

mR

68.

9“

R 750

mm

R 29.

5“

R 7

50m

m

R 2

9.5“

R 1

750

mm

R 6

8.9“

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 97: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Discipline-specific installation positions 97

Recommended installation position for Neuro, Spine, Uro and Gyn

S8 ceiling mount positioned laterally to the operating table, approximatelymidway along the table. Flange area for accessory carrier (2) in inwardposition. Preferable if OR illuminators are mounted on the flange tube.

1

2

2

1

M 1:20

S8

R 175

0mm

R 68.

9“

R 750mm

R 29.5“

R 750mm

R 29.5“

R 1

750

mm

R 6

8.9“

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 98: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

98 Discipline-specific installation positions

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 99: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 99

Installation on an existing substructure

Installation options 101

Working ranges 101

Mounting options 102

Adapter plate (1071-924) 102

Installation on an intermediate piece of S23 or EMD2 104

Mounting the adapter plate in an offset position 104

Mounting the adapter plate in a centered position 108

Installation on an existing ZDK intermediate piece 112

Electrical components installed at mounting bracket 112

Ceiling panel extension 300mm (11.8") 116

On-site preparations 117

Customer's responsibilities 117

Constructional requirements 119

Forces and torques 119

Confirmation of the structural calculation and execution of installation 120

Ordering data 121

Mounting an S8/S81 ceiling mount on an existing intermediate piece 121

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 100: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

100 Installation on an existing substructure

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 101: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 101

Installation options

Under certain circumstances, the ceiling mounts S8 and S81 can be con-nected to existing substructures of ceiling mounts S23, EM2, S5, S51, S6,or S61.

Note:It is not possible to install the ceiling mount on an existing ceiling track.

A special installation set is available for adapting ceiling mounts S8 andS81 to existing substructures (pre-installation sets of older ceilingmounts). The key element of the special mounting set is the adapter plate.In this application, the adapter plate replaces the mount flange comprisedin the delivery by default.

This concerns opthalmologic surgery, ENT surgery, and P&R surgery.

Note:Only use this special installation set if you are unable to install the pre-in-stallation set for new installations (Cat.-No. 1078-181) in the OR.The typical working distances (microscope axis - pivot axis 1) of 1250mm(49.2") for ceiling mount S8 or 1000mm (39.4") for ceiling mount S81 canonly be implemented with the pre-installation set for new installations;also refer to page 21 or page 23.

Working ranges

Ceiling mounts EMD2 and S23 are dimensioned for optimum working dis-tances (mount flange to microscope axis) of 650mm (25.6"). With a fixedOR table, working distances of 900mm (35.4") can be achieved with theadapter plate rotated by 180°. With an additionally possible lateral shiftingof the adapter plate by 90mm (3.5"), working distances of 990mm (39")can be achieved.

Note:For ceiling mounts S8/S81, the typical recommended working ranges (= distance between pivot axis 1 and microscope axis) are as follows:

– 1250mm ± 500mm (49.2" ± 19,7") for ceiling mount S8.

– 1000mm ± 400mm (39.4" ± 15,7") for ceiling mount S81.

Accordingly, you have reached the rear mechanical stop when adaptingceiling mount S8, as shown in the drawings on page 104.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 102: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

102 Installation on an existing substructure

Mounting options

Using the adapter plate, the S8 or S81 ceiling mount can be mountedon:

– existing intermediate piece (305658-0000.000) of an S23 or EMD2ceiling mount, with the adapter plate in a laterally offset position andthe electrical components mounted on the mounting bracket.

– existing intermediate piece (305658-0000.000) of an S23 or EMD2ceiling mount, with the adapter plate in a centered position and option-ally:

– electrical components mounted on the mounting bracket or

– electrical components mounted on the adapter plate.

– existing ZDK intermediate piece (305658-0000.000) of an S5, S51, S6or S61 ceiling mount, and optionally:

– electrical components mounted on the mounting bracket or

– electrical components mounted on the adapter plate.

The different mounting options are described in more detail in the fol-lowing.

Adapter plate (1071-924)

1 Hole circleThe Ø440mm (17.3") hole circle is intended for installation to the ex-isting intermediate piece ZDK (305942-9103.000) of ceiling mountsS5, S51, S6, or S61.

2 Lines of boresThe lines of bores are intended for installation to the existing interme-diate piece (305658-0000.000) of ceiling mounts S23 or EMD2.Alternatively, the adapter plate may be laterally displaced by90mm (3.5") before mounting it to the intermediate piece of ceilingmounts S23 or EMD2.

t = 20mm (0.8"), plate thickness of adapter plate

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 103: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 103

2

2

1

mm Inch

Ø14 Ø0.55

Ø15 Ø0.6

Ø270 Ø10.6

Ø160 Ø6.3

Ø440 Ø17.3

120 4.7

140 5.5

mm Inch

250 9.8

500 19.7

90 3.5

123 4.8

150 5.9

275 10.8

550 21.7

t = 20 mm (0.8“)

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 104: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

104 Installation on an existing substructure

Installation on an intermediate piece of S23 or EMD2

Mounting the adapter plate in an offset position

Mounted adapter plate, laterally displaced by 90mm (3.5")

The two following drawings show a mounted adapter plate laterally dis-placed by 90mm (3.5"). The respective working area for the OR micro-scope is between the sectors marked with dotted lines. For reason of theabove, check when adapting a ceiling mount S8 or S81 whether it is pos-sible to reach the optimum working distance by moving the OR table:1250mm (49.2") for the S8 and 1000mm (39.4") for the S81.

Working range of the ceiling mount S8 with adapter plate laterallydisplaced by 90mm (3.5")

1 Pivot axisThe radii of the working range R = 750mm (29.5") and R = 1750mm (68.9") relate to this pivot axis.

1

990mm / 39“

R 1750mm

R 68.9“

R 750mm

R 29.5“

M 1:20

S8

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 105: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 105

Working range of the ceiling mount S81 with adapter plate laterallydisplaced by 90mm (3.5")

1 Pivot axisThe radii of the working range R = 600mm (23.6") and R = 1400mm(55.1") relate to this pivot axis.

1

M 1:20

990mm / 39“

R 600

mm

R 23.

6“ R 1400mm

R 55.1“

S81

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 106: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

106 Installation on an existing substructure

Mounted adapter plate, laterally displaced, andelectrical components installed on mounting bracket

Note:The electrical components can only be attached to the intermediatepiece (1) by means of the mounting bracket when the intermediatepiece (1) has a clear height of min. 310mm (12.2").

1 Intermediate piece of ceiling mounts S23 or EMD2(305658-0000.000)

2 False ceiling

3 Adapter plate

4 Electrical componentsinstalled on mounting bracket

5 Mounting bracketAlternatively, the mounting bracket may be turned by 180°.

Caution:When ordering an S81 ceiling mount for installation on an existing inter-mediate piece, you must determine and specify dimension B in the "Ordersheet for S81 ceiling mounts in ORs with false ceilings“ (see page 57) asfollows:

• Measure the distance between the bottom surface of the intermediatepiece to the floor.

• Subtract the probable distance between the adapter plate and the in-termediate piece and enter the value obtained as dimension B in theorder sheet.

The assumed distance between the adapter plate and the intermediatepiece is at least 50mm (1.97") when the electrical components are posi-tioned laterally on the mounting bracket.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 107: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 107

1

2

3

4 5

min

. 310

mm

/ 12

.2"

100

mm

3.

9"

45m

m

1.8"

min

. 50

mm

min

. 2.0

"

100 (50)mm3.9 (2.0)"

240 (200)mm9.4 (7.9)"

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 108: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

108 Installation on an existing substructure

Mounting the adapter plate in a centered position

Electrical components installed on mounting bracket

Note:The electrical components can only be attached to the intermediatepiece (1) by means of the mounting bracket when the intermediatepiece (1) has a clear height of min. 310mm (12.2").If applicable, the electrical components may also be mounted on adapterplate (3).

1 Intermediate piece of ceiling mounts S23 or EMD2(305658-0000.000)

2 False ceiling

3 Adapter plate

4 Electrical componentsinstalled on mounting bracket

5 Mounting bracketAlternatively, the mounting bracket may be turned by 180°.

Caution:When ordering an S81 ceiling mount for installation on an existing inter-mediate piece, you must determine and specify dimension B in the "Ordersheet for S81 ceiling mounts in ORs with false ceilings“ (see page 57) asfollows:

• Measure the distance between the bottom surface of the intermediatepiece to the floor.

• Subtract the probable distance between the adapter plate and the in-termediate piece and enter the value obtained as dimension B in theorder sheet.

The assumed distance between the adapter plate and the intermediatepiece is at least 50mm (1.97") when the electrical components are posi-tioned laterally on the mounting bracket.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 109: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 109

1

2

3

4 5

100

mm

3.

9"

45

mm

1.8"

min

. 50

mm

min

. 2.0

"

150mm5.9"

min

. 310

mm

/ 12

.2"

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 110: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

110 Installation on an existing substructure

Electrical components installed on mounting bracket

Note:The electrical components can only be installed on the adapter plate (3)when the clear height between the intermediate piece (1) and the adapterplate 3) is min. 108mm (4.3"). If applicable, the electrical components may also be mounted on the sideof the intermediate piece (1) by means of the mounting bracket.

1 Intermediate piece of ceiling mounts S23 or EMD2(305658-0000.000)

2 False ceiling

3 Adapter plate

4 Electrical componentsinstalled on adapter plate.

Caution:When ordering an S81 ceiling mount for installation on an existing inter-mediate piece, you must determine and specify dimension B in the "Ordersheet for S81 ceiling mounts in ORs with false ceilings“ (see page 57) asfollows:

• Measure the distance between the bottom surface of the intermediatepiece to the floor.

• Subtract the probable distance between the adapter plate and the in-termediate piece and enter the value obtained as dimension B in theorder sheet.

The assumed distance between the adapter plate and the intermediatepiece is at least 108mm (4.3") when the electrical components are posi-tioned on the adapter plate.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 111: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 111

1

2

3

4

100

mm

3.

9"

45m

m

1.8"

min

. 108

mm

min

. 4.3

"

150mm5.9"

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 112: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

112 Installation on an existing substructure

Installation on an existing ZDK intermediate piece

Intermediate piece ZDK (305942-9103.000) was used to install ceilingmounts S5, S51, S6, and S61.

Electrical components installed at mounting bracket

Note:The electrical components can only be attached to the intermediatepiece(1) by means of the mounting bracket when the intermediate piece(1) has a clear height of min. 310mm (12.2").If applicable, the electrical components may also be mounted on adapterplate (3).

.

1 Intermediate piece ZDK (305942-9103.000)of ceiling mounts S5, S51, S6, and S61

2 False ceiling

3 Adapter plate

4 Electrical componentsinstalled on mounting bracket

Caution:When ordering an S81 ceiling mount for installation on an existing inter-mediate piece, you must determine and specify dimension B in the "Ordersheet for S81 ceiling mounts in ORs with false ceilings“ (see page 57) asfollows:

• Measure the distance between the bottom surface of the intermediatepiece to the floor.

• Subtract the probable distance between the adapter plate and the in-termediate piece and enter the value obtained as dimension B in theorder sheet.

The assumed distance between the adapter plate and the intermediatepiece is at least 50mm (1.97") when the electrical components are posi-tioned laterally on the mounting bracket.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 113: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 113

1

2

3

4

min

. 310

mm

/ 12

.2"

100

mm

3.

9"

45m

m

1.8"

min

. 50

mm

min

. 2.0

"

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 114: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

114 Installation on an existing substructure

Electrical components installed on mounting bracket

Note:The electrical components can only be installed on the adapter plate (3)when the clear height between the intermediate piece (1) and the adapterplate (3) is min. 108mm (4.3").If applicable, the electrical components may also be mounted on the sideof the intermediate piece (1) by means of the mounting bracket (1124-211).

1 Intermediate piece ZDK (305942-9103.000)of ceiling mounts S5, S51, S6, and S61

2 False ceiling

3 Adapter plate

4 Electrical componentsinstalled on adapter plate.

Caution:When ordering an S81 ceiling mount for installation on an existing inter-mediate piece, you must determine and specify dimension B in the "Ordersheet for S81 ceiling mounts in ORs with false ceilings“ (see page 57) asfollows:

• Measure the distance between the bottom surface of the intermediatepiece to the floor.

• Subtract the probable distance between the adapter plate and the in-termediate piece and enter the value obtained as dimension B in theorder sheet.

The assumed distance between the adapter plate and the intermediatepiece is at least 108mm (4.3") when the electrical components are posi-tioned on the adapter plate.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 115: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 115

1

2

3

4

45m

m /

1.8"

min

. 108

mm

min

. 4.3

"

100

mm

3.

9"

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 116: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

116 Installation on an existing substructure

Ceiling panel extension 300mm (11.8")

You need the ceiling panel extension (1) to fully cover protruding interme-diate pieces of ceiling mounts S23, EMD2, S5, S51, S6, or S61.

To this end, a ceiling panel extension 300mm (11.8") with the respectivemounting instructions (1177-632) is comprised with every "installation setfor adapting S8D/S81D to existing ceiling anchors" (1120-925).

On site, the installer will cut the 300mm (11.8") ceiling panel extension tomatch the individual requirements, and mount it in accordance with themounting instructions (1177-632).

1 Ceiling panel extension 300mm (1177-632)

2 Tandem ceiling panel for ceiling mounts S8 / S81 (1083-804)

3 Adapter plate (1071-924)

4 False ceiling

5 Intermediate piece of ceiling mounts S23 or EMD2Here, the intermediate piece of ceiling mounts S23 or EMD2 is shownby way of example. The ceiling panel extension (1) can also be usedwith the intermediate piece ZDK of ceiling mounts S5, S51, S6, orS61.

6 Structural ceiling

3

4

21

6

5

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 117: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 117

On-site preparations

Customer's responsibilities

Note:Zeiss service staff can install the ceiling mount only if all points of the fol-lowing checklist applicable to the relevant installation conditions havebeen fulfilled.

Caution:• Obtain the structural verification for an existing substructure from a

structural engineer, i.e. make sure that the engineer confirms the ef-fective strength of the existing anchors. Structural verification must be performed prior to the installation of themount.Please add a copy of the "Confirmation of structural calculation" toyour order (see page 120).

• On-site conditions also include building vibrations, which the structuralengineer responsible must take into account right during the planningphase (see page 26). Obtain a written confirmation from your structural engineer stating thatpossible building vibrations have been taken into account (see page120).

• If an existing substructure is to be used, make sure that the maximuminclination of the ceiling anchor plate under load does not exceed 0.2°.

• The structural engineer must check that no modifications have beenmade to the substructure since the original installation.

• Obtain a written confirmation from a structural engineer stating thatthe applicable national codes and regulations have been compliedwith.

• If any differences exist between the planning documents and the ac-tual on-site situation, please inform your contact at Carl Zeiss or theplanning expert prior to the installation of the ceiling flange or pre-in-stallation set.

• Please note the information provided on page 106 for ordering an S81ceiling mount for installation on an existing substructure (existing in-termediate piece).

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 118: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

118 Installation on an existing substructure

Warning!• If an existing flange plate or intermediate piece must be exchanged,

never re-use the old anchors. New anchor holes must be drilled. When calculating the effective strength of the new anchors, the struc-tural engineer must take into account the weakening effect of the oldholes in the ceiling.

Planning the installation

• Inspect the mounting components supplied for completeness anddamage.

• Prior to the installation of a ceiling mount, you must always check thatthe actual installation conditions - in particular the room height - corre-spond to the specifications in the drawing.

• Two installers are required for mounting the mounting kit required forinstallation on existing ceiling anchors.

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 119: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 119

Constructional requirements

The actual load on the ceiling depends on a large number of different fac-tors. The requirements to be met by the ceiling or substructure result fromthe addition of perpendicular forces and torques produced by the suspen-sion system and accessories. These are the forces to be transmitted intothe structural ceiling via the ceiling anchors. The column must be aligned in a vertical position (max. deviation ± 0.5°).

Forces and torques

Caution!Your structural engineer must ensure for the individual case on site thatthe existing substructure and the structural ceiling can receive the forcesand torques defined below. The structural engineer must take into ac-count any other loads on the ceiling, if applicable, and add the requiredsafety margin under observation of the applicable national regulations.

Important:– An additional load of 800N (180) has been included in the perpendic-

ular forces and torques specified below. It is generated by having aperson hang on to the end of the spring arm (i.e. the microscope). Oth-er safety margins are not taken into account.

– The perpendicular forces and torques were dimensioned based on themaximum permissible payload at the spring arm.

For a ceiling mount S8 or S81 on its own (without accessories at the ac-cessory interface), the structural ceiling must be able to take the followingloads:

Ceiling mount S8 Ceiling mount S81

– Perpendicular force: min. 3115N min. (700lbf)

min. 2717N (min. 611lbf)

– Torque: min. 3245N (min. 2393lbf.ft)

min. 2316N (min. 1708lbf.ft)

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 120: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

120 Installation on an existing substructure

Confirmation of the structural calculation and execution of installation

Sales order no.: ...........................................................................................

Customer address / Delivery address:

...........................................................................................

...........................................................................................

...........................................................................................

By signing below, the following persons confirm that they have per-formed their work in a proper and orderly way:

The structural engineer for

– the selection and layout of the installation site, taking possible build-ing vibrations into account

– the structural calculation of the ceiling stiffness for the installation lo-cation

– the structural calculation, taking into account the applicable nationalregulations and the planning manual

– the structural checking of an existing substructure

– the structural calculation of a substructure built on site

– the final checking and release of the structural calculations:

Name and address ofthe structural engineer:

...........................................................................................

...........................................................................................

...........................................................................................

.............................. ..................................................................

Date Signature

The installer forthe proper mounting of the pre-installation set or the ceiling or wall flangefrom Carl Zeiss:

Name and address ofthe executing companyand installer’s name:

...........................................................................................

...........................................................................................

...........................................................................................

.............................. ..................................................................

Date Signature

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 121: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Installation on an existing substructure 121

Ordering data

Mounting an S8/S81 ceiling mount on an existing intermediate piece

Caution:When ordering an S81 ceiling mount for installation on an existing inter-mediate piece, you must determine and specify dimension B in the "Ordersheet for S81 ceiling mounts in ORs with false ceilings“ (see page 57) asfollows:

• Measure the distance between the bottom surface of the intermediatepiece to the floor.

• Subtract the probable distance between the adapter plate and the in-termediate piece and enter the value obtained as dimension B in theorder sheet.

Description Cat.No.

Kit for mounting an S8/S81 CM on existing ceiling an-chor plate

1120-925

The mounting kit (1120-925) includes:

– adapter plate (1071-924)

– mounting bracket (1124-211).

– 300 mm (11.8") ceiling panel extension (1177-632)

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 122: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

122 Installation on an existing substructure

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 123: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Index 123

Index

AAccessories from other manufacturers, coupling with Zeiss system 64Accessory components at the OPMI, cable installation 36Accessory components, power supply 73Accessory interface 64Adapter plate 101, 102Adapter plate (1071-924) 116, 121Adapter plate mounted in centered position 108Adapter plate, displaced 104BBlind cover 66CCeiling anchor plate 10Ceiling anchor plate, installation positions 12Ceiling mount S81, dimensions 8Ceiling mounts EMD2 and S2 101Ceiling panel 10, 48, 66, 116Ceiling panel extension 300 mm (1177-632) 48, 116Ceiling stiffness 28Check connection to power supply 42Column length 56, 60Column, vertical alignment 30, 119Conduits, installation 36Confirmation of execution of installation 49, 75, 120Confirmation of structural calculation 49, 75, 120Construction plan 78Constructional requirements 119Coupling of Zeiss system with accessories from other manufacturers 64Cover frame 66Customer's responsibilities 24, 71, 117DDimensions, ceiling mount S81 8Dimensions, S8 ceiling mount 7Ductwork for future extensions 36EElectrical components on mounting bracket 108, 110, 112, 114Electrical connections for accessory modules 73Electrical installation, on site 40ENT, alternative installation position 88, 89, 90, 91Execution of installation, confirmation of 49, 75, 120

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 124: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

124 Index

FFlange area for an accessory carrier 68Flange area for ceiling mount 68Forces 10Forces and torques 30, 72, 119GGebäudeschwingungen 26Ground clearance 14, 56, 60Gynecology, recommended installation positions 95HHole circle 102Hole circle with 8 Ø17 mm bores 68IInstallation above operating table 12Installation in cramped conditions 16, 18Installation laterally to operating table 12Installation position 65Installation position in the OR 12Installation positions for Ophthalmology and ENT 79Installation positions for specific surgical disciplines 78Installation positions of ceiling anchor plate 12Installation positions, specific for surgical disciplines 78Installation set, special 101Installation site, layout 49, 75, 120Installation, proper 49, 75, 120Installing the interface plate 47Installing the spacers 46Interface plate 10, 48Intermediate piece (305658-0000.000) 106, 108, 110Intermediate piece ZDK (305658-0000.000) 112Intermediate piece ZDK (305942-9103.000) 114Intermediate piece, existing 102KKey to symbols 2LLines of bores 102Load on the ceiling, actual 30, 119MMechanical installation 44Mount flange 10, 66, 68Mount flange and ceiling panel 66Mount flange with flange tube 69Mounting bracket (1124-211) 121Mounting kit (1120-925) 121

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 125: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Index 125

Mounting options 102Mounting the ceiling anchor plate 44Mounting the wall socket 38NNeurology, recommended installation positions 95OOn-site electrical installation 40On-site preparations 24, 30, 117Operating position 16Operating range for surgical microscope 20, 22Operating range of ceiling mount 20Ophthalmology and ENT, preferred installation position 80, 81, 82, 83Ophthalmology, alternative installation position 84, 85, 86, 87Optimum installation position 12OR illuminators, 24 V DC with emergency power supply 36OR illuminators, connections for 40, 74Ordering data 50, 53, 121PP&R, Hand, installation position 92P&R, Hand, recommended installation position 93, 94Perpendicular force 30Pivot axis 1 20, 22Pivot axis 2 20, 22Planning the electrical installation 35Planning, careful 78Potential equalization 36Potential equalization, connections for the 40, 74Power cable, installation 36Power current connections 40, 74Pre-installation set 10Pre-installation set for mounting to ceiling structures with supply-air cei-

ling 32Pre-installation set, complete cover 48Pre-installation sets of older ceiling mounts 101RReview and release 49, 75, 120SS8 ceiling mount 20S8 ceiling mount, dimensions 7S81 ceiling mount 22Scale like construction plan 78Schwingung, andauernde 26Schwingung, kurzzeitige 26Signature, confirm by 49, 75, 120

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 126: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

126 Index

Spacers 10Spatial situation 78Structural calculation 49, 75, 120Structural calculation, confirmation of 49, 75, 120Structural ceiling 10Structural engineer 49, 75, 120Stud bolt 10Substructure, produced on-site 49, 75, 120Substructures, existing 101TTop part of carrier arm 66Torque 30Torques 10Transparent sheet 78Turning the operating table 92TV, cable installation 36UUrology, recommended installation positions 95WWall socket for foot control panel 36Working ranges 101

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 127: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

127

M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0Printed on 15. 07. 2013

Page 128: S8 / S 81 Ceiling Mount - Infrastructure BC · 2016. 8. 31. · 2 M-30-1382-en S8 / S 81 Ceiling Mount Issue 16.0 Printed on 15. 07. 2013 Key to symbols Warning! The warning triangle

Carl Zeiss Meditec AGGoeschwitzer Strasse 51-5207745 JenaGermany

Fax: + 49 (0)7364 - 20 4823Email: [email protected]: www.meditec.zeiss.com

M-30-1382-en Printed in Germany CG-ST