(Condo, Apartment, Office, Industrial) APPLICATION
PACKET
Complete Package shall be submitted to Planning and Development
Services
Land Development 1001 Sarasota Center Blvd Sarasota, Florida
34240
(941) 861-6576
CONCURRENT COMMERCIAL (S&D) REVIEW PROCEDURES
1. GENERAL. A Concurrent Site and Development Plan shall be
required for all development other than the creation of a
subdivision. Condominiums shall be processed through the Concurrent
Site and Development review process.
a. Exceptions are: Increase in the impervious surface of less than
50% of a developed site providing such increase is less than 2,000
square feet and no additional impacts; (e.g., new access points,
parking, redesign of stormwater structures, intensification of use,
etc.) will occur. (An Exemption by Land Development would be
required)
b. Zoning: Prior to consideration by the County, any proposed
development must have the appropriate zoning for the intended
use.
2. REVIEW. The representative/applicant shall submit a Concurrent
Site and Development Plan application to Land Development, in
accordance with the submission requirements of the Land Development
Regulations (LDR). At the time of application, fees as approved by
the Board of County Commissioners shall be required.
Signed, sealed, and folded plans (including signed, sealed, and
folded surveys, done with the benefit of a current title search),
submitted for review shall be forwarded by Land Development to the
following entities:
Land Development Transportation Planning Stormwater Utilities
Permitting Fire Marshal Environmental Health History Center
Environmental Permitting Tree Protection Air & Water Quality
Landscape Zoning Planning Design Standards Review (If applicable)
Traffic Operations (If a signal is required)
Prior to submission of an application, the representative/applicant
is strongly encouraged to arrange a Presubmittal conference with
the Sarasota County Development Review Committee (DRC). The purpose
of the conference is to assist the representative/applicant who has
questions concerning the submittal procedures or the requirements
for the Concurrent Site and Development Plan Review.
3. DETERMINATION. Fifteen (15) working days will be given the
entities for review. The submittal shall be either authorized with
stipulations, or deemed insufficient by the County. In the event
the submittal is deemed insufficient by the County, the
insufficient items shall be resubmitted and reviewed under the same
procedures as the original submission. During the review process,
the representative/applicant may be called upon for consultation
from the review entities.
FormLDSPKT02 – Revised 7/19/17 2
4. DURATION OF APPROVAL STATUS. The Concurrent Site and Development
Plans shall be void if substantial construction work, as determined
by the County Engineer, has not commenced within two (2) years of
Construction Authorization. Resubmittal, review and reapproval of
Concurrent Site and Development Plans shall be required.
"Substantial construction work" means the commencement and
continuous prosecution of construction of required improvements to
completion. For previously approved phased developments, the
representative/applicant will demonstrate that activity, roadway
engineering design and permitting have occurred. Such activity will
be considered as meeting the requirements for substantial
construction. Plans thus submitted for review and re- approval
shall comply with all current Regulations.
In cases of unforeseen circumstances, the representative/applicant
may apply for an extension of the Construction Authorization prior
to the expiration date of the original approval. The approval
status may be extended once for an additional two (2) year period,
if a written request is received by the County at least thirty (30)
days prior to the termination of the original approval status. The
extension shall be for the original site use and configuration
only. Approval will not be granted if the project is not in
compliance with all current requirements.
5. AUTHORITY GRANTED BY APPROVAL. Approval of the Plan by the
County shall be construed as authority for the
representative/applicant to:
a. construct improvements such as stormwater facilities, excavation
and fill, bulkheads, sidewalks, paving; and b. apply for building
permits.
CONCURRENT SITE AND DEVELOPMENT PLAN SUBMISSION REQUIREMENTS:
PLANS shall include the following unless the County determines that
one or more of the following does not apply to the particular
development (specific requirements for each of these can be found
in the LDR):
1. OWNERSHIP AND UNIFIED CONTROL (on Site Plan). A statement of
ownership and unified control of the entire property for which
development approval is requested.
2. CHARACTER AND INTENDED USE (on Site Plan). A statement
describing in detail the character and intended use of the
development.
3. GENERAL LOCATION MAP (on Site Plan). A map showing the
relationship of the site to major streets, schools, existing
utilities, shopping concentrations, important physical features in
and adjoining the project, and the like.
4. SITE PLAN folded, signed and sealed by registered engineer
showing graphically (site surveys, done with the benefit of a
current title search, folded, signed and sealed by a Professional
Surveyor and Mapper required with each set of the site
plans):
a. title of the project, name of owner(s) and
representative/applicant, if applicable, date, north arrow, legal
description and scale;
b. location of any buildings, approximate age of existing buildings
(for History Center review), off-street vehicular use areas,
parking spaces (number required and number provided), access ways,
retention/detention ponds, existing and proposed easements, and
existing and proposed road rights-of-way;
c. number of residential units and resulting density; d. gross
floor area; e. the total gross acreage of the project shall be
presented and the percentage thereof, along with the
area/acreage, for each of the following shall be shown: (1)
building coverage, (2) open space, and (3) impervious
coverage.
FormLDSPKT02 – Revised 7/19/17 3
5.
6.
7.
f. building height(s), number of floors, floor elevations, type of
construction, and use of structures; g. location of sidewalks; h.
location of refuse collection facilities, including screening; i.
phase lines, if development is to be constructed in phases; j.
preserve areas; k. FEMA flood zones, floodways, and flood zone map
number (if applicable); l. Watershed Model floodplain delineation;
m. landscape buffer types and widths; n. location of any wells
and/or septic tanks or a statement that none exist; and o. any
stipulations from the Rezone Petition or Special Exception
Resolution shall be printed on the plans.
MAINTENANCE OF COMMON FACILITIES STATEMENT (on Site Plan). When
common facilities such as recreation areas or structures, private
streets, private drainage facilities, common open space, etc. are
proposed, statements shall be included explaining how such common
facilities are to be provided and permanently maintained (at other
than public expense) and stating the designated responsible entity
for the facility. The statements would refer to deed restrictions,
deeds of trust, homeowners associations, surety arrangements, or
other legal instruments providing adequate guarantees that such
common facilities will not become a future liability to the County.
The actual legal instrument is not required for this review.
ALL EXISTING CONDITIONS AND IMPROVEMENTS on and abutting within two
hundred (200) feet of the tract (topographical survey; folded,
signed/sealed by a Professional Surveyor and Mapper);
a. Boundaries of the tract (shown by a heavy line) with bearings
and distances, section lines, and significant topographical
conditions (water courses, wetlands, vegetation, wooded areas,
etc.);
b. Sarasota County Gulf Beach Setback Line (DNR Coastal
Construction Control Line and/or Barrier Island Pass Twenty (20)
Year Hazard Line, Florida Department of Environmental Protection
[FDEP] Coastal Construction Control Line), and Gulf Front Setback
Line, if applicable;
c. Flood plain area designations; d. Names of owners, zoning, and
current use of abutting tracts of land; e. Existing contours at one
(1) foot intervals based on National Geodetic Vertical Datum of
1929 (NGVD-29)
for the tract extending twenty-five (25) feet beyond the tract
boundary; f. Existing streets and platted rights-of-way. The name,
location, right-of-way width, pavement width, and
established centerline elevation, as applicable; g. Existing
stormwater and other drainage facility locations; and h. Other
existing improvements including utilities, easements, and
buildings.
UTILITIES PLANS and statement indicating the proposed method
intended to provide water (including fire hydrants), sewer, power,
telephone, refuse collection, gas, street lighting, etc., and the
following, where applicable:
a. The utility company(ies) intended to supply water and/or sewer
service and a statement of available plant capacity from the
appropriate utility company(ies) or utility franchise(s). Statement
must include: (1) existing or proposed plant capacities, (2)
average and peak daily flows, obtained from the most recent twelve
(12) months State operating
reports or from the Sarasota County Utilities Plant Data
Information Forms, (3) number of commitments, (4) number of
connections, and (5) indication of the ability to serve the
proposed development.
b. Preliminary engineering report on any proposed central water
and/or sewer system; c. Other proposed methods or systems (e.g.,
septic, etc.) with subsoil examination, tests, and calculations,
as
required; and d. Service requirement statement indicating that the
developer is aware that all service requirements contained
therein must be complied with prior to acceptance by the County and
issuance of the First Letter.
4FormLDSPKT02 – Revised 7/19/17
8.
9.
10.
11.
12.
13.
14.
15.
BUILDING ELEVATIONS/TYPE OF MATERIALS (on Site Plan or separate
sheet) shall be provided for buildings in the development along
with information as to the number of dwelling units, sizes, and
types.
LANDSCAPE PLANS AND SPECIFICATIONS (folded, signed and sealed by a
Florida Registered Landscape Architect and separate from the
construction plan set) shall be provided which include:
a. buffer types and widths; b. a list of all plants/structures
required and provided for each buffer; c. location of all
plants/structures in buffers and in parking lots; d. a plant list
with the size, quantity and quality of all required plants; and e.
provisions for irrigation and maintenance shall also be
provided.
The location of all trees protected by the current County Tree
Protection Ordinance shall be shown on a survey map prepared by a
registered land surveyor (unless an aerial of adequate scale and
resolution is proposed and approved by Environmental Permitting
prior to the submittal of the plan), as well as all plantings and
other elements required by the Sarasota County Zoning Ordinance,
and in compliance with the LDR.
HABITAT MAP (on Site Plan or separate copy) with all habitats
delineated clearly, in accordance with Florida Land Use, Cover, and
Forms Classification System (FLUCCS) nomenclature. Habitats shall
be delineated on an aerial photograph (scale not larger than 1 inch
= 200 feet). All preservation (including mitigation areas and
conservation areas) must be labeled appropriately on the Site
Plan.
LITTORAL ZONE PLAN, if wet retention, (on Site Plans) the plan
shall follow the requirements outlined in the LDR Environmental
Technical Manual.
WETLAND MITIGATION, MAINTENANCE & MONITORING PLAN (on Site Plan
or separate copy) (if applicable). The plan shall follow the
requirements in the LDR Environmental Technical Manual.
WETLAND HYDROPERIOD MAINTENANCE PLAN (on Site Plan or separate
copy) (if applicable). The plan shall be submitted, which includes
the following:
a. topography of each wetland; b. description of the vegetative
cover in each wetland; c. depiction of wet season high water
elevation in each wetland; d. discussion of how seasonal high water
elevations will be maintained under post-development conditions; e.
depiction of the boundaries and topography of each wetland's
watershed; and f. description of how rainfall reaching impervious
surfaces within a wetland's watershed will be treated and
routed to the wetland, wetland buffer, surficial water table within
the wetland's watershed, or lake adjacent to the wetland.
TREE PROTECTION PLAN (on Site Plan). A tree location plan including
provisions for protection of existing trees and for installation of
any trees required by County regulations. This tree location plan
shall be in the form of a survey prepared by a registered
Professional Survey Mapper unless an aerial of adequate scale and
resolution is proposed and approved by Environmental Permitting
prior to the submittal of the site plan.
MANAGEMENT PLAN FOR CONSERVATION & PRESERVATION AREAS (on Site
Plan). A management plan, based on best available technology, shall
be submitted for all conservation and preservation areas. All such
areas shall be labeled on all plans and maintained in perpetuity by
a designated responsible entity. Pursuant to Section 74-62 of the
LDR, no filling, excavating, removing native vegetation (both trees
and understory plants), or storing materials shall be allowed
within conservation and preservation areas, unless written approval
is first obtained from Environmental Permitting.
5FormLDSPKT02 – Revised 7/19/17
15.
17.
18.
19.
OUTDOOR LIGHTING PLAN (if no buildings are included that will be
CO’d with the project). Pursuant to Section 7.5 of the Zoning
Ordinance, lighting shall be designed in a consistent and
coordinated manner for the entire site. The lighting and lighting
fixtures shall be integrated and designed so as to enhance the
visual impact of the project on the community and/or should be
designed to blend into the surrounding landscape. Lighting design
and installation shall ensure that lighting accomplishes on-site
lighting needs without intrusion on adjacent properties.
STORMWATER MANAGEMENT PLAN (signed and sealed). The calculations
shall be submitted which include the following:
a. LDR Appendix C26; b. proposed treatment method, treatment volume
required, treatment volume provided and drawdown
calculations; c. pre-development attenuation and post-development
attenuation; d. maintenance responsibility; and e. if a hydrograph
routing method will be used, also include pre-development and
post-development conditions
for the sub-basins, nodes, pipes, canals, cross-sections, drop
structures and weirs. Also include a pre- development and
post-development sub-basin map.
The plan shall be submitted which includes the following:
a. easements and right-of-way; b. existing and proposed swales,
ditches, canals, storm sewers, structures, littoral areas,
detention basins and
applicable cross-sections; c. existing and proposed flow
directions, contours and grades, water elevations, and discharge
locations; and d. drainage basin location, project area, drainage
area (including off-site contributions), 100-year floodplain
designation, FEMA designation and soils information.
The Land Development Regulations require that developments greater
than 35 acres or 8 acres of new impervious area be incorporated
into the County’s Watershed Model to demonstrate that no adverse
increase in offsite flood levels will result from the proposed
development. To more efficiently process the reviews please contact
Public Utilities – Stormwater at 941-861-0910 to schedule a
pre-submittal meeting if any of the following apply:
a. Is the project 35 acres or greater? b. Does the project propose
8 acres or more of impervious coverage? c. Does the project propose
significant changes to the Watershed conveyance system?
If any of the above apply, an additional set of plans shall be
submitted and a 20 working day review period will be required for
the stormwater inclusion or revision to the existing condition
model. Any revisions to the existing conditions model must be
reviewed and approved prior to incorporation of the project into
the model.
REZONE PETITION/SPECIAL EXCEPTION(S), the applicant shall furnish a
copy of applicable Rezone Petition(s)/Special Exception(s) and
approved Ordinance(s)/Resolution(s), including binding Development
Concept Plan(s) pertaining thereto with the initial plan
submittal.
CHECK SHEET, on which the representative/applicant initials each of
the items submitted or why not submitted. The Check Sheet must be
submitted with the application. You will find the Check Sheet
included in this package.
6FormLDSPKT02 – Revised 7/19/17
20. OTHER ADDITIONAL INFORMATION, data, maps, plans, preservation
or conservation areas, required buffers around wetlands, surveys,
or statements as may be required by the County for the particular
uses or activities proposed or as the representative/applicant may
believe pertinent to the Concurrent Review of the Site and
Development Plans.
NOTE: The requirements above shall be prepared by a Florida
registered Professional Surveyor and Mapper, engineer, architect,
landscape architect, or a biologist/environmental scientist as may
be appropriate to the particular requirement.
A letter of exemption or an Earthmoving Permit (in excess of 10,000
cubic yards) is required prior to hauling any excess fill from a
construction site(s). In addition, an earthmoving permit is
required prior to using any Type B (concrete, broken asphalt) or
Type C (vegetative land clearing debris) fill for construction
purposes on-site. Please contact the County for more information on
Earthmoving Permits or letters of exemption.
FEES AND CHARGES (Concurrent Site and Development):
The total fee charged for a Concurrent Site and Development
(Commercial) submittal is comprised of Land Development, Zoning,
Fire, History Center, Landscape and Environmental Health. Please
make 1 check payable to the Board of County Commissioners.
FormLDSPKT02 – Revised 7/19/17 7
CONCURRENT PLAN SUBMITTAL CHECK-SHEET FOR ELECTRONIC
SUBMITTALS
REQUIRED ITEMS FOR INITIAL SUBMITTALS (Items marked with an * are
described on pages 12-14). REFER TO THE LAND DEVELOPMENT COMMENT
LETTER FOR REQUIRED NUMBER OF ITEMS ON SUBSEQUENT SUBMITTALS.
CD with .pdfs of below items or emailed to
[email protected]
(1)
Application (2)
Check-sheet (1)
Response to Presubmittal Comments letter, if applicable (1)
*Survey (2)
Utilities Master Plan (Included as part of Concurrent Plan
set)(2)
Stormwater Management Plan/Calculations,
signed/sealed/dated(2)
Appendix C26 signed/sealed/dated (2)
Building Elevations/Type of Materials (1)
Signature of Applicant acknowledging that all the above items are
included
Date
ADDITIONAL INFORMATION TO BE INCLUDED WITH PLAN, AS
APPLICABLE
• Littoral Zone Plan (if wet retention per C26)(Included as part of
Concurrent Plan set)(2)
• *Tree Protection Plan (Included as part of Concurrent Plan set)
(2)
• Habitat Map (Land Cover Map) on recent aerial, based on FLUCCS
(2, in color)
• Listed Species Survey (include aerial overlaid with survey
transects) (2, in color)
• Turning templates for fire and trash vehicles (Included as part
of Concurrent Plan set)
• Underground Storage Tank Systems (Included as part of Concurrent
Plan set)
• Phasing Plan (Included as part of Concurrent Plan set)
• Wetland Hydroperiod Maintenance Plan shown on site plan
• Resource Management Plan for Conservation & Preservation
Areas (if protected native habitat on-site) shown on site
plan
• Wetland Mitigation, Maintenance and Monitoring Plan (if wetland
impacts proposed) shown on site plan
• *Site Lighting Plan 24x36/signed/sealed/dated/folded (Separate
from Concurrent Plan set) (3)
• Comply with the Florida Accessibility Code for handicap
accessible site elements such as parking and accessible
routes
• Provide an accessible route from the accessible building
entrances and parking spaces to the sidewalk in the public
right-of-way
• Provide building heights, number of floors, floor elevations,
type of construction and total square footage
• Provide setbacks from all proposed buildings to property
lines
• If Redevelopment, Neighborhood Meeting Notice and Meeting Minutes
(1)
• Transportation Analysis signed and sealed by a FL licensed
transportation/traffic engineer, if required ($1000 review fee)
(2)
• *School Board Concurrency Letter of Receipt or Exemption (If
Residential) (1)
• Onsite Sewage Treatment & Disposal System (OSTDS) Application
(2)
• *Zoning Determination Letter or Alternative Parking Plan signed
by the Zoning Administrator (1)
Revised 4/26/17 10
ADDITIONAL INFORMATION TO BE INCLUDED WITH PLAN, AS APPLICABLE
(CONTINUED)
• If overall site is greater than 35 acres, or greater than 8 acres
impervious area, include a CD with an ICPR model (1)
• Appendix C26b if the site is in a listed watershed/waterbody and
net improvements for water quality are proposed
Revised 4/26/17 11
DESCRIPTION OF REQUIRED ITEMS
*Concurrent Plan - 24x36/signed/sealed/dated/folded by a Florida
Professional Engineer (2)
*SURVEY - Boundary and Topographic survey of the site which has
been prepared with the benefit of a CURRENT TITLE SEARCH for
easements, encumbrances and encroachments. Please include existing
and proposed cross access agreements with contiguous properties.
Signed/sealed/dated by a Florida Professional Surveyor & Mapper
(Included as part of Concurrent Plan set)
*LANDSCAPE PLAN - 24x36/signed/sealed/dated/folded by a Florida
Registered Landscape Architect (Separate from Concurrent Plan
set)
*TREE PROTECTION PLAN (site plan overlaid onto tree survey) - Show
how there will be minimization to tree impacts, protected trees
versus trees to be removed are labeled and all Grand Trees are
shown. The Grand Trees should be labeled and shown as protected to
their dripline on the plan. (Included as part of Concurrent Plan
set)
*ALTERNATIVE PARKING PLAN - Provide parking calculations to
demonstrate that parking requirements will be met. If the parking
exceeds 100 percent of the required parking, an alternative parking
plan will be required. Submit your request for an Alternative
Parking Plan to Donna Thompson, Zoning Administrator, 1001 Sarasota
Center Blvd, Sarasota, Florida 34240 along with $1,000. For
questions regarding the submittal process, please contact Donna
Thompson at 941- 232-1238. (Zoning Ordinance Section 7.1.11. and
7.1.13.k.).
SOLID WASTE (DUMPSTERS) - Contact Brian Usher (Solid Waste
941-861-1532) regarding the appropriate solid waste disposal
method(s) if an approved method does not currently exist. Solid
Waste Ordinance 2003-092 requires all businesses to have recycling
service (open market) and franchise hauler garbage service.
Enclosures must be of adequate size to contain all garbage and
recycling containers. Please identify all current refuse areas on
any future site plans. Applicants may be required to provide a
turning template to demonstrate collection vehicle accessibility to
enclosure. (LDR Section 74-62(a)(5)(i), Zoning Ord. Section
7.3.19.c.l, 2, and 3., Solid Waste Ord. No.2003-092.).
FIRE - The construction site must comply with NFPA 241. Fire
hydrants must be installed and activated prior to combustible
construction material arriving on site. Stable road surface access
must be provided and maintained to all areas of construction for
emergency vehicles.
HEALTH - Swimming pool and spa for apartment complex amenity center
must meet Department of Health design standards and when complete
would come under regulation by DOH swimming pool program. For
questions call Brian Dietz, P.E. 941 861-6135.
ADDRESSING - Submit requests for address assignment and/or street
name approval to the Sarasota County Address Coordinator.
Construction authorization will not be granted until this process
has been completed. Contact: Tara Dickerson, Address
Coordinator/Public Safety Communications, 6050 Porter Way,
Sarasota, FL 34232, Office 941/861-5510, Cell 941/445-3649, Fax
941/861-5577.
Revised 4/26/17 12
DESCRIPTION OF REQUIRED ITEMS (CONTINUED)
*LIGHTING – 24x36/signed/sealed/dated/folded (Separate from
Concurrent Plan set) Only required at Concurrent Commercial Plan
review when construction does not include structures needing a
Certificate of Occupancy. (Must comply with section 7.5 of the
County Zoning Code.)(3)
In an effort to increase efficiency, Site Lighting plans shall not
be required at the time of Site & Development Plan review.
However, a lighting plan shall be submitted for new parking areas
and buildings when building plans are submitted for permitting. The
lighting plan must be submitted as a separate permit. The building
plans will not be approved until the separate lighting plan has
been submitted to the building department. (Zoning Ordinance
Section 7.5.) Additionally, the Site Lighting Permit shall be
approved and finaled prior to issuance of the Business Use
Permit.
The application for Site Lighting shall include, but is not limited
to the following; a finalized photometrics lighting plan in
compliance with Article 7.5 of the Zoning Code, site plan,
electrical plan, light pole specifications with footer detail, and
light fixture details.
All outdoor lighting shall be designed and located such that the
maximum illumination measured in footcandles at the property line
does not exceed 0.2 on adjacent residential uses, and 0.5 on
adjacent commercial sites and public rights- of-way. (Zoning
Ordinance Section 7.5.4.)
The lighting engineer shall inspect and provide a signed and sealed
letter certifying the lighting levels prior to issuance of the
Business Use Permit (BUP). The letter shall include language that
the lighting levels for the subject property comply with the
lighting levels outlined in Sarasota County Zoning Code Article
7.5. If any changes to the approved plan occurred during
construction, then one (1) lighting asbuilt plan shall be submitted
in addition to the engineer’s certification letter.
*SCHOOL BOARD - The School District of Sarasota County, Sarasota
County Government, the Town of Longboat Key and the cities of North
Port, Sarasota and Venice entered into an interlocal agreement in
2008 establishing the process and procedures to facilitate public
school facilities planning. The School Concurrency Management
System requires the School District of Sarasota County to maintain
a minimum level-of-service for public school facilities.
Accordingly, all new residential development must be reviewed to
ensure that adequate school capacity is in place or will be in
place to mitigate the impacts of additional students on the public
school system.
School Concurrency Application Process: Prior to submitting an
application to Sarasota County Government Land Development Services
for review of the following types of projects:
• Final site plan for new multi-family or condominiums • Final
subdivision plat for new single family lots
Revised 4/26/17 13
DESCRIPTION OF REQUIRED ITEMS (CONTINUED)
The applicant shall obtain a School Impact Analysis Application
Letter of Receipt from the Sarasota School District. Please submit
a completed School Impact Analysis Application packet, including
the applicable fees (checks made payable to the Sarasota School
District) as follows:
Mail or in person to: School Board of Sarasota County Planning
Department 7889 Fruitville Road Sarasota, Florida 34240
Via email to
[email protected]
Upon receipt of the completed application to the Sarasota School
District, the applicant will be given a School Impact Analysis
Application Letter of Receipt to be included as part of the
development review package submittal to Land Development
Services.
• A School Concurrency Determination will be required at the time
of the submittal for any final site plan or final plat for a
residential project.
• The letter of receipt must be submitted prior to the expiration
date or a new letter of receipt will need to be issued by school
district staff.
• All subdivision plats must be approved and recorded within two
years of the original date of the letter or a new letter of receipt
will need to be issued by school district staff.
The final results of the School Impact Analysis for any projects
requiring a public hearing (i.e. comprehensive plan amendments,
rezones or villages etc.) shall be provided to the local
government's Case Planner within the time frames set by each local
government for their respective development review processes.
School concurrency capacity is not reserved nor guaranteed for
comprehensive plan amendments, rezones or villages etc.
Revised 4/26/17 14
STANDARD NOTES (To be printed on plan set)
LAND DEVELOPMENT
• General Location Map shown on plan
• North Arrow shown on all plan sheets
• Engineer’s Certification statement shown on Cover of Plans
(Appendix C18)
• Ownership and Unified Control Statement shown on plan
• A statement describing in detail the character and intended use
of the development (Article III, Section 74-62.a.2)
• A general construction note specifying “Longitudinal lines shall
be standard thermoplastic with a minimum thickness of 0.10 inch or
100 mils and a maximum thickness 0.15 inch or 150 mils when
measured above the pavement surface. All chevrons, diagonal and
transverse lines, messages, symbols, and arrows, wherever located,
will have a thickness of 0.09 inch or 90 mils to 0.12 inch or 120
mils when measured above the pavement surface in accordance with
FDOT Specifications Section 711-4.2. (DITM, Section B.1.h, page
108)”
• A general construction note specifying sod at the back of all
curbs, pavement edges, swales and detention areas. (DITM, Section
B.1.g, page 98)(DITM, Section C.2, page 101)
• A general construction note specifying 3000 psi concrete for
roadway and drainage structures. (FDOT Standard Specifications
Section 346)
• A general construction note specifying all drainage culvert
joints shall be wrapped per FDOT Index 280. (FDOT Index)
• A note providing for paved inverts in drainage structures to
prevent impounded water. (STM, Section B.4.e.5, page 140)
• A “closure plan” for the subject site describing how all
construction and stockpiled vegetative debris and fill will be
removed from the site in the event the construction site is
abandoned prior to project completion. A general construction note
will suffice. (Article III, Section 74-62(a)22, Page 60)
• A general construction note specifying compliance with the
Americans with Disabilities Act and the Florida Accessibility Code.
or
• A general construction note specifying compliance with the
Americans with Disabilities Act and the Fair Housing Act Design
Manual.
Revised 7/20/17 15
STANDARD NOTES (CONTINUED)
• A general construction note specifying “all traffic control signs
within the right-of-way shall be per Section 700 of the FDOT
Specifications in addition to Sarasota County Supplemental
Specification SS700. All signs shall be constructed in accordance
with MUTCD criteria for sign size and shape and lettering
dimensions.”
• A general construction note specifying “all traffic sign posts
within the project shall be 2” x 2” square break-away 14 gauge
galvanized steel with punched holes in accordance with Appendix C3
of the LDR.
• Include any applicable Rezone Petition and/or Special Exception
stipulations on the plans. To obtain a copy of a rezone petition or
special exception, please contact the Planning Services “Planner of
the day” at 861-5232 (Article III, Section 74-62a.5m)
FIRE PROTECTION
• The construction site must comply with NFPA 241. Provide a note
on the Civil Engineering Site Plan cover sheet indicating “Water
mains and hydrants shall be completed and in service (per phase)
prior to commencing vertical construction on any building or
bringing combustible stock on site”.
• Where a fire alarm, fire sprinkler, fire main underground and/or
fire suppression system is required in accordance with the Florida
Building Code or Florida Fire Prevention Code: State licensed fire
alarm, fire sprinkler and underground fire main contractors will
submit separate plans for code compliance review to obtain separate
permits. Please relay this information to these contractors.
• Per the Land Development Regulations: The building may require an
automatic fire sprinkler and a monitored fire alarm system based on
construction type, square footage and/or occupancy use.
• Fire hydrant placement and requirements must comply with Sarasota
County Utility Code (SCUC), Section 12. Please show locations on
Utility Plan.
• A sign identifying the address served by the Fire Department
Connection shall be mounted to the FDC or its riser with a
corrosion-resistant bracket. The sign shall be 7” by 10”, with a
reflective white background and red letters ‘’FDC” a minimum of 2
¾” tall with a ¾‘’ stroke. The address shall be letters a minimum
of 1 ½’’ tall with a 3/8’’ stroke.
• Fire line underground piping for a fire protection system,
including the backflow preventer, shall be installed by a
Contractor I, II, or V per Chapter 633 Florida Statutes. The
underground fire riser shall extend to one (1) foot above finish
floor or finish grade.
• The required number of access roads shall be in accordance with
NFPA 1141.
Revised 7/20/17 16
STANDARD NOTES (CONTINUED)
ENVIRONMENTAL HEALTH
• Show all existing wells on the site plan or provide a statement
that no wells exist.
• Any wells discovered during excavation, earthmoving or
construction must be reported to the Sarasota County Health
Department, Environmental Health within 24 hours of
discovery.
• Any wells on site that will not be used must be plugged by a
licensed well drilling contractor in an approved manner.
• A DEP permit is required for the water line and fire line
extension.
• The proper backflow prevention device must be installed and
certified on the central water connection.
TREE PROTECTION
ENVIRONMENTAL PERMITTING
• Impacts to state and federally protected species as listed in the
most current version of "Florida's Endangered Species, Threatened
Species and Species of Special Concern: Official Lists" prepared by
the Florida Fish and Wildlife Conservation Commission (FWC) are not
authorized by this permit. These species may include, but are not
limited to, Florida scrub jay, American bald eagle, Sherman's fox
squirrel, burrowing owl, gopher tortoise, gopher frog, and eastern
indigo snake. Protection extends to the nests, burrows and habitat
utilized by these species. If a listed species (or its evidence,
such as burrows, nests, scat, tracks) that was not addressed in
this permit is observed prior to or during construction, all
clearing and earthmoving on-site shall cease. The Permittee shall
consult with the FWC regional office and/or the U.S. Fish and
Wildlife Service regional office regarding necessary protection
measures and provide evidence of such consultation to the
Environmental Protection Division prior to resuming work.
• If any Type A fill (clean earthen material) is to be hauled
off-site, an earthmoving permit or letter of exemption is required
from the Environmental Protection Division. If any Type A fill
hauled off-site is to be stockpiled or filled upon private
properties within the unincorporated areas of Sarasota County, the
receiving property(s) shall possess authorization in the form of an
earthmoving permit, a written earthmoving exemption, a building
permit, or construction plan approval prior to receiving said fill.
No Type B (concrete, broken asphalt, rocks), Type C (vegetative
land clearing debris), or Type D (garbage, refuse, wood, metal,
plastic, etc.) fill may be buried within or outside approved
construction limits. Type D fill must be disposed at an approved
landfill or recycling facility. Type B, C, and D fills generated
on- site shall not be stockpiled on-site for greater than six
months. Type B, C,
Revised 7/20/17 17
STANDARD NOTES (Continued)
and D fills shall not be hauled to the site from off-site sources.
For information about earthmoving permits or exemptions, contact
the Environmental Protection Division at 941-861-5000. If fill
material is to be stockpiled within the approved construction
limits, the project engineer must provide detailed drawings to Land
Development for review and approval.
HISTORY CENTER - SARASOTA COUNTY FORTUITOUS FINDS STATEMENT
• The following requirements apply to all building construction or
alteration, or land alteration activities in accordance with
Sarasota County Ordinance #2004- 073 and with the Historic
Preservation chapter of the Sarasota County Comprehensive
Plan:
a. If evidence of the existence of historic resources is discovered
or observed at development sites or during development activities
after final approval, all work shall cease in the area of effect as
determined by the Director. The developer, owner, contractor, or
agent thereof shall notify the Director of Historical Resources
within two working days. Examples of such evidence include whole or
fragmentary stone tools, shell tools, aboriginal or historic
pottery, historic glass, historic bottles, bone tools, historic
building foundations, shell mounds, shell middens, or sand mounds.
The Director shall assess the significance of the finds within
three working days of notification and to mitigate any Adverse
Effects so as to minimize delays to development activities.
b. If any human skeletal remains or associated burial artifacts are
discovered at development sites or during development activity, all
work in the area must cease, and the permittee must immediately
notify the nearest law enforcement office and notify the Director
of Historical Resources within two working days. According to
chapter 872, Florida Statutes, it is unlawful to disturb,
vandalize, or damage a human burial.
AIR & WATER QUALITY
1. National Pollutant Discharge Elimination System (NPDES) coverage
under the state Generic Permit for Stormwater Discharge from Large
and Small Construction Activities (aka. Construction Generic
Permit, or CGP) is required for projects that contribute stormwater
discharges to surface waters of the state (or into a municipal
separate storm sewer system – MS4); and that disturb more than one
acre of land, or less than one acre of land if part of a larger
common plan of development.
Sarasota County requires the submittal of a copy of the completed
Notice of Intent (NOI), and a copy of the Stormwater Pollution
Prevention Plan (SWPPP) as outlined in Rule 62-621.300(4)(a),
F.A.C., and in accordance with Sec. 54- 187(g) (Water Pollution
Control) of the Sarasota County Code. For additional assistance the
Florida Department of Environmental Protection as information
available at its website at
http://www.dep.state.fl.us/water/stormwater/npdes/swppp.htm.
Revised 7/20/17 18
STANDARD NOTES (Continued)
2. Dewatering operations that discharge offsite, or to onsite
surface waters of the state, may be covered under the CGP if the
groundwater is uncontaminated as outlined in Part 3.4 of the
Generic Permit. A separate permit may be required for discharges
from contaminated sites. Applicants are urged to contact the South
District of FDEP at (239) 344-5600 for permitting information
relating to a specific project. Ground water sampling results must
be submitted to Sarasota County prior to the commencement of
dewatering pursuant to Sec. 54-185(b) of the Water Pollution
Control Code.
3. Accommodations must be made for the proper handling and disposal
of waste materials, and wastewater. Wastewater discharges shall be
consistent with Utilities, Air and Water Quality, and Environmental
Health Services regulations. Separate agency permitting (i.e. DEP)
may be required. The plans should show areas that have the
potential to be significant sources of pollution such as equipment
and vehicle wash racks or wash areas; waste handling facilities;
chemical, equipment, and material storage areas. Food service
establishments must provide dedicated can wash areas that are
connected to the sanitary sewer.
4. Please note that accommodations must be made for proper disposal
of overflow water and filter backwash water from proposed swimming
pools. Such discharges shall be consistent with Air & Water
Quality and Environmental Health Services regulations. If adequate
provisions are made for dechlorination, the overflow water may be
discharged to the stormwater system. Filter backwash water shall
not be directed to the stormwater system, or to any surface waters.
It shall be discharged to the sanitary sewer, or an approved drain
field.
5. Prior to renovation or demolition of existing on site structures
an asbestos survey and/or asbestos notification may be
required.
6. Please disclose any known pollution-related environmental
concerns. Provide copies of any environmental site assessment
reports. Provide copies of agency correspondence relative to
completed remediation activities.
7. Relative to the landscape design and plans, please be advised
that fertilizer application must be consistent with Chapter 54,
Article XXXII (Fertilizer and Landscape Management) of the Sarasota
County Code.
8. The construction plans must include an erosion and sediment
control plan showing the location of, and details of, all erosion
and sediment control best management practices (BMPs), especially
perimeter controls, stabilization of site ingress/egress points
(soil tracking prevention measures – typically the former FDOT
Index 106 or equivalent), inlet protection, outlet stabilization,
and protection of receiving waters and stormwater conveyances. A
dewatering plan is required if dewatering discharge(s) are to be
directed off site, or to onsite wetlands or surface waters. The
plan must include a detail of sediment traps or basins.
9. The techniques depicted in the State of Florida Erosion and
Sediment Control Designer and Reviewer Manual, July 2013, or
equivalent, shall serve as the basic design criteria for erosion
and sediment control best management practices (BMPs).
Revised 7/20/17 19
STANDARD NOTES (Continued)
10.POLLUTION PREVENTION NOTES: Please add these notes to the
construction plans.
a. Erosion and sediment control BMPs in addition to those presented
on the plans and outlined in the Erosion and Sediment Control Plan
(ECP), Best Management Practices (BMP) Plan, or Stormwater
Pollution Prevention Plan (SWPPP) shall be implemented as necessary
to prevent turbid discharges from flowing onto adjacent properties
or roadways, off site stormwater conveyances or receiving waters,
or on site wetlands and surface waters. BMPs shall be designed,
installed, and maintained by the site Operator to ensure that off
site surface water quality remains consistent with State and local
regulations. [The Operator is the entity that owns or operates the
construction activity and has authority to control those activities
at the project necessary to ensure compliance.]
b. Off site surface water discharges, discharges to the MS4, or
discharges to onsite wetlands or surface waters with turbidity in
excess of 29 Nephelometric Turbidity Units (NTUs) above background
level shall be immediately corrected. Such incidents shall be
reported to Sarasota County within 24 hours of the occurrence (ph.:
941.861.5000; email:
[email protected]). The report shall
include the cause of the discharge and corrective actions
taken.
c. The Operator shall ensure that adjacent properties are not
impacted by wind erosion, or emissions of unconfined particulate
matter in accordance with Rule 62-296.320(4)(c)1, F.A.C., by taking
appropriate measures to stabilize affected areas.
d. Fuel and other petroleum product spills that enter stormwater
drains or waterbodies, or fuel and other petroleum product spills
that are in excess of 25 gallons shall be contained, cleaned up,
and immediately reported to Sarasota County (ph.: 941.861.5000;
email:
[email protected]). Smaller ground surface spills
shall be cleaned up as soon as practical.
e. If previously unknown Recognized Environmental Conditions (e.g.
contaminated soil and/or groundwater, buried wastes, etc.) are
discovered during development of the site, all activity in the
immediate vicinity shall cease, and Sarasota County shall be
contacted (ph.: 941.861.5000; email:
[email protected]).
f. Prior to renovation or demolition of existing on site structures
an asbestos survey and/or asbestos notification may be
required.
g. Fertilizer application shall be consistent with Chapter 54,
Article XXXII (Fertilizer and Landscape Management) of the Sarasota
County Code.
h. National Pollutant Discharge Elimination System - Stormwater: i.
NPDES Construction Generic Permit coverage shall be obtained at
least 48
hours in advance of construction commencement in accordance with
the requirements of the National Pollutant Discharge Elimination
System (NPDES) Generic Permit for Stormwater Discharge from Large
and Small Construction Activities (aka. Construction Generic
Permit, or CGP).
ii.A copy of the certified NPDES NOI, or a copy of the FDEP
coverage confirmation letter shall be posted at the site in
accordance with Part 2.6 of the Generic Permit, and as per Sec
54-187(g)(1) of the Sarasota county Code.
Revised 7/20/17 20
STANDARD NOTES (Continued)
iii. A copy of the certified NPDES NOI, or a copy of the FDEP
coverage confirmation letter shall be provided to Sarasota County
within 7 calendar days in accordance with Part 2.6 of the Generic
Permit, and Sec. 54- 187(g)(1) of the Sarasota County Code.
iv.The SWPPP shall be certified in accordance with Part 4.6 of the
Generic Permit, and a copy of the certified document shall be
submitted to Sarasota County at least 48 hours prior to the
commencement of construction per Sec 54-187(g)(1) of the Sarasota
County Code.
v. A copy of the SWPPP, and copies of the inspection and
maintenance records shall be maintained at the project site, and
shall be readily available to county or state inspectors per Sec
54-187(g)(1) of the Sarasota County Code.
i. National Pollutant Discharge Elimination System - Dewatering: If
not otherwise covered as outlined under Part 3.4 of the Generic
Permit, the discharge of groundwater produced through dewatering,
to surface waters, or to any portion of the MS4 will require
separate permitting from the Florida Department of Environmental
Protection (DEP). Permit(s) shall be obtained prior to the
commencement of dewatering. Analytical results from pre-discharge
testing shall be provided to Sarasota County pursuant to Section
54-185(b) of the Sarasota County Code.
11.OTHER PERMITS
a. Stormwater: National Pollutant Discharge Elimination System
(NPDES) Generic Permit For Stormwater Discharge from Large and
Small Construction Activities (aka Construction Generic Permit of
CGP) per DEP Document 62- 621.300(4)(a).
b. Dewatering: Generic Permit for Discharges From Petroleum
Contaminated Sites (DEP Document 62-621.300(1)); or, Generic Permit
for the Discharge of Groundwater from Dewatering Operations (DEP
Document 62-621.300(2)); or, Individual Permit pursuant to Chapter
62, Florida Administrative Code (F.A.C.).
c. Environmental Resource Permitting: Environmental Resource
Permitting is a state program (whereas the NPDES permitting noted
above is a federal program delegated to the state). The ERP Program
is separate and apart from the NPDES Program.
Revised 7/20/17 21
OFFICE REVIEWER PHONE
STORMWATER ROBERT BRESCIANI 861-0908
LANDSCAPE KRISTEN HELLMAN 861-0734
AIR & WATER QUALITY JOE KRAUS 726-4061
ENVIRONMENTAL HEALTH RICH CANTIN 228-2871 (Septic Systems) VIRGINIA
BESS 861-6653
HISTORY CENTER STEVE KOSKI 861-6882
ENV. PERMITTING JIM DIEROLF 702-0017
TREE PROTECTION MARK McCLINTOCK (North) 780-7670 ELIZABETH BAYLISS
(South) 202-1689
UTILITIES MIKE MEHAN 861-0582
ZONING DAVE YOUNG 861-3726
OTHERS
COUNTY SURVEYOR TERI OWEN 861-6709 SCHOOL BOARD MICKI RYAN 927-9000
x69051 IMPACT FEES TOM POLK 650-7896 SOLID WASTE (DUMPSTERS) TOM
FRANKLIN 861-6218 AFFORDABLE HOUSING VIVIAN ROE 861-5106 SCAT ERIC
PORTER 315-5259
Revised 1/25/17
Procedures to Apply for an Online Sarasota County DRC Presubmittal
or Exemption
Obtain a DRC Presubmittal or Exemption Application from the
following link:
https://www.scgov.net/DevelopmentServices/Pages/Documents.aspx
under the Land Development Applications heading.
If you are already a registered user of our online services, login
as always using your login and password; otherwise, click on the
following link to create an Online Account as the GENERAL PUBLIC.
Make sure to create security questions so your password can be
recovered if necessary:
https://building.scgov.net/PublicPortal/Sarasota/AutoRegEmailValidation.jsp
Click on the following link to sign in to apply for a DRC
Presubmittal or Exemption (Do Not Select Pre-Application):
https://building.scgov.net/PublicPortal/Sarasota/logon.jsp?pagename=MyService
Click on Apply for Permit and follow the prompts to create your
submittal and upload your documents.
You can pay for the permit with a credit card at this time or
submit a check, with the permit number written on it, to:
Land Development Services 1001 Sarasota Center Blvd Sarasota, FL
34240
Application Fee: $400.00
This Application must be completely filled in, including the
applicant’s signature. Include a concept plan showing specific
location and/or aerial overly and a written narrative of the scope
o work. Submit the packet following the attached “Procedures to
Apply for an Online Sarasota County DRC Presubmittal”. If you have
any issues, please contact
[email protected]. Meetings are
scheduled on the 1st and 3rd Thursdays of the month, pending
availability, and begin promptly at 9:00 am. Submittals must be
received two (2) Fridays prior to an anticipated meeting date but
are not guaranteed a spot on that agenda.
___The Planning and Development Services Department is committed to
providing excellent customer service. Please check here if it is ok
for someone from the County to follow-up with you regarding your
experience and how we can improve our service.
Application Type (please pick one):
Subdivision [ ] Conventional [ ] Conservation Commercial [ ]
Non-residential [ ] Multi-family [ ] Mixed Use
Project
Name__________________________________________________________________________
__ Owner/Contract Purchaser __ Name: ____________________ Phone
Number:______________
Address: ______________________________ City: _______________
State: ______Zip:_______
Address: ______________________________ City: _______________
State: ______Zip:_______
Address: ______________________________ City: _______________
State: ______Zip:_______
_________________________________ _______________________________
________
FormLDS05 – Revised 5/10/17
APPLICATION
Check if applicable: [ ] Conservation Subdivision [ ] Redevelopment
(Commercial Only) [ ] SMART [ ] Affordable Housing
___The Planning and Development Services Department is committed to
providing excellent customer service. Please check here if it is ok
for someone from the County to follow- up with you regarding your
experience and how we can improve our service.
Property Identification Number:____________________
Intended Use:
__________________________________________________________________
New Impervious (Sq Ft):______ Building Size (Sq Ft):______ Parcel
Size (Acres):_____
#Units:__ #Stories:__ #Parking Required:____ #New Parking:_____
#Existing Parking:____
Owner's Name: __________________________________ Phone Number
[Day]:_________________ Address: ______________________________
City: _______________ State: ______Zip:_______ Email:
________________________________
Representative/Applicant: _______________________ Phone Number
[Day]: ___________________ Address: ______________________________
City: _______________ State: ______Zip:_______
Email:_________________________________
Engineer of Record: ______________________________ Phone Number
[Day]: _______________ Address: ______________________________
City: _______________ State: ______Zip:_______
Email:_________________________________
Planned Water Source: [ ] Central: Utility Name
________________________ [ ] Well Planned Sewer Facility: [ ]
Central: Utility Name ________________________ [ ] Septic
Is this project 35 acres or larger? ( )Yes ( )No Does this project
propose 8 acres or more of impervious coverage?( )Yes ( )No Does
the project propose changes to the Watershed Model conveyance
system?( )Yes ( )No
If Yes to any of the above, please contact Stormwater at
941-861-0910 to schedule a pre-application meeting.
I certify that the above information is correct as of this date.
__________________________________ _______________________________
________
Property Owner's Original Signature Printed Name & Title
Date
FormLDS01 - Revised 5/10/17
FEE CALCULATION SHEET
Land Development Services:
Base Submittal $4,000.00
Adjusted Acreage (Rounded to the next whole acre): _______ x
$600.00
Plus the following for each Parking Space:
First 1 - 40: _____ x $45.00
Next 41 - 80: _____ x $35.00
Next 81 - 160: _____ x $25.00
Next 161 - 320: _____ x $15.00
Next 321 - 600: _____ x $10.00
Next 601 - 1200: _____ x $5.00
over 1200: _____ x $2.00
_________
_________
_________
_________
_________
_________
_________
Landscape Plan and Inspection: $200.00 Environmental Engineering:
$300.00 History Center: $150.00 Zoning: $600.00 Fire and Life
Safety: $150.00 Records: $15.00 Outdoor Lighting (If applicable as
noted on checklist): $150.00 TOTAL FEE (ALL FEES ARE REQUIRED TO BE
PAID UPON SUBMITTAL)
*Stormwater participates as part of the Development Review
Committee but they are not part of Land Development Services.
Review fees are charged at an hourly rate above and beyond the
initial review fees pursuant to Resolution No. 2007-229.
FormLDS08 - Revised 12/16/15
Sheet1
OTHERS
FormLDS04-Land Development Review Fee Payment by CC
3-12-14.pdf
Project Name:__________________________________
Case Number:________________________________________
Land Development Review Application.pdf
Address: ______________________________ City: _______________
State: ______Zip:_______
Minor Revision Application.pdf
DRC Members.pdf
FormLDS04-Land Development Review Fee Payment by CC
3-12-14.pdf
Project Name:__________________________________
Case Number:________________________________________
DRAFT FormLDS05-DRC Presubmittal Request Form 9-11-14.pdf
Email:_________________________________
DRC Members.pdf
DRC PRESUBMITTAL APPLICATION.pdf
Minor Revision Application.pdf
Concurrent Commercial Fee Calc Sheet.pdf
Sheet1
Address: ______________________________ City: _______________
State: ______Zip:_______
DRC Members.pdf
Address: ______________________________ City: _______________
State: ______Zip:_______
Minor Revision Application Fillable.pdf
Address: ____________________________________________ City:
_______________ State: ______Zip:________
DRC Members.pdf
Address: ______________________________ City: _______________
State: ______Zip:_______
pg 3.pdf
Sheet1
OTHERS
FormLDS04-Land Development Review Fee Payment by CC
3-12-14.pdf
Project Name:__________________________________
Case Number:________________________________________
Land Development Review Application.pdf
Address: ______________________________ City: _______________
State: ______Zip:_______
Minor Revision Application.pdf
DRC Members.pdf
FormLDS04-Land Development Review Fee Payment by CC
3-12-14.pdf
Project Name:__________________________________
Case Number:________________________________________
DRAFT FormLDS05-DRC Presubmittal Request Form 9-11-14.pdf
Email:_________________________________
DRC Members.pdf
DRC PRESUBMITTAL APPLICATION.pdf
Minor Revision Application.pdf
Concurrent Commercial Fee Calc Sheet.pdf
Sheet1
DRC Members.pdf
Address: ______________________________ City: _______________
State: ______Zip:_______
FormLDS06-Minor Revision Application 8-10-16.pdf
Address: ____________________________________________ City:
_______________ State: ______Zip:________
DRC Members.pdf
Concurrent Commercial Fee Calc Sheet Fillable.pdf
Sheet1
Email:_________________________________
DRC Members.pdf
DRC PRESUBMITTAL APPLICATION FILLABLE.pdf
Email:_________________________________
Email:_________________________________
Email:_________________________________
ELECTRONIC SUBMITTAL CHECKLIST FILLABLE.pdf
DRC PRESUBMITTAL APPLICATION FILLABLE.pdf
Email:_________________________________
Email:_________________________________
Email:_________________________________
Email:_________________________________
Email:_________________________________
Address: ______________________________ City: _______________
State: ______Zip:_______
Land Development Review Application Fillable.pdf
Address: ______________________________ City: _______________
State: ______Zip:_______
ELECTRONIC SUBMITTAL CHECKLIST.pdf
Check Box1: Off
Check Box2: Off
Check Box3: Off
Adjusted Acreage Rounded to the next whole acre:
TOTALAdjusted Acreage Rounded to the next whole acre x 60000:
x 4500:
x 3500:
x 2500:
x 1500:
x 1000:
x 500:
x 200:
TOTALEnvironmental Engineering 30000:
TOTALHistory Center 15000:
TOTALRecords 1500:
TOTALOutdoor Lighting If applicable as noted on checklist
15000:
TOTALTOTAL FEE ALL FEES ARE REQUIRED TO BE PAID UPON
SUBMITTAL:
Text1:
Text2:
Text3:
Text6:
Text7:
Text4:
Printed Name:
Intended Use:
Printed Name Title:
TOTAL:
TOTAL_2:
TOTAL_3:
TOTAL_4:
TOTAL_5:
TOTAL_6:
TOTAL_7:
TOTAL_8: