1 SCHEDULE OF COMPLETED WORKS March 2015 April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location Type of Work Quantity LOWER MANAWATU SCHEME MANAWATU RIVER RB Fitzherbert Bridge Spraying of Rock RB City Reaches Mow of stopbank 6.3km 0 to 5 km RB Foxton Beach Stopbank Mow top of stopbank 5000m 5 to 6 km RB Foxton Loop Walkway Mow top of stopbank 1000m 22.9 km RB Landcorp Bend spraying 23.1 to 26.6 km LB Moxham Gorse mulching 3500m 23.4 km LB Moxham Bend spraying 24 km LB Moxham’s Bury pipes in stopbank after Mowing 3 24.3 km LB Moxham Bend spraying 25.2 km RB Landcorp Bend spraying 26.4 km LB Moxham Bend spraying 29 km LB Mangaore Outlet Berm Mow side of stopbank 1000m 31 km RB Parlato Mow top of stopbank 1000m 31 km LB Seymore’s to Funnell’s Mow top of stopbank 2000m 39 km LB Funnell / McAloon Mow top of stopbank 11,000m 39.5 km LB Funnell / HRC Bend spraying 41.9 km LB Funnell / HRC Bend spraying 42.5 km RB Cole Bend spraying 44.0 km RB Anderson- Himatangi Block Rd Layer and/or mulch existing river edge willows 1000m 44.4 km RB Anderson Bend spraying 44.9 km RB Anderson Bend spraying 46.2 km RB Funnell / HRC Bend spraying 46.6 km RB Anderson Bend spraying 47.1 km LB Funnell / HRC Bend spraying 48.6 km RB Cole Bend spraying 49.7 km LB Funnell / HRC Bend spraying 52 km RB Burkes Drain Re-erection of river berm fences 200m 52.5 km LB McAloon / HRC Bend spraying 53 km RB Burkes Drain Assisting contractors 60m

SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

1

SCHEDULE OF COMPLETED WORKS

March 2015 – April 2015

CENTRAL AREA

River Distance (km)

River Bank (LB/RB)

Property Owner / Location

Type of Work

Quantity

LOWER MANAWATU SCHEME MANAWATU RIVER

RB Fitzherbert Bridge Spraying of Rock

RB City Reaches Mow of stopbank 6.3km

0 to 5 km RB Foxton Beach Stopbank

Mow top of stopbank 5000m

5 to 6 km RB Foxton Loop Walkway

Mow top of stopbank 1000m

22.9 km RB Landcorp Bend spraying

23.1 to 26.6 km LB Moxham Gorse mulching 3500m

23.4 km LB Moxham Bend spraying

24 km LB Moxham’s Bury pipes in stopbank after

Mowing

3

24.3 km LB Moxham Bend spraying

25.2 km RB Landcorp Bend spraying

26.4 km LB Moxham Bend spraying

29 km LB Mangaore Outlet Berm

Mow side of stopbank

1000m

31 km RB Parlato Mow top of stopbank 1000m

31 km LB Seymore’s to Funnell’s

Mow top of stopbank 2000m

39 km LB Funnell / McAloon Mow top of stopbank 11,000m

39.5 km LB Funnell / HRC Bend spraying

41.9 km LB Funnell / HRC Bend spraying

42.5 km RB Cole Bend spraying

44.0 km RB Anderson-Himatangi Block Rd

Layer and/or mulch existing river edge

willows

1000m

44.4 km RB Anderson Bend spraying

44.9 km RB Anderson Bend spraying

46.2 km RB Funnell / HRC Bend spraying

46.6 km RB Anderson Bend spraying

47.1 km LB Funnell / HRC Bend spraying

48.6 km RB Cole Bend spraying

49.7 km LB Funnell / HRC Bend spraying

52 km RB Burkes Drain Re-erection of river berm fences

200m

52.5 km LB McAloon / HRC Bend spraying

53 km RB Burkes Drain Assisting contractors 60m

Page 2: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

2

re-piling / fencing

54 km RB River Road Wall Mow top of stopbank/ spray

gorse

1000m

60 km RB Whitelock’s Mow top of stopbank/ spray

gorse

6000m

60.2 km LB Akers Bend spraying

61.2 km LB Akers Gravel Extraction 2350m³

63.8 km LB Whitelocks Bend spraying

64.5 km LB Whitelocks Gravel Extraction 1113m³

64.8 km LB Whitelocks Bend spraying

66.1 km LB Whitelocks Bend spraying

67.6 km RB Akers Bend spraying

71.5 km RB Walkers Road Bend spraying

76.5 to 77.5 km RB Dittmer Drive Spraying of Rock 1000m

77.1 km LB Massey Bend spraying

79 km LB Massey Natives Maintenance of natives and spraying

1.2km

82.4 to 83.2 km RB Fitzroy Groynes Mow Berm 9.9 hectares

83.9 km RB Gasworks Drain Outlet

Spraying of Rock 220m

87 km LB Barnett’s Mow of stopbank

88 km LB Stacey’s Road Mow top of stopbank 1500m

95 km RB All Floodgates Check for issues 137

98 km RB Ashhurst Walkway Maintenance of natives and spraying

1.5km

LOWER MANAWATU SCHEME OROUA RIVER

9 to 24 km LB/RB Kopane Bridge to Hoihere Road Bridge

Mow top of stopbank 26,000m

24.0 to 25.0 km LB/RB Hills / Amey Gravel Extraction 4900 m3

Kopane House Section maintenance work

24 to 27 km LB Oroua Road Spillway

Mow top of stopbank 5000m

32.0 to 41.0 km LB/RB Inside River Bends/Beaches

Bend / Beach spraying

9000 m

39.7 km RB River Bend and Stopbank

Mulching 750 m

40.0 to 25.0 km LB/RB River Bends Mulching 15.0 km

LOWER MANAWATU SCHEME MANGAONE

10 to 17 km LB/RB Flygers Line

Dignam

Wellfield

Houghton

O`Hagan

McKlean

Spot Spraying for willow, wattle, pampas, and blackberry regrowth.

7000m

LB/RB City Reaches Mowing of stopbanks 12.5km

Page 3: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

3

LOWER MANAWATU SCHEME MAKINO

7.5 to 11.5 km LB/RB Feilding Township Spray stream channel for weeds

4km

10 km LB/RB North Street to Duke Street

Channel maintenance – replacing displaced rip rap, relocating gravel build ups, gravel extraction

156m³

13 km LB Bailey – Reid’s Line West

Drainage culvert extension, new headwall, stopbank repairs & fencing.

Woodville Group Fish passage 2 days

Tavistock Road Koputoroua

Fish passage 2 days

Queen Street East Fish Passage 1 day

LOWER MANAWATU SCHEME JACKS CREEK

LOWER MANAWATU SCHEME STONEY CREEK

LOWER MANAWATU SCHEME MOUTOA GATES

Moutoa Gate and Tower

Clean out in front of gates and clear drain

9 Gates

Moutoa Gate and Tower

Annual electrical inspection

9 Gates

Moutoa Gate and Tower

Spray and change dirt to lime on top of piers

5 Piers

Moutoa Gate and Tower

Mow spillway floor for removal of dirt

1 hectare

LOWER MANAWATU SCHEME MOUTOA FLOODWAY

3 to 9 km LB Landcorp / Easton’s Mow top of stopbank 6000m

Check Floodgates 11

LOWER MANAWATU SCHEME MANGAORE STREAM

0.9 km LB/RB Spray Gorse

1.8 km RB Check Floodgates 2

LOWER MANAWATU SCHEME KARA CREEK - MANGAPUKATEA

Check Floodgates 9

LOWER MANAWATU SCHEME TOKOMARU RIVER

Check Floodgates 9

5 to 8 km LB Hopkins / McKinnon / Hands

Mow top of stopbank / spray gorse

5000m

8 km RB Hopkins Mow top of stopbank / spray gorse

1000m

9.5 km Ingram’s Channel work to remove excess shingle

2 sites

10 km Hopkins Spray gorse from channel

1000m

Page 4: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

4

ASHHURST STREAM SCHEME ASHHURST

LOWER KIWITEA STREAM SCHEME KIWITEA

0.0 km-1.0 km LB/RB Channel / Beaches Beach spraying 1000 m

ENVIRONMENTAL GRANT

Page 5: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

5

NORTHERN AREA

River Distance (km)

River Bank (LB/RB)

Property Owner / Location

Type of Work

Quantity

SCHEME NAME RANGITIKEI RIVER CONTROL SCHEME

RIVER NAME RANGITIKEI

2.00 RB Parewanui Stopbank Check all floodgates

3.20 LB Tangimoana Construct platform for Iwi memorial

50 m2

3.28 LB Tangimoana Stopbank Check all floodgates

6.15 to 7.00 RB Walmac Farm-Parewanui

Stopbank upgrade 400 m

8.10 LB McKelvie Extend seven groynes

262 m

9.70 LB Scott Put in new groynes 392 m

10.10 RB Flock House Live tree bank protection work

80 m

15.90 RB Whisker Live tree bank protection work

80 m

16.20 LB O’Donnell Extend groynes 230 m

Bulls Bridge Remove trees under bridge

X 20

23.15 Hastings Rock Repairs 120 m

23.16 Hastings Put track back in above rock

300 m

SCHEME NAME POHANGINA-OROUA SCHEME

RIVER NAME POHANGINA RIVER

0 to 30.00 Various locations Beach aerial spraying

47 ha

21.40 LB Carroll Live tree bank protection work

SCHEME NAME POHANGINA-OROUA SCHEME

RIVER NAME OROUA

32.00 GWK Investments Beach aerial spraying

0.05 ha

SCHEME NAME POREWA VALLEY FLOOD CONTROL SCHEME

Porewa Stream Remove trees from channel

X 10

Dam 46 Drain clean inlet/outlet, remove trees

250 m

Queens Park Remove fallen trees from stream

X 30

Page 6: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

6

SCHEME NAME MAKIRIKIRI FLOOD CONTROL SCHEME

Diversion channel

Surveyed cross sections

SCHEME NAME MATARAWA FLOOD CONTROL SCHEME

Long Acre Remove trees from channel

3 km

Diversion channel

Mechanical clean drain 1.2 km

Kaimatira Drain Mechanical clean drain 900 m

Adkins Drain Mechanical clean drain 1.3 km

Adkins Stopbank

Repairs to stopbank 200 m

Dam 3.1 Mechanical clean dam /blocked grill

Dams Inspect and clean dams X 5

General Spray willows in streams

SCHEME NAME TUTAENUI FLOOD CONTROL SCHEME

Tutaenui Stream

Noxious weed spraying

Dam W.1 Repairs to headwall / topsoil

Bulls Domain Drain

Mechanical clean drain 480 m

Bulls Domain Drain

Remove trees from side of drain

X 40

Bulls Domain Drain

Install two new gates X 2

Folly Stream Remove trees from channel

X 10

Tutaenui – Ian Williams

Remove trees from stream

X 40

Tutaenui – Blackley

Remove trees from stream

X 120

Tutaenui – Fullerton-Smith

Remove trees from stream

X 5

Tutaenui – Lampp

Remove trees from stream

X 4

Tutaenui – Sherriff

Remove trees from stream

X 5

Tutaenui – Hammond

Remove trees from stream

X 2

Folly Stream Install new apron under bridge

SCHEME NAME FOREST ROAD DRAINAGE SCHEME

Road Drain Mechanical clean drain 1.5 km

Rod McNeil Mechanical clean drain 1.3 km

Rod McNeil Put new gate in boundary 1

Rod McNeil Remove trees from plantation on drain

X 4

SCHEME NAME HAUNUI DRAINAGE SCHEME

Ruatangata Re-graded drain 610m

Page 7: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

7

Road Drain

SCHEME NAME UPPER WHANGANUI RIVER MANAGEMENT SCHEME

Wanganui River

245.60 RB Saleyards outlet

Replace culvert flap

Ongarue River

RB Pony Club Paddock

Fell/coppice poplar 425 m

RB Pony Club Paddock

Mulch slash 221 m3

RB Pony Club Paddock

Sow grass seed 425 m

SCHEME NAME LOWER WHANGANUI RIVER MANAGEMENT SCHEME

LB Upokongaro Jetty

Monthly maintenance X 2

LB Anzac Pde (opposite Tipu St)

Fell and chip willow 105 m

LB Anzac Pde (Pauls St)

Weed control 800 m

RB Railyards Repair slump for WDC 20 m

RB Railyards Replace culvert/repair rockwall

15 m

RB Papaiti Road Spray willow 900 m

LB Anzac Pde (opposite Tipu St)

Cut bamboo, spray weeds 365 m

SCHEME NAME WHANGAEHU-MANGAWHERO RIVER SCHEME

RIVER NAME WHANGAEHU

41.10 RB Swan Repair fencing 221 m

SCHEME NAME TARINGAMOTU RIVER SCHEME

RB & LB Mid section Clear channel debris and over-hanging trees

4.0 km

RB Taringamotu – Hayes/Hill

Tree bank protection work 45 m

OTHER ACTIVITIES

Non Scheme MOAWHANGO

LB & RB Maunganui St to Waikakahi Road Bridge

Cut and paste/spray willow

8.3 km

Approvals Pending

Hautapu – Taihape Golf Club

Debris removed 20 m

Mangatipona – Tripe

Repair grade control structure

2 each

Page 8: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

8

SOUTHERN AREA

River Distance (km)

River Bank (LB/RB)

Property Owner / Location

Type of Work

Quantity

SCHEME NAME: OHAU-MANAKAU

RIVER NAME: OHAU RIVER

16.3 LB Webb property Extension of TTW to cover erosion

20m

RIVER NAME: WAIKAWA STREAM

5-5.5 BOTH Miritana/McArly Gravel extraction 4,500m3

9.8 LB Up stream SH1 Dig in tree groynes to protect bank

180m

RIVER NAME: DRAINAGE

Drain Maintenance - Chemical

1.6km

SCHEME NAME: MAKERUA DRAINAGE

Liggins Drain (T11) Replace floodgated culvert

Drain Maintenance - Chemical

32km

SCHEME NAME: MANAWATU DRAINAGE

Whiskey Creek Remove fallen tree and bank protection

Buick Drain Clean drain and fence

100m

Drain Maintenance - Chemical

76km

SCHEME NAME: KOPUTAROA DRAINAGE

0 - 2.1 Koputaroa Stream Machine clean 2.1km

B1 & B2 drain Clearing of weed blockages

B1 drain gate Filling in hole in side of gate

SCHEME NAME: MOUTOA DRAINAGE

Drain 13 Clearing of weed blockages

Diagonal pumpstation

Refurbish access track to station

SCHEME NAME: TE KAWAU DRAINAGE

Te Kawau Main Drain

Bank Protection 100m

Smiths Drain Dain Protection and shaping

200m

Drain Maintenance – Mechanical

0.4km

Drain Maintenance - Chemical

15km

Page 9: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

9

SCHEME NAME: WHIROKINO DRAINAGE

Drain No1 Northern

Removal of weed blocking drain

0.75km

SCHEME NAME: HOKIO DRAINAGE

Hokio Stream Installation of depth gauge at bridge

SCHEME NAME: FOXTON EAST DRAINAGE

Purcell St Drain

Extend floodgated culvert

SCHEME NAME: HOKIO DRAINAGE

Drain Maintenance - Chemical

5km

Page 10: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

10

EASTERN AREA – TARARUA SCHEMES

River Distance (km)

River Bank (LB/RB)

Property Owner / Location

Type of Work

Quantity

MANGATAINOKA SCHEME RIVER / REACH: Mangatainoka River: Reach 1 (LH)

0.5km RB Burmeister

Cut & paste/spray weeds 4ha

8.0km RB Victory Park Spray rock lining 80m

RIVER / REACH: Mangatainoka River: Reach 2 (MH)

11.2km RB Tui Farm Cut & paste/spray weeds 2ha

14.2km LB Butler PMU Groynes 20m

16km LB Bisset TBPW 30m

18.7km RB Mahoney Driving willow logs 50ea

RIVER / REACH: Mangatainoka River: Reach 3 (MH) 19-23km LB & RB Various Layering/CC 4km

21.2km LB Swansson Concrete riprap 15t

22km LB Smith Spray rock lining 100m

26-27km LB & RB Smythe/Smith Mulching 800m

RIVER / REACH: Mangatainoka River: Reach 4 (MH) 27-29km LB & RB Manderson/Taratahi Mulching 2km

RIVER / REACH: Mangatainoka River: Reach 5 (UH) 41.2km RB Bengston PMU 60m

RIVER / REACH: Mangatainoka River: Reach 6 (UH) 46km RB Carter R&R Groyne 50m

47.8km RB Spring PMU groynes 30m

48km LB Long CC/TBPW 40m

RIVER / REACH: Makakahi River (KL)

RIVER / REACH: Mangaramarama River (MR)

RIVER / REACH: Drainage (DR) Nireaha Channel Drain Reach Spray drain 17542m

Hamua Channel Drain Reach Spray drain 6164m Hobbs, Avery, Manderson Channel Drain Reach Spray drain 1421m

Town Creek Channel Drain Reach Spray drain 1430m

DB Brewery Channel Drain Reach Spray drain 271m

Donald Grubner Channel Drain Reach Spray drain 969m

Bisset, Sowry Channel Drain Reach Spray drain 1283m

Brewery Ext Channel Drain Reach Spray drain 153m

Pukemiku Channel Drain Reach Spray drain 3753m

SOUTH EASTERN RUAHINES SCHEME RIVER / REACH: Raparapawai Stream (M1)

2 km L&RB D. Cammock Channel clear 100m

Page 11: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

11

4.1 km L&RB Lyons Channel lear 200m

RIVER / REACH: Oruakeretaki Stream (M1) 6.5 km L&RB D. Burn Layer willow CC 150m

RIVER / REACH: Mangapukakakahu Stream (M1) RIVER / REACH: Manga-Atua Stream (M2) 18.8 km RB C. Brown Place Rock lining 60 T

18.9km LB C. Brown Shape Channel 40 m

RIVER / REACH: Tamaki River (M4) 7.5 km RB R. Lowe Extract Gravel 1000 m3

10.5 km RB J. Lamason Extract Gravel 200 m3

RIVER / REACH: Drainage (DR) Drain 35 Sinclairs Creek G. Kent/ P. Mudford Clean 300m

Drains Various

Spray 40 km

UPPER MANAWATU/LOWER MANGAHAO RIVER / REACH: Manawatu and Mangahao River: Reach 1 (U1)

114.2km LB Longfields TBPW 100m

116 - 117km RB Cleghorn Layer 1km

111 - 125km Both Various Aerial Spray 16ha

Mangahao 3.0km LB Longfields Rope and Rail Repair 15m

RIVER / REACH: Manawatu River: Reach 2 (U2) 125 - 135km Both Various Aerial Spray 5ha

RIVER / REACH: Manawatu River: Reach 3 (U3) 136.6km RB Castles RipRap 100t

135 - 140km Both Various Aerial Spray 5ha

RIVER / REACH: Manawatu River: Reach 4 (U4) 140 - 143km Both Various Aerial Spray 6ha

RIVER / REACH: Mangahao River: Reach 1 (M1) 12.0km RB Beech & Noakes Burn debris piles X3

RIVER / REACH: Mangahao River: Reach 2 (M2) 14.0km RB Noakes Burn debris piles X1

RIVER / REACH: Drainage (DR) 457000 Soldiers Rd Drain Beech Mechanical Clean 500m

Drains

Various Chemical Clean 14km

EASTERN MANAWATU SCHEME RIVER / REACH: Manawatu River: Lower Reach (EL)

RIVER / REACH: Manawatu River: Upper Reach (EU) 207 km L&RB A. Ellingham Cut Debris 2 sites

208 km L&RB Alderson/Poulton Clear Debris 3 sites 100m

AKITIO SCHEME RIVER / REACH: Akitio River (RC)

3 - 40 km L & RB Various

Spray Willow & weeds. 20 ha

TAWATAIA / MANGAONE SCHEME RIVER / REACH:

Drains

Various Spray 10 km

IHURAUA SCHEME RIVER / REACH:

3-5 km L & RB P. Baucke/Ham Clean Drain. 2 km

Page 12: SCHEDULE OF COMPLETED WORKS - horizons.govt.nz · 1 SCHEDULE OF COMPLETED WORKS March 2015 – April 2015 CENTRAL AREA River Distance (km) River Bank (LB/RB) Property Owner / Location

12

12 - 7 km L & RB Johnston/Mckay Spray drain 5 km

MANGAROA PROJECT RIVER / REACH:

ENVIRONMENTAL GRANTS RIVER / REACH:

Owahango Both Ramsden

Spray Willow Congestion 6ha