Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

Embed Size (px)

Citation preview

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    1/16

    Sci Rivr op Spac mastr Pa

    Fr east Fas t maa i Piapia, Psvaia

    ExECUTivE SUMMARy

    RoxboRough

    LoweRM

    eRion

    Manayunk

    east FaLLs

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    2/16

    2

    the philadelphia building1315 walnut street

    suite 900

    philadelphia pa 19107

    www.bkurbandesign.com

    Pa prpar bIqiris, pas ctact:

    Manayunk East Falls

    Kay Sykora Gina [email protected] [email protected]

    215-482-9565 x 206 215-848-8084

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    3/16

    EXECUTIVE SUMMARY 3

    ACKNOWLEDGEMENTS

    Many partners have contributed to this document. Teir contributions and insight are greatly appreciated.

    Avisr Citt

    Alce Ballard| East Falls resident; advocate or in-river swimmingJennfer Barr | Philadelphia Planning CommissionDenns Burton | Schuylkill Center or Environmental EducationStepane Cragead | Fairmount ParkJoanne Dame | Philadelphia Water DepartmentTom Dgnam | Philadelphia Department o Recreation

    Jane Glenn | Manayunk Neighborhood CouncilJon Grad | East Falls Development CorporationCrs Leswng | Lower Merion ownshipTerr Lorng | Manayunk Development CorporationMattew McClure | East Falls Development CorporationDan Neducsn | Manayunk Development CorporationBob Swarbrck| Manayunk Development CorporationCaroln Sutton | East Falls Development CorporationKurt Zwkl | Schuylkill River Heritage Area

    Prct Partrs

    Sculkll ProjectKay Sykora, Executive Director

    Gwen Cohen, Education Coordinator

    East Falls Deelopment CorporatonGina Snyder, Executive Director

    Manaunk Deelopment CorporatonLoree Jones, Executive Director

    Spcia Tas t r Prct Spsr

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    4/16

    4

    Wissahickon

    Valley

    Schuylkill River Trail Connections

    Existing Trails

    Planned Trails

    Existing Trails

    Undergoing Enhancement

    Proposed Trails

    Neighborhood Connections

    Proposed Bike Lanes

    Manayunk

    East Falls

    Venice

    Island

    Lower Merion

    Flat Rock

    Dam

    West Laurel

    Hill Cemetery

    Westminster

    CemeteryPencoydBridge

    Blackie Bridge

    (Norfolk Southern)

    PA Rail

    Bridge

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    5/16

    EXECUTIVE SUMMARY 5

    GOAL 3 | ENGAGE PEOPLE iN RivER ACTiviTiES

    Acti Stps

    Continueexistingeducationalopportunitiesandexpandprogramoerings. Supportexistingandcreatenewfestivalsandevents. Getpeoplewet-promoteopportunitiesforswimming,boatingandshing.

    GOAL 1 | iMPROvE MOvEMENT ALONG ThE RivER

    Acti Stps

    Connectthetrailsystemwheretherearegaps.Improveandmaintainthequalityoftrails.Improvepedestrianandbicyclemovementonstreets.

    GOAL 2 | CREATE GREAT PLACES ON ThE RivER

    Acti Stps

    Emphasizetheimportanceofgatewayareas,landmarksandriveraccesslandings.Improveopenspaceamenit iesalongtheriver.Ensurethatprivatedevelopmentrelatestotheriver.

    A Visi Fr T Sci Rivr

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    6/16

    6

    Cct t trai sst wr tr ar aps

    Projects

    Wissahickon Gateway trail connections waterfront access and trail

    connections at the rivers edge in the area between the WissahickonCreek, the Pencoyd Bridge and the CVS drug store.

    LinktoLowerMerionTownshipwithnewconnectionsonthe

    Pennsylvania Railroad Bridge, Pencoyd Bridge and Norolk Southern

    SpurBridgeatthetipofLowerVeniceIsland.

    Biketrailinabandonedrailbedonriversideofthecanal.

    Iprv a aitai t qait f trais

    Projects

    ImprovementsatthetrailheadtotheWissahickon-improvesignage,

    update bus shelter, create link to bikeway across the street.

    IntroductionofnewplantingsalongtheManayunkCanalTowpath.

    Iprv pstria a bicc vt strts

    Projects

    Newon-streettrailsoneithersideofRidgeAvenuebetween

    the Wissahickon Creek and the Ridge/Main ork.

    TraccalmingonKellyDrivesothatpeoplecanmovebetweenthe East Falls Riverront Business District and the river.

    Installationofwayndingsignagetohelppedestriansandcyclists

    navigate through East Falls and the Wissahickon Gateway area.

    GOAL 1ImPRoVe moVemenT Along The RIVeR

    Te Schuylkill Project has the ollowing vision or the Schuylkill Riverront:

    Te Schuylkill Riverfront will be a resource for

    local neighborhoods and the region, tying together

    riverfront communities through a connected system

    of River rails, River Places and Neighborhood

    Connections.

    goAlS And ACTIon STePS

    With the vision and goals in mind, this plan lays out a series o Action Steps,

    which are recommendations or the creation and maintenance o a thriving

    Schuylkill Riverront designed to address the key concerns or open space

    developmentontheriver.AframeworkofthreeGoalsisusedtoorganize

    theActionSteps.eseGoalsare1)Improvemovementalongandtothe

    river; 2) Create great places on the river; 3) Engage people in river activities.

    Tese goals and action steps are described in the ollowing pages.

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    7/16

    EXECUTIVE SUMMARY 7

    epasiz atwas, aars a rivr accss ais

    Projects

    Planned river docks in East Falls and Manayunk.

    Restoration of Manayunk Canal locks and associated dredging.

    CreationofgatewaysintoRoxboroughandEastFalls.

    Iprv p spac aitis a t rivr

    Projects

    Improvedviewstorivercreatedbyselectivelyeliminatingovergrown

    vegetation on the banks o the Wissahickon Creek.

    Parkinglotsasariverfrontamenity,stressingthemanagementof

    stormwaterandprotectionofwaterquality.

    MidvaleStepsasanattractivestoppingpoint.

    ImprovementstoInnYardPark.

    esr tat privat vpt rats t t rivr

    Projects

    RedevelopmentoftheDuronPaints/self-storagesitetoariverfrontuse.

    CreationofwaterfrontplazasatManayunkDinerandmovietheater.

    PropertiesonManayunkCanaltoopendoorsonthecanalbasedon

    existing design guidelines.

    Negotiationwithdeveloperstobuildandmaintainrivertrailsaspartof

    new developments.

    GOAL 2CReATe gReAT PlACeS on The RIVeR

    Cti xisti catia prras a xpa ffris

    Projects

    Restoration of the Bathey House as an information center along

    the trail.

    Continuationofsuccessfulwatershededucationwithschoolsincluding

    Shawmont, St. Bridgets, Miin and Dobson and one community

    center- the North Light Community Center. Expand reach to other

    schools where possible.

    Introductionofastormwatereducationprogramforchildren.

    gt pp wt

    Projects

    Developmentofriverbusinessesincludingtoursandcanoeandshing

    outtters.

    In-riverswimmingfacilityatthetipofLowerVeniceIsland.

    Spprt fstivas a vts a t rivr

    Projects

    ContinuationofsuccessfuleventsliketheEastFallsFishingFestival

    and Arts by the River, the East Falls Bike Race Block Party, the

    PhiladelphiaInternationalCyclingChampionship,ManayunkSecond

    Saturdays and the Manayunk Arts Festival.

    Neweventstogetpeopletotheriver.Possibleeventsincludea

    Philadelphia tube race and a amily triathlon, which would incorporate

    biking, canoeing and walking.

    GOAL 3engAge PeoPle In RIVeR ACTIVITIeS

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    8/16

    8

    PRiORiTy PROJECTWISSAhICkon gATeWAy TRAIl ConneCTIonS

    Te most important gap in the trail system can be ound in the area between

    theWissahickonCreekandthePencoydBridge.Infact,thereisnotsimply

    asinglemissinglinkrather,thereareseveralgaps:

    Asafebike/pedcrossingofWissahickonCreek

    CrossinginfrontoftheSEPTATransferStationonRidgeAvenue

    passes through waiting pedestrians

    AcleartrailheadintotheWissahickontrails

    AriversidetrailorsafetrailalongRidgeRoad

    Opportunities to provide a trail are limited because the level land between the

    riverandthesteephillsideparalleltoRidgeAvenueisquitenarrow.erefore,

    any plausible resolution will occupy easements with the agreement o riverside

    property owners including the Fairmount Park Commission, the Roxborough

    Canoe Club, SEPA, PECO, and the owners to the Duron Paints property.

    Overtheyears,potentialalignmentshavebeendiscussed.Infact,SEPTA

    and PECO have agreed to let a multi-purpose trail cross their properties (with

    certainprovisos).Inaddition,thereisawaterfrontaccesseasementinthe

    tenant agreements with the owner o the commercial property.

    Anidealarrangementwouldprovideachoiceofroutesfordierenttypes

    o users, including a riverront alignment or recreational cyclists, a trail next

    to the road on the south side o Ridge Avenue and saer sidewalks and bicycle

    amenities on the north side o Ridge Avenue.

    PcBri

    BiSf-Stra

    Ri Av.,St Si

    PeCoSit

    Bimvi Tatr

    Ri Av.,nrt Si

    Traia

    k drivRap

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    9/16

    EXECUTIVE SUMMARY 9

    OPTiONS FOR WiSSAhiCKON GATEWAy TRAiL CONNECTiONS

    On roads and sidewalks:

    Marked crosswalks, smart

    crossings and sharrows can

    help to promote ped/bike safety.

    On-road trail: Alignment would

    need to cross the Wissahickon

    Creek, the SEPTA Transfer

    Station and several driveways.

    SEPTA

    WiSSAh

    iCKO

    NC

    REEK

    DURON

    PAiNTS

    SELF-

    STORAGE

    PECO

    MOviE

    ThEATER

    DiNER

    Possible bridge and

    pathway to bypass the

    on-road alignment would

    require a path through or

    next to the PECO site.

    There is plenty of waterfront

    space to bring a trail behind the

    movie theater and parking lots.

    The waterfront trail and/or

    on-road connections lead

    to the Pencoyd Bridge,which connects to trails in

    Montgomery County.

    gr Rt: Rivrfrt Trai

    R Rt: Ri Avmti-Prps Trai

    ora Rt: o-RaP/Bi Aitis

    Cyclists can ride on

    Ridge Avenue as an

    alternative link between

    this area and the Kelly

    Drive trail downriver.

    GUSTiNE LAKE

    iNTERChANGE

    KELLy

    DRivE

    TRAiL

    PennDOT bridge

    removal will create

    safer conditions

    for pedestrians onRidge Avenue.

    PENCOyDBRiDGE

    The Self-Storage facility blocks

    the waterfront trail connection.

    Link to Lower

    Merion Trails.

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    10/16

    10

    R Rt: Ri Av

    mti-Prps Trai

    isalignmentwouldconnectthe Kelly Drive rail with

    Manayunk without orcing cyclistsandpedestrianstocrosstrac.

    isalignmentcouldbeinstalled as part o new potentialdevelopment on the site.

    isalignmentwouldbehighlyvisible to anyone passing throughthe area.

    gr Rt: Watrfrt Trai

    isalignmentwouldmake

    a direct visual and physical

    connection with the Schuylkill

    River.

    isalignmentwouldbe

    a preerred approach o

    recreational trail users.

    Publicwaterfrontaccesshasalready been negotiated with

    property owners.

    Bfr

    Bfr Aftr

    Aftr Ridge Avenue between Wissahickon

    Creek and the Main Street split

    Waterfront behind self-storage

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    11/16

    EXECUTIVE SUMMARY 11

    ora Rt: Ri Av Bi/P Iprvts

    isalignmentcouldbe

    implementedquicklyandsimply.

    Sharrowswillhelpbringvisibility

    to cyclists on the road.

    PennDOTremovalofbridgeand

    thenewtraclightwillcreatesafer

    conditions or pedestrians. Trailheadparkingcouldbe

    integrated into this areaGateway to Roxborough

    Gateway to East Falls

    Bfr

    Bfr

    Aftr

    Aftr

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    12/16

    12

    PRiORiTy PROJECTeAST FAllS RIVeR ACCeSS lAndIng

    A river access study was completed in 2006, which explored options or river

    landingsinEastFallsandManayunk.InEastFalls,thepreferredwateraccess

    point, north o the Falls Bridge, was envisioned as a scenic docking and launching

    area or human-powered crat. Tis particular site is located where a gentle grade

    downtotheriverexists.Aproposedriveraccesslandingherecanoerwide

    steps that descend to the river. A new dock structure would be located at the

    base o the steps and a secured platorm above beach level would be connected byahingedgangwayleadingtoaoatingdock.Inadditiontothesteps,agently

    sloping path would lead those carrying a canoe or kayak to the waters edge.

    PRiORiTy PROJECTRIVeR ACCeSS AT loWeR VenICe ISlAnd PARk

    An important river access location in Manayunk occurs at the southern tip o

    VeniceIsland.issitemarkstheconvergenceofthehistoricNorfolkSouthern

    Spur Bridge, the end o the Manayunk Canal and the popular restaurant,ManayunkBrewery,whichoersriverfrontdecksoverthewater.eLower

    VeniceIslandPark,ajointprojectofthePhiladelphiaWaterDepartmentand

    Recreation Department that will break ground this all, will introduce a new

    perormance center, sports acilities and parking lots to the island. Public river

    access sites should be introduced as a part o park development.

    For example, the existing boat launch, introduced on the river below the

    Manayunk Brewery to serve kayakers, canoeists and dragon boat racers, should be

    strengthenedthroughtheinstallationofamorepermanentstructureasspecied

    intheManayunkRiverAccessStudy.Inaddition,aproposedin-riverswimmingfacilityforthetipofLowerVeniceIslandisbeingstudied.Patioscouldbebuilt

    on the river banks near these boating and swimming acilities to provide seating,

    views and other amenities.

    Pt f xisti citis t str tip f Vic Isa

    Rri f t prps rivr accss ai lwr Vic Isa i maa

    Pa viw f t prps east Fas lai

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    13/16

    EXECUTIVE SUMMARY 13

    PRiORiTy PROJECTReSToRATIon oF mAnAyunk CAnAl loCkS

    Locks 68, 69 and 70 raised were used to allow navigation by fat bottom boats

    through the Manayunk canal on the Schuylkill River in the nineteenth century.

    Once the canal became obsolete at the end o the nineteenth century, the locks ell

    into disrepair.

    Te Schuylkill Project, along with the Friends o the Manayunk Canal and the

    Manayunk Development Corporation, are currently working to raise money to

    restore Locks 68, 69 and 70 to their original unction. Tis restoration projectwill be accompanied with associated dredging along the length o the canal. With

    the restoration o the locks, the groups will seek designation o the canal as a

    National Landmark, in addition to its existing status as a National Historic Site.

    PRiORiTy PROJECTBAThey houSe

    eBatheyHouseinEastFallssitsonlandownedbyFairmountPark.Inthepast

    the building housed a swimming pool, but it has sat vacant and unused or many

    years. Te site is situated at the southeast gateway to East Falls, between KellyDrive and Ridge Avenue, just south o the win Bridges o Route 1.

    Local community leaders and businesses see the empty Bathey House as an

    opportunitytorevitalizetheEastFallsRiverfrontBusinessDistrict.Itsstrategic

    location along the Kelly Drive rail, at the entrance to East Falls presents exciting

    ideas or what could happen there. Plans or the renovation o the Bathey House

    are underway. Sixty thousand dollars have already been raised through the

    Schuylkill Project, along with $7,500 through the Pennsylvania Department o

    Conservation and National Resources, $125,000 through the Delaware Valley

    Regional Planning Commission, ake me to the River program and a grant

    rom the Schuylkill River National and State Heritage Area (SRNSHA) or aninormation kiosk. Te East Falls Development Corporation is partnered with a

    private developer who will be bring a ood concessionaire and possibly bike rental

    to the location. Tey also plan to partner with the East Falls Historical Society in

    raising unds and renovating the building or public use.T Bat hs i east Fas

    lcs 69 a 70

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    14/16

    14

    CONNECTiNGPROJECT

    ACCESSPROJECTS

    LOCALATTRACTiON

    PROJECTS

    PRIoRITy PRojeCT CoST

    gatwa ara $2 mllon for brdgetrai cctis & tral connecton;

    $1.6 mllon for tral$200,000 Eng. Assesment

    east Fas Rivr $450,000 - $700,000Accss lai

    Pbic accss fr bati $850,000swii lwr Vic Isa

    Rstrati f t $2 mllon for locksmaa Caa lcs $5 mllon for dredgng(a assciat ri)

    Bat hs $400,000

    Pririt Prcts, Csts a Iptati dtais

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania

    15/16

    EXECUTIVE SUMMARY 15

    AgenCy RelATed PlAnS ImPlemenTATIon deTAIlS

    Farmount Park; Sculkll Project; Rdge Aenue Gatewa Plan Workng drawngs for te preferredSEPTA; PennDOT brdge opton ae been completed

    b Urban Engneers.

    PennDOT; Farmount Park; Rer Access Stud Prelmnar desgn stud as beenSculkll Project; Canoe Club completed. Net steps nclude

    furter detalng and desgn, as wellas obtanng te necessar permttng.

    Farmount Park; Sculkll Rer Rer Access Stud; Prelmnar desgn stud as beenNatonal and State hertage Area; in-rer Swmmng Feasblt Stud and completed. Net steps ncludeSculkll Project furter detalng and desgn, as well

    as obtanng te necessar permttng.

    Frends of Manaunk Canal, Workng drawngs ae beenManaunk Deelopment Corporaton completed b Pennon Assocates.

    Applcaton for Natonal Landmarkstatus to occur wt completon ofrestoraton.

    Farmount Park; East Falls Renoaton work must be completedhstorcal Socet; EFDC; SRSNhA before cafe and nformaton kosk

    can be ntroduced.

  • 7/27/2019 Schuylkill River Open Space Master Plan: From East Falls to Manayunk in Philadelphia, Pennsylvania