    Saad Bin SharfAPI-510, API-570 & API-653 Certified Inspector

    LEEA Level I Inspector

    Cell: +966 535 816 112 / +92 333 3388 557Land line: +92 213 640 6567

    Email: [email protected]

    Career Goal:

    To establish myself as a major contributor in the field of Inspection, Testing and Corrosion control and to help

    the organization in improving the efficiency, competitiveness and growth.

    Career Highlights:

    An individual with distinctive leadership and planning capabilities, A result oriented person having more than 06

    yearsof experience in the field of Inspection & Testing, Corrosion monitoring and Risk base inspection.

    Having experience in Inspection, planning, supervision and documentation of various inspection andmaintenance activities. Familiar with international code and standards.

    Having sound work experience under safety environment of worlds top ranked Oil, Gas and Petrochemical

    Companies like BP, ENI, OMV, Chevron, Shell, OGDCL, PPL, Qaltex, Oryx GTL, Woqod, PSO, FFBL, Engro

    Vopak and Chemanol.

    Academic Qualification:

    Graduation: 2007 B.E (Metallurgy & Material Science Engg.)from DCET Recognized by PEC

    Certifications:

    API-510 Authorize Pressure Vessel Inspector (Cer. No 42968 Exp. Date: 31-01-2015)(Pressure vessel Inspection Code: In-Service Inspection, Rating, Repair, and Alteration)

    API-570 Authorize Piping Inspector (Cer. No. 44912 Exp. Date: 31-07-2015)(Piping Inspection: In-Service Inspection, Rating, Repair, and Alteration of piping system)

    API-653 Authorize Tank Inspector (Cer. No. 37658 Exp. Date: 31-05-2016)(Above Ground Storage Tank Inspection, Repair, alteration and Reconstruction Standard)

    LEEA Level I - Lifting Equipment and Engineers Association, UK for lifting equipment inspection ASNT Certification: Level II in UT, MT, PT, RT and VT Internal Auditor Certified Internal Auditor from Intertek Moody

  • 8/13/2019 Saad Bin Sharf (01.11.2013)

    2/5

    Experience:

    Abdallah I. Al Tamimi Industrial Services Est. Kingdom of Saudi Arabia June 2011 to Present

    Designation:Sr. Inspection Engineer

    Responsibilities:

    Inspection of Storage tanks, pressure vessels, boilers and pipelines. Corrosion rate, Remaining life, Next inspection interval calculation and repair recommendations as per API-

    653, API-510 and API-570.

    To establish the Procedure of inspection of tank, pressure vessel and pipeline. Inspection of Mobile cranes, Overhead Cranes, Fork lifters, Mobile trucks, Slings, Shackles, webbing slings.

    Load testing and Repair recommendations.

    Drawing reviews and sketching, Calculation and Report writing as per relevant Codes and Standards. Bid preparation and technical analysis of Bid documents. Planning and Scheduling of job, Execution of Job as per scope of work, Progress monitoring, updating plans

    and rescheduling, Resource calculation.

    Implementation of requirements of quality management system ISO 9001:2008, internal auditchecklist preparation, planning and execution of internal and external audit.

    Project Details:

    Client Project Scope Location

    Applicable

    Standard Date Status

    SWCC Inspection of TankJeddah, Saudi

    ArabiaAPI-653 Oct. 2013 Inspector Engineer

    SWCC Inspection of Overhead CranesAl Khobar,

    Saudi Arabia

    LEEA

    ASMEOct. 2013 LEEA Inspector

    Obeikan Inspection of Tank & BoilerRiyadh, Saudi

    ArabiaAPI-653 Sep. 2013 Inspection Enginee

    CHEMANOLInspection of Pressure Vessel,

    Columns

    Jubail,

    Saudi ArabiaAPI-510 May 2013

    Static Equipment

    Inspector

    SWCC Lifting Equipment inspectionJeddah,

    Saudi Arabia

    LEEA

    ASMEDec. 2012 Inspection Enginee

    SWCC Lifting Equipment inspectionShoaiba,

    Saudi Arabia

    LEEA

    ASME Oct. 2012 Inspection Enginee

    ARAMCOHoliday testing of internal lining

    of tanks

    Jubail,

    Saudi ArabiaAPI-653 June 2012 Inspection Enginee

    SWCC Inspection of TanksShoaiba,

    Saudi ArabiaAPI-653 Aug. 2011 Inspection Enginee

    SWCCHydro test of Chlorine

    pipelineRiyadh,

    Saudi ArabiaAPI-570 June 2011 Inspection Enginee

  • 8/13/2019 Saad Bin Sharf (01.11.2013)

    3/5

    Experience: (Continued)

    SGS Pakistan (Pvt.) Ltd. Islamic Republic of Pakistan March 2008 to June 2011

    Designation:Sr. Inspection Engineer

    Responsibilities:

    Inspection of Storage Tanks, Pressure Vessels and Pipelines as per scope and international standards. Short Term / Long Term Corrosion rate determination, Remaining life, next inspection interval calculation and

    repair recommendations as per API-510, API-570 and API-653.

    Inspection of Mobile cranes, Overhead Cranes, Fork lifters, Mobile trucks, Slings, Shackles, webbing slings.Load testing and Repair recommendations.

    Report writing and reviews as per relevant international Codes and Standards, Drawing reviews and sketching. Planning and Scheduling of job, Execution of Job as per scope of work, Progress monitoring, updating plans

    and rescheduling, Resource calculation.

    Preparation and Technical analysis of Bid, Tender and Contract documents. Leading team of Inspection Engineers at various sites, Daily progress monitoring. Implementation of requirements of quality management system ISO 9001:2008. Temperature evaluation and Hot spot monitoring after Thermography, report preparation on Flir software.

    Project Details:

    Client Project Scope LocationApplicable

    Standard

    Date Status

    QALTEX Inspection of TankMussaid,

    QatarAPI-653 June 2010 API Inspector

    ORYX GTLInspection of Tank &Pressure Vessel

    Ras Lafan,Qatar

    API-510API-653

    April. 2010 Inspection Enginee

    WOQOD Inspection of TanksAbu Hamour

    Depot, QatarAPI-653 2009-2011 Inspection Enginee

    OGDCL Inspection of Tank Pakistan API-653 2010 API Inspector

    Shell Inspection of Tanks Pakistan API-653 2009-2010 API Inspector

    CaltexChevron

    Inspection of Tanks Pakistan API-653 2009-2010 API Inspector

    PSO Inspection of Tanks Pakistan API-653 2009-2010 API Inspector

    BP Pressure Vessel Inspection Pakistan API-510 2010 Inspection EngineeOGDCL Pressure Vessel Inspection Pakistan API-510 2010 Inspection EngineeLotte PPTA Pressure Vessel Inspection Pakistan API-510 2010 Inspection EngineeOGDCL Inspection of Pipeline Pakistan API-570 2010 Inspection EngineeSHELL MFL scanningof Tanks bottom Pakistan API-653 2010 Inspection EngineePARCO MFL scanningof Tanks bottom Pakistan API-653 2010 Inspection Enginee

    OMVBuried Pipe Line Coating

    Inspection by PCMPakistan - 2009 Inspection Enginee

    MOL Post Shipment Inspection Pakistan API-5L 2009 Inspector

    SHELL Inspection of Tank Ghana, Africa API-653 June 2009 Inspection EngineeFFBL Thermography of Ammonia Pakistan - 2009 Inspection Enginee

  • 8/13/2019 Saad Bin Sharf (01.11.2013)

    4/5

    Client Project Scope LocationApplicable

    StandardDate Status

    Reforming Section & GasTurbine for Hot spot monitoring

    APLBuried Pipe Line Coating

    Inspection by PCMPakistan - 2009 Inspection Enginee

    PPL

    Inspection of Mobile cranes,

    Overhead Cranes, Fork lifters,Mobile trucks, Slings, Shackles,

    webbing slings. Load testing

    Sui, Adhi,

    Mazarani,Pakistan

    LEEAASME 2009 Inspection Enginee

    OGDCLMetallography Assessment ofPipelines

    Kunar,Pakistan

    - 2009 Inspection Enginee

    Eni Pressure Vessel Inspection Pakistan API-510 Aug 2008 Inspection Enginee

    OGDCL

    Inspection of Mobile cranes,

    Overhead Cranes, Fork lifters,Mobile trucks, Slings, Shackles,

    webbing slings. Load testing

    PakistanLEEAASME

    2008 Inspection Enginee

    ENI RBI Data Entry Pakistan API-580 2008 Inspector

    Engro VopakInspection of underwater pilling

    for Evaluation of Zn Anode

    Pakistan API 2008 Visual Inspector

    Atlas Engineering Islamic Republic of Pakistan Oct 2007 to Feb 2008

    Designation: Project Internee

    Responsibilities:

    Metallography & Chemical composition analysis of sample of Honda cylinders. Hardness testing of Honda cylinders made through Shell core casting.

    Shut Down / Turn around Experience:

    Involved in Seven (07) shutdowns of various Oil & Gas, Petro chemical Plants. Client Shutdown Scope Location

    Applicable

    StandardDate Status

    OBEIKANTank, Boiler & PipelineInspection

    RiyadhSaudi Arabia

    API-653API-570

    Sept. 2013InspectionEngineer

    ChemanolInspection of Pressure Vessel,

    Boiler Life Assessment

    Jubail

    Saudi ArabiaAPI-510 May 2013

    Static Equipment

    Inspector

    ORYX GTL Remote visual inspectionRas Lafan,

    Qatar

    API-653

    API-510Apr. 2010 Inspector

    PPTA Inspection Pressure VesselKarachi

    PakistanAPI-510 Aug 2010 Plant Inspector

    OGDCLTanks, Pipelines & Pressure

    Vessels InspectionKunnar

    Pakistan

    API-570

    API-653

    API-510

    Aug 2009 API Team Leader

    PPTAPressure Vessel & TankInspection

    PakistanAPI-510API-653

    Aug 2008 Plant Inspector

    ENI Visual Inspection Bhit PakistanAPI-510

    API-653June 2008

    Static Equipment

    Inspector

  • 8/13/2019 Saad Bin Sharf (01.11.2013)

    5/5

    Training & Courses:

    Involved in various in-house and client base trainings includes,

    Training Description Duration Details

    TOFD (Time of Flight Diffraction) One day Method of inspection, limits of techniques, applicationsPhase Array One day Applications, Technique basics, LimitsInfrared Thermography One day Operation of Flir P-65 Camera, Reporting SoftwareRVI (Remote Visual Inspection) One day RVI equipment functions and report essentialsPMI (Positive Material Identification) One day Niton PMI Equipment operation and safetyLRUT (Guided Wave) Five Days Technique basics, reporting software and Collar placement

    Course Description Duration Details

    High Temperature Hydrogen Attack One day Effects on equipment, Detection techniquesImpression Management One day Impression building, Personality development

    Leading for Results One day Result orientation objectives and planning

    General Safety & Fire Fighting One day Fire and Extinguishers types, Practical fire fighting

    Code Familiarization:

    Standard Details

    ASME IX Welding requirements, Tension and Bend Test, Essential Variables, Non-Essential Variables

    ASME V UT, MT, PT, RT Procedure and Requirements

    API 577 Welding and Metallurgy, WPS and PQR Review

    API-580 Risk base inspection

    API 571 Damage Mechanisms Affecting Fixed Equipment in the Refining Industry

    Computer Skills:

    MS Office: (Word, Excel, Power Point)

    Internet: (Internet Browsing, E-mails)

    Auto CAD: (General Overview)

    Personnel Details:

    Fathers Name: Sharfuddin Ahmed

    E-mail: [email protected]

    Mobile No.: +966 5358 16 112 / +92 333 3388 557Date of birth: 12

    thFEB, 1986

    Passport No: CK5124702

    Postal Adress: S-3/154, Shahwaliullah Nagar, Sector 11 , Orangi Town, Karachi-75800 Pakistan

    Nationality: Pakistani

    Marital Status: Married