SCADA/EMS System SCADA/EMS System An Overview An Overview

SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

Embed Size (px)

Citation preview

Page 1: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

SCADA/EMS System SCADA/EMS System

An OverviewAn Overview

Page 2: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

P Q

V

O

SS

DS

DC

MW MVAR

VOLTAGE

TAP POSITION

SINGLE STATUSISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE

DOUBLE STATUS CIRCUIT BREAKER POSITION

DIGITALCONTROLCIRCUIT BREAKER CONTROL

F FREQUENCY

THE PARAMETERS ARE MONITORED FOR FOLLOWING STATIONS :

•Substations 220 KV and above

•132/110KV AC Interstate Tie lines and in loop of 220 KV transmissions system

•Generating Station above 50MW capacity.

•Significant stations identified by constituents

P Q

DS DC

SS

SS

V F

DS

SS

SS

O

P Q

SS

DS

P Q

P Q

DS

DS

SS

SS

SS

SS

Q

DS

V F

SS

SS

SS

SS

SSSS

SS

DATA ACQUISITION PRINCIPLE FOR ULDC SCHEME

Page 3: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

CommunicationFront-end

SCADA/EMSServers

ISRServers

ICCPServers

DTSServer

DevelopmentServer

DevelopmentConsole

DTSOperatorConsoles

PeripheralEquipment

WANRouters

To RTUs

ToSLDCs, CPCC Remote

VDUs

Headquarters

Operator Consoles

(*)

NetworkManagement

Console

(*) Five 2-CRT consoles, two 1-CRT consoles and one Operations Scheduling Console

RSCC ARCHITECTURE

Page 4: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

`

CommunicationFront-end

SCADA/EMSServers

ISRServers

ICCPServers

DevelopmentConsole

PeripheralEquipment

WANRouters

ToRTUs

To RSCC, Sub-LDCs

Remote VDUs

Headquarters

Operator Consoles

(*)

NetworkManagement

Console

Three or four 2-CRT consoles, one 1-CRT consoles and one Operation Scheduling console

SLDC ARCHITECTURE

DevelopmentServer

Page 5: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

CommunicationFront-end

Processor/Desktop console

PeripheralEquipment

WANRouters

To relevant SLDC (Sub-LDCs)

or to RSCC (CPCC)

SUB-LDC/CPCC ARCHITECTURE

Page 6: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

Sql*Net

relational database ORACLE Export file

HABITAT

dBs

HIMSampler

SCADA/EMSServers

HIMRecorder

Retained

Data

Reconstructed

Data

HIM tables Archiving

Reconstruction

and Maintenance

JUKE BOX

Sampling

Directives

and

Storage

Definitions

Export Import

Files

ISR Servers

OperatorConsoles

Habitat dB

HIM OVERVIEW

Page 7: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

SYSTEM CO-ORDINATION & CONTROL PROJECT

(NORTHERN REGION)

Chandigarh,BBMB

DESU

Lucknow

Panipat(HSEB)

Jutog

Patiala

Panipat (BBMB)

Dadri (B)

Dadri (H)

Sultanpur

Moradabad

Varanasi

Rishikesh

Bhilwara

Kota

Ratangarh

Narwana

Hamirpur

Kunihar

Laltonkalan

Jallandhar (P)

Jallandhar (B)

Ganguwal (B)

Heerapura

Pakistan

N e pa l

ChinaJammu & Kashmir

HimachalPradesh

Punjab

Har

y

UttarPradesh

Rajasthan

Delhi

Gujarat

MadhyaPradesh

Bemina

J&K SEB

• 1 SLDC • 1 Sub-LDC• 13 RTUs

PSEB

• 1 SLDC • 2 Sub-LDC• 19 RTUs

HVPNL

• 1 SLDC • 2 Sub-LDC• 40 RTUs

RVPN

• 1 SLDC • 3 Sub-LDC• 21 RTUs

HPSEB

• 1 SLDC •2 Sub-LDC• 16 RTUs

BBMB

• 1 SLDC • 4 Sub-LDC• 21 RTUs

DVB

• 1 SLDC • 4 Sub-LDC• 31 RTUs

UPPCL

• 1 SLDC•5 Sub-LDC• 82 RTUs

RLDC•NEW DELHI• 38 RTUs

CPCCKANPUR4 RTUs

SLDCSub - LDC

Gladni

Panki

ana

Page 8: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

RTUs

SUBLDCDS

SLDCICCP

RSCCICCP

RSCCDS

SLDCOPERATOR CONSOLE

SLDCDS

SLDCICCP

SLDCDS

RTUs

SUBLDCDS

RTUsRTUs

RTUs

CPCC

RTUs

CS RTUs REPORTING

TO RSCC

DATA OF CS & OTHER

SLDCs

DATA OF CS &

OTHER SLDCs

RTUS REPORTING

TO SLDC

RTUs REPORTING

TO RSCC

Data flow in ULDC scheme

RTUs REPORTING

TO SLDC

RSCCOPERATOR CONSOLE

SLDCOPERATOR CONSOLE

Page 9: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS
Page 10: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

PANIPAT

MURADNAGAR

DADRI-HVDC

BALLABGARH

BADARPUR

OKHLA

MALVIYANAGAR

MEHRAULIVASANT KUNJ

SONEPAT

BAWANA

PATPARGANJ

IP EXT

SARITA VIHAR

J & K, PUNJAB, BBMB, HPSEB

UPSEB

J & K, PUNJAB,BBMB,HPSEBMAIN DATA S/B DATA

UP SEBMAIN DATA S/B DATA

DELHI

DELHIMAIN DATA S/B DATA

NARELA-JHANGIRPURI- GOPALPUR-WAZIRABAD

KANJHAWALANAJAFGARH

RSCC

ABAMNAULI

RAJESTHANMAIN

STD BY

Page 11: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

CRITICAL STATION AFFECTING COMMUNICATION LINK FROM

SLDCs TO RSCC

MOST CRITICAL STATION AFFECTING ALL MAIN & MOST CRITICAL STATION AFFECTING ALL MAIN & STANDBY DATA OF ALL SLDCs : STANDBY DATA OF ALL SLDCs : BADARPURBADARPUR

SECOND MOST CRITICAL STATION AFFECTING MAIN SECOND MOST CRITICAL STATION AFFECTING MAIN DATA OF ALL SLDCs :DATA OF ALL SLDCs : MURADNAGAR-I MURADNAGAR-I

: : DADRI HVDCDADRI HVDC :BALLABGARH:BALLABGARH

OUTAGE OF OUTAGE OF PANIPAT & DHULKOTEPANIPAT & DHULKOTE WILL ALSO WILL ALSO AFFECTAFFECT main and standby of main and standby of ALL SLDCs EXCEPT UP & ALL SLDCs EXCEPT UP & RAJASTHANRAJASTHAN

Page 12: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

FREQUENT PROBLEMS OF COMMUNICATION SYSTEM

POWER SUPPLYPOWER SUPPLY LOAD SHEDDING IN RURAL LOCATIONSLOAD SHEDDING IN RURAL LOCATIONS HIGH RESTORATION TIME DUE TO UNMANNED REMOTE HIGH RESTORATION TIME DUE TO UNMANNED REMOTE

LOCATIONS.LOCATIONS.

• FIBER OPTIC CUTTING• ONLY UNDER GROUND CABLES AND APPROACH CABLE.

• FADING• E.g.- 1. Rihand-Singrauli Region ( No Diversity Antena)----Summer

2. Meerut – Muradnagar --------Winter

Page 13: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

SCADA Support Functions

NETWORK SERVICES NETWORK PRINTING

MANAGEMENT.REMOTE PROCEDURE CALLREMOTE TERMINAL

SESSIONNETWORK TIME SYNCBACK UP OVER LANEMAIL

CONFIGURATION MANAGEMENTFACILITY TO ADD &

DELETE ADDRESSES AND LINKS, CONTROL DATA BLOCKS AND SET DATA TRANSMISSION AND RECEPTION PARAMETERS

MAINTAIN & CONTROLS GRAPHICAL DISPLAY OF NETWORK CONNECTIVITY AND DEVICE STATUS

PERFORMANCE MONITORING

MAINTAIN PERFORMANCE, RESOURCE USAGE AND ERROR STATISTICS FOR ALL MANAGED LINKS AND DEVICES.

PROVIDE FACILITIES FOR PATH AND ROUTING CONTROL AND QUEUE SPACE CONTROL

FAULT MANAGEMENT ALARMS FOR ERROR

HANDLING.REMOTE AND LOCAL

DIAGNOSTICS

Page 14: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

SCADA Problems

CFE hanging frequently at many locations resulting CFE hanging frequently at many locations resulting into loss of RTUinto loss of RTU

Frequent failure of Applications resulting into Frequent failure of Applications resulting into failure of DATA SERVERS. Interruption of data and failure of DATA SERVERS. Interruption of data and loss of HIM data.loss of HIM data.

In HDR different values at the same time point with In HDR different values at the same time point with change of sample ratechange of sample rate

In HIM Frequent crashing of Oracle, reset of juke In HIM Frequent crashing of Oracle, reset of juke box,long term storage of Databox,long term storage of Data

Reports for MIN,MAX,Avg still not available Reports for MIN,MAX,Avg still not available

Page 15: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

SCADA Problems (continued)

LAN-B/NETIO problemLAN-B/NETIO problem Shortcoming in trending functions ( scale , tabular Shortcoming in trending functions ( scale , tabular

etc.)etc.) Frequent tripping of UPS especially at SUBLDC Frequent tripping of UPS especially at SUBLDC

level.level. Non deployment of the trained person at SUBLDC Non deployment of the trained person at SUBLDC

levellevel

Page 16: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

OPERATION SCHEDULING

Load forecastingInflow forecastingUnit commitmentHydro schedulingHydro Thermal

CoordinationInterchange schedulingInterchange transaction

evaluationCurrent operating planOutage scheduling

POWER SYSTEM ANALYSIS

Network Topology

State estimationContingency

analysisOptimal power

flowTransmission

loss sensitivity factors

Post disturbance analysis

LOAD GENERATION BALANCE

Operation monitoringAGC Economic despatchReserve monitoringLoadshed /Restoration Production costing

EMS SOFTWARE FUNCTIONS

Page 17: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

EMS PROBLEMS-RESOURCE SCHEDULING &

COMMITMENT (RSC)

Scheduling Philosphy 15 minutes block instead of Scheduling Philosphy 15 minutes block instead of hourly.hourly.

Regional and Inter-regional bi-lateral not coveredRegional and Inter-regional bi-lateral not covered Desired treatment of Hydro station not providedDesired treatment of Hydro station not provided Share/Entitlement not provided as per requirementShare/Entitlement not provided as per requirement Unit wise scheduling instead of Plant wiseUnit wise scheduling instead of Plant wise No provision of Regional and inter-regional lossesNo provision of Regional and inter-regional losses ..

Page 18: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

EMS NETWORK APPLICATIONS (State Estimation,Contingency

Analysis,Security Enhancement)

Non-Availability of Complete Status of CBs and Non-Availability of Complete Status of CBs and Isolators through Telemetry.Isolators through Telemetry.

Non-Availability of complete Generator data such Non-Availability of complete Generator data such as capability curve etc. Database modelled with as capability curve etc. Database modelled with typical generators.typical generators.

Page 19: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

DISPATCHER TRAINING

SIMULATOR

Page 20: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

What is DTS ?

The Dispatcher Training Simulator (DTS) is a Group of applications and related displays that Create a training environment.

In this environment the Dispatcher can practice routine and emergency Tasks.

Dispatcher Training Simulator (DTS)

Page 21: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

Control centreApplications

Power system Dynamic Simulation

InstructionalSubsystem

Dispatcher Training Simulator (DTS)

++

SCADA EMS

Prime Mover ? and Relay dynamics ? Power flow

Event ManagementDTS Control

Page 22: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

Dispatcher Training Simulator (DTS)

SCADA Collect data from the monitored systemIssue Control Commands

EMSPre despatch functionsReal time despatch functions

• Generation dispatch• Network Analysis

Page 23: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

DTS -Application

Primary use:

Training of Dispatchers for routine and emergency scenario in a controlled and safe off-line manner.

Network split, blackouts

Large voltage or frequency excursions

Engineering tool for operations planning(generation plans, network switching, etc..) and for understanding of power system behavior.

Page 24: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

DTS -Application

Tuning of EMS applications (Network, Generation etc.)

Test bed for new EMS functions

Validating new databases before upgrading EMS

Factory acceptance tests

Demonstrations

DTS –PROBLEMUNABLE TO INITIALISE FROM REAL TIME

Page 25: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

Critical SERVERS of ULDC WAN.

Data server at SUBLDCData server at SUBLDCICCP server at SLDCICCP server at SLDCICCP server at RSCCICCP server at RSCCData server at RSCCData server at RSCC

DATA from each control centre is important in the system to get good results of EMS applications .

Page 26: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

Recent Problem

Data is being interrupted in case of outage of standby Data is being interrupted in case of outage of standby Links in spite of availablity of Main links.Links in spite of availablity of Main links.E.g Outage of sarita Vihar (07.11.03) and Wazirabad E.g Outage of sarita Vihar (07.11.03) and Wazirabad (12.11.03)(12.11.03)Testing was carried out on 11.11.03 by manualy Testing was carried out on 11.11.03 by manualy switching of MCB at Sarita Vihar.switching of MCB at Sarita Vihar.

Page 27: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS
Page 28: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

RTU Reporting Status

1. Total RTUs-3662. RTUs Integrated-3333. RTUs Reporting- 275

BEMINA SUBLDC HAVING 8 RTUs

NOT INTEGRATED.

Page 29: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

Pending important Analog points

1 Gross unit generation data for 1 Gross unit generation data for Badarpur,Singrauli, Unchahar not available.Badarpur,Singrauli, Unchahar not available.

2 Unit generation data of Dadri-Gas, 2 Unit generation data of Dadri-Gas, Anta ,Chamera and Auriya not available.Anta ,Chamera and Auriya not available.

3 Few line/ICT flows not available.3 Few line/ICT flows not available.

Page 30: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

Pending important Digital points

1. NTPC- AURIYA, BADARPUR,DADRI-GAS1. NTPC- AURIYA, BADARPUR,DADRI-GAS 2. POWERGRID- SOME POINTS PENDING.2. POWERGRID- SOME POINTS PENDING. 3. DTL- 50 % PENDING3. DTL- 50 % PENDING 4. UPPCL- 30 % PENDING4. UPPCL- 30 % PENDING 5. RVPNL- 20 % PENDING 5. RVPNL- 20 % PENDING

Page 31: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS

PLCC LINK PROBLEM

11. EITHER MAIN OR STAND BY LINK FOR AGRA, . EITHER MAIN OR STAND BY LINK FOR AGRA, ALLAHABAD, FARIDABAD –PP, MEERUT, ALLAHABAD, FARIDABAD –PP, MEERUT, VINDHYACHAL,ABDULLAPUR, MALERKOTLA, VINDHYACHAL,ABDULLAPUR, MALERKOTLA, NALLAGARH AND SRINAGAR NOT WORKING.NALLAGARH AND SRINAGAR NOT WORKING.

2. EITHER MAIN OR STANDBY LINK FOR SALAL, 2. EITHER MAIN OR STANDBY LINK FOR SALAL, BAIRASUIL, CHAMERA, URI, ANTA,AURIYA, BAIRASUIL, CHAMERA, URI, ANTA,AURIYA, UNCHAHAR, NARORA AND RAPP NOT WORKING.UNCHAHAR, NARORA AND RAPP NOT WORKING.

Page 32: SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS