SCOPE OF WORK
Feasibility Study for Fishing Access
Drag Island Somers Point, Atlantic County, N.J.
PROJECT NO. P1138-00
STATE OF NEW JERSEY
Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt. Governor
DEPARTMENT OF THE TREASURY
Andrew P. Sidamon-Eristoff, Treasurer
DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION
Steven Sutkin, Director
Date: 5/13/16
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 2
TABLE OF CONTENTS SECTION PAGE
I. OBJECTIVE .......................................................................................... 4
II. CONSULTANT QUALIFICATIONS ................................................ 4
A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS ........................................ 4
III. PROJECT SCHEDULE ....................................................................... 4
A. SCOPE OF WORK DESIGN & CONSTRUCTION SCHEDULE ............................................... 4 B. CONSULTANT’S PROPOSED FEASIBILITY STUDY SCHEDULE ....................................... 4 C. APPROVED FEASIBILITY STUDY SCHEDULE ...................................................................... 5
IV. PROJECT SITE LOCATION & TEAM MEMBERS ...................... 6
A. PROJECT SITE ADDRESS ........................................................................................................... 6 B. PROJECT TEAM MEMBER DIRECTORY ................................................................................. 6
1. Agency Project Manager: ........................................................................................................... 6 2. Client Agency Representative: ................................................................................................... 6
V. PROJECT DEFINITION ..................................................................... 7
A. BACKGROUND ............................................................................................................................ 7 B. FUNCTIONAL DESCRIPTION OF THE SITE ............................................................................ 7
VI. CONSULTANT FEASIBILITY STUDY REQUIREMENTS ......... 7
A. PROPOSED SITE LAYOUT AND IMPROVEMENTS ............................................................... 7 1. Proposed Site Layout .................................................................................................................. 7 2. Site Improvements: ..................................................................................................................... 7
B. ANTICIPATED PROJECT COSTS AND ESTIMATES .............................................................. 8 1. Proposed Project Costs ............................................................................................................... 8 2. Professional Cost Estimator ........................................................................................................ 8
C. ANTICIPATED DESIGN AND CONSTRUCTION SCHEDULE ............................................... 8 D. PROJECT COMMENCEMENT .................................................................................................... 9
1. Project Directory: ........................................................................................................................ 9 2. Site Access: ................................................................................................................................. 9 3. Project Coordination: .................................................................................................................. 9 4. Existing Documentation: ............................................................................................................ 9 5. Scope of Work: ........................................................................................................................... 9 6. Project Schedule: ...................................................................................................................... 10
E. STUDY MEETINGS & PRESENTATIONS ............................................................................... 10 1. Study Meetings: ........................................................................................................................ 10
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 3
2. Study Presentations: .................................................................................................................. 10
VII. GENERAL REQUIREMENTS ......................................................... 11
A. SCOPE CHANGES ...................................................................................................................... 11
VIII. SUBMITTAL REQUIREMENTS ..................................................... 11
A. CONTRACT DELIVERABLES .................................................................................................. 11 B. PROJECT DOCUMENT BOOKLET .......................................................................................... 11
IX. SOW SIGNATURE APPROVAL SHEET ....................................... 12
X. CONTRACT DELIVERABLES ....................................................... 13
XIII. EXHIBITS ............................................................................................ 15
A. SAMPLE PROJECT SCHEDULE FORMAT B. PROJECT SITE LOCATION PLAN C. AERIAL VIEW OF SITE
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 4
I. OBJECTIVE
The objective of this project is to provide a feasibility study to identify all design factors and construction costs in order to create recreational fishing access on Drag Island, Somers Point, NJ.
II. CONSULTANT QUALIFICATIONS
A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS
The Consultant shall be a firm pre-qualified with the Division of Property Management & Construction (DPMC) in the following discipline(s):
• P005 Civil Engineering
The Consultant shall also have in-house capabilities or Sub-Consultants pre-qualified with, any and all other Architectural, Engineering and Specialty Disciplines necessary to complete the project as described in this Scope of Work (SOW).
III. PROJECT SCHEDULE
A. SCOPE OF WORK DESIGN & CONSTRUCTION SCHEDULE The following schedule identifies the estimated design and construction phases for this project and the estimated durations. PROJECT PHASE ESTIMATED DURATION (Calendar Days) 1. Preliminary Draft Feasibility Study 25% (Minimum) 25
• Project Team Review & Comment 14 2. Final Draft Feasibility Study 50% (Minimum) 50
• Project Team Review & Comment 14 3. Final Feasibility Study 100% 50
• Project Team Review & Approval 14
B. CONSULTANT’S PROPOSED FEASIBILITY STUDY SCHEDULE
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 5
The Consultant shall submit a bar chart schedule with their technical proposal that is similar in format and detail to the schedule depicted in Exhibit ‘A’. The bar chart schedule developed by the Consultant shall reflect their recommended project phases, phase activities, activity durations. A written narrative shall also be included with the technical proposal explaining the schedule submitted and the reasons why and how it can be completed in the time frame proposed by the Consultant. This schedule and narrative will be reviewed by the Consultant Selection Committee as part of the evaluation process and will be assigned a score commensurate with clarity and comprehensiveness of the submission.
C. APPROVED FEASIBILITY STUDY SCHEDULE The Consultant shall issue the approved Feasibility Study schedule at the first design kickoff meeting. This schedule will be binding for the Consultant’s activities and will include the start and completion dates for each activity. The Consultant and Project Team members shall use this schedule to ensure that all milestone dates are being met for the project. The Consultant shall update the schedule to reflect performance periodically (minimally at each study phase) for the Project Team review and approval. Any recommendations for deviations from the approved design schedule must be explained in detail as to the causes for the deviation(s) and impact to the overall project schedule.
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 6
IV. PROJECT SITE LOCATION & TEAM MEMBERS
A. PROJECT SITE ADDRESS The location of the project site is: Drag Island Somers Point, NJ 08244 GPS Coordinates: 39.300057, -74.617598 The island is located at the end of old route 9 in the area of the old Beasley’s Point Bridge. See Exhibit ‘B’ for the project location plan.
B. PROJECT TEAM MEMBER DIRECTORY
The following are the names, addresses, and phone numbers of the Project Team members. 1. Agency Project Manager: Name: Edward Mulvan, Project Manager Address: DEP, NHRG- Office of Resource Development 501 East State Street, 4th Floor Trenton, NJ 08625 Phone No: (609) 984-3819 E-Mail No: [email protected] 2. Client Agency Representative: Name: William White, Client Agency Representative Address: DEP, NHRG- Office of Resource Development 501 East State Street, 4th Floor Trenton, NJ 08625 Phone No: (609) 802-5886 E-Mail No: [email protected]
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 7
V. PROJECT DEFINITION
A. BACKGROUND The New Jersey Turnpike Authority is constructing a new bridge over Great Egg Harbor. The Old Beasley’s Point Bridge was demolished as part of this expansion project. The Agency is seeking this feasibility study to determine all design elements and construction costs associated with the construction of a parking area, pedestrian bridge and a fishing pier for recreational use of the island.
B. FUNCTIONAL DESCRIPTION OF THE SITE
Drag Island is a small land mass located between Somers Point and Beesley’s Point in Great Egg Harbor Bay. The island is approximately 67 acres and is mostly comprised of saltwater marshlands.
See Exhibit ‘C’ for an overhead view of the existing site.
VI. CONSULTANT FEASIBILITY STUDY REQUIREMENTS
A. PROPOSED SITE LAYOUT AND IMPROVEMENTS
1. Proposed Site Layout
The Consultant shall provide a proposed site layout identifying where the improvements can be located based on the information obtained from the site investigation and Agency interviews. The Consultant shall evaluate the existing roadway and make recommendations for its use. 2. Site Improvements:
The Consultant shall identify all site improvements required to achieve the proposed site layout including, but not limited to:
Parking Area:
The Consultant shall provide a conceptual layout for a parking area that shall accommodate twenty five (25) vehicles. Parking area lighting shall be solar powered.
Pedestrian Bridge:
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 8
The pedestrian bridge shall span the distance from the southern side of Somers Point to the northern side of Drag Island. The bridge shall be designed to accommodate small emergency vehicles. The Consultant shall assess the viability of reusing the old Route 9 support pilings. The pedestrian bridge shall have solar powered lighting. Fishing Pier: The fishing pier shall be constructed on the southernmost point on the island. The fishing pier shall have benches and solar lighting.
Consideration in the design and cost estimates shall allow for non-pollutant eco-friendly materials and minimal maintenance.
B. ANTICIPATED PROJECT COSTS AND ESTIMATES
1. Proposed Project Costs The Consultant shall determine the construction cost estimate (CCE) and current working estimate (CWE) for the site improvements described in the Feasibility Study. Project cost items shall include, but not limited to: site assessments, construction costs, consultant design and construction administration fees, testing costs, DPMC management fees, contingencies, permits, allowances, and escalation factors for the anticipated construction year of the site improvements. 2. Professional Cost Estimator The Consultant or Sub-Consultant providing the cost estimates must be pre-qualified with DPMC in the Estimating/Cost Analysis Specialty Discipline. All cost estimates shall be adjusted for regional location, site factors, construction phasing, security issues, and inflation factors based on the year in which the work is to be performed. All cost estimates must be submitted on a DPMC-38 Project Cost Analysis form for each improvement recommended with a detailed construction cost analysis in CSI format for all appropriate divisions and sub-divisions.
C. ANTICIPATED DESIGN AND CONSTRUCTION SCHEDULE
The Consultant shall submit a project design and construction bar chart schedule with their final feasibility study that is similar in format and detail to the schedule depicted in Exhibit ‘A’. The bar chart schedule developed by the Consultant shall reflect their recommended project phases, phase activities, activity durations.
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 9
D. PROJECT COMMENCEMENT A pre-design meeting shall be scheduled with the Consultant and the Project Team members at the commencement of the project to obtain and/or coordinate the following information: 1. Project Directory: Develop a project directory that identifies the name and phone number of key designated representatives who may be contacted during the phases of this project. 2. Site Access: Develop procedures to access the project site and provide the names and phone numbers of approved escorts when needed. Obtain copies of special security and policy procedures that must be followed during all work conducted at the site and include this information in the study. 3. Project Coordination: Review and become familiar with any current and/or future projects at the site that may impact the design, construction, and scheduling requirements of this project. Incorporate all appropriate information and coordination requirements in the study. 4. Existing Documentation: The State does not attest to the accuracy of the information provided and accepts no responsibility for the consequences of errors by the use of any information and material contained in the documentation provided. It shall be the responsibility of the Consultant to verify the contents and assume full responsibility for any determination or conclusion drawn from the material used. If the information provided is insufficient, the Consultant shall take the appropriate actions necessary to obtain the additional information required. All original documentation shall be returned to the provider at the completion of the project. 5. Scope of Work: Review the study responsibilities and the submission requirements identified in this Scope of Work with the Project Team members. Items such as: contract deliverables, special sequencing or phased construction requirements, special hours for construction based on Client Agency programs or building occupancy, security needs, delivery dates of critical and long lead items, utility interruptions or shut down constraints for tie-ins, weather restrictions, and coordination with other project construction activities at the site shall be addressed.
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 10
This information and all general administrative information, including a narrative summary of the work for this project, shall be included in the report. 6. Project Schedule: Review and update the project design and construction schedule with the Project Team members.
E. STUDY MEETINGS & PRESENTATIONS
1. Study Meetings: Conduct the appropriate number of review meetings with the Project Team members during each phase of the project so they may determine if the project meets their requirements, question any aspect of the contract deliverables, and make changes where appropriate. The Consultant shall describe the philosophy and process used in the development of the study criteria and the various alternatives considered to meet the project objectives. Selected studies, sketches, cost estimates, schedules, and other relevant information shall be presented to support the design solutions proposed. Special considerations shall also be addressed such as: Contractor site access limitations, utility shutdowns and switchover coordination, phased construction and schedule requirements, security restrictions, available swing space, material and equipment delivery dates, etc. It shall also be the responsibility of the Consultant to arrange and require all critical Sub-Consultants to be in attendance at the design review meetings. Record the minutes of each design meeting and distribute within seven (7) calendar days to all attendees and those persons specified to be on the distribution list by the Project Manager. 2. Study Presentations: The minimum number of design presentations required for each phase of this project is identified below for reference: Preliminary Draft Phase: One (1) oral presentation at phase completion. Final Draft Phase: One (1) oral presentation at phase completion. Final Report: One (1) oral presentation at phase completion.
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 11
VII.GENERAL REQUIREMENTS
A. SCOPE CHANGES The Consultant must request any changes to this Scope of Work in writing. An approved DPMC 9d Consultant Amendment Request form reflecting authorized scope changes must be received by the Consultant prior to undertaking any additional work. The DPMC 9d form must be approved and signed by the Director of DPMC and written authorization issued from the Project Manager prior to any work being performed by the Consultant. Any work performed without the executed DPMC 9d form is done at the Consultant’s own financial risk.
VIII.SUBMITTAL REQUIREMENTS
A. CONTRACT DELIVERABLES All submissions shall include the Contract Deliverables identified in Section X of this Scope of Work and described in the DPMC Procedures for Architects and Engineers Manual.
B. PROJECT DOCUMENT BOOKLET The Consultant shall submit all of the required Contract Deliverables to the Project Manager at the completion of each phase of the project. All reports, meeting minutes, plan review comments, project schedule, cost estimate in CSI format (2004 Edition), correspondence, calculations, and other appropriate items identified on the Submission Checklist form provided in the A/E Manual shall be presented in an 8½” x 11” bound “booklet” format.
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 13
X. CONTRACT DELIVERABLES PRELIMINARY DRAFT FEASIBILITY STUDY:
6.1 Project Schedule (Bar Chart Format) 6.2 Meetings & Minutes (Minutes within five (5) calendar days of meeting) 6.3 Correspondence
6.4 Submission Requirements 6.4.1 A/E Statement of Site Visit 6.4.3 Special Features Description 6.4.4 Site Evaluation 6.4.8 Identify Regulatory Agency Approvals 6.4.8.2 NJ Department of Community Affairs (a) UCC Permit for Building Construction 6.4.8.3 NJ Department of Environmental Protection (a) Coastal Development (CAFRA) (b) Waterfront Development (RIPARIAN) (c) Wetlands Development Permit (d) Dredge and Fill 6.4.10 Drawings: 6 sets Cover Sheet (See A/E Manual for format) Existing Site Plan Existing Site Utility Plan 6.4.12 Proposed Construction Cost Estimate in CSI Format & Cost Analysis 38 Form 6.4.13 Bar Chart of Proposed Design and Construction Schedule 6.4.14 Oral Presentation of Submission to Project Team 6.4.15 SOW Compliance Statement 6.4.16 This Submission Checklist (See A/E Manual, Figure 6.4.16 for format) 6.4.17 Deliverables Submission in Booklet Form: 7 sets 6.5 Approval 6.5.1 Respond to Submission Comments FINAL DRAFT FEASIBILITY STUDY: 7.1 Project Schedule (Update Bar Chart Schedule)
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 14
7.2 Meetings & Minutes (Minutes within five (5) calendar days of meeting) 7.3 Correspondence 7.4 Submission Requirements 7.4.1 A/E Statement of Site Visit 7.4.3 Special Features Description 7.4.4 Site Evaluation 7.4.8 Regulatory Agency Approvals (See Section 6.4.8 for listing) 7.4.10 Drawings: 6 sets Cover Sheet (See A/E Manual for format) Existing Site Plan Proposed Site Layout 7.4.12 Proposed Construction Cost Estimate in CSI Format & Cost Analysis 38 Form 7.4.13 Bar Chart of Proposed Design and Construction Schedule 7.4.14 Oral Presentation of Submission to Project Team 7.4.15 SOW Compliance Statement 7.4.16 This Submission Checklist (See A/E Manual, Figure 6.4.16 for format) 7.4.17 Deliverables Submission in Booklet Form: 7 sets 7.5 Approval 7.5.1 Respond to Submission Comments 7.6 Submission Forms Figure 7.4.12 Current Working Estimate/Cost Analysis Figure 7.4.16 Submission Checklist FINAL FEASIBILITY STUDY: 8.1 Schedule (Update Bar Chart Schedule) 8.2 Meeting & Minutes (Minutes within five (5) calendar days of meeting) 8.3 Correspondence 8.4 Submission Requirements 8.4.1 A/E Statement of Site Visit 8.4.3 Special Features Description
PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16
PAGE 15
8.4.4 Site Evaluation 8.4.8 Regulatory Agency Approvals (Include itemized list specific to this project) 8.4.10 Drawings: 6 sets 8.4.12 Current Working Estimate in CSI Format & Cost Analysis 38 Form 8.4.13 Bar Chart of Design and Construction Schedule 8.4.14 Oral Presentation of this Submission to Project Team 8.4.15 Plan Review/SOW Compliance Statement 8.4.16 This Submission Checklist 8.4.17 Final Report Submission including: plans, findings, etc., in Booklet Form and Digitally on Compact Disc: 7 copies 8.5 Approvals 8.5.1 Respond to Submission Comments
XIII.EXHIBITS The attached exhibits in this section will include a sample project schedule, and any supporting documentation to assist the Consultant in the design of the project such as maps, drawings, photographs, floor plans, studies, reports, etc.
END OF SCOPE OF WORK
February 7, 1997Rev.: January 29, 2002
Responsible Group Code Table
The codes below are used in the schedule field “GRP” that identifies the group responsible for theactivity. The table consists of groups in the Division of Property Management & Construction(DPMC), as well as groups outside of the DPMC that have responsibility for specific activities ona project that could delay the project if not completed in the time specified. For reportingpurposes, the groups within the DPMC have been defined to the supervisory level ofmanagement (Le., third level of management, the level below the Associate Director) to identifythe “functional group” responsible for the activity.
CODE DESCRIPTION REPORTS TO ASSOCIATE DIRECTOR OF:
CM Contract Management Group Contract Management
CA Client Agency N/A
CSP Consultant Selection and Technical ServicesPrequalification Group
NE Architect/Engineer N/A
PR Plan Review Group Technical Services
CP Construction Procurement Planning & Administration
CON Construction Contractor N/A
FM Financial Management Group Planning & Administration
OEU Office of Energy and N/AUtility Management
PD Project Development Group Planning & Administration
EXHIBIT ‘A’
Page 1 of 4
Act
ivity
Ix
tesc
ar.p
ti.n
ii,,
ni
,,,,u.in,,,,,
i,a
it,i
pi.
agn.
;..itu.n
.ii
i.
iiii
,i
in.
mii
i...
..
ii.
Iq
uin
tnin
imi
IH
tiii
.,.u
i.p..
.ini
,nni,
nrn
ii,.in
.ni
ii
h Des
CV
3)l
Sche
dule
/Con
duct
Predesign/P
roject
Kic
kO
ffM
tgC
M
CV
3020
Prep
are
Program
Phas
eSu
bmitt
alA
E
CV
3021
Dis
trib
ute
Prog
ram
Subm
ittal
for
Rev
iew
CM
CV
3OZI
Prep
are
&Su
bmit
Prbj
ect
Cos
t Analy
sis
(DPM
C38
)C
M
CV
3022
Rev
iew
&A
pprove
Program
Subm
ittal
CA
CV
3023
Revie
w&
Approve
Program
Subm
ittal
PR
CVSO
24R
evie
w&
Approve
Program
Subm
ittal
CM
CV
3025
Con
solid
ate
&R
etur
nPr
ogra
mSu
bmitt
alC
omm
ents
CM
CV
3030
Prep
are
Sche
mat
icPh
ase
Subm
ittal
AE
CV
3031
Dis
trib
ute
Sche
mat
icSu
bmitt
alfo
rR
evie
wC
M
CV
3037
Prep
are
&Su
bmit
Proj
ect
Cos
tAna
lysi
s(D
PMC
38)
CM
CVSO
3ZR
evie
w&
App
rove
Sche
mat
icSu
bmitt
alC
A
CV
3033
Rev
iew
&A
ppro
veSc
hem
atic
Subm
ittal
PR
Rev
iew
&A
ppro
veSc
hem
atic
Subm
ittal
CM
CV
3035
Con
solid
ate
&R
etur
nSc
hem
atic
Subm
ittal
Com
men
tC
M
CV
3040
Pre
pare
Des
ignD
evel
opm
entP
hase
Sub
mit
tal
AE
CV3O
S1D
istr
ibut
eD
DSu
bmitt
alfo
rR
evie
wC
M
C’O
47Pr
epar
e&
Subm
itPr
ojec
tCos
t Ana
lysi
s(D
PMC
38)
CM
CV
3042
Rev
iew
&A
ppro
veD
esig
nD
evel
opm
ent S
ubm
ittal
CA
CV
3043
Rev
iew
&A
ppro
veD
esig
nD
evel
opm
ent S
ubm
ittal
PRC
’130
44R
evie
w&
App
rove
Des
ign
Dev
elop
men
tSu
bmitt
alC
MCV
SO45
Con
solj
date
&R
etum
DD
.Sub
mit
talC
omm
ents
CM
Prep
are
Fina
lD
esig
nPh
ase
Subm
ittal
AE
CV3O
SID
istr
ibut
eFi
nal
Des
ign
Subm
ittal
for
Rev
iew
CM
CV
3052
Rev
iew
&A
ppro
veFi
nal
Des
ign
Subm
ittal
CA
CV
3053
Rev
iew
&A
ppro
veFi
nal
Des
ign
Subm
ittal
PRC
V30
54R
evie
wFi
nal
Des
ign
Subm
itifo
rC
onst
ruct
abili
tyO
CS
:N
OT
E:
DB
cA.T
FS
TS
heti
of3
Ref
erto
sect
ion
“IV
Pro
ject
Sch
edul
e”of
the
Bur
eau
ofD
esig
n&
Con
stru
ctio
nS
ervi
ces
Sco
peof
Work
for
contr
act
phas
edu
rati
ons.
Rou
tine
Pro
ject
IX
h1b
it‘
iS0
Prl
mav
era
Sys
tem
s,In
c.
Page 2 of 4
Act
ivit
y.
II)
L)e
seri
pti
on
‘R
evie
w&
App
rove
Fina
lD
esig
nSu
bmitt
alC
M
‘3
0C
onso
lidat
e&
Ret
urn
Fina
lDes
ign
Com
men
tsC
M
Prep
are
&Su
bmit
Perm
itA
pplic
atio
nD
ocum
ents
AE
CV
3068
Prep
are
&Su
bmit
Bid
ding
Cos
tAna
lysi
s(D
PMC
38)
CM
Pla
nR
evie
w-P
ernz
ztA
cgw
stho
nC
V40
0iR
evie
wC
onst
rD
ocum
ents
&Se
cure
UC
CPe
rmit
PR
CV4O
1OPr
ovid
eFu
ndin
gfo
rC
onst
ruct
ion
Con
trac
tsC
A
CV
4020
Secu
reB
idC
lear
ance
CM
Adv
ertis
e-B
id-A
war
dC
V50
0IA
dver
tise
Proj
ect&
Bid
Con
stru
ctio
nC
ontr
acts
CP
CV5O
IOO
pen
Con
stru
ctio
nB
ids
CP
CVSO
II
Eva
luat
eB
ids
&Pr
epR
ecom
men
datio
nfo
rA
war
dC
M
CV
5Oi2
Eva
luat
eB
ids
&Pr
epR
ecom
men
datio
nfo
rA
war
dA
E
CV
5Oi4
Com
plet
eR
ecom
men
datio
nfo
rAw
ard
CP
CV
5020
Aw
ardC
onst
ruct
ionC
ontr
acts
/lss
ueN
TP
CP
:
Con
sfru
ctio
nC
’P
roje
ctC
onst
ruct
ion
Slar
tfls
sue
NT
PC
M
CV
6mi
Con
trac
tSta
rtlC
ontr
actW
ork
(25%
)C
ompl
ete
CO
N
CV
tOO
2Pr
econ
stru
cuon
Mee
ting
CM
CV
t()03
Beg
inPr
econ
stru
ctio
nSu
bmitt
als
CO
N
CVI5
004
Lon
gest
Lea
dPr
ocur
emen
tIte
mO
rder
edC
ON
CVtO
OS
Lea
dT
ime
for
Lon
gest
Lea
dPr
ocur
emen
tIt
emC
ON
Prep
are
&Su
bmit
Shop
Dra
win
gsC
ON
CV
6007
Com
plet
eC
onst
ruct
ion
Subm
ittal
sC
ON
CVSO
I IR
ough
ing
Wor
kSt
art
CO
N
CV
eoia
Perf
orm
Rou
ghin
gW
ork
CO
N
CVSO
IOC
ontr
actW
ork
(50%
+)C
ompl
ete
CO
N
CV
tOt3
Lon
gest
Lea
dPr
ocur
emen
tIte
mD
eliv
ered
CO
N
“°
Con
trac
tW
ork
(75%
)C
ompl
ete
CO
N
NO
TE
:D
BC
AT
ES
TSl
ieet
2or3
Ref
erto
sect
ion
“IV
Pro
ject
Sche
dule
”of
the
Bur
eau
ofD
esig
n&
Con
stru
ctio
nSe
rvic
esSc
ope
ofW
ork
for
cont
ract
phas
edu
rati
ons.
Rou
tine
Pro
ject
1xli
i I)i
t@
Pil
mav
era
Syst
ems,
Inc.
Page 3 of 4
Act
ivity
11)
-
t)es
crip
tion
si)r
.C
VO
14R
ough
ing
Wor
kC
ompl
ete
CO
N
CV
6021
Inte
rior
Fini
shes
Star
tC
ON
CV
)22
Inst
all
Inte
rior
Fini
shes
CO
N
CV
O3O
Con
trac
tWor
kto
Subs
tant
ialC
ompl
etio
nC
ON
(DV
O3l
Subs
tant
ialC
ompl
etio
nD
ecla
red
CM
CVC’
075
Com
plet
eD
efer
red
Punc
hL
ist)
Seas
onal
Act
iviti
esC
OI4
CV
6079
Proj
ectC
onst
ruct
ion
Com
plet
eC
M:
CV60
84)
Clo
seO
utC
onst
ruct
ion
Con
trac
tsC
M
CV
6O&
Con
stru
ctio
nC
ontr
acts
Com
plet
eC
M
CV6O
SOC
lose
Out
A/E
Con
trac
tC
M
CV
6092
Proj
ectC
ompl
etio
nD
ecla
red
CM
NO
TE
:D
BC
AT
ES
TS
hee
t3of3
Ref
erto
sect
ion
“IV
Pro
ject
Sche
dule
”of
the
Bure
auof
Des
ign
&C
onst
ruct
ion
Ser
vic
esSc
ope
ofW
ork
for
cont
ract
phas
edu
ratio
ns.
Routi
ne
Pro
ject
Ixli
i bit
‘
©P
rim
aver
aS
yste
ms,
Inc.
Page 4 of 4
Project Location Plan
DPMC Project P1138-00
FEASIBILITY STUDY DRAG ISLAND
SOMERS POINT, NJ GPS COORDINATES: 39.300057, -74.617598
EXHIBIT ‘B’
Drag Island, Somers Point