September 12th, 2021 Savannah Arena Weekly AcƟvity Report Week 89 (09/06/2021 - 09/12/2021) Page 1 CURRENT CONSTRUCTION ACTIVITIES ConƟnued sun shade installaƟon on South Curtain wall. ConƟnued West side curtain wall installaƟon. ConƟnued install of metal deck ADA Plaƞorms throughout Stadia. ConƟnued with Ice Floor ProtecƟon ConƟnued running 24” Force Main for SƟles Ave running North of GwinneƩ. ConƟnued with interior framing on Overlook Quads 1 and 3. ConƟnued installing Plumbing Fixtures Quads 1 and 2 suite level ConƟnued hanging drywall throughout Quads 1 through 4 on Event Level. ConƟnued Ɵle installaƟon on Overlook Level. ConƟnued with installaƟon of ice floor controls. ConƟnued terminaƟng all panels and tesƟng throughout Arena. ConƟnued roughing in electrical feeds for SOG in Parking Garage. ConƟnued Catwalk Level power and systems. ConƟnued painƟng CMU throughout Event Level. Commenced Con- course Restroom painƟng. ConƟnued Ɵling walls on Concourse and Suite Level in Quads 1 and 2 and conƟnued grouƟng. ConƟnued with plumbing rough in throughout Visitor Locker Rooms, Star Rooms, and Overlook Level. ConƟnued with Parking Garage plumbing rough in on 1st and 2nd level. ConƟnued duct work installaƟon throughout Arena. ConƟnued with HVAC controls on Event, Concourse, and Suite Levels. ConƟnued with plumbing fixture installaƟon on Concourse Level. ConƟnued InstallaƟon of Handrails Completed Permanent Power switchover to Arena. ConƟnued Pile placement at canal bulkhead Exterior West—Crews installing exterior wall metal framing Looking East Concourse Level– Crews applying mesh tape and mud at drywall joint Q2 looking Northeast

Savannah Arena Weekly Acvity Report Week 89 (09/06/2021

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

September 12th, 2021

Savannah ArenaWeekly Ac vity Report

Week 89 (09/06/2021 - 09/12/2021)

Page 1

CURRENT CONSTRUCTION ACTIVITIES

Con nued sun shade installa on on South Curtain wall.

Con nued West side curtain wall installa on.

Con nued install of metal deck ADA Pla orms throughout Stadia.

Con nued with Ice Floor Protec on

Con nued running 24” Force Main for S les Ave running North of Gwinne .

Con nued with interior framing on Overlook Quads 1 and 3.

Con nued installing Plumbing Fixtures Quads 1 and 2 suite level

Con nued hanging drywall throughout Quads 1 through 4 on Event Level.

Con nued le installa on on Overlook Level.

Con nued with installa on of ice floor controls.

Con nued termina ng all panels and tes ng throughout Arena.

Con nued roughing in electrical feeds for SOG in Parking Garage.

Con nued Catwalk Level power and systems.

Con nued pain ng CMU throughout Event Level. Commenced Con-course Restroom pain ng.

Con nued ling walls on Concourse and Suite Level in Quads 1 and 2 and con nued grou ng.

Con nued with plumbing rough in throughout Visitor Locker Rooms, Star Rooms, and Overlook Level.

Con nued with Parking Garage plumbing rough in on 1st and 2nd level.

Con nued duct work installa on throughout Arena.

Con nued with HVAC controls on Event, Concourse, and Suite Levels.

Con nued with plumbing fixture installa on on Concourse Level.

Con nued Installa on of Handrails

Completed Permanent Power switchover to Arena.

Con nued Pile placement at canal bulkhead

Exterior West—Crews installing exterior wall metal framing Looking East

Concourse Level– Crews applying mesh tape and mud at drywall joint Q2 looking Northeast

September 12th, 2021

Savannah ArenaWeekly Ac vity Report

Week 89 (09/06/2021 - 09/12/2021)

Page 2

UPCOMING CONSTRUCTION ACTIVITIES

Commence interior stadia railing install.

Commence beverage piping installa on at Suite Level in Quad 1.

Con nue VAV Piping on Event Level Quad 2.

Con nue with Parking Garage Electrical Underground.

Con nue 24” Force Main for S les Ave.

Con nue pulling data cable throughout Suite Level.

Con nue installa on of FCU piping throughout Arena on all levels.

Con nue with Freon Pipe installa on All Levels Quads 3 and 4.

Con nue with HVAC controls on Event, Suite, and Overlook Levels.

Con nue with duct work installa on throughout Arena.

Con nue se ng panel cans, transformers, and switchgear in Quad 4.

Con nue with pulling feeder wire in Quad 4.

Con nued install of AC mini split units

Con nue with installa on of electrical panel interiors.

Con nue with in wall rough in for electrical on Event and Overlook Levels.

Con nue cable tray installa on on the Event Level.

Con nue with termina ng panels and tes ng.

Con nue with fireproof patching throughout Arena.

Con nuing with topping out Metro Deck area in Quads 3-4.

Con nue with plumbing fixtures on Concourse Level.

Con nue interior framing in Quads 1 through 4 on all levels.

Con nue on with ling on Suite and Overlook level Restrooms.

Con nue with Fire Protec on Tes ng throughout Arena.

Commence Scored board and Ribbon board mobiliza on

Overlook Level– Crews installing le on floors and walls in Q2 Restroom Looking Northwest

Concourse Level– Crews applying paint in North corridor between Q1 and Q2 Looking West

08/10/2021

08/12/2021

September 12th, 2021

Savannah ArenaWeekly Ac vity Report

Week 89 (09/06/2021 - 09/12/2021)

Page 3

ADDITIONAL PROGRESS PHOTOS

Concourse Level– Crews installing Fire Alarm Boxes in Q2 Looking North

Concourse Level– Crews installing drywall at Elevator sha Q3 Looking southwest

Northwest Low Roof– Crews connec ng power to roo op mechanical units Looking Southeast

Exterior East– Crews installing Deep Founda on Piles for Canal Bulkhead

September 12th, 2021

Savannah ArenaWeekly Ac vity Report

Week 89 (09/06/2021 - 09/12/2021)

Page 4

ADDITIONAL PROGRESS PHOTOS

Concourse Level– Crews installing Fire protec on lines at Q1 and Q4 Looking West

Parking Garage– Crews placed Generators in the Mechanical Yard Looking Northwest

Concourse Level– Crews installing Ladder rack in IT room Q1 Looking southeast

South Low Roof– Crews installing Metal Panel on low roof soffit Q4 Looking North

September 12th, 2021

Savannah ArenaWeekly Ac vity Report

Week 89 (09/06/2021 - 09/12/2021)

Page 5

ADDITIONAL PHOTOGRAPHIC DOCUMENTATION

09/15/2020

Arena Bowl– Ice Slab

South Eleva on - Looking North

September 12th, 2021

Savannah ArenaWeekly Ac vity Report

Week 89 (09/06/2021 - 09/12/2021)

Page 6

�WEATHER

Inclement Weather Days This Week: 0 DayInclement Weather Days To Date: 27 Days

DISADVANTAGED BUSINESS ENTERISES AND LOCAL TRACKING

� ASSET TRACKING

September 12th, 2021

Savannah ArenaWeekly Ac vity Report

Week 89 (09/06/2021 - 09/12/2021)

Page 7

�KEY PERFORMANCE INDICATORS

On Schedule Behind Schedule Caution: Subject to Fall Behind

Key�Performance�Indicators

Loca on Total Complete to Date % Complete Schedule Status

EXTERIOR METAL WALL FRAMING (CFMF)

West Exterior Wall 762 LF 650 LF 85.30%

MASONRY

Event Level - Quad 1 25,898 SQ/FT 24,215 SQ/FT 93.50%

Event Level - Quad 4 16,451 SQ/FT 15,628 SQ/FT 95.00%

CURTAIN WALL

West Wall 279 LF 270 LF 96.77%

East Wall 828 LF 822 LF 99.27%

South Wall 792 LF 790 LF 99.74%

CANAL BULKHEAD

Deep Founda on Piles 264 piles 63 Piles 23.86%

Metal Panels

Corrugated/Screen Wall 12,818 SF 200 SF 1.56%

ACM 13,881 SF 1,018 SF 7.33%

Handrails

Overall Rail 9,187 LF 688 LF 7.48%

Overlook Cable Rail 2,105 LF 208 LF 9.00%

Concourse Aisle Rail 475 LF 332 LF 70.00%

Overlook Aisle Rail 181 LF 148 LF 82.00%

ELECTRICAL

Normal and U lity Power from Mech. Yard to Building 55,000 LF 53,000 LF 96.36%

Overall Primary and Secondary Feeders 181,000 LF 137,994 LF 76.24%

Branch Circuit Wire 945,000 LF 313,500 LF 33.17%

MECHANICAL UNITS

FCU Power Connec on 70 Units 55 Units 78.57%

EAV/CAV/VAV Box Hydronics 28 Units 12 Units 42.85%

AC Mini—Split 42 Units 7 Units 16.67%

September 12th, 2021

Savannah ArenaWeekly Ac vity Report

Week 89 (09/06/2021 - 09/12/2021)

Page 8

WEEKLY MANCOUNT

TRADE�CONTRACTORS�ON�SITE

Subcontractor Trade # of Employees03A - Precision Concrete Concrete 49

04A - Bibler Masonry Contractors Inc. Masonry 205A - Banker Steel Structural Steel 7

06A Hollywood Woodwork Millwork 207A - Elite Roofing Roofing 607B - Crown Corr Curtainwall, Glass, and Glazing 9

07C - Barrier South Waterproofing, Caulking, and Sealants 507D - Rolling Plains Fireproofing 6

09A & 09B - Colby Enterprises Exterior Framing and Sheathing/Interior Drywall 9909C - Real Floors Flooring 10

09G - Miller Pain ng Pain ng 2511B - Johnson Lancaster Food Service 3

13A - Cimco Ice Floor 321A - Northstar Fire Suppression 4

22A - Campbell Plumbing Plumbing 1623A - Erickson & Associates Mechanical 48

26B - Ace Electric Electrical & Fire Alarm 5527B - NetPlanner Security 30

26D– Musco Sports Ligh ng 331A - C.A. Murren & Sons Site Work & U li es 18

31C - APAC Atlan c S les Ave Roadwork 232B - Savannah Hardscapes Hardscapes 1

TOTAL 405

03C– Metromont Precast 2

MANPOWER BY GEOGRAPHIC LOCATION

Totals by County, St 08/26 – 09/01 % ONSITEAll Others 130 29%Chatham, Ga 114 25%Bulloch, Ga 63 14%Bryan, Ga 13 4%Jeff Davis, Ga 12 3%Ta nall, Ga 8 3%Glynn, Ga 8 2%Effingham, Ga 6 2%Toombs, Ga 6 2%Mecklenburg, Nc 12 3%Duval, Fl 3 1%Montgomery, Ga 5 1%Beaufort, Sc 7 2%Dekalb, Ga 4 1%Clayton, Ga 3 1%Nassau, Fl 3 1%Spartanburg, Sc 1 1%

September 12th, 2021

Savannah ArenaWeekly Ac vity Report

Week 89 (09/06/2021 - 09/12/2021)

Page 9

Days Without an Incident = 39

Days Without Lost Time = 667

Permit 20-01968-BC had inspec ons on 09/09/2021 (2) All inspec ons passed.

Third Party Inspec ons: Whitaker Labs onsite for daily Masonry, Steel Detailing, Precast Erec on, Field Density Tes ng, Rebar and Concrete Inspec ons.

S les Avenue - Force Majeure le er received for S les Ave material PVC procurement indica ng poten al cost escala on due to recent Texas freeze in addi on to COVID-19.