SAFETY MEASURES IN TEHRI DAM

• Tehri Dam is a 260.5m high Earth & Rockfill dam across river Bhagirathi, which originates from Gaumukh glacier of Himalayas.

• To safeguard dam against ill effects of earthquake and other factors, a number of safety measures have been adopted during Design & Construction stages.

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 3: Safety measures in Tehri dam, India

TEHRI TEHRI PSPPSP

(1000 MW)(1000 MW)

KISHAU DAMKISHAU DAM(600 MW)(600 MW)

UTTARANCHAL (INDIA)

Page 4: Safety measures in Tehri dam, India

SAFETY MEASURES - DESIGN STAGE

  Location of Dam :Dam is located in a narrow, S- shaped valley; left abutment of valley providing toe support to the dam.

 Geological Explorations through exploratory drift in river bed area :A 3m to 20m thick major shear was suspected under the river bed. An exploratory drift parallel to dam axis was excavated 30m below river bed.

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 5: Safety measures in Tehri dam, India

BHIL

LANG

NAA

RIVE

R

BHAGIRATHI R

IVER

BHAGIRATH

I RIV

ER

POWER INTAKE OF HPP

POWER INTAKE OF PSP

HRT OF PSP

SHAFT SPILLWAYS

TEHRI DAM

TRANSFORMER HALL

M/C HALL OF HPP

TRT OF HPP

CHUTE SPILLWAY

SHAFT SPILLWAYS

INTERMEDIATE

LEVEL OUT LET

PSP (1000MW)

HRT OF HPP DIVERSION TUNNEL T1&T2

TRT OF PSP

DIVERSION TUNNEL T3 &

T4

Page 6: Safety measures in Tehri dam, India

SAFETY MEASURES - DESIGN STAGE

  Liquefaction Studies for Dam Fill Materials :To exclude possibility of development of excess pore pressure during occurrence of strong earthquake, liquefaction studies on shell and core material indicated no significant loss of strength.

•  Optimised Geometry of Dam Core :• Under dynamic loading, plastic zones are formed on

u/s face of dam with u/s inclined core, whereas alternative with vertical core was safe.

• In static condition, stress transfer from core to shell was highly pronounced in case of vertical core.

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 7: Safety measures in Tehri dam, India

25.5 M

SHELL

FSL 830.0 M

CORE

RIP-RAP

FINE FILTER

SHELL

COARSE FILTER

RIP-RAP

COFFER DAM

2B

TOP INSPECTION GALLERY(EL.835.4 M ±)

2D

2A

2A

2D

31

3EL.638.00M

D/S

U/S

EL.839.5 M

4

Main Dam Axis

EL.635.0±

2C

EL.615.0±

INSPECTION GALLERY(EL. 725.0 ±)

2.51

12.03

1

34

2D

2A

5 5

30M

60M

D/S Row of Grout Curtain (60M) U/S Row of Grout Curtain (30M)

Grouting Gallery

Consolidation Grouting (10M)

Page 8: Safety measures in Tehri dam, India

SAFETY MEASURES - DESIGN STAGE

  Large Free-board :To take care of any settlements of crest due to large earthquake, very liberal freeboard of 9.5 m (above normal reservoir level) has been provided. A 1.2 m high parapet wall has also been provided.

  Settlement allowance :Crest of dam has been raised by 2.5m i.e. about 1 % of dam height to allow for post construction vertical deformation resulting from compression and / or settlement of embankment.

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 9: Safety measures in Tehri dam, India

SAFETY MEASURES - DESIGN STAGE

• Flatter dam slopes :U/S and D/S slopes of dam are 2.5 H :1V and 2.0 H:1V, are flatter as compared to many other high dams in highly seismic region.

• Wide crest with Flaring near abutments :To safe guard against ill effects of magnification of earthquake acceleration near dam crest.

• High density of material compaction :Dry density of 2.36 T/m³ in shell and 1.90 T/m³ in core zone has been achieved reducing the chances of differential settlement.

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 10: Safety measures in Tehri dam, India

SAFETY MEASURES - DESIGN STAGE

Two inspection galleries through impervious core, one at middle height and other near crest:- Provide access for physical inspection of dam

behaviour.- Accommodate Strong Motion Accelerographs. - Observe 3D movement of dam core.

Instrumentation Scheme : For monitoring performance during construction, operation period:- 350 instruments in the body of dam and foundation.-145 Surface settlement observation points.

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 11: Safety measures in Tehri dam, India

TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDTEHRI HYDRO DEVELOPMENT CORPORATION LIMITED

LEGEND

Page 12: Safety measures in Tehri dam, India

SAFETY MEASURES - CONSTRUCTION

  Surface Treatment :• Foundation in core trench is prepared with max. slope

as 0.75 H : 1 V and max. permissible change in slope as 200 in longitudinal direction .

• Slope in the transverse direction is kept not more than 2H:1V dipping in u/s direction.

• To protect the exposed sound rock from weathering, 50 mm thick layer of guniting has been provided.

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 13: Safety measures in Tehri dam, India

SAFETY MEASURES - CONSTRUCTION

   Subsurface Treatment :• Consolidation grouting has been done to fill the

voids, fractures and cracks around the core foundation contact and improve its impermeability.

Depth - 10m, Grout pressures 2 – 4 kg/ cm2. • Curtain grouting along center line of core trench

consists of two-rows 60/30m deep. Acceptable permeability of rockmass ~ 1

Lugeon, Grout pressure 10 –12 kg/ cm2.

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 14: Safety measures in Tehri dam, India

TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDTEHRI HYDRO DEVELOPMENT CORPORATION LIMITED

Page 15: Safety measures in Tehri dam, India

SAFETY MEASURES - CONSTRUCTION

• Horizontal Filter Drain  Placement of processed shell material having high

permeability of the order of A x 10 –1 cm /sec in D/S portion of dam.

• Production of core material by blending clay with pebbles:In order to reduce compressibility & improve shear properties, core material was produced by blending clay with pebbles (60:40 ratio by volume).

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 16: Safety measures in Tehri dam, India

SAFETY MEASURES - CONSTRUCTION

  Depressions in core near abutment: – To prevent transverse surface cracking in core

due to canyon effect, a crack preventive procedure based on Centrifugal Model Studies was developed.

– Core material in the potential cracking zones was placed with certain time lag as compared to central portion by providing depressions adjacent to canyon.

- Formation of depressions was timed during wet season.

TEHRI HYDRO DEVELOPMENT CORPORATION TEHRI HYDRO DEVELOPMENT CORPORATION LIMITEDLIMITED

Page 17: Safety measures in Tehri dam, India
Page 18: Safety measures in Tehri dam, India
Page 19: Safety measures in Tehri dam, India