7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
1/20
Lance Butler, Manager
Environmental Restoration & Monitoring
Philadelphia Water Department
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
2/20
ProjectLocationy Locatedinnorthwest
Philadelphia
y BetweenShawmontAvenueandLockStreet
y Approximately1.7
miles
in
length
y Approximately1.2miles
upstreamfrom
the
Citys
QueenLaneIntake
SchuylkillRiver
Wiss
ahick
onCre
ek
Manayu
nkCanal
Queen Lane
Intake
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
3/20
HistoricalPerspective:
y Completedin1819
y Acomponent
of
the
108
mile
SchuylkillRiverNavigationSystem
y Providedpassage
for
cargo
ships
fromthetidewaters atFairmountinPhiladelphiatoPortCarbon,SchuylkillCounty.
y Providedwaterpowerforfactories,transformingthissectionoftheCityintoamajor
textile
producing
region
Early 20th century photographs of upper
portion of Manayunk Canal showing theSluice House and Lock 68.
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
4/20
HistoricalPerspective:
y ProvidedeasytransportofanthracitecoalandagriculturalproductsintotheCity.
y In1842,completionoftherailroadlinefromPhiladelphiatoSchuylkillCountymarkedthedeclineofthecanalsystem.
y Lastcoaltransportthroughthecanaloccurredin1917
y Lastcommercialtrafficin1922
y Decommissionedinthe1940sandfell
into
disrepair
over
the
next
five
decades
Recreational activities along the Manayunk
Canal at Leverington Street (Circa 1918)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
5/20
EcologicalPerspective
y Highlyproductive
y
Supports
large
populations
of:y Fishy Macroinvertebratesy Amphibiansy Reptilesy Birds
y 2003surveyrevealed13speciesoffishy Pollutiontolerantassemblagey
Results
suggest
a
stressed
communityy Stuntedgrowthinvariousspecies
y Ecologyreflectslowgradient,slowmovingwaterconditions
Staff scientists from PWD performing a
fisheries survey in the Manayunk Canal(2003)
A Great Blue Heron wading in the upstream
portion of Manayunk Canal (2000)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
6/20
Water
Quality
Concerns
AlgalBlooms
y Canoccurfrequentlyduringthe
summermonths
in
low
flow
conditions
y Aestheticallyunpleasing
y Profoundimpactonwaterqualityandaquaticorganisms
y TasteandodorconcernsforCitysdrinkingwater(e.g.,Geosmin&MIB)
Algal bloom during drought conditions
in 1999 (Upstream view at Lock Street)
Floating mats of benthic algae at Lock
Street bridge (2006)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
7/20
WaterQuality
Concerns
DissolvedOxygen
y Lowdissolvedoxygenconditionsinthe
canal
are
aresult
of:
y Stagnantflow
y Minimalfreshwaterinputs
y Chronicinputs
of
BOD
(Biochemical
Oxygen
Demand)
y Highoxygendemandinthesediment(SOD)
y LargefluctuationsinDOduetoprimaryproductivity(i.e.,algae)
y Haveresultedinthreesignificantfishkillsinthecanaloverthelastdecade
Hemorrhagic septicemia in Gizzard shad as a
result of chronic low dissolved oxygen in the
canal (Manayunk Canal, 2003)
Fish kill in the Manayunk Canal as a result of lowflow, high temperatures and algae bloom
( June, 2011)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
8/20
y Sedimentinputsfromhillslopeprocesses
y Landuseactivitiesy Masserosiony Roads
y Transportoflegacysedimentsdownstream
y Bankerosioninupstreamareasofthecanal
y Lackofsedimentmanagementprogram(O&M)
Water
Quality
Concerns
Siltation
Sediment accrual in the Manayunk Canal atLeverington Street and Domino Lane (2011)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
9/20
y Heavyaccumulationof:y Bottles,
cans,
plastics
y Constructiondebrisy Volatiles(paints,gasoline)y Woodydebris
y Aestheticallyunpleasing
y Potentialacuteeffectstoaquaticlife
y Odorsemanatingfromorganic
decomposition
y Causefrequentdebrisjamsatlowerportionofcanal
Water
Quality
Concerns
Trash&Debris
Trash and debris present in the lower portion
of the canal (Lock Street, 2002)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
10/20
PastRestorationProjectsy LockStreetBridge 1997
y CottonStreetCrossing 1998
y ManayunkCanalBoardwalk 2001
y ManayunkCanalBankRestoration 2002
y LockStreetToFountainStreetLandscapingAndLighting 2004
y ManayunkCanalRestorationProject(PhaseIII) 2005y Timber
Cribbing
y Bulkheadsy Fencingy Landscaping
y ManayunkCanalTowPathRestoration2012 Restoration of the boardwalk and left bank ofManayunk Canal between Lock Street and
Leverington Street (PP&R, 2000)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
11/20
CurrentRestoration&EnhancementProjectsAlongManayunkCanal
Aerial View Of Venice Island
Project (2011)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
12/20
GoalsOfTheManayunkCanalImprovementProject:y Aesthetics
y Thisphaseofthecanalimprovementprojectswillimproveandenhancethepark/naturallandscapearea
y HistoricalPreservationy Manayunk
canal
is
amajor
contributing
element
to
the
ManayunkNationalHistoricDistrict
y RecreationAndAthleticProgramsy Bikingy Kayakingandcanoeingy Fishing
y Commercial/Businessy Encourage/promotebusinessestousecanalasastorefrontamenity(e.g.,BourbonBlue)
y SourceWaterProtectiony ImprovetheintegrityabovetheCitysdrinkingwater
intake
y
Ecology
y SignificantimprovementstotheenvironmentalqualityofthisareaofPhiladelphia
y EnsurethehealthandpersistenceoftheCitysaquaticresources
y Synergyy SimultaneouslymeetingthegoalsofbothCityagencies
y
PWDy PP&R
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
13/20
ManayunkCanal
New Channel
NewSluiceGateStructure
NewFlowDiversionStructure
SpillwayExpansion
Dredging
SchuylkillRiver
ManayunkCanal
PlannedImprovementstoCanal
UpstreamLock
System
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
14/20
y Criticalcomponentto
successof
this
project
y Threesignificantdredge
locations:y Site1:CanalAtParkerAvenue
y Site2: CanalatDominoLane
y Site3: UpstreamLock(PWD)
y Approximately5,600cubicyardsofsedimentremoved
anne mprovementsto ana
Dredging
And
Sediment
Removal
Sediment accrual in canal
at Site 2 (2011)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
15/20
CurrentStatusy SpillwayRehabilitation
y FederalandStatepermitsunderreview
y Designsandspecifications 60%
y AttractionFlowStructurey Designsandspecifications 30%y Hydraulics
and
hydrologic
modeling Complete(underreview)
y Dredging
y Prepermit
meeting
with
PADEP
andUSACE July7th
y Permitsubmittedy Additioninformationrequestedby
USACE
Manayunk Canal at upstream lock (Lock 68),
1918
Manayunk Canal at upstream lock (Lock 68),
2011
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
16/20
30% Rendering
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
17/20
30% Rendering
Frontal View
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
18/20
UpdatedTimeLine
Completion!
Fall 2013
Winter 2012
2014
Spring 2013
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
19/20
Partners
y PhiladelphiaWaterDepartment
y PhiladelphiaParks&Recreation
y
Capital
Program
Office
y ManayunkDevelopmentCorporation
y TheSchuylkillProject
y FriendsoftheManayunkCanal Clean up activities along the lower portion ofthe Manayunk Canal (2003)
7/21/2019 Restoration of the Manayunk Canal - PWD Presentation
20/20
Questions