4
Préparation de surface Application peinture (théorique et gestuelle) Maîtrise des appareils de contrôle Les normes Gestion de chantier (chef d’équipe et de chantier ) INSPECTION INSPECTION INSPECTION INSPECTION METAL AND METAL AND METAL AND METAL AND WELDING SUPERVISION WELDING SUPERVISION WELDING SUPERVISION WELDING SUPERVISION SECOND SECOND SECOND SECOND AND THIRD PARTY INSPECTION AND THIRD PARTY INSPECTION AND THIRD PARTY INSPECTION AND THIRD PARTY INSPECTION SUPERVISION SUPERVISION SUPERVISION SUPERVISION OF WORKS OF WORKS OF WORKS OF WORKS NON NON NON NON-DESTRUCTIVE DESTRUCTIVE DESTRUCTIVE DESTRUCTIVE TESTINGS TESTINGS TESTINGS TESTINGS EXPEDITING EXPEDITING EXPEDITING EXPEDITING Oil & Gas - Energy Parc du Hode 5559 voie des Hérons – 76430 Saint Vigor d’Ymonville France Phone : +33(0)6.30.64.94.10 – Siret : 75223847700018 Technical inspection & Work Supervision

sales brochure AGIS · 2016. 1. 22. · · European directive 2010 / 35 / EU ( TPED) · March 5th, 2014 for pipes of multifluidtransport and August 8th, 2013 for pipes vapor Analysis

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: sales brochure AGIS · 2016. 1. 22. · · European directive 2010 / 35 / EU ( TPED) · March 5th, 2014 for pipes of multifluidtransport and August 8th, 2013 for pipes vapor Analysis

� Préparation de surface� Application peinture (théorique et gestuelle)���� Maîtrise des appareils de contrôle���� Les normes� Gestion de chantier (chef d’équipe et de

chantier )

���� I N S P E C T I O N I N S P E C T I O N I N S P E C T I O N I N S P E C T I O N M E T A L A N D M E T A L A N D M E T A L A N D M E T A L A N D W E L D I N G S U P E R V I S I O NW E L D I N G S U P E R V I S I O NW E L D I N G S U P E R V I S I O NW E L D I N G S U P E R V I S I O N

���� S E C O N D S E C O N D S E C O N D S E C O N D A N D T H I R D P A R T Y I N S P E C T I O NA N D T H I R D P A R T Y I N S P E C T I O NA N D T H I R D P A R T Y I N S P E C T I O NA N D T H I R D P A R T Y I N S P E C T I O N

���� S U P E R V I S I O N S U P E R V I S I O N S U P E R V I S I O N S U P E R V I S I O N O F W O R K S O F W O R K S O F W O R K S O F W O R K S

���� N O NN O NN O NN O N ---- D E S T R U C T I V E D E S T R U C T I V E D E S T R U C T I V E D E S T R U C T I V E T E S T I N G ST E S T I N G ST E S T I N G ST E S T I N G S

���� E X P E D I T I N GE X P E D I T I N GE X P E D I T I N GE X P E D I T I N G

O i l & G a s - E n e r g y

P a r c d u H o d e – 5 5 5 9 v o i e d e s H é r o n s – 7 6 4 3 0 S a i n t V i g o r d ’ Y m o n v i l l e – F r a n c e P h o n e : + 3 3 ( 0 ) 6 . 3 0 . 6 4 . 9 4 . 1 0 – S i r e t : 7 5 2 2 3 8 4 7 7 0 0 0 1 8

Technical inspection & Work Supervision

Page 2: sales brochure AGIS · 2016. 1. 22. · · European directive 2010 / 35 / EU ( TPED) · March 5th, 2014 for pipes of multifluidtransport and August 8th, 2013 for pipes vapor Analysis

Pressure equipment in service

Our teams allow you to have pressure equipment corresponding to the regulations, to protect yourself and your installations and your pressure equipment by inspections and to optimize the sustainability of your pressure equipment.

Inspection of pressure equipment (gas, vapor, heat exchangers)External and internal inspection Control of putting into service, initial check on marchSupervision of equipments in serviceTechnical support, repairs monitoring

We intervene on new equipments, in service or during shutdown.

New pressure equipment - PED / DESP

We are capable of accompanying you to meet the requirements of the regulations materials on pressure equipment (furnace, piping, heat exchanger)· European directive 97 / 23 / CE ( PED)· European directive 2010 / 35 / EU ( TPED)· March 5th, 2014 for pipes of multifluid transport and August 8th, 2013 for pipes vapor

Analysis of manufacturing book: review of calculations note, welding book.Support of the industrial in the definition of the scope of its responsibilities and in the assistance to write its specificationsOn-site inspection

Welding book, welding qualification and welders qualifications

We validate the adequacy of a welding book compared with your assemblies. We accompany you on your building sites or in your production workshops

Production monitoringWithin the framework of the realization of metallic works forced by a regulations (97 / 23 / CE by ex), a construction code (ASME / CODAP) or an industrial specification.

Page 3: sales brochure AGIS · 2016. 1. 22. · · European directive 2010 / 35 / EU ( TPED) · March 5th, 2014 for pipes of multifluidtransport and August 8th, 2013 for pipes vapor Analysis

Non-destructive testings (NDT)

These techniques allow to check the internal and superficial health of parts, subsets and structures, to maintain the invested capital and to make sure of the safety of the properties and of the people. We provide you with a wide range of controls:

Detection of outlet defects (Liquid penetrant test, visual inspections)Detection of in-depth defects (Radiography, Ultrasonic test, IRIS, TOFD, Phased Array)Detection of superficial internal defects (Magnétoscopie, eddy currents, ACFM, MFL)

According to your need, we guide you on the choice of a checking procedure.

Inspection 2nd and 3rd party

Shop inspections, in the course of manufacturing, before shipment on-site in reception before integration:Follow your equipments in the course of manufacturingReception of raw materialsValidation of welding bookValidation of scop of non-destructive testings

Followed Quality of the manufacturings/Expediting/evaluation of the suppliers

Definition of inspection plan and coordination of inspectionsRelaunching of the suppliers on the objectives to achieveInspection - check of the conformity with the contract (required materials, quality of the realizations, conformity with the plans)

IPT (Inspections and Tests Plan)

After analysis of all elements, we draft your ITP.We are capable of representing your company during meeting (Pre-Inspection Meeting).

Page 4: sales brochure AGIS · 2016. 1. 22. · · European directive 2010 / 35 / EU ( TPED) · March 5th, 2014 for pipes of multifluidtransport and August 8th, 2013 for pipes vapor Analysis

W H E R E Y O U A R E , W E A R E

Alexandre GRAIN Manager / technical EngineerPhone : +33 (0) [email protected]

Maxime DE LANGENHAGEN Welding EngineerPhone : +33 (0) [email protected]

Head officeParc du hode5559 voie des hérons76430 SAINT VIGOR D’YMONVILLE [email protected]