SEIU BARGAINING UNITS 1, 3, 4, 11, 14, 15, 17, 20 and 21
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.1
8 hours Holiday Credit.2
Total of 20 hours for the day:
Compensation at one and one-half (1.5) times for
each hour worked.3
8 hours Holiday Credit.4
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as either Holiday Credit or straight
pay.5
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 12 hours for the day:
Key an additional 8 hours of Holiday Credit or straight pay; and
Key 8 hours of half-time pay.6
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.7
8 hours Holiday Pay.8
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – Holiday Pay is included in regular pay warrant.
*Regular Day Off (RDO)
1 Art. 7.1.G of the 2016-20 MOU.
2 Art. 7.1.G.
3 Art. 7.1.G.
4 Art. 7.1.G.
5 Method of holiday compensation is at the state’s discretion. (Art. 7.1.G.)
6 Method of holiday compensation is at the state’s discretion. (Art. 7.1.G.)
7 Art. 7.1.F.
8 Art. 7.1.A .
SEIU BARGAINING UNITS 1, 3, 4, 11, 14, 15, 17, 20 and 21
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG E/SE full-time employee who is required to work and works 8 hours on the holiday receives:
8 hours at the regular
rate of pay.9
8 hours Holiday Credit for the holiday.10
8 hours Holiday Credit for
the holiday.11
4 hours Informal Time Off for the holiday.12
Personnel Specialist Keying Examples:
WWG E/SE employees are paid a salary that is full compensation for all hours worked.
In most cases, 8 hours of pay are included in the pay warrant as salary. To key an additional 8 hours for the day:
Key 8 hours as Holiday
Credit.
To key an additional 12 hours for the day:
Key 8 hours as Holiday
Credit; and
Key 4 hours Informal Time Off.
Holiday falls on RDO Holiday falls on non-RDO
A WWG E/SE full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.13
8 hours Holiday Pay.14
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
9
Art. 7.1.I. 10
Art. 7.1.I. 11
Art. 7.1.H. 12
Art. 7.1.H. 13
Art. 7.1.F. 14
Art. 7.1.A.
BARGAINING UNIT 2
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.15
8 hours Holiday Credit.16
Total of 20 hours for the day:
Compensation at one and one-half (1.5) times for
each hour worked.17
8 hours Holiday Credit.18
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as either Holiday Credit or straight
pay.19
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 12 hours for the day:
Key 8 hours of Holiday Credit or straight pay; and
Key 8 hours of half-time pay.20
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.21
8 hours Holiday Pay.22
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
15 Art. 8.1.G of the 2016-19 MOU.
16 Art. 8.1.G; Gov. Code § 19853(c).
17 Art. 8.1.G.
18 Art. 8.1.G; Gov. Code § 19853(c).
19 Method of holiday compensation is at the state’s discretion. (Art. 8.1.G.)
20 Method of holiday compensation is at the state’s discretion. (Art. 8.1.G.)
21 Art. 8.1.F.
22 Art. 8.1.A.
BARGAINING UNIT 2
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG E/SE full-time employee who is required to work and works 8 hours on the holiday receives:
8 hours Holiday Credit.23 8 hours Holiday Credit.24
4 hours Informal Time Off.25
Personnel Specialist Keying Examples:
WWG E/SE employees are paid a salary that is full compensation for all hours worked.
To key an additional 8 hours for the day:
Key 8 hours as Holiday Credit.
To key an additional 12 hours for the day:
Key 8 hours as Holiday Credit ; and
Key 4 hours Informal Time Off.
Holiday falls on RDO Holiday falls on non-RDO
A WWG E/SE full-time employee who does not work on the holiday receives:
8 hours Holiday Credit.26 8 hours Holiday Pay.27
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday
Credit.
No additional keying – holiday pay is included in regular pay warrant.
23 Art. 6.2.B and Art. 6.2.C; Art. 8.1.I.
24 Art. 6.2.B and Art. 6.2.C; Art. 8.1.I.
25 Art. 8.1.I.
26 Art. 8.1.F; Art. 8.1.I.
27 Art. 6.2.B and Art 6.2.C; Art. 8.1.A.
BARGAINING UNIT 7
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.28
8 hours Holiday Credit.29
Total of 20 hours for the day:
Compensation at one and one-half (1.5) times for
each hour worked.30
8 hours Holiday Credit.31
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as either Holiday Credit or straight
pay.32
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 12 hours for the day:
Key an additional 8 hours of Holiday Credit or straight pay; and
Key 8 hours of half-time pay.33
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.34
8 hours Holiday Pay.35
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday
Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
28 Art. 8.1.J of the 2016-19 MOU.
29 Art. 8.1.J.
30 Art. 8.1.K.
31 Art. 8.1.K.
32 Method of holiday compensation is at the state’s discretion. (Art. 8.1.J.)
33 Method of holiday compensation is at the state’s discretion. (Art.8.1.K.)
34 Art. 8.1.J; 8.1.K.
35 Art. 8.1.A .
BARGAINING UNIT 7
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG E/SE full-time employee who is required to work and works 8 hours on the holiday receives:
Up to 8 hours Holiday
Credit for the holiday.36
Up to 8 hours Holiday
Credit for the holiday.37
Personnel Specialist Keying Examples:
WWG E/SE employees are paid a salary that is full compensation for all hours worked.
To key an additional 8 hours for the day:
Key 8 hours as Holiday
Credit.
To key an additional 8 hours for the day:
Key 8 hours as Holiday
Credit.
Holiday falls on RDO Holiday falls on non-RDO
A WWG E/SE full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday. 38
8 hours Holiday Pay.39
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
36 Art. 8.1.O.
37 Art. 8.1.O.
38 Derived from Art. 8.1.J and Art. 8.1.K. Additionally, Art. 8.1.G provides for 8 hours holiday credit for holidays
that fall on Saturday. 39
Art. 8.1.A.
BARGAINING UNIT 9
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.40
8 hours Holiday Credit.41
Total of 20 hours for the day:
Compensation at one and one-half (1.5) times for
each hour worked.42
8 hours Holiday Credit.43
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as either Holiday Credit or straight
pay.44
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 12 hours for the day:
Key an additional 8 hours of Holiday Credit or straight pay; and
Key 8 hours of half-time pay.45
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.46
8 hours Holiday Pay.47
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
40 Art. 9.1.G of the 2015-18 MOU.
41 Art. 9.1.G; Gov. Code § 19853(c).
42 Art. 9.1.G of the 2015-18 MOU.
43 Art. 9.1.G; Gov. Code § 19853(c).
44 Method of holiday compensation is at the state’s discretion. (Art. 9.1.G.)
45 Method of holiday compensation is at the state’s discretion. (Art.9.1.G.)
46 Art. 9.1.F.
47 Art. 9.1.A.
BARGAINING UNIT 9
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG E/SE full-time employee who is required to work and works 8 hours on the holiday receives:
Up to 8 hours Holiday
Credit for the holiday.48
4 hours Informal Time Off (if holiday falls on
RDO).49
Up to 8 hours Holiday
Credit for the holiday.50
4 hours Informal Time Off (if holiday falls on
RDO).51
Personnel Specialist Keying Examples:
WWG E/SE employees are paid a salary that is full compensation for all hours worked.
To key additional hours for the day:
Key 8 hours as Holiday Credit; and
Key 4 hours Informal Time Off (if holiday falls on RDO).
To key additional hours for the day:
Key 8 hours as Holiday Credit; and
Key 4 hours Informal Time Off (if holiday falls on RDO).
Holiday falls on RDO Holiday falls on non-RDO
A WWG E/SE full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday. 52
8 hours Holiday Pay.53
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday
Credit.
No additional keying – holiday pay is included in regular pay warrant.
48
Art. 9.1.I; Art. 8.2.b.2. 49
Art. 9.1.I; 4 hours of ITO for working on a holiday only apply when holiday falls on an RDO. 50
Art. 9.1.I; Art. 8.2.b.. 51
Art. 9.1.I; 4 hours of ITO for working on a holiday only apply when holiday falls on an RDO. 52
Art. 9.1.I; Art. 9.1.F. 53
Art. 9.1.A.
BARGAINING UNIT 10
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.54
8 hours Holiday Credit.55
Total of 20 hours for the day:
Compensation at one and one-half (1.5) times for
each hour worked.56
8 hours Holiday Credit.57
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as either Holiday Credit or straight
pay.58
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 12 hours for the day:
Key an additional 8 hours of Holiday Credit or straight pay; and
Key 8 hours of half-time pay.59
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.60
8 hours Holiday Pay.61
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
54 Art. 4.1.G of the 2015-18 MOU.
55 Art. 4.1.G; Gov. Code § 19853(c).
56 Art. 4.1.G.
57 Art. 4.1.G; Gov. Code § 19853(c).
58 Method of holiday compensation is at the state’s discretion. (Art. 4.1.G.)
59 Method of holiday compensation is at the state’s discretion. (Art.4.1.G.)
60 Art. 4.1.F.
61 Art. 4.1.A .
BARGAINING UNIT 10
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG E/SE full-time employee who is required to work and works 8 hours on the holiday receives:
Up to 8 hours Holiday
Credit for the holiday.62
1 hour of Administrative Time Off for every 2 hours worked (if holiday
falls on RDO).63
Up to 8 hours Holiday
Credit for the holiday.64
1 hour of Administrative Time Off for every 2 hours worked (if holiday
falls on RDO).65
Personnel Specialist Keying Examples:
WWG E/SE employees are paid a salary that is full compensation for all hours worked.
To key additional hours for the day:
Key 8 hours as Holiday Credit; and
Key 4 hours Informal Time Off (if holiday falls on RDO).
To key additional hours for the day:
Key 8 hours as Holiday Credit; and
Key 4 hours Informal Time Off (if holiday falls on RDO).
Holiday falls on RDO Holiday falls on non-RDO
A WWG E/SE full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday. 66
8 hours Holiday Pay.67
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
62 Art. 4.1.I.
63 Art. 4.1.I; ATO for working on a holiday only applies when holiday falls on an RDO.
64 Art. 4.1.I.
65 Art. 4.1.I; ATO for working on a holiday only applies when holiday falls on an RDO.
66 Art. 4.1.I; Art. 4.1.F.
67 Art. 4.1.A.
BARGAINING UNIT 12
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.68
8 hours Holiday Credit.69
Total of 20 hours for the day:
Compensation at one and one-half (1.5) times for
each hour worked.70
8 hours Holiday Credit.71
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as Holiday Credit.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 12 hours for the day:
Key an additional 8 hours of Holiday Credit; and
Key 8 hours of half-time pay.
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.72
8 hours Holiday Pay.73
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday
Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
68 Art. 9.L of the 2015-20 MOU.
69 Art. 9.L; Gov. Code § 19853(c).
70 Art. 9.L.
71 Art. 9.L; Gov. Code § 19853(c).
72 Art. 9.G.
73 Art. 9.F.
BARGAINING UNIT 12
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
Bargaining Unit 12 has no WWG E/SE employees.
N/A
N/A
* Holiday provisions for the Department of Water Resources are governed by Article 8.5 of the Bargaining Unit 12 MOU.
BARGAINING UNIT 13
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.74
8 hours Holiday Credit.75
Total of 20 hours for the day:
Compensation at one and one-half (1.5) times for
each hour worked.76
8 hours Holiday Credit.77
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as Holiday
Credit or straight pay.78
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 12 hours for the day:
Key an additional 8 hours of Holiday Credit or straight pay; and
Key 8 hours of half-time pay.79
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.80
8 hours Holiday Pay.81
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
74 Art. 8.1.K of the 2016-19 MOU.
75 Art. 8.1.K; Gov. Code § 19853(c).
76 Art. 8.1.K.
77 Art. 8.1.K; Gov. Code § 19853(c).
78 Method of holiday compensation is at the state’s discretion. (Art. 8.1.K.)
79 Method of holiday compensation is at the state’s discretion. (Art. 8.1.K.)
80 Art. 8.1.G.
81 Art. 8.1.F.
BARGAINING UNIT 13
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
Bargaining Unit 13 has no WWG E/SE employees.
N/A
N/A
BARGAINING UNIT 16
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
Bargaining Unit 16 has no WWG 2 employees.
N/A
N/A
BARGAINING UNIT 16
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG E/SE full-time employee who is required to work and works 8 hours on the holiday receives:
Up to 8 hours Holiday
Credit for the holiday.82
Up to 8 hours Holiday
Credit for the holiday.83
1 hour of Administrative Time Off for every 2
hours worked.84
Personnel Specialist Keying Examples:
WWG E/SE employees are paid a salary that is full compensation for all hours worked.
To key an additional 8 hours for the day:
Key 8 hours as Holiday
Credit.
To key additional hours for the day:
Key 8 hours as Holiday
Credit; and
Key 1 hour of Administrative Time Off for every 2 hours worked.
Holiday falls on RDO* Holiday falls on non-RDO
A WWG E/SE full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday. 85
8 hours Holiday Pay.86
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
Note: According to Article 8.1.I of the MOU, an employee who is working an On-Call/Call Back Assignment on a holiday should be compensated in accordance with Attachment C of the BU 16 MOU.
According to Article 8.1.H, employees working on a holiday pursuant to Article 7, Section 7.8 (Assignment and Payment of Medical Officer of the Day) will be compensated according to that section.
82
Gov. Code § 19853(c). 83
Art. 8.1.G of the BU 16 2016-20 MOU; Gov. Code § 19853(c) 84
Art. 8.1.G. 85
Art. 8.1.F. 86
Art. 8.1.A.
BARGAINING UNIT 18
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.87
8 hours Holiday Credit.88
Total of 20 hours for the day:
Compensation at one and one-half (1.5) times for
each hour worked.89
8 hours Holiday Credit.90
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as Holiday
Credit or straight pay.91
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 12 hours for the day:
Key an additional 8 hours of Holiday Credit or straight pay; and
Key 8 hours of half-time pay.92
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.93
8 hours Holiday Pay.94
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
87 Art. 6.1.D of the BU 18 2016-19 MOU.
88 Art. 6.1.D.
89 Art. 6.1.D.
90 Art. 6.1.D.
91 Method of holiday compensation is at the state’s discretion. (Art. 6.1.D.)
92 Method of holiday compensation is at the state’s discretion. (Art. 6.1.D.)
93 Art. 6.1.E.
94 Art. 6.1.A.
BARGAINING UNIT 18
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
Bargaining Unit 18 has no WWG E/SE employees.
N/A
N/A
BARGAINING UNIT 19
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.95
8 hours Holiday Credit.96
Total of 20 hours for the day:
Compensation at one and one-half (1.5) times for
each hour worked.97
8 hours Holiday Credit.98
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as Holiday
Credit or straight pay.99
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 12 hours for the day:
Key an additional 8 hours of Holiday Credit or straight pay; and
Key 8 hours of half-time pay.100
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
Up to 8 hours Holiday
Credit for the holiday.101
8 hours Holiday Pay.102
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
95 Gov. Code § 19853(c).
96 Gov. Code § 19853(c).
97 Art. 8.1.G of the 2016-20 BU 19 MOU.
98 Art. 8.1.G.
99 The state’s discretion to determine form of holiday compensation is inferred from Art. 8.1.G.
100 Method of holiday compensation is at the state’s discretion. (Art. 8.1.G.)
101 Art. 8.1.F.
102 Art. 8.1.A.
BARGAINING UNIT 19
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG E/SE full-time employee who is required to work and works 8 hours on the holiday receives:
Up to 8 hours Holiday
Credit for the holiday.103
8 hours Holiday Credit for
the holiday.104
4 hours of Informal Time Off.105
Personnel Specialist Keying Examples:
WWG E/SE employees are paid a salary that is full compensation for all hours worked.
To key an additional 8 hours for the day:
Key 8 hours as Holiday Credit.
To key an additional 12 hours for the day:
Key 8 hours as Holiday Credit; and
Key 4 hours of Informal Time Off.
Holiday falls on RDO Holiday falls on non-RDO
A WWG E/SE full-time employee who does not work on the holiday receives:
Up to 8 hours Holiday
Credit for the holiday. 106
8 hours Holiday Pay.107
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday
Credit.
No additional keying – holiday pay is included in regular pay warrant.
103 Gov. Code § 19853(c).
104 Art. 8.1.H.
105 Art. 8.1.H.
106 Art. 8.1.F.
107 Art. 8.1.A.
EXCLUDED EMPLOYEES
WWG 2 EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG 2 full-time employee who is required to work and works 8 hours on the holiday receives:
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.108
8 hours Holiday Credit.109
Total of 16 hours for the day:
Compensation at straight time rate for each hour
worked.110
8 hours Holiday Credit.111
Personnel Specialist Keying Examples:
Departments must ensure that total hours earned for the day include any hours already included in the regular pay warrant for the holiday.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as Holiday Credit.
In most cases, 8 hours of pay are included in the pay warrant. To key an additional 8 hours for the day:
Key 8 hours as Holiday Credit.
Holiday falls on RDO* Holiday falls on non-RDO
A WWG 2 full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday.112
8 hours Holiday Pay.113
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday
Credit.
No additional keying – holiday pay is included in regular pay warrant.
*Regular Day Off (RDO)
108
Gov. Code § 19853(c). 109
Gov. Code § 19853(c). 110
Gov. Code § 19853(c). 111
Gov. Code § 19853(c). 112
CalHR infers from the general language of Gov. Code § 19853 that when a holiday falls on the RDO, employees receive the benefit of the holiday in the form of Holiday Credit. 113
Gov. Code § 19853(a).
EXCLUDED EMPLOYEES
WWG E/SE EMPLOYEE:
REGULAR HOLIDAY PREMIUM HOLIDAY
A WWG E/SE full-time employee who is required to work and works 8 hours on the holiday receives:
Up to 8 hours Holiday
Credit for the holiday.114
8 hours Holiday Credit for
the holiday.115
Personnel Specialist Keying Examples:
WWG E/SE employees are paid a salary that is full compensation for all hours worked.
To key an additional 8 hours for the day:
Key 8 hours as Holiday
Credit.
To key an additional 8 hours for the day:
Key 8 hours as Holiday
Credit.
Holiday falls on RDO Holiday falls on non-RDO
A WWG E/SE full-time employee who does not work on the holiday receives:
8 hours Holiday Credit for
the holiday. 116
8 hours Holiday Pay.117
Personnel Specialist Keying Examples:
To key an additional 8 hours:
Key 8 hours as Holiday Credit.
No additional keying – holiday pay is included in regular pay warrant.
114 Gov. Code § 19853(c).
115 Gov. Code § 19853(c).
116 CalHR infers from the general language of Gov. Code § 19853 that when a holiday falls on the RDO, employees
receive the benefit of the holiday in the form of Holiday Credit. 117
Gov. Code § 19853(a).