1
RAN MMA HER DUL LRV TOW CAR PAR PER OVR KEN EST CHE DUN PAT SPR LAN CAT WOO WST PIK NEW OWN FRA RAN MMA HER DUL LRV TOW CAR PAR PER OVR KEN EST CHE DUN PAT SPR LAN CAT WOO WST PIK NEW OWN FRA BEFORE: SCENARIO 2 ACTION: RESULT: Capacity Below 90% 90% - 110% Above 110% Capacity Below 90% 90% - 110% Above 110% Scenario Detailed Summary Catonsville HS Chesapeake HS Dulaney HS Dundalk/Sollers Point HS Eastern Technical HS Franklin HS G.W. Carver HS Hereford HS Patapsco HS Perry Hall HS Pikesville HS Randallstown HS Sparrows Point HS Towson HS Western School of Technology Woodlawn HS Kenwood HS Lansdowne HS Loch Raven HS Milford Mill Academy New Town HS Overlea HS Owings Mills HS Parkville HS CAT WST WOO LAN MMA CHE KEN OVR EST DUN PAT DUL HER CAR PRK PER FRA NEW RAN SPR OWN PIK LRV TOW 500 1000 1500 2000 2500 CAT CHE DUL DUN EST FRA CAR HER KEN LAN LRV MMA NEW OVR OWN PAR PAT PER PIK RAN SPR TOW WOO WST Catonsville HS Chesapeake HS Dulaney HS Dundalk/Sollers Point HS Eastern Technical HS Franklin HS G.W. Carver HS Hereford HS Kenwood HS Lansdowne HS Loch Raven HS Milford Mill Academy New Town HS Overlea HS Owings Mills HS Parkville HS Patapsco HS Perry Hall HS Pikesville HS Randallstown HS Sparrows Point HS Towson HS Woodlawn HS Western School of Technology 1,029 1,029 1,750 1,750 1,019 1,032 1,984 1,984 1,730 1,726 1,339 1,339 1,647 1,645 1,548 1,543 1,918 1,928 1,420 1,420 2,000 2,000 1,465 1,204 1,303 1,303 1,230 1,206 1,103 1,103 2,037 2,037 1,582 1,577 2,110 2,110 1,007 1,007 1,379 1,222 871 958 2,000 1,962 2,129 1,951 1,009 981 School Name KEY Enrollment Capacity SCENARIO Actions Scenario 2 Increase Capacity: Addition Boundary Change Process Increase Capacity: Replacement Multi Action 2 2 2 No Action Summary Students Relocating 2,246 275M $ 0 Capital Projects 4 2,325 0 Boundary Change or Move to Magnets 17 5 384 Magnet Seats Added $ Total Seats Added Total Capital Cost Of Total, Cost Related to Magnet Schools Action Icons Increase Capacity: Addition Increase capacity at existing school by less than 50% of the current capacity, with an addition to the existing school building. Increase Capacity: Replacement Increase capacity at existing school by over 50% of the current capacity, with a replacement school building on site. Boundary Change Process Through a public Boundary Change Process, student attendance areas, or Boundaries, change to best utilize new and existing school capacity. Boundary Change or Move to Magnets Either students will move to newly available magnet seats, or, through a public Boundary Change Process, (See above). Multi Action More than one of the above strategies. No Action None of the above listed strategies. Increase Capacity: Magnet School Increase capacity at existing school site by over 50% of the current capacity, with a new school customized for magnet programs. CAT CHE DUL DUN EST FRA CAR HER KEN LAN LRV MMA NEW OVR OWN PAR PAT PER PIK RAN SPR TOW WOO WST Catonsville HS Chesapeake HS Dulaney HS Dundalk/Sollers Point HS Eastern Technical HS Franklin HS G.W. Carver HS Hereford HS Kenwood HS Lansdowne HS Loch Raven HS Milford Mill Academy New Town HS Overlea HS Owings Mills HS Parkville HS Patapsco HS Perry Hall HS Pikesville HS Randallstown HS Sparrows Point HS Towson HS Woodlawn HS Western School of Technology 1,029 912 1,750 2,232 1,019 1,032 1,984 2,041 1,450 1,726 1,339 1,176 1,647 1,645 1,548 1,486 1,918 1,928 1,420 1,496 975 1,007 1,465 1,204 1,303 1,347 1,230 1,206 1,103 1,177 2,037 2,398 1,302 1,577 2,110 2,572 1,007 1,247 1,379 1,104 871 1,121 1,260 2,009 2,129 1,469 1,009 905 500 1000 1500 2000 2500 Enrollment Capacity School Name KEY 2027 Goal 2027 Projection July 9, 2018 July 12, 2018 July 17, 2018

Scenario 2 July 9, 2018 July 12, 2018 No July 17, 2018 · 2018-07-09 · ran mma her dul lrv tow car par per ovr ken est che dun pat lan spr cat woo wst pik new own fra ran mma her

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Scenario 2 July 9, 2018 July 12, 2018 No July 17, 2018 · 2018-07-09 · ran mma her dul lrv tow car par per ovr ken est che dun pat lan spr cat woo wst pik new own fra ran mma her

RANMMA

HER

DUL

LRVTOW

CAR

PAR

PER

OVRKEN

EST

CHEDUNPATSPRLAN

CAT

WOOWST

PIKNEWOWN

FRA

RANMMA

HER

DUL

LRVTOW

CAR

PAR

PER

OVRKEN

EST

CHEDUNPAT

SPRLANCAT

WOOWST

PIKNEWOWN

FRA

BEFORE: SCENARIO 2 ACTION: RESULT:

Capacity

Below 90%

90% - 110%

Above 110%

Capacity

Below 90%

90% - 110%

Above 110%

Scenario Detailed Summary

Catonsville HS

Chesapeake HS

Dulaney HS

Dundalk/Sollers Point HS

Eastern Technical HS

Franklin HS

G.W. Carver HS

Hereford HS

Patapsco HS

Perry Hall HS

Pikesville HS

Randallstown HS

Sparrows Point HS

Towson HS

Western School of Technology

Woodlawn HS

Kenwood HS

Lansdowne HS

Loch Raven HS

Milford Mill Academy

New Town HS

Overlea HS

Owings Mills HS

Parkville HS

CAT

WST

WOO

LAN

MMA

CHE

KENOVR

EST

DUN

PAT

DUL

HER

CAR

PRK

PER

FRA

NEW

RAN

SPR

OWN

PIK

LRV

TOW

500 1000 1500 2000 2500

CAT

CHE

DUL

DUN

EST

FRA

CAR

HER

KEN

LAN

LRV

MMA

NEW

OVR

OWN

PAR

PAT

PER

PIK

RAN

SPR

TOW

WOO

WST

Catonsville HS

Chesapeake HS

Dulaney HS

Dundalk/Sollers Point HS

Eastern Technical HS

Franklin HS

G.W. Carver HS

Hereford HS

Kenwood HS

Lansdowne HS

Loch Raven HS

Milford Mill Academy

New Town HS

Overlea HS

Owings Mills HS

Parkville HS

Patapsco HS

Perry Hall HS

Pikesville HS

Randallstown HS

Sparrows Point HS

Towson HS

Woodlawn HS

Western School of Technology

1,0291,029

1,7501,750

1,0191,032

1,9841,984

1,7301,726

1,3391,339

1,6471,645

1,5481,543

1,9181,928

1,4201,420

2,0002,000

1,4651,204

1,3031,303

1,2301,206

1,1031,103

2,0372,037

1,5821,577

2,1102,110

1,0071,007

1,3791,222

871 958

2,0001,962 2,1291,951

1,009981

School NameKEYEnrollmentCapacity

SCEN

ARIO

Actio

nsScenario 2 Increase Capacity: Addition

Boundary Change Process

Increase Capacity: Replacement

MultiAction2

22

NoAction

Sum

mar

y

StudentsRelocating2,246

275M $0

CapitalProjects4 2,3250

Boundary Change or Move to Magnets17

5384 Magnet

Seats Added $

Total SeatsAdded Total Capital

CostOf Total, Cost Related to Magnet Schools

Action IconsIncrease Capacity: AdditionIncrease capacity at existing school by less than 50% of the current capacity, with an addition to the existing school building.

Increase Capacity: ReplacementIncrease capacity at existing school by over 50% of the current capacity, with a replacement school building on site.

Boundary Change ProcessThrough a public Boundary Change Process, student attendance areas, or Boundaries, change to best utilize new and existing school capacity.

Boundary Change or Move to MagnetsEither students will move to newly available magnet seats, or, through a public Boundary Change Process, (See above).

Multi Action More than one of the above strategies.

No Action None of the above listed strategies.

Increase Capacity: Magnet SchoolIncrease capacity at existing school site by over 50% of the current capacity, with a new school customized for magnet programs.

CAT

CHE

DUL

DUN

EST

FRA

CAR

HER

KEN

LAN

LRV

MMA

NEW

OVR

OWN

PAR

PAT

PER

PIK

RAN

SPR

TOW

WOO

WST

Catonsville HS

Chesapeake HS

Dulaney HS

Dundalk/Sollers Point HS

Eastern Technical HS

Franklin HS

G.W. Carver HS

Hereford HS

Kenwood HS

Lansdowne HS

Loch Raven HS

Milford Mill Academy

New Town HS

Overlea HS

Owings Mills HS

Parkville HS

Patapsco HS

Perry Hall HS

Pikesville HS

Randallstown HS

Sparrows Point HS

Towson HS

Woodlawn HS

Western School of Technology

1,029912

1,750 2,232

1,019 1,032

1,984 2,041

1,450 1,726

1,3391,176

1,6471,645

1,5481,486

1,918 1,928

1,420 1,496

975 1,007

1,4651,204

1,303 1,347

1,2301,206

1,103 1,177

2,037 2,398

1,302 1,577

2,110 2,572

1,007 1,247

1,3791,104

871 1,121

1,260 2,009

2,1291,469

1,009905

500 1000 1500 2000 2500

EnrollmentCapacitySchool NameKEY

2027Goal

2027Projection

July 9, 2018July 12, 2018July 17, 2018