San Diego, CA March 22, 2013

Black River Generation – Retrofit Project

Biomass Power Association Annual Conference

Page 2: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Fast Facts

• Inside the fence at U.S. Army installation Fort Drum, near Watertown, NY

• 60 MW generating capacity

• Idled coal-burning facility• Purchased by ReEnergy December 2011• Selected to sell RECs through 10-year

contract with NYSERDA

• Supported by local governments with PILOT

2

Page 3: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Fast Facts

• Priority project of North Country Regional Economic Development Council, which approved $30M tax-exempt bond volume cap

• Site visits by Governor Cuomo and Assistant Secretary of Army Hammack

• Eligible for 1603 grant program• Partnered with SUNY ESF in USDA grant to

commercialize shrub willow project• Goal to secure PPA with Army for 100% of Fort

Drum’s energy needs

3

Page 4: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Economic Benefits

• 178 construction jobs• 33 full-time jobs at facility• Approximately 145 jobs in the forest• Additional spin-off jobs

4

Page 5: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Environmental Benefits

• Reduced emissions compared to prior use• New cooling tower to reduce water use and

thermal discharge into Black River

• Reduce limestone usage

• SFI fiber sourcing certification

5

Page 6: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Fuel Supply

• $11 million/year in green wood purchases• Expansion of innovative equipment

leasing program• Integration of alternative fuels

6

Page 7: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Retrofit

• $34 million invested• Commenced Summer 2012• General Contractor: Cianbro Corporation• Daily on-site head count as high as 190

7

Page 8: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Retrofit: New Fuel Receiving/Handling Equipment

8

Page 9: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Retrofit:Construction of Cooling Tower

9

• Addition of the Cooling TowerReduces withdrawal from the Black RiverFrom 30,000gpm to <5,000gpmReduces thermal discharge back to riverReduces environmental footprintLess disruptive to local ecosystem

Page 10: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Retrofit:Control Room Upgrades

10

• $1.5 million DCS upgrade• Latest technology – Invensys/Foxboro DCS

System• More centralized control of entire facility• Updated trending and monitoring systems

Page 11: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Retrofit:Boilers

11

• Three Pyropower/Ahlstrom circulating fluidized bed boilers• Upgraded emission controls• Upgraded flue gas path• Upgraded bottom ash system• Addition of vortex finders in CFBs• Complete overhaul of entire unit and all

associated auxiliary components

Page 12: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Retrofit: Turbine Generator

12

• Complete overhaul of unit and all associated auxiliary components

Page 13: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

Retrofit:Site Work

13

• Previous delivery of coal fuel was by rail• Deliveries of biomass by truck• New signal light to be installed to improve traffic

flow

• New roadways

• New weigh system

Page 14: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

14

• Existing coal bins modified to accept biomass wood chips

• Center screw reclaimer system inside modified coal bins

• New drag cain conveyor and rotary valve feed system

Retrofit:Fuel Feed System

Page 15: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

15

Timetable

• Fuel deliveries began in February• Boiler tests to begin week of March 25th • Commercial operations in late April

Page 16: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference

16

Thank You