Document Format Revision (7/20/15) SCOPE OF WORK Feasibility Study for Fishing Access Drag Island Somers Point, Atlantic County, N.J. PROJECT NO. P1138-00 STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt. Governor DEPARTMENT OF THE TREASURY Andrew P. Sidamon-Eristoff, Treasurer DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION Steven Sutkin, Director Date: 5/13/16

SCOPE OF WORK Feasibility Study for Fishing Access SOW/P1138-00 Final SOW...SCOPE OF WORK Feasibility Study for Fishing Access ... submitted and the reasons why and how it can be completed

Embed Size (px)

Citation preview

Document Format Revision (7/20/15)

SCOPE OF WORK

Feasibility Study for Fishing Access

Drag Island Somers Point, Atlantic County, N.J.

PROJECT NO. P1138-00

STATE OF NEW JERSEY

Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt. Governor

DEPARTMENT OF THE TREASURY

Andrew P. Sidamon-Eristoff, Treasurer

DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION

Steven Sutkin, Director

Date: 5/13/16

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 2

TABLE OF CONTENTS SECTION PAGE

I. OBJECTIVE .......................................................................................... 4

II. CONSULTANT QUALIFICATIONS ................................................ 4

A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS ........................................ 4

III. PROJECT SCHEDULE ....................................................................... 4

A. SCOPE OF WORK DESIGN & CONSTRUCTION SCHEDULE ............................................... 4 B. CONSULTANT’S PROPOSED FEASIBILITY STUDY SCHEDULE ....................................... 4 C. APPROVED FEASIBILITY STUDY SCHEDULE ...................................................................... 5

IV. PROJECT SITE LOCATION & TEAM MEMBERS ...................... 6

A. PROJECT SITE ADDRESS ........................................................................................................... 6 B. PROJECT TEAM MEMBER DIRECTORY ................................................................................. 6

1. Agency Project Manager: ........................................................................................................... 6 2. Client Agency Representative: ................................................................................................... 6

V. PROJECT DEFINITION ..................................................................... 7

A. BACKGROUND ............................................................................................................................ 7 B. FUNCTIONAL DESCRIPTION OF THE SITE ............................................................................ 7

VI. CONSULTANT FEASIBILITY STUDY REQUIREMENTS ......... 7

A. PROPOSED SITE LAYOUT AND IMPROVEMENTS ............................................................... 7 1. Proposed Site Layout .................................................................................................................. 7 2. Site Improvements: ..................................................................................................................... 7

B. ANTICIPATED PROJECT COSTS AND ESTIMATES .............................................................. 8 1. Proposed Project Costs ............................................................................................................... 8 2. Professional Cost Estimator ........................................................................................................ 8

C. ANTICIPATED DESIGN AND CONSTRUCTION SCHEDULE ............................................... 8 D. PROJECT COMMENCEMENT .................................................................................................... 9

1. Project Directory: ........................................................................................................................ 9 2. Site Access: ................................................................................................................................. 9 3. Project Coordination: .................................................................................................................. 9 4. Existing Documentation: ............................................................................................................ 9 5. Scope of Work: ........................................................................................................................... 9 6. Project Schedule: ...................................................................................................................... 10

E. STUDY MEETINGS & PRESENTATIONS ............................................................................... 10 1. Study Meetings: ........................................................................................................................ 10

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 3

2. Study Presentations: .................................................................................................................. 10

VII. GENERAL REQUIREMENTS ......................................................... 11

A. SCOPE CHANGES ...................................................................................................................... 11

VIII. SUBMITTAL REQUIREMENTS ..................................................... 11

A. CONTRACT DELIVERABLES .................................................................................................. 11 B. PROJECT DOCUMENT BOOKLET .......................................................................................... 11

IX. SOW SIGNATURE APPROVAL SHEET ....................................... 12

X. CONTRACT DELIVERABLES ....................................................... 13

XIII. EXHIBITS ............................................................................................ 15

A. SAMPLE PROJECT SCHEDULE FORMAT B. PROJECT SITE LOCATION PLAN C. AERIAL VIEW OF SITE

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 4

I. OBJECTIVE

The objective of this project is to provide a feasibility study to identify all design factors and construction costs in order to create recreational fishing access on Drag Island, Somers Point, NJ.

II. CONSULTANT QUALIFICATIONS

A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS

The Consultant shall be a firm pre-qualified with the Division of Property Management & Construction (DPMC) in the following discipline(s):

• P005 Civil Engineering

The Consultant shall also have in-house capabilities or Sub-Consultants pre-qualified with, any and all other Architectural, Engineering and Specialty Disciplines necessary to complete the project as described in this Scope of Work (SOW).

III. PROJECT SCHEDULE

A. SCOPE OF WORK DESIGN & CONSTRUCTION SCHEDULE The following schedule identifies the estimated design and construction phases for this project and the estimated durations. PROJECT PHASE ESTIMATED DURATION (Calendar Days) 1. Preliminary Draft Feasibility Study 25% (Minimum) 25

• Project Team Review & Comment 14 2. Final Draft Feasibility Study 50% (Minimum) 50

• Project Team Review & Comment 14 3. Final Feasibility Study 100% 50

• Project Team Review & Approval 14

B. CONSULTANT’S PROPOSED FEASIBILITY STUDY SCHEDULE

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 5

The Consultant shall submit a bar chart schedule with their technical proposal that is similar in format and detail to the schedule depicted in Exhibit ‘A’. The bar chart schedule developed by the Consultant shall reflect their recommended project phases, phase activities, activity durations. A written narrative shall also be included with the technical proposal explaining the schedule submitted and the reasons why and how it can be completed in the time frame proposed by the Consultant. This schedule and narrative will be reviewed by the Consultant Selection Committee as part of the evaluation process and will be assigned a score commensurate with clarity and comprehensiveness of the submission.

C. APPROVED FEASIBILITY STUDY SCHEDULE The Consultant shall issue the approved Feasibility Study schedule at the first design kickoff meeting. This schedule will be binding for the Consultant’s activities and will include the start and completion dates for each activity. The Consultant and Project Team members shall use this schedule to ensure that all milestone dates are being met for the project. The Consultant shall update the schedule to reflect performance periodically (minimally at each study phase) for the Project Team review and approval. Any recommendations for deviations from the approved design schedule must be explained in detail as to the causes for the deviation(s) and impact to the overall project schedule.

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 6

IV. PROJECT SITE LOCATION & TEAM MEMBERS

A. PROJECT SITE ADDRESS The location of the project site is: Drag Island Somers Point, NJ 08244 GPS Coordinates: 39.300057, -74.617598 The island is located at the end of old route 9 in the area of the old Beasley’s Point Bridge. See Exhibit ‘B’ for the project location plan.

B. PROJECT TEAM MEMBER DIRECTORY

The following are the names, addresses, and phone numbers of the Project Team members. 1. Agency Project Manager: Name: Edward Mulvan, Project Manager Address: DEP, NHRG- Office of Resource Development 501 East State Street, 4th Floor Trenton, NJ 08625 Phone No: (609) 984-3819 E-Mail No: [email protected] 2. Client Agency Representative: Name: William White, Client Agency Representative Address: DEP, NHRG- Office of Resource Development 501 East State Street, 4th Floor Trenton, NJ 08625 Phone No: (609) 802-5886 E-Mail No: [email protected]

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 7

V. PROJECT DEFINITION

A. BACKGROUND The New Jersey Turnpike Authority is constructing a new bridge over Great Egg Harbor. The Old Beasley’s Point Bridge was demolished as part of this expansion project. The Agency is seeking this feasibility study to determine all design elements and construction costs associated with the construction of a parking area, pedestrian bridge and a fishing pier for recreational use of the island.

B. FUNCTIONAL DESCRIPTION OF THE SITE

Drag Island is a small land mass located between Somers Point and Beesley’s Point in Great Egg Harbor Bay. The island is approximately 67 acres and is mostly comprised of saltwater marshlands.

See Exhibit ‘C’ for an overhead view of the existing site.

VI. CONSULTANT FEASIBILITY STUDY REQUIREMENTS

A. PROPOSED SITE LAYOUT AND IMPROVEMENTS

1. Proposed Site Layout

The Consultant shall provide a proposed site layout identifying where the improvements can be located based on the information obtained from the site investigation and Agency interviews. The Consultant shall evaluate the existing roadway and make recommendations for its use. 2. Site Improvements:

The Consultant shall identify all site improvements required to achieve the proposed site layout including, but not limited to:

Parking Area:

The Consultant shall provide a conceptual layout for a parking area that shall accommodate twenty five (25) vehicles. Parking area lighting shall be solar powered.

Pedestrian Bridge:

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 8

The pedestrian bridge shall span the distance from the southern side of Somers Point to the northern side of Drag Island. The bridge shall be designed to accommodate small emergency vehicles. The Consultant shall assess the viability of reusing the old Route 9 support pilings. The pedestrian bridge shall have solar powered lighting. Fishing Pier: The fishing pier shall be constructed on the southernmost point on the island. The fishing pier shall have benches and solar lighting.

Consideration in the design and cost estimates shall allow for non-pollutant eco-friendly materials and minimal maintenance.

B. ANTICIPATED PROJECT COSTS AND ESTIMATES

1. Proposed Project Costs The Consultant shall determine the construction cost estimate (CCE) and current working estimate (CWE) for the site improvements described in the Feasibility Study. Project cost items shall include, but not limited to: site assessments, construction costs, consultant design and construction administration fees, testing costs, DPMC management fees, contingencies, permits, allowances, and escalation factors for the anticipated construction year of the site improvements. 2. Professional Cost Estimator The Consultant or Sub-Consultant providing the cost estimates must be pre-qualified with DPMC in the Estimating/Cost Analysis Specialty Discipline. All cost estimates shall be adjusted for regional location, site factors, construction phasing, security issues, and inflation factors based on the year in which the work is to be performed. All cost estimates must be submitted on a DPMC-38 Project Cost Analysis form for each improvement recommended with a detailed construction cost analysis in CSI format for all appropriate divisions and sub-divisions.

C. ANTICIPATED DESIGN AND CONSTRUCTION SCHEDULE

The Consultant shall submit a project design and construction bar chart schedule with their final feasibility study that is similar in format and detail to the schedule depicted in Exhibit ‘A’. The bar chart schedule developed by the Consultant shall reflect their recommended project phases, phase activities, activity durations.

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 9

D. PROJECT COMMENCEMENT A pre-design meeting shall be scheduled with the Consultant and the Project Team members at the commencement of the project to obtain and/or coordinate the following information: 1. Project Directory: Develop a project directory that identifies the name and phone number of key designated representatives who may be contacted during the phases of this project. 2. Site Access: Develop procedures to access the project site and provide the names and phone numbers of approved escorts when needed. Obtain copies of special security and policy procedures that must be followed during all work conducted at the site and include this information in the study. 3. Project Coordination: Review and become familiar with any current and/or future projects at the site that may impact the design, construction, and scheduling requirements of this project. Incorporate all appropriate information and coordination requirements in the study. 4. Existing Documentation: The State does not attest to the accuracy of the information provided and accepts no responsibility for the consequences of errors by the use of any information and material contained in the documentation provided. It shall be the responsibility of the Consultant to verify the contents and assume full responsibility for any determination or conclusion drawn from the material used. If the information provided is insufficient, the Consultant shall take the appropriate actions necessary to obtain the additional information required. All original documentation shall be returned to the provider at the completion of the project. 5. Scope of Work: Review the study responsibilities and the submission requirements identified in this Scope of Work with the Project Team members. Items such as: contract deliverables, special sequencing or phased construction requirements, special hours for construction based on Client Agency programs or building occupancy, security needs, delivery dates of critical and long lead items, utility interruptions or shut down constraints for tie-ins, weather restrictions, and coordination with other project construction activities at the site shall be addressed.

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 10

This information and all general administrative information, including a narrative summary of the work for this project, shall be included in the report. 6. Project Schedule: Review and update the project design and construction schedule with the Project Team members.

E. STUDY MEETINGS & PRESENTATIONS

1. Study Meetings: Conduct the appropriate number of review meetings with the Project Team members during each phase of the project so they may determine if the project meets their requirements, question any aspect of the contract deliverables, and make changes where appropriate. The Consultant shall describe the philosophy and process used in the development of the study criteria and the various alternatives considered to meet the project objectives. Selected studies, sketches, cost estimates, schedules, and other relevant information shall be presented to support the design solutions proposed. Special considerations shall also be addressed such as: Contractor site access limitations, utility shutdowns and switchover coordination, phased construction and schedule requirements, security restrictions, available swing space, material and equipment delivery dates, etc. It shall also be the responsibility of the Consultant to arrange and require all critical Sub-Consultants to be in attendance at the design review meetings. Record the minutes of each design meeting and distribute within seven (7) calendar days to all attendees and those persons specified to be on the distribution list by the Project Manager. 2. Study Presentations: The minimum number of design presentations required for each phase of this project is identified below for reference: Preliminary Draft Phase: One (1) oral presentation at phase completion. Final Draft Phase: One (1) oral presentation at phase completion. Final Report: One (1) oral presentation at phase completion.

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 11

VII.GENERAL REQUIREMENTS

A. SCOPE CHANGES The Consultant must request any changes to this Scope of Work in writing. An approved DPMC 9d Consultant Amendment Request form reflecting authorized scope changes must be received by the Consultant prior to undertaking any additional work. The DPMC 9d form must be approved and signed by the Director of DPMC and written authorization issued from the Project Manager prior to any work being performed by the Consultant. Any work performed without the executed DPMC 9d form is done at the Consultant’s own financial risk.

VIII.SUBMITTAL REQUIREMENTS

A. CONTRACT DELIVERABLES All submissions shall include the Contract Deliverables identified in Section X of this Scope of Work and described in the DPMC Procedures for Architects and Engineers Manual.

B. PROJECT DOCUMENT BOOKLET The Consultant shall submit all of the required Contract Deliverables to the Project Manager at the completion of each phase of the project. All reports, meeting minutes, plan review comments, project schedule, cost estimate in CSI format (2004 Edition), correspondence, calculations, and other appropriate items identified on the Submission Checklist form provided in the A/E Manual shall be presented in an 8½” x 11” bound “booklet” format.

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 13

X. CONTRACT DELIVERABLES PRELIMINARY DRAFT FEASIBILITY STUDY:

6.1 Project Schedule (Bar Chart Format) 6.2 Meetings & Minutes (Minutes within five (5) calendar days of meeting) 6.3 Correspondence

6.4 Submission Requirements 6.4.1 A/E Statement of Site Visit 6.4.3 Special Features Description 6.4.4 Site Evaluation 6.4.8 Identify Regulatory Agency Approvals 6.4.8.2 NJ Department of Community Affairs (a) UCC Permit for Building Construction 6.4.8.3 NJ Department of Environmental Protection (a) Coastal Development (CAFRA) (b) Waterfront Development (RIPARIAN) (c) Wetlands Development Permit (d) Dredge and Fill 6.4.10 Drawings: 6 sets Cover Sheet (See A/E Manual for format) Existing Site Plan Existing Site Utility Plan 6.4.12 Proposed Construction Cost Estimate in CSI Format & Cost Analysis 38 Form 6.4.13 Bar Chart of Proposed Design and Construction Schedule 6.4.14 Oral Presentation of Submission to Project Team 6.4.15 SOW Compliance Statement 6.4.16 This Submission Checklist (See A/E Manual, Figure 6.4.16 for format) 6.4.17 Deliverables Submission in Booklet Form: 7 sets 6.5 Approval 6.5.1 Respond to Submission Comments FINAL DRAFT FEASIBILITY STUDY: 7.1 Project Schedule (Update Bar Chart Schedule)

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 14

7.2 Meetings & Minutes (Minutes within five (5) calendar days of meeting) 7.3 Correspondence 7.4 Submission Requirements 7.4.1 A/E Statement of Site Visit 7.4.3 Special Features Description 7.4.4 Site Evaluation 7.4.8 Regulatory Agency Approvals (See Section 6.4.8 for listing) 7.4.10 Drawings: 6 sets Cover Sheet (See A/E Manual for format) Existing Site Plan Proposed Site Layout 7.4.12 Proposed Construction Cost Estimate in CSI Format & Cost Analysis 38 Form 7.4.13 Bar Chart of Proposed Design and Construction Schedule 7.4.14 Oral Presentation of Submission to Project Team 7.4.15 SOW Compliance Statement 7.4.16 This Submission Checklist (See A/E Manual, Figure 6.4.16 for format) 7.4.17 Deliverables Submission in Booklet Form: 7 sets 7.5 Approval 7.5.1 Respond to Submission Comments 7.6 Submission Forms Figure 7.4.12 Current Working Estimate/Cost Analysis Figure 7.4.16 Submission Checklist FINAL FEASIBILITY STUDY: 8.1 Schedule (Update Bar Chart Schedule) 8.2 Meeting & Minutes (Minutes within five (5) calendar days of meeting) 8.3 Correspondence 8.4 Submission Requirements 8.4.1 A/E Statement of Site Visit 8.4.3 Special Features Description

PROJECT NAME: Feasibility Study PROJECT LOCATION: Drag Island, Somers Point PROJECT NO: P1138-00 DATE: 5/13/16

PAGE 15

8.4.4 Site Evaluation 8.4.8 Regulatory Agency Approvals (Include itemized list specific to this project) 8.4.10 Drawings: 6 sets 8.4.12 Current Working Estimate in CSI Format & Cost Analysis 38 Form 8.4.13 Bar Chart of Design and Construction Schedule 8.4.14 Oral Presentation of this Submission to Project Team 8.4.15 Plan Review/SOW Compliance Statement 8.4.16 This Submission Checklist 8.4.17 Final Report Submission including: plans, findings, etc., in Booklet Form and Digitally on Compact Disc: 7 copies 8.5 Approvals 8.5.1 Respond to Submission Comments

XIII.EXHIBITS The attached exhibits in this section will include a sample project schedule, and any supporting documentation to assist the Consultant in the design of the project such as maps, drawings, photographs, floor plans, studies, reports, etc.

END OF SCOPE OF WORK

February 7, 1997Rev.: January 29, 2002

Responsible Group Code Table

The codes below are used in the schedule field “GRP” that identifies the group responsible for theactivity. The table consists of groups in the Division of Property Management & Construction(DPMC), as well as groups outside of the DPMC that have responsibility for specific activities ona project that could delay the project if not completed in the time specified. For reportingpurposes, the groups within the DPMC have been defined to the supervisory level ofmanagement (Le., third level of management, the level below the Associate Director) to identifythe “functional group” responsible for the activity.

CODE DESCRIPTION REPORTS TO ASSOCIATE DIRECTOR OF:

CM Contract Management Group Contract Management

CA Client Agency N/A

CSP Consultant Selection and Technical ServicesPrequalification Group

NE Architect/Engineer N/A

PR Plan Review Group Technical Services

CP Construction Procurement Planning & Administration

CON Construction Contractor N/A

FM Financial Management Group Planning & Administration

OEU Office of Energy and N/AUtility Management

PD Project Development Group Planning & Administration

EXHIBIT ‘A’

Page 1 of 4

Act

ivity

Ix

tesc

ar.p

ti.n

ii,,

ni

,,,,u.in,,,,,

i,a

it,i

pi.

agn.

;..itu.n

.ii

i.

iiii

,i

in.

mii

i...

..

ii.

Iq

uin

tnin

imi

IH

tiii

.,.u

i.p..

.ini

,nni,

nrn

ii,.in

.ni

ii

h Des

CV

3)l

Sche

dule

/Con

duct

Predesign/P

roject

Kic

kO

ffM

tgC

M

CV

3020

Prep

are

Program

Phas

eSu

bmitt

alA

E

CV

3021

Dis

trib

ute

Prog

ram

Subm

ittal

for

Rev

iew

CM

CV

3OZI

Prep

are

&Su

bmit

Prbj

ect

Cos

t Analy

sis

(DPM

C38

)C

M

CV

3022

Rev

iew

&A

pprove

Program

Subm

ittal

CA

CV

3023

Revie

w&

Approve

Program

Subm

ittal

PR

CVSO

24R

evie

w&

Approve

Program

Subm

ittal

CM

CV

3025

Con

solid

ate

&R

etur

nPr

ogra

mSu

bmitt

alC

omm

ents

CM

CV

3030

Prep

are

Sche

mat

icPh

ase

Subm

ittal

AE

CV

3031

Dis

trib

ute

Sche

mat

icSu

bmitt

alfo

rR

evie

wC

M

CV

3037

Prep

are

&Su

bmit

Proj

ect

Cos

tAna

lysi

s(D

PMC

38)

CM

CVSO

3ZR

evie

w&

App

rove

Sche

mat

icSu

bmitt

alC

A

CV

3033

Rev

iew

&A

ppro

veSc

hem

atic

Subm

ittal

PR

Rev

iew

&A

ppro

veSc

hem

atic

Subm

ittal

CM

CV

3035

Con

solid

ate

&R

etur

nSc

hem

atic

Subm

ittal

Com

men

tC

M

CV

3040

Pre

pare

Des

ignD

evel

opm

entP

hase

Sub

mit

tal

AE

CV3O

S1D

istr

ibut

eD

DSu

bmitt

alfo

rR

evie

wC

M

C’O

47Pr

epar

e&

Subm

itPr

ojec

tCos

t Ana

lysi

s(D

PMC

38)

CM

CV

3042

Rev

iew

&A

ppro

veD

esig

nD

evel

opm

ent S

ubm

ittal

CA

CV

3043

Rev

iew

&A

ppro

veD

esig

nD

evel

opm

ent S

ubm

ittal

PRC

’130

44R

evie

w&

App

rove

Des

ign

Dev

elop

men

tSu

bmitt

alC

MCV

SO45

Con

solj

date

&R

etum

DD

.Sub

mit

talC

omm

ents

CM

Prep

are

Fina

lD

esig

nPh

ase

Subm

ittal

AE

CV3O

SID

istr

ibut

eFi

nal

Des

ign

Subm

ittal

for

Rev

iew

CM

CV

3052

Rev

iew

&A

ppro

veFi

nal

Des

ign

Subm

ittal

CA

CV

3053

Rev

iew

&A

ppro

veFi

nal

Des

ign

Subm

ittal

PRC

V30

54R

evie

wFi

nal

Des

ign

Subm

itifo

rC

onst

ruct

abili

tyO

CS

:N

OT

E:

DB

cA.T

FS

TS

heti

of3

Ref

erto

sect

ion

“IV

Pro

ject

Sch

edul

e”of

the

Bur

eau

ofD

esig

n&

Con

stru

ctio

nS

ervi

ces

Sco

peof

Work

for

contr

act

phas

edu

rati

ons.

Rou

tine

Pro

ject

IX

h1b

it‘

iS0

Prl

mav

era

Sys

tem

s,In

c.

Page 2 of 4

Act

ivit

y.

II)

L)e

seri

pti

on

‘R

evie

w&

App

rove

Fina

lD

esig

nSu

bmitt

alC

M

‘3

0C

onso

lidat

e&

Ret

urn

Fina

lDes

ign

Com

men

tsC

M

Prep

are

&Su

bmit

Perm

itA

pplic

atio

nD

ocum

ents

AE

CV

3068

Prep

are

&Su

bmit

Bid

ding

Cos

tAna

lysi

s(D

PMC

38)

CM

Pla

nR

evie

w-P

ernz

ztA

cgw

stho

nC

V40

0iR

evie

wC

onst

rD

ocum

ents

&Se

cure

UC

CPe

rmit

PR

CV4O

1OPr

ovid

eFu

ndin

gfo

rC

onst

ruct

ion

Con

trac

tsC

A

CV

4020

Secu

reB

idC

lear

ance

CM

Adv

ertis

e-B

id-A

war

dC

V50

0IA

dver

tise

Proj

ect&

Bid

Con

stru

ctio

nC

ontr

acts

CP

CV5O

IOO

pen

Con

stru

ctio

nB

ids

CP

CVSO

II

Eva

luat

eB

ids

&Pr

epR

ecom

men

datio

nfo

rA

war

dC

M

CV

5Oi2

Eva

luat

eB

ids

&Pr

epR

ecom

men

datio

nfo

rA

war

dA

E

CV

5Oi4

Com

plet

eR

ecom

men

datio

nfo

rAw

ard

CP

CV

5020

Aw

ardC

onst

ruct

ionC

ontr

acts

/lss

ueN

TP

CP

:

Con

sfru

ctio

nC

’P

roje

ctC

onst

ruct

ion

Slar

tfls

sue

NT

PC

M

CV

6mi

Con

trac

tSta

rtlC

ontr

actW

ork

(25%

)C

ompl

ete

CO

N

CV

tOO

2Pr

econ

stru

cuon

Mee

ting

CM

CV

t()03

Beg

inPr

econ

stru

ctio

nSu

bmitt

als

CO

N

CVI5

004

Lon

gest

Lea

dPr

ocur

emen

tIte

mO

rder

edC

ON

CVtO

OS

Lea

dT

ime

for

Lon

gest

Lea

dPr

ocur

emen

tIt

emC

ON

Prep

are

&Su

bmit

Shop

Dra

win

gsC

ON

CV

6007

Com

plet

eC

onst

ruct

ion

Subm

ittal

sC

ON

CVSO

I IR

ough

ing

Wor

kSt

art

CO

N

CV

eoia

Perf

orm

Rou

ghin

gW

ork

CO

N

CVSO

IOC

ontr

actW

ork

(50%

+)C

ompl

ete

CO

N

CV

tOt3

Lon

gest

Lea

dPr

ocur

emen

tIte

mD

eliv

ered

CO

N

“°

Con

trac

tW

ork

(75%

)C

ompl

ete

CO

N

NO

TE

:D

BC

AT

ES

TSl

ieet

2or3

Ref

erto

sect

ion

“IV

Pro

ject

Sche

dule

”of

the

Bur

eau

ofD

esig

n&

Con

stru

ctio

nSe

rvic

esSc

ope

ofW

ork

for

cont

ract

phas

edu

rati

ons.

Rou

tine

Pro

ject

1xli

i I)i

t@

Pil

mav

era

Syst

ems,

Inc.

Page 3 of 4

Act

ivity

11)

-

t)es

crip

tion

si)r

.C

VO

14R

ough

ing

Wor

kC

ompl

ete

CO

N

CV

6021

Inte

rior

Fini

shes

Star

tC

ON

CV

)22

Inst

all

Inte

rior

Fini

shes

CO

N

CV

O3O

Con

trac

tWor

kto

Subs

tant

ialC

ompl

etio

nC

ON

(DV

O3l

Subs

tant

ialC

ompl

etio

nD

ecla

red

CM

CVC’

075

Com

plet

eD

efer

red

Punc

hL

ist)

Seas

onal

Act

iviti

esC

OI4

CV

6079

Proj

ectC

onst

ruct

ion

Com

plet

eC

M:

CV60

84)

Clo

seO

utC

onst

ruct

ion

Con

trac

tsC

M

CV

6O&

Con

stru

ctio

nC

ontr

acts

Com

plet

eC

M

CV6O

SOC

lose

Out

A/E

Con

trac

tC

M

CV

6092

Proj

ectC

ompl

etio

nD

ecla

red

CM

NO

TE

:D

BC

AT

ES

TS

hee

t3of3

Ref

erto

sect

ion

“IV

Pro

ject

Sche

dule

”of

the

Bure

auof

Des

ign

&C

onst

ruct

ion

Ser

vic

esSc

ope

ofW

ork

for

cont

ract

phas

edu

ratio

ns.

Routi

ne

Pro

ject

Ixli

i bit

©P

rim

aver

aS

yste

ms,

Inc.

Page 4 of 4

Project Location Plan

DPMC Project P1138-00

FEASIBILITY STUDY DRAG ISLAND

SOMERS POINT, NJ GPS COORDINATES: 39.300057, -74.617598

EXHIBIT ‘B’

Drag Island, Somers Point

Aerial View of Building

DPMC Project P1138-00

FEASIBILITY STUDY DRAG ISLAND

SOMERS POINT, NJ GPS COORDINATES: 39.300057, -74.617598

EXHIBIT ‘C’