SCHEDULE OF COMPLETED WORKS
March 2015 – April 2015
CENTRAL AREA
River Distance (km)
River Bank (LB/RB)
Property Owner / Location
Type of Work
Quantity
LOWER MANAWATU SCHEME MANAWATU RIVER
RB Fitzherbert Bridge Spraying of Rock
RB City Reaches Mow of stopbank 6.3km
0 to 5 km RB Foxton Beach Stopbank
Mow top of stopbank 5000m
5 to 6 km RB Foxton Loop Walkway
Mow top of stopbank 1000m
22.9 km RB Landcorp Bend spraying
23.1 to 26.6 km LB Moxham Gorse mulching 3500m
23.4 km LB Moxham Bend spraying
24 km LB Moxham’s Bury pipes in stopbank after
Mowing
3
24.3 km LB Moxham Bend spraying
25.2 km RB Landcorp Bend spraying
26.4 km LB Moxham Bend spraying
29 km LB Mangaore Outlet Berm
Mow side of stopbank
1000m
31 km RB Parlato Mow top of stopbank 1000m
31 km LB Seymore’s to Funnell’s
Mow top of stopbank 2000m
39 km LB Funnell / McAloon Mow top of stopbank 11,000m
39.5 km LB Funnell / HRC Bend spraying
41.9 km LB Funnell / HRC Bend spraying
42.5 km RB Cole Bend spraying
44.0 km RB Anderson-Himatangi Block Rd
Layer and/or mulch existing river edge
willows
1000m
44.4 km RB Anderson Bend spraying
44.9 km RB Anderson Bend spraying
46.2 km RB Funnell / HRC Bend spraying
46.6 km RB Anderson Bend spraying
47.1 km LB Funnell / HRC Bend spraying
48.6 km RB Cole Bend spraying
49.7 km LB Funnell / HRC Bend spraying
52 km RB Burkes Drain Re-erection of river berm fences
200m
52.5 km LB McAloon / HRC Bend spraying
53 km RB Burkes Drain Assisting contractors 60m
2
re-piling / fencing
54 km RB River Road Wall Mow top of stopbank/ spray
gorse
1000m
60 km RB Whitelock’s Mow top of stopbank/ spray
gorse
6000m
60.2 km LB Akers Bend spraying
61.2 km LB Akers Gravel Extraction 2350m³
63.8 km LB Whitelocks Bend spraying
64.5 km LB Whitelocks Gravel Extraction 1113m³
64.8 km LB Whitelocks Bend spraying
66.1 km LB Whitelocks Bend spraying
67.6 km RB Akers Bend spraying
71.5 km RB Walkers Road Bend spraying
76.5 to 77.5 km RB Dittmer Drive Spraying of Rock 1000m
77.1 km LB Massey Bend spraying
79 km LB Massey Natives Maintenance of natives and spraying
1.2km
82.4 to 83.2 km RB Fitzroy Groynes Mow Berm 9.9 hectares
83.9 km RB Gasworks Drain Outlet
Spraying of Rock 220m
87 km LB Barnett’s Mow of stopbank
88 km LB Stacey’s Road Mow top of stopbank 1500m
95 km RB All Floodgates Check for issues 137
98 km RB Ashhurst Walkway Maintenance of natives and spraying
1.5km
LOWER MANAWATU SCHEME OROUA RIVER
9 to 24 km LB/RB Kopane Bridge to Hoihere Road Bridge
Mow top of stopbank 26,000m
24.0 to 25.0 km LB/RB Hills / Amey Gravel Extraction 4900 m3
Kopane House Section maintenance work
24 to 27 km LB Oroua Road Spillway
Mow top of stopbank 5000m
32.0 to 41.0 km LB/RB Inside River Bends/Beaches
Bend / Beach spraying
9000 m
39.7 km RB River Bend and Stopbank
Mulching 750 m
40.0 to 25.0 km LB/RB River Bends Mulching 15.0 km
LOWER MANAWATU SCHEME MANGAONE
10 to 17 km LB/RB Flygers Line
Dignam
Wellfield
Houghton
O`Hagan
McKlean
Spot Spraying for willow, wattle, pampas, and blackberry regrowth.
7000m
LB/RB City Reaches Mowing of stopbanks 12.5km
3
LOWER MANAWATU SCHEME MAKINO
7.5 to 11.5 km LB/RB Feilding Township Spray stream channel for weeds
4km
10 km LB/RB North Street to Duke Street
Channel maintenance – replacing displaced rip rap, relocating gravel build ups, gravel extraction
156m³
13 km LB Bailey – Reid’s Line West
Drainage culvert extension, new headwall, stopbank repairs & fencing.
Woodville Group Fish passage 2 days
Tavistock Road Koputoroua
Fish passage 2 days
Queen Street East Fish Passage 1 day
LOWER MANAWATU SCHEME JACKS CREEK
LOWER MANAWATU SCHEME STONEY CREEK
LOWER MANAWATU SCHEME MOUTOA GATES
Moutoa Gate and Tower
Clean out in front of gates and clear drain
9 Gates
Moutoa Gate and Tower
Annual electrical inspection
9 Gates
Moutoa Gate and Tower
Spray and change dirt to lime on top of piers
5 Piers
Moutoa Gate and Tower
Mow spillway floor for removal of dirt
1 hectare
LOWER MANAWATU SCHEME MOUTOA FLOODWAY
3 to 9 km LB Landcorp / Easton’s Mow top of stopbank 6000m
Check Floodgates 11
LOWER MANAWATU SCHEME MANGAORE STREAM
0.9 km LB/RB Spray Gorse
1.8 km RB Check Floodgates 2
LOWER MANAWATU SCHEME KARA CREEK - MANGAPUKATEA
Check Floodgates 9
LOWER MANAWATU SCHEME TOKOMARU RIVER
Check Floodgates 9
5 to 8 km LB Hopkins / McKinnon / Hands
Mow top of stopbank / spray gorse
5000m
8 km RB Hopkins Mow top of stopbank / spray gorse
1000m
9.5 km Ingram’s Channel work to remove excess shingle
2 sites
10 km Hopkins Spray gorse from channel
1000m
4
ASHHURST STREAM SCHEME ASHHURST
LOWER KIWITEA STREAM SCHEME KIWITEA
0.0 km-1.0 km LB/RB Channel / Beaches Beach spraying 1000 m
ENVIRONMENTAL GRANT
5
NORTHERN AREA
River Distance (km)
River Bank (LB/RB)
Property Owner / Location
Type of Work
Quantity
SCHEME NAME RANGITIKEI RIVER CONTROL SCHEME
RIVER NAME RANGITIKEI
2.00 RB Parewanui Stopbank Check all floodgates
3.20 LB Tangimoana Construct platform for Iwi memorial
50 m2
3.28 LB Tangimoana Stopbank Check all floodgates
6.15 to 7.00 RB Walmac Farm-Parewanui
Stopbank upgrade 400 m
8.10 LB McKelvie Extend seven groynes
262 m
9.70 LB Scott Put in new groynes 392 m
10.10 RB Flock House Live tree bank protection work
80 m
15.90 RB Whisker Live tree bank protection work
80 m
16.20 LB O’Donnell Extend groynes 230 m
Bulls Bridge Remove trees under bridge
X 20
23.15 Hastings Rock Repairs 120 m
23.16 Hastings Put track back in above rock
300 m
SCHEME NAME POHANGINA-OROUA SCHEME
RIVER NAME POHANGINA RIVER
0 to 30.00 Various locations Beach aerial spraying
47 ha
21.40 LB Carroll Live tree bank protection work
SCHEME NAME POHANGINA-OROUA SCHEME
RIVER NAME OROUA
32.00 GWK Investments Beach aerial spraying
0.05 ha
SCHEME NAME POREWA VALLEY FLOOD CONTROL SCHEME
Porewa Stream Remove trees from channel
X 10
Dam 46 Drain clean inlet/outlet, remove trees
250 m
Queens Park Remove fallen trees from stream
X 30
6
SCHEME NAME MAKIRIKIRI FLOOD CONTROL SCHEME
Diversion channel
Surveyed cross sections
SCHEME NAME MATARAWA FLOOD CONTROL SCHEME
Long Acre Remove trees from channel
3 km
Diversion channel
Mechanical clean drain 1.2 km
Kaimatira Drain Mechanical clean drain 900 m
Adkins Drain Mechanical clean drain 1.3 km
Adkins Stopbank
Repairs to stopbank 200 m
Dam 3.1 Mechanical clean dam /blocked grill
Dams Inspect and clean dams X 5
General Spray willows in streams
SCHEME NAME TUTAENUI FLOOD CONTROL SCHEME
Tutaenui Stream
Noxious weed spraying
Dam W.1 Repairs to headwall / topsoil
Bulls Domain Drain
Mechanical clean drain 480 m
Bulls Domain Drain
Remove trees from side of drain
X 40
Bulls Domain Drain
Install two new gates X 2
Folly Stream Remove trees from channel
X 10
Tutaenui – Ian Williams
Remove trees from stream
X 40
Tutaenui – Blackley
Remove trees from stream
X 120
Tutaenui – Fullerton-Smith
Remove trees from stream
X 5
Tutaenui – Lampp
Remove trees from stream
X 4
Tutaenui – Sherriff
Remove trees from stream
X 5
Tutaenui – Hammond
Remove trees from stream
X 2
Folly Stream Install new apron under bridge
SCHEME NAME FOREST ROAD DRAINAGE SCHEME
Road Drain Mechanical clean drain 1.5 km
Rod McNeil Mechanical clean drain 1.3 km
Rod McNeil Put new gate in boundary 1
Rod McNeil Remove trees from plantation on drain
X 4
SCHEME NAME HAUNUI DRAINAGE SCHEME
Ruatangata Re-graded drain 610m
7
Road Drain
SCHEME NAME UPPER WHANGANUI RIVER MANAGEMENT SCHEME
Wanganui River
245.60 RB Saleyards outlet
Replace culvert flap
Ongarue River
RB Pony Club Paddock
Fell/coppice poplar 425 m
RB Pony Club Paddock
Mulch slash 221 m3
RB Pony Club Paddock
Sow grass seed 425 m
SCHEME NAME LOWER WHANGANUI RIVER MANAGEMENT SCHEME
LB Upokongaro Jetty
Monthly maintenance X 2
LB Anzac Pde (opposite Tipu St)
Fell and chip willow 105 m
LB Anzac Pde (Pauls St)
Weed control 800 m
RB Railyards Repair slump for WDC 20 m
RB Railyards Replace culvert/repair rockwall
15 m
RB Papaiti Road Spray willow 900 m
LB Anzac Pde (opposite Tipu St)
Cut bamboo, spray weeds 365 m
SCHEME NAME WHANGAEHU-MANGAWHERO RIVER SCHEME
RIVER NAME WHANGAEHU
41.10 RB Swan Repair fencing 221 m
SCHEME NAME TARINGAMOTU RIVER SCHEME
RB & LB Mid section Clear channel debris and over-hanging trees
4.0 km
RB Taringamotu – Hayes/Hill
Tree bank protection work 45 m
OTHER ACTIVITIES
Non Scheme MOAWHANGO
LB & RB Maunganui St to Waikakahi Road Bridge
Cut and paste/spray willow
8.3 km
Approvals Pending
Hautapu – Taihape Golf Club
Debris removed 20 m
Mangatipona – Tripe
Repair grade control structure
2 each
8
SOUTHERN AREA
River Distance (km)
River Bank (LB/RB)
Property Owner / Location
Type of Work
Quantity
SCHEME NAME: OHAU-MANAKAU
RIVER NAME: OHAU RIVER
16.3 LB Webb property Extension of TTW to cover erosion
20m
RIVER NAME: WAIKAWA STREAM
5-5.5 BOTH Miritana/McArly Gravel extraction 4,500m3
9.8 LB Up stream SH1 Dig in tree groynes to protect bank
180m
RIVER NAME: DRAINAGE
Drain Maintenance - Chemical
1.6km
SCHEME NAME: MAKERUA DRAINAGE
Liggins Drain (T11) Replace floodgated culvert
Drain Maintenance - Chemical
32km
SCHEME NAME: MANAWATU DRAINAGE
Whiskey Creek Remove fallen tree and bank protection
Buick Drain Clean drain and fence
100m
Drain Maintenance - Chemical
76km
SCHEME NAME: KOPUTAROA DRAINAGE
0 - 2.1 Koputaroa Stream Machine clean 2.1km
B1 & B2 drain Clearing of weed blockages
B1 drain gate Filling in hole in side of gate
SCHEME NAME: MOUTOA DRAINAGE
Drain 13 Clearing of weed blockages
Diagonal pumpstation
Refurbish access track to station
SCHEME NAME: TE KAWAU DRAINAGE
Te Kawau Main Drain
Bank Protection 100m
Smiths Drain Dain Protection and shaping
200m
Drain Maintenance – Mechanical
0.4km
Drain Maintenance - Chemical
15km
9
SCHEME NAME: WHIROKINO DRAINAGE
Drain No1 Northern
Removal of weed blocking drain
0.75km
SCHEME NAME: HOKIO DRAINAGE
Hokio Stream Installation of depth gauge at bridge
SCHEME NAME: FOXTON EAST DRAINAGE
Purcell St Drain
Extend floodgated culvert
SCHEME NAME: HOKIO DRAINAGE
Drain Maintenance - Chemical
5km
10
EASTERN AREA – TARARUA SCHEMES
River Distance (km)
River Bank (LB/RB)
Property Owner / Location
Type of Work
Quantity
MANGATAINOKA SCHEME RIVER / REACH: Mangatainoka River: Reach 1 (LH)
0.5km RB Burmeister
Cut & paste/spray weeds 4ha
8.0km RB Victory Park Spray rock lining 80m
RIVER / REACH: Mangatainoka River: Reach 2 (MH)
11.2km RB Tui Farm Cut & paste/spray weeds 2ha
14.2km LB Butler PMU Groynes 20m
16km LB Bisset TBPW 30m
18.7km RB Mahoney Driving willow logs 50ea
RIVER / REACH: Mangatainoka River: Reach 3 (MH) 19-23km LB & RB Various Layering/CC 4km
21.2km LB Swansson Concrete riprap 15t
22km LB Smith Spray rock lining 100m
26-27km LB & RB Smythe/Smith Mulching 800m
RIVER / REACH: Mangatainoka River: Reach 4 (MH) 27-29km LB & RB Manderson/Taratahi Mulching 2km
RIVER / REACH: Mangatainoka River: Reach 5 (UH) 41.2km RB Bengston PMU 60m
RIVER / REACH: Mangatainoka River: Reach 6 (UH) 46km RB Carter R&R Groyne 50m
47.8km RB Spring PMU groynes 30m
48km LB Long CC/TBPW 40m
RIVER / REACH: Makakahi River (KL)
RIVER / REACH: Mangaramarama River (MR)
RIVER / REACH: Drainage (DR) Nireaha Channel Drain Reach Spray drain 17542m
Hamua Channel Drain Reach Spray drain 6164m Hobbs, Avery, Manderson Channel Drain Reach Spray drain 1421m
Town Creek Channel Drain Reach Spray drain 1430m
DB Brewery Channel Drain Reach Spray drain 271m
Donald Grubner Channel Drain Reach Spray drain 969m
Bisset, Sowry Channel Drain Reach Spray drain 1283m
Brewery Ext Channel Drain Reach Spray drain 153m
Pukemiku Channel Drain Reach Spray drain 3753m
SOUTH EASTERN RUAHINES SCHEME RIVER / REACH: Raparapawai Stream (M1)
2 km L&RB D. Cammock Channel clear 100m
11
4.1 km L&RB Lyons Channel lear 200m
RIVER / REACH: Oruakeretaki Stream (M1) 6.5 km L&RB D. Burn Layer willow CC 150m
RIVER / REACH: Mangapukakakahu Stream (M1) RIVER / REACH: Manga-Atua Stream (M2) 18.8 km RB C. Brown Place Rock lining 60 T
18.9km LB C. Brown Shape Channel 40 m
RIVER / REACH: Tamaki River (M4) 7.5 km RB R. Lowe Extract Gravel 1000 m3
10.5 km RB J. Lamason Extract Gravel 200 m3
RIVER / REACH: Drainage (DR) Drain 35 Sinclairs Creek G. Kent/ P. Mudford Clean 300m
Drains Various
Spray 40 km
UPPER MANAWATU/LOWER MANGAHAO RIVER / REACH: Manawatu and Mangahao River: Reach 1 (U1)
114.2km LB Longfields TBPW 100m
116 - 117km RB Cleghorn Layer 1km
111 - 125km Both Various Aerial Spray 16ha
Mangahao 3.0km LB Longfields Rope and Rail Repair 15m
RIVER / REACH: Manawatu River: Reach 2 (U2) 125 - 135km Both Various Aerial Spray 5ha
RIVER / REACH: Manawatu River: Reach 3 (U3) 136.6km RB Castles RipRap 100t
135 - 140km Both Various Aerial Spray 5ha
RIVER / REACH: Manawatu River: Reach 4 (U4) 140 - 143km Both Various Aerial Spray 6ha
RIVER / REACH: Mangahao River: Reach 1 (M1) 12.0km RB Beech & Noakes Burn debris piles X3
RIVER / REACH: Mangahao River: Reach 2 (M2) 14.0km RB Noakes Burn debris piles X1
RIVER / REACH: Drainage (DR) 457000 Soldiers Rd Drain Beech Mechanical Clean 500m
Drains
Various Chemical Clean 14km
EASTERN MANAWATU SCHEME RIVER / REACH: Manawatu River: Lower Reach (EL)
RIVER / REACH: Manawatu River: Upper Reach (EU) 207 km L&RB A. Ellingham Cut Debris 2 sites
208 km L&RB Alderson/Poulton Clear Debris 3 sites 100m
AKITIO SCHEME RIVER / REACH: Akitio River (RC)
3 - 40 km L & RB Various
Spray Willow & weeds. 20 ha
TAWATAIA / MANGAONE SCHEME RIVER / REACH:
Drains
Various Spray 10 km
IHURAUA SCHEME RIVER / REACH:
3-5 km L & RB P. Baucke/Ham Clean Drain. 2 km
12
12 - 7 km L & RB Johnston/Mckay Spray drain 5 km
MANGAROA PROJECT RIVER / REACH:
ENVIRONMENTAL GRANTS RIVER / REACH:
Owahango Both Ramsden
Spray Willow Congestion 6ha