Maintaining a Balance Life:Nurturing Growth, Fostering Prosperity, Preserving Nature
KesiapanKesiapan SektorSektor SwastaSwastaMenanggapiMenanggapi RencanaRencana PemerintahPemerintah
MendirikanMendirikan PLTN PLTN didi Indonesia: Indonesia: IndustriIndustri NuklirNuklir NasionalNasional..
SEMINAR TEKNOLOGI NUKLIR DAN APLIKASINYA BAGI KESEJAHTERAAN MANUSEMINAR TEKNOLOGI NUKLIR DAN APLIKASINYA BAGI KESEJAHTERAAN MANUSIASIATeknikTeknik NuklirNuklir JurusanJurusan TeknikTeknik FisikaFisika FT UGM FT UGM –– SekolahSekolah TinggiTinggi TeknologiTeknologi NuklirNuklir
YogyakartaYogyakarta, 11 , 11 AgustusAgustus 2009 2009
MEDCOENERGIPOWER
Page 2
MEDCOENERGIPOWER
PT Medco Power IndonesiaPT Medco Power Indonesia
Business StructureBusiness Structure
RenewableGeothermalBiomassWindfarm
Thermal
Gas Fired PPCoal Fired PPNuclear
SarullaGeothermal
SarullaGeothermal
SingaporeBiomass
BaliWind farmNew
SingaporeBiomass
Alternative
MEB
NPPs
Small scale PP
DEB Sengkang New
Batam TJB
Gas FiredCoal FiredOther (Geothermal) Spare
parts
O&M
MPI’s core business remains as a power project developer with aggressive expansion in renewable and alternative energies as well as project infrastructure.
The EnergyNavigatNew
Project Management
New
Page 3
MEDCOENERGIPOWER
NATIONAL ENERGY MIX TARGET 2025
Presidential Regulation No.5 Year 2006Presidential Regulation No.5 Year 2006National Energy Blueprint National Energy Blueprint -- DESDMDESDM
15% Non-Fossil
Oil54,4%
Gas26,5%
Coal14,1%
Hydro3,4%Geothermal
1,4%Other Renew.0,2%
5% Non-Fossil
MiniHydro 0.2%
Biofuels 5%
Solar 0.2%
Wind 0.05%Fuel cell 0.00%Biomass 0.5%
Nuclear 2%
Hydro >2%
Others >8%
Geothermal >5%
Coal >35%(Incl. 2% Coal Liq.)
Oil <20%Gas>30%
++ 2 times2 timesmoremore
Primary Energy Projection 2025Primary Energy Projection 2025
Energy Condition 2003
Page 4
MEDCOENERGIPOWER
Electricity Projection for Electricity Projection for JawaJawa--Bali GridBali Grid
0102030405060708090
100
2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026
GW
PLTU-BB PLTGU-G/M PLTG-G/M PLTD PLTN PLTA/MH PLTP PLTU-M/G
Jawa-Bali Island – Big Energy Importer !!Lebih dari 90% jumlah energi didatangkan dari luar Jawa.
20 Unit460 or./km2200749 JutaKorea55 Unit340 or./km22007128 JutaJepang
4 unit ??1010 or./km22025170 JutaJawa-BaliJumlah PLTNKepadatanThPendudukPerbandingan
(Studi PLN 2007)
Page 5
MEDCOENERGIPOWER
NPP Program Revised in IndonesiaNPP Program Revised in Indonesia
20102005 20202015 2025Years
Go Nuclear
2009
Energy Planning
Banten-2
2024
NPP
Banten-1
2023
NPP
Muria-1
2019
NPP
Muria-2
2020
NPP
Bidding Construction
2011 2013
Site Permit
Construction Permit
Commissioning Permit
Environmental Permit
Operation Permit
Operation Operation
Bid Invitation Spesification (BIS)
Site Evaluation Report (SER)
Preliminary Safety Analysis Report (PSAR) Environmental
Analysis Document
Plan of Commissioning
Document
Plan of Operation Document
National Team
Presidential Decree
Banten = Another possibility NPP site
Page 6
MEDCOENERGIPOWER
BAGANBAGANPERSETUJUAN PEMBANGUNAN LISTRIK SWASTAPERSETUJUAN PEMBANGUNAN LISTRIK SWASTA
MENTERI
MENTERI BUMN/RUPS PT PLN
(Pemilik Perusahaan)
PT PLN (Persero)(Pemegang Kuasa
Usaha Ketenagalistrikan)
DJLPEa/n. Menteri
IMPLEMENTASI
DEPARTEMEN ESDM(Regulator Listrik)
MAKRORegulasiSektor
MIKRORegulasiKorporasi
1 2
7
3 4
8 8
IPP
5 6
1 Permohonan Izin Usaha Ketenagalistrikan untuk Umum (IUKU) d/h Surat Persetujuan Pendahuluan(SPP)IUKU SementaraPermohonan persetujuan Harga JualTenaga ListrikPenetapan Harga Jual Tenaga ListrikPermohonan persetujuan PPAPersetujuan PPA
Draft PPAPPA
23
45678
KETERANGAN:
(PT. PLN Persero)
Page 7
MEDCOENERGIPOWER
NPP Organization: ConsortiumNPP Organization: Consortium
ConsortiumCompany (IPP)
EPC Contractor
Transmition /Distribution
PPA
IndonesianGovernment
kWh Revenue
PT. PLN
Project Support
Manufacture
Govt. Institution/National Team
National Private
Company
PurchaseAgreement
ContractAgreement
10% Equity
National/International FINANCING
20-30% Equity
60-70
% L
oan/
Inve
stmen
t
Pre-Project
Project Excecution
MEDCOMEDCO&Others&Others
BATAN BATAN LeaderLeader
DESDM DESDM LeaderLeader
Guarantee
BAPETENBAPEDAL
Regulationand Permit
Page 8
MEDCOENERGIPOWER
Possibilities of NPP Financing in IndonesiaPossibilities of NPP Financing in Indonesia
Ownership by private company (IPP) with finance composition(International investment vary between 49-70% and national invesment vary between 30-51%):
1. Government through PT. PLN Persero about 10-15%2. National private investment about 20-36% (G to B to B) or (B to B) 3. Foreign private investment about 49-70%.
Ownership by public company with finance composition(government responsibility 51% minimum and commercial loan 49% maximum):
1. Government through PT. PLN Persero about 15-20% 2. Government loan about 36-80% (G to G) 3. Commercial loan (local/international) 49% max. (B to B).
IPP Financing IPP Financing -- ConsortiumConsortium
Page 9
MEDCOENERGIPOWER
Economy of NPPEconomy of NPP
Levelized Generation Cost ¢US$ /kWh 3,7831
Capital Cost ¢US$ /kWh 2,5113
O&M Cost ¢US$ /kWh 0,8283
Fuel Cost ¢US$ /kWh 0,4435
Romania actual case in 2007:2x720 MWe NPP Project using IPP scheme (CANDU-700 Cervamoda unit 3 dan unit 4). Total invesment needed about EUR 2,2 milyard. Resulted lower generation cost about 2.8-3.2 centsEUR/kWh.
Influence of oil price increasing in 2008:Akan mempengaruhi kenaikan biaya material dan konstruksi PLTN. Sehingga diperkirakan generation cost untuk nuklir akan menjadi sekitar 5-6 cent US$/kWh. Masih bernilai ekonomis untuk harga jual listrik sekitar tahun 2018.
Page 10
MEDCOENERGIPOWER
Public Ownership in Nuclear Power IndustryPublic Ownership in Nuclear Power IndustryInternational FactInternational Fact
Andrew D. Paterson, Deloitte Energy & Resources Practice
Page 11
MEDCOENERGIPOWER
Public Public –– Private RiskPrivate Risk--Sharing ModelSharing Model
First few nuclear reactors can be built through risk-sharing mechanisms between the public and private sectors. Risks vary by phase of development, construction and operation. Industry and government bring different risk-bearing approaches to the common goals of building first units.
ProjectDevelopment
Design &Construction
Commis-sioning
Operations /D & D
0% 20% 40% 60% 80% 100%
ProjectDevelopment
Design &Construction
Commissioning
Operations /D&D
Ris
k Sh
ared
Government Industry
Andrew D. Paterson, Deloitte Energy & Resources Practice
Government participation
Page 12
MEDCOENERGIPOWER
PemerintahPemerintah: : -- PengaturanPengaturan regulasiregulasi dandan menyiapkanmenyiapkan infrastrukturinfrastruktur-- PemberianPemberian fasilitasfasilitas dandan insentifinsentif-- SebagaiSebagai pionirpionir dandan ikutikut menanggungmenanggung resikoresiko..
SwastaSwasta::-- PengembanganPengembangan industriindustri secarasecara masalmasal / / investasiinvestasi-- PeningkatanPeningkatan dandan mengembangkanmengembangkan ekonomiekonomi-- SebagaiSebagai penyerappenyerap tenagatenaga kerjakerja..
PeranPeran PemerintahPemerintah & & IndustriIndustri SwastaSwasta
Page 13
MEDCOENERGIPOWER
KebutuhanKebutuhan SDM SDM NuklirNuklirMasaMasa PembangunanPembangunan dandan OperasiOperasi PLTNPLTN
Page 14
MEDCOENERGIPOWER
ROADMAP OF NUCLEAR ENERGY INDUSTRYROADMAP OF NUCLEAR ENERGY INDUSTRY((BukuBuku PutihPutih RistekRistek))
Page 15
MEDCOENERGIPOWER
Nuclear Power Development ProcessNuclear Power Development Process
Page 16
MEDCOENERGIPOWER
CondensorCondensor for Oikulotofor Oikuloto--3 Project, 3 Project, FinlandiaFinlandia1600 MWe NPP
Produced by Produced by PT.SiemenPT.Siemen Indonesia, Indonesia, CilegonCilegon, , BantenBanten..
National participation National participation could attain 40could attain 40--50% 50% for the first 1000 for the first 1000 MWeMWeNPP.NPP.
-- Reduce cost for Reduce cost for transportationtransportation-- Less construction Less construction costcost-- Cheaper generation Cheaper generation costcost-- More competitiveMore competitive
Page 17
MEDCOENERGIPOWER
TidakTidak cukupcukup hanyahanya membangunmembangun PLTN PLTN sajasaja, , tetapitetapiharusharus menghidupkanmenghidupkan industriindustri nuklirnuklir nasionalnasional
HanyaHanya sektorsektor industriindustri nuklirnuklir yang yang dapatdapat menyerapmenyerapSDM SDM nuklirnuklir secarasecara maksimalmaksimal..
KemandirianKemandirian industriindustri nuklirnuklir nasionalnasional sangatsangatdiperlukandiperlukan sebagaisebagai jaminanjaminan penyerapanpenyerapan tenagatenagakerjakerja secarasecara maksimalmaksimal didi sektorsektor ketenaganukliranketenaganukliran..
KesimpulanKesimpulan
Page 18
MEDCOENERGIPOWER
DR.IrDR.Ir. Arnold Soetrisnanto. Arnold SoetrisnantoTechnology SupportTechnology SupportPT. Medco Power Indonesia, Medco Tower PT. Medco Power Indonesia, Medco Tower The Energy, 50th Floor SCBDThe Energy, 50th Floor SCBDJlJl. . JendJend. . SudirmanSudirman KavKav. 52. 52--5353Jakarta 12190 Jakarta 12190 –– IndonesiaIndonesiaPhone. +62.21.2995.1300 / 2995.1316, Fax. Phone. +62.21.2995.1300 / 2995.1316, Fax. +62.21.2995.1301+62.21.2995.1301Mobile Phone. +62.8128218940Mobile Phone. +62.8128218940Email: Email: [email protected]@medcoenergi.comwww.medcoenergi.comwww.medcoenergi.com