9
Scope of Work - Single Family, Grant Ave, El Cajon , CA Project Introduction and Overview Spectacular renovation in southwest El Cajon. This 3 BR/ 2.5 BA 1,612 square foot house is located just off of the 8 highway with easy access to the 8 and the 125 freeways, shopping, parks and schools. Rehab Overview The home is outdated and needs new finishes throughout. We did custom tile work in kitchen and baths and updated lighting and added new flooring throughout and new paint on the interior and exterior. The renovation included converting the existing garage into a master suite including a bathroom and walk in closet and constructing a new 2 car garage. Contractor Overview Licensed contractors were used to complete all renovations. EXTERIOR: General: 1. Remove all debris in front and back yard 2. Remove shed in the back yard 3. Remove existing patio cover 4. Convert existing car port to two car garage and finish with T1-11 siding (provide bid for stucco)(See attached layout) 5. Install new roll up garage door and opener 6. Install wooden fence (Dog ears) to the left of new garage and seal with clear coat 7. Construct a new deck porch off of French doors going to back yard (cover existing concrete porch) 8. Remove existing wood deck in front yard 9. Paint entire house per color scheme

Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

Scope of Work - Single Family, Grant Ave, El Cajon , CA Project Introduction and Overview Spectacular renovation in southwest El Cajon. This 3 BR/ 2.5 BA 1,612 square foot house is located just off of the 8 highway with easy access to the 8 and the 125 freeways, shopping, parks and schools. Rehab Overview The home is outdated and needs new finishes throughout. We did custom tile work in kitchen and baths and updated lighting and added new flooring throughout and new paint on the interior and exterior. The renovation included converting the existing garage into a master suite including a bathroom and walk in closet and constructing a new 2 car garage. Contractor Overview Licensed contractors were used to complete all renovations. EXTERIOR: General: 1. Remove all debris in front and back yard 2. Remove shed in the back yard 3. Remove existing patio cover 4. Convert existing car port to two car garage and finish with T1-11 siding (provide bid for stucco)(See

attached layout) 5. Install new roll up garage door and opener 6. Install wooden fence (Dog ears) to the left of new garage and seal with clear coat 7. Construct a new deck porch off of French doors going to back yard (cover existing concrete porch) 8. Remove existing wood deck in front yard 9. Paint entire house per color scheme

Page 2: Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

Color Location Color Code Finish

Valspar/Lowes Stone Manor Exterior 6006-2A Flat

Extra White Exterior Trim and pergola 7006 Flat

Black Front Door

Extra White All ceilings 7006 Flat

Navajo White Bathrooms SW 6126 Semi Gloss

Navajo White Living/ Dining/ Halls, Laundry, Kitchen, Bedrooms

SW 6126 Flat

Extra White All Trim & Doors SW 7006 Semi Gloss

Roof: 1. Install new Architectural shingle roof over existing torch down roof (charcoal color) 2. Paint all vents black to match roof 3. Inspect all vents and make sure they are sealed properly 4. Install new torch down roof on new garage 5. Install Seamless rain gutters Landscape: 1. Remove all weeds in front and back house 2. Removal all debris in front and back yard 3. Remove tree in back yard (one behind new garage) 4. Remove tree in front yard (when standing in the street looking at the front of the house the one

on the left is to be removed) 5. Trim tree in the front of the house (when standing in the street looking at the front of the house

the one on the right is to be trimmed) 6. Install Sod in front and back yard 7. Install Irrigation System in front and back yard 8. Plant drought tolerant plants in planters and add wood chips 9. Install rocks to left of driveway (entire area) to create gravel driveway for RV parking

Page 3: Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

Windows: 1. Test all windows and make sure they operate properly 2. Make sure all windows and sliding glass doors have screens 3. Replace the window in the new master bedroom with smaller window to provide proper height from floor

to bottom of window (or keep existing and cut header to raise existing) INTERIOR: DEMO: 1. Remove all trash in house 2. Demo kitchen and remove all cabinets, countertops and backsplash 3. Demo bathroom toilet, vanity, and shower surround 4. Demo wall dividing kitchen and living room (see attached layout) 5. Demo interior of existing converted garage GENERAL: 1. Paint all interior doors 2. Change all door hinges and hardware with brush nickel 3. Sand and refinish existing hardwood floors 4. Install carpet in all bedrooms (contractor to supply samples for CT Homes to select) 5. Convert existing garage into master suite (see attached layout) 6. Construct new walk in close in new master suite (see attached layout) 7. Construct new master bath in new master suite (see attached layout) 8. Replace front door, supply new single handle door knob (brush nickel, paint per color scheme) 9. Supply three keys to CT Homes 10. Move laundry hook ups to new garage (see attached layout) 11. Drywall patch where needed

Page 4: Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

KITCHEN (See attached layout): 1. Install backsplash– Arizona Tile – WC-Wheatfield $10.50 per sheet 2. Install new stainless steel appliances Pacific Sales Stainless Steel Package

A. Frigidaire 26 Cu. Ft. Refrigerator Model: FFHS2612LS - $899.00 B. Frigidaire 1.6 Cu. Ft. Over-The-Range Microwave Model: FFMV164LS - $169.00 C. Frigidaire 24" Built-In Dishwasher Model: FFBD2407LS – $337.60 D. Frigidaire 30" Freestanding Gas Range Model: FFGF3047LS - $493.20

3. Install new faucet– Brushed nickel, single handle pull out 4. Install new countertops– Rainbow Stone “New Venetian Gold” Granite 5. Install new cabinets– Lowes unfinished cabinets and finish with cognac finish 6. Install recessed lights 7. Install new floor - Home Depot - #478-629 “Hacienda” 12x12 installed subway style 8. Paint as per color scheme.

Page 5: Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

HALL BATH: 1. New toilet–(elongated bowl) 2. Install new tub 3. New single handle chrome shower valve 4. Install new vanity 5. New Faucet (chrome) 6. New chrome bath accessories 7. New Wood Frame Vanity Mirror 8. Install Tile surround– Home Depot - #668-521, 6”x6” Almond - $1.89 sq/ft subway style - (tile to

ceiling) 9. Accent Tile –#686-181, Onyx Studio Glass Moasic 12”- $12.99/ea 10. Tile floor– Home Depot - #478-629 “Hacienda” 12x12 installed subway style MASTER BATH (See attached Layout): 1. New toilet– (elongated bowl) 2. Install new tub – (soaking tub) 3. Install Rain showerhead and regular shower head (chrome finish) 4. Install single handle three way shower diverter (chrome finish) 5. Install single handle shower valve (chrome finish) 6. Install new vanity 7. New chrome faucet 8. Construct niche cut out on wall adjacent to control wall (see CT Homes for Details) 9. Tile niche cut out - Arizona Tile – SL Cashew glossy 3”x6” install subway style 10. Accent Tile on control wall– Arizona Tile – SL Cashew glossy 3”x6” install subway style 11. Tile Shower surround and ceiling – Arizona Tile – Country Blend Travertine 18”x18” cut down to

9”x18” and install subway style 12. Install new wood frame vanity mirror 13. Tile wall where sink is from sink to ceiling not exceeding width of mirror– Arizona Tile – SL Cashew

glossy 3”x6” install subway style (make sure to have a clean edge) 14. Tile floor- Arizona Tile – Country Blend Travertine 18”x18” cut down to 9”x18” and install

subway style

Page 6: Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

BEDROOMS: 1. Install Slab Closet Doors (use hallow core doors and hang on track, install floor track and door

handles) 2. Lighting– Home Depot Hampton Bay 2- Light Flush mount With Opal Glass, #534-435,

$39.97/ea

PLUMBING: 1. Check all existing plumbing & repair/replace as needed, per code. 2. Remove water heater & replace with new one (install earthquake straps, pressure release valve,

exhaust vent, and block if needed) 3. Install pressure regulator 4. New angle stops on all water lines. 5. Install new laundry hook ups in garage along with drain and vent 6. Check gas lines & repair/replace as needed. 7. Check all drain lines & repair/replace as needed

ELECTRICAL: 1. Replace all outlets & switches. 2. Check all wiring & replace where needed, per code. 3. Install recessed lighting in kitchen. 4. Install smoke and carbon monoxide detectors per code. HVAC 1. Install new double sided wall heater where existing one is GARAGE: 1. Install new roll up garage door 2. Install Garage door opener 3. Paint interior of garage (walls and ceiling) white (dust white, ask Craig for details)

Page 7: Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

BEDROOMS: 1. Install Slab Closet Doors (use hallow core doors and hang on track, install floor track and door

handles) 2. Lighting– Home Depot Hampton Bay 2- Light Flush mount With Opal Glass, #534-435,

$39.97/ea

PLUMBING: 1. Check all existing plumbing & repair/replace as needed, per code. 2. Remove water heater & replace with new one (install earthquake straps, pressure release valve,

exhaust vent, and block if needed) 3. Install pressure regulator 4. New angle stops on all water lines. 5. Install new laundry hook ups in garage along with drain and vent 6. Check gas lines & repair/replace as needed. 7. Check all drain lines & repair/replace as needed

ELECTRICAL: 1. Replace all outlets & switches. 2. Check all wiring & replace where needed, per code. 3. Install recessed lighting in kitchen. 4. Install smoke and carbon monoxide detectors per code. HVAC 1. Install new double sided wall heater where existing one is GARAGE: 1. Install new roll up garage door 2. Install Garage door opener 3. Paint interior of garage (walls and ceiling) white (dust white, ask Craig for details)

Completion of Final Punch List

General Contracting Work - $35,300.00 All framing, counters, cabinets, paint and patch. Fixtures, backsplash, windows and doors. Appliances- $1,800.00 Stainless Steel Refrigerator, Free Standing Range, Hood and Over The Range Microwave, Dishwasher. Electrical - $2,700.00 Install new fixtures; add recessed lighting, replace outlets and switches, panel upgrade Plumbing - $4,500.00 Install new toilets, facets, shower valves, kitchen sink, garbage disposal, dishwasher, Add tub and shower Flooring - $5,000.00 Install new carpet, hardwood and tile Landscaping - $2,200.00 HVAC- $1,000.00 Staging (2 month minimum contract)- $2,500.00 Misc. and Permits - $3,000.00

TOTAL - $64,000.00

Page 8: Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

BE

DR

OO

M 1

BE

DR

OO

M 2

LIVIN

G R

OO

MH

ALL

EN

TRY

BA

TH 1

KITC

HE

ND

ININ

G

GR

EA

T RO

OM

CA

R P

OR

T

Before Layout

Page 9: Scope of Work - Single Family, Grant Ave, El Cajon , CAs3.amazonaws.com/Fortunebuilders/ScopeOfWorks/Grant-SOW-Pics.… · Scope of Work - Single Family, Grant Ave, El Cajon , CA

LIVIN

G R

OO

MH

ALL

EN

TRY

KITC

HE

ND

ININ

G

2 CA

R G

AR

AG

E

MA

STE

RB

ED

RO

OM

MS

TR.

BA

TH

CLS

T.

BE

DR

OO

M 2

BE

DR

OO

M 3

BA

TH 2

After Layout