San Ysidro Land Port of Entry Expansion & Reconfiguration
Community Representative Committee (CRC)
U.S. General Services Administration/
Customs & Border Protection August 6, 2015
San Ysidro LPOE, CA
San Ysidro LPOE Master Plan
San Ysidro LPOE Master Plan
Phase 2 (Completion 2019)
Phase 1b (Completion
2014) Phase 1d & VATC (Completion 2016)
Phase 3 (Completion 2019)
07/01/20
West Pedestrian Facility
WEST PEDESTRIAN Design – Build Start Fall 2014 Design Completed Spring 2015 Construction Started Spring 2015 Construction completion Spring 2016
Plan for 10 NB Pedestrian processing lanes Plan for 2 SB pedestrian processing lanes POV return to US inspection area Pedestrian Repatriation processing Public Plaza Area
West Pedestrian Facility
West Pedestrian Facility
PedWest
Transit Center
Proposed West Pedestrian Facility
West Pedestrian Facility
07/31/15 – WPB: Vapor Barrier Installation
07/30/15 – WPB: Sand Placement
Virginia Avenue Transit Center (VATC)
VA Transit Center Concept Design Start Winter 2014 Concept Design Completed Spring 2015 Community Workshop June 04, 2015 Design – Build Start Summer 2015 Construction completion Spring 2016
VATC Plans to Accommodate: 4 Buses, 10 Taxi, 18 POV and 5 Pedicabs.
Virginia Avenue Transit Center Community Workshop – June 04, 2015
Concept Design Proposed Virginia Avenue Transit Center
Concept Design Proposed Virginia Avenue Transit Center
Concept Design Proposed Virginia Avenue Transit Center
Phase 2 Improve NB/SB Pedestrian Through-put on East Side
PHASE 2 – FUNDING Funded December 2014 PHASE 2 - SCHEDULE
Design Start Fall 2015 Design completion Spring 2016 Construction Start Summer 2016 Construction completion Summer 2019
San Ysidro LPOE
• Phase II – Plan for 6 SB lanes pedestrian processing – Plan for 20 NB pedestrian processing lanes. – Pedestrian Plaza adjacent to Public Access – Administrative Facilities – Renovation/restoration of the Historic Customs
House to include Southbound Pedestrian Processing
Phase 2 Proposed Construction – View from Northbound Pedestrian Shade Canopy
Phase 2 Proposed Construction – Approach to Main Pedestrian Building from Mexico
Phase 2 Proposed Construction – NB Pedestrian Processing
Phase 2 Proposed Construction – Looking South from the Pedestrian Plaza
Phase 2 Proposed Construction – Looking South Pedestrian Plaza Rendering
Phase 2 Proposed Construction – Public Entry North of the Pedestrian Building
Phase 2 Proposed Construction – View from Pedestrian Bridge Looking South
Phase 2 Proposed Construction – Looking Outside 2nd Floor of the Historic Custom House
Phase 2 Proposed Construction – Looking Inside 1st Floor of the Historic Custom House
Phase 3 Improve SB & NB Vehicle Through-put
PHASE 3 Design Start Summer 2014 Design completion Summer 2015 Construction Start Early 2016 Construction completion Spring 2019
San Ysidro LPOE
• Phase III – Phase III adds 8 lanes of NB throughput and adds
15 NB inspection booths – 10 SB lanes Will significantly reduce queue length
when CBP is operating its pulse and surge southbound inspections.
– Employee parking structure
Phase 3 Proposed Construction – Additional Primary Lanes / Secondary Inspection
Phase 3 Proposed Construction – Southbound Lanes
Phase 3 Proposed Construction – Southbound Lanes & Headhouse Building
Phase 3 Proposed Construction – Employee Parking Structure
Start of Phase 3
Phase 3 Completed
EIS Addendum (NEPA) Update
QUESTIONS?