Saverio Minutoli INFN Genova
1Saverio Minutoli INFN Genova
1
T1 Electronic status
Electronics Cards involved:
Anode Front End Card Cathode Front End Card Read-Out Control card VFAT hybrids T1 Trigger Mezzanine
Other development: 16chs preamplifier.
Cabling and Power Supplies:
T1 Trigger Architecture Optic cabling High Voltage Low Voltage Patch panels
CERN Electronics Meeting 22 Nov. 2007
Saverio Minutoli INFN Genova
2Saverio Minutoli INFN Genova
2
Electronics Cards
Saverio Minutoli INFN Genova
3Saverio Minutoli INFN Genova
3
VFAT hybrid input ground isolation new feature.
5 pieces of 1P and 5G already produced. Waiting for the components loading.
Mass production launched. PCBs ready within Dec. 2007. Decision on passive components networks
within Dec. 07 Components mounting within ½ Feb.08 End tests, validation and CSCs soldering
March 08
AFEC
Saverio Minutoli INFN Genova
4Saverio Minutoli INFN Genova
4
CFEC (1) First PCB almost tested.
Results under evaluation New layout in progress. Ten PBCs ready 51st w/07 PCBs mounted within 2nd-3rd
w/08
Decision on passive components networks within Dec. 07
Mass production ready within ½ Feb.08
End tests and validation March 08.
Saverio Minutoli INFN Genova
5Saverio Minutoli INFN Genova
5
CFEC (2)
Upgrade to high resolution.
New layout Jan. 08 Few prototypes
ready March 08. End tests and
validation April 08. Mass production
ready June 08.
Saverio Minutoli INFN Genova
6Saverio Minutoli INFN Genova
6
ROC (1)
Some delays due to CERN custom components procurement. Needed to avoid wrong components packages association.
Several features implemented: DOHM and CCUM emulation. DOHM I2C lines handling (follow the CCUM-SCR redundancy
scheme). Trigger VFAT Mezzanine GOHs mezzanines input pattern generator. Several Data GOH DAV sources available. Several Trigger GOHs DAV sources (BC0, Static, Timed by CCUM) Foreseen a SPY Mezzanine based on T1 Digital Mezzanine.
The layout is in progress. 5 PCB ready ½ Dec.07 3 Circuits mounted and tested ½ Jan.08 PCBs mass production ½ Feb. 08 Full ROCs ready within March 08.
Saverio Minutoli INFN Genova
7Saverio Minutoli INFN Genova
7
ROC (2)
Saverio Minutoli INFN Genova
8Saverio Minutoli INFN Genova
8
ROC (3)
BC0b
IDLEb/ON
TR_GOH_DAV
I/O CCUM
MUX
CSC1
A
DATA_GOH_DAV
I/O CCUM
MUX
MUX
MUX
I/O CCUM
CSC2
A
K
K
K
TRIGGER
DAV
DATA
DAV
Has been tested ???
Saverio Minutoli INFN Genova
9Saverio Minutoli INFN Genova
9
VFAT hybrids
Hybrids production (PCBs and components mounting) at CERN. High density input connectors available from T1.
Bonding may be made in Genoa. Needs agreement with the people in Genoa lab. Needs to know all the rules and material used by the CERN
bonding lab. Needs some VFAT dummy chips in order to test all the procedures. Could be useful a training period at CERN of our bonding
technician. Validation of the first hybrids in accord with the CERN people
(W.S.- P.A.). The installation of 1 arm (30 CSCs) in March 08 involve 140 VFAT
hybrids. This number is equivalent to the full T1 anode VFATS hybrids
production including spares. In this installation 60 will be dedicates for the anodes and 80 for
the cathodes (CFEC VFAT only based). VFAT hybrids schedule is CERN production dependent…
Saverio Minutoli INFN Genova
10Saverio Minutoli INFN Genova
10
T1 Trigger Mezzanine
T1 detector have 15 trigger fibers per each ¼ while each OptoRx mezzanine accept up to 12 fibers.
In order to merge and manipulate with a dedicate algorithm all the trigger bits (30 fibers in total), we will need the custom TTM mezzanine to add to the Trigger TOT-FED.
The trigger system is not completely fixed, need some more iterations within the trigger group.
TTM not needed at the beginning (March 08). Expected to be available in June 08.
Saverio Minutoli INFN Genova
11Saverio Minutoli INFN Genova
11
16 channels preamplifier (1)
This small boards use the same FE preamplifier device integrated inside the VFAT chip (see Jan Kaplon).
Needed for final studies on T1 CSC detector. Layout in progress. Some PCBs ready and mounted 2nd w/Dec.07 End tests and decision on the AFEC and CFEC
passives networks components within Dec. 07
Saverio Minutoli INFN Genova
12Saverio Minutoli INFN Genova
12
16 channels preamplifier (2)
Saverio Minutoli INFN Genova
13Saverio Minutoli INFN Genova
13
Cabling and Power Supplies
Saverio Minutoli INFN Genova
14Saverio Minutoli INFN Genova
14
OLD Section
Saverio Minutoli INFN Genova
15Saverio Minutoli INFN Genova
15
Platform to 6th T1 Frame cable tray
Who is responsible for this cables ??(Putting in work and purchase)
NEW Section
Saverio Minutoli INFN Genova
16Saverio Minutoli INFN Genova
16
T1 Trigger Architecture
~6kwires
CSC
ROC
T1 ARM
8
1x22
30
~6kwires
CSC
ROC
T1 ARM
8
1x2 2
x15 30
T1 TRG_TOTFED
12 1233
T1 TRG_TOTFED
1212 3 3
GLOBALTRG_TOTFED
8bits
X XCOUNTING ROOM
CAVERN
Trigger Bits 2 x 480 = 960
x15
x2 x2
(Needs TRG algo.)LV1
Y
(16bits)VFAT
(16bits) 8bitsVFAT
TTM TTM
Saverio Minutoli INFN Genova
17Saverio Minutoli INFN Genova
17
CSC#1
CSC#15
HV ch#1
HV ch#15
Patch Panel on 6th frame
Patch Panel on T1 Platform
A1
55
0P
-Ca
en
HV
24
ch
sH
V P
.S.
100m HV Cable
15m HV Cable
Counting Room
T1 Rack Platform
T1 ¼
Ma
in F
ram
eS
Y1
52
7
Inside T1 1/4
T1 ¼ HV cabling schematicS.M. 24/04/2007
Saverio Minutoli INFN Genova
18Saverio Minutoli INFN Genova
18
T1 Optic Architecture (OLD version)
Saverio Minutoli INFN Genova
19Saverio Minutoli INFN Genova
19
Low Voltage and High Voltage components.
Placed order at CERN for 5 WIENER fully equipped MARATON low voltages system. Two simple VME crates are also purchased for
the MARATON remote control cards. Delivery expected within March 2008.
Almost placed an order to CAEN for 6 HV modules A1550P, and one mainframe SY1527. Delivery expected March/April 2008.
Saverio Minutoli INFN Genova
20Saverio Minutoli INFN Genova
20
Patch panels
Hosted on the platform: Low voltage it could simplify the connections with the
WIENER. (not needed at the beginning) High Voltage to be done, (not needed at the
beginning) but ok for March 08. Connector procurement done.
Hosted on the 6th T1 Frame: Low voltage prototype almost ready, ok March 08. High Voltage all produced, one prototype almost
ready, ok March 08. Optic fiber to be done, need a fiber cable fan-out and
MPO connector for the dimensioning of the box (see W.S.).