21
Sepsis and Defect Analysis Roger Resar, Senior Fellow, IHI Thursday, December 19 2013

Sepsis and Defect Analysis

  • Upload
    marcy

  • View
    77

  • Download
    0

Embed Size (px)

DESCRIPTION

Thursday, December 19 2013. Sepsis and Defect Analysis. Roger Resar , Senior Fellow, IHI. Session Objectives. Learn a methodology that surfaces and scopes improvements in a complex process design (sepsis) Learn how to engage both the leadership and frontline in a ground up improvement work - PowerPoint PPT Presentation

Citation preview

Page 1: Sepsis and Defect Analysis

Sepsis and Defect Analysis

Roger Resar, Senior Fellow, IHI

Thursday, December 19 2013

Page 2: Sepsis and Defect Analysis

Session ObjectivesLearn a methodology that surfaces and scopes improvements in a complex process design (sepsis)

Learn how to engage both the leadership and frontline in a ground up improvement work

Develop the skill to utilize minimal (data, persons, time and meetings) resources

P2

Page 3: Sepsis and Defect Analysis

Assumptions I have MadeYou have formed a team

A protocol has been designed by the team for implementation of the bundle guidelines in the affected departments

Some early testing has been started

P3

Page 4: Sepsis and Defect Analysis

Sepsis 3 Hour BundleMeasure Lactate levelObtain blood cultures prior to administration of antibioticsAdminister broad-spectrum antibioticsAdminister 30mL/Kg crystalloid for hypotension or lactate >4

P4

Page 5: Sepsis and Defect Analysis

Sepsis Bundle 6 HourApply vasopressors (for hypotension that does not respond to initial fluid resuscitation) to maintain a mean arterial pressure (MAP)>65 mm HgIn the event of persistent arterial hypotension despite volume resuscitation (septic shock) or initial lactate> 4 mmol/L (36mg/dL):

Measure central venous pressureMeasure central venous oxygen saturation

• Remeasure lactate if initial lactate was elevated

P5

Page 6: Sepsis and Defect Analysis

Facts of DesignComplex protocols require the design of multiple processes

Processes need to be designed by the frontline that will be using the process or little chance of success let alone sustaining the process will be enjoyed

Process design needs to have clearly articulated standard work (who, when, where, what, how and with what)

P6

Page 7: Sepsis and Defect Analysis

Team and the DyadThe team sets the overall goals and designs a protocol based on science (what we want to do and accomplish)

The frontline designs the standard work of how are we going to actually accomplish this while still doing everything else they have to do

It means rethinking the role of the frontline as a resource to actually do the design rather than a passive group that will bid the teams demands

P7

Page 8: Sepsis and Defect Analysis

Frontline Structured

Conversation

FrontlineDefects

Clinical Non-clinical

CollectData

Suggest Strategies

Identify

Defects

Frontline Engagement

Small TestsLeadingToProjectSuccess

Frontline Defect Driven Project Design

Page 9: Sepsis and Defect Analysis

Surface Defects

Scope Defects Validate

Select specific

work

Design Strategy

Finish Project

Actions

DesignBenefits

Timeline 90 min 2 Days 1 day 60 min 60 min 30 days

FrontlineEngagement

LeadershipEngagement

FrontlineEngagement

Tester Engagement

FrontlineEngagement

DesignBasics of theActions

ConversationSpecificMethodology

Anchoring Questions

Frontline Feedback

Align work

Gauge Capacity

ArticulateImplications

Study the next defect

Y/N FrontlineData Collection

Determinefrequency

DefineBoundaries

Determine Simplemeasures

Frontline Input

SmallTests

Frontline Defect Driven Project Design

R Resar

Page 10: Sepsis and Defect Analysis

The Conversation with the FrontlineOrganize the visit to the unit beforehand

SPECIFIC DUTIESSelect a mix of frontline staff (6-8)Select a small “leadership” team (From the Sepsis workgroup)Arrange for at 60 minutes of conversationArrange for a location on the unit for the conversation

Page 11: Sepsis and Defect Analysis

11

The Conversation with the FrontlineSTEP 1

DESIRED OUTCOMECross-section of staff working on the unitEnough time for all staff to have an opportunity to talkA location where interruptions are minimized

Page 12: Sepsis and Defect Analysis

The Conversation with the FrontlineSTEP 2

Have each of the participants describe how they see their role in the protocol

SPECIFIC DUTIESEstablish a non-threatening atmosphereLimit this part of the conversation to the first 10-15 minutesPurpose of this portion is to understand the work and work environment

Page 13: Sepsis and Defect Analysis

13

The Conversation with the FrontlineSTEP 2

DESIRED OUTCOMETrust from the frontline staff this is not about assessing personal work performanceParticipants who are willing to talk about the work, how they do it, and how they add value to the processes being designed

Page 14: Sepsis and Defect Analysis

The Conversation with the FrontlineSTEP 3

Assess using “anchoring questions”

SPECIFIC DUTIESUse questions like: How does our protocol fit your work day? Tell us about how it worked the last time? Were you happy about the results of using the protocol? Use these questions to learn about both clinical and non-clinical situationsCenter questions around identified defects where actual harm discussions are avoided but potential of harm is presentSteer discussion away from solutions

Page 15: Sepsis and Defect Analysis

15

The Conversation with the FrontlineSTEP 3

DESIRED OUTCOMEFind a specific example of a defect around which you can anchor subsequent questions about frequency, type of patient involved, previous attempts to fix, or what might happen with your day if it were resolvedKeep the discussion to a completely non-threatening, blame-free environment to allow for maximal information sharingKeep a simple record of the defects surfaced for further discussion at the team level

Page 16: Sepsis and Defect Analysis

16

The Conversation with the FrontlineSTEP 4

DESIRED OUTCOMEGenerate a list of defects that the frontline has surfacedAchieve buy-in from the frontline for possible actionAchieve buy-in from the questioning team as to the need for action

Page 17: Sepsis and Defect Analysis

Surface Defects

Scope Defects Validate

Select specific

work

Design Strategy

Finish Project

Actions

DesignBenefits

Timeline 90 min 2 Days 1 day 60 min 60 min 30 days

FrontlineEngagement

LeadershipEngagement

FrontlineEngagement

Tester Engagement

FrontlineEngagement

DesignBasics of theActions

ConversationSpecificMethodology

Anchoring Questions

Frontline Feedback

Align work

Gauge Capacity

ArticulateImplications

Study the next defect

Y/N FrontlineData Collection

Determinefrequency

DefineBoundaries

Determine Simplemeasures

Frontline Input

SmallTests

Frontline Defect Driven Project Design

R Resar

Page 18: Sepsis and Defect Analysis

18

Scoping the Projects

Team needs to decide if this is within the abilities of a Dyad to solve

Team needs to give specific direction to the Dyad in regards to methodology for design of that part of the process

Page 19: Sepsis and Defect Analysis

19

Properly ScopedThe Dyad will feel comfortable working on this particular defect in the design because the new design is integral with the current work they do

The solution for the defect will easily be designed within a few weeks (max 30 days)

Multiple designs for multiple defects can be taking place at the same time

Page 20: Sepsis and Defect Analysis

Surface Defects

Scope Defects Validate

Select specific

work

Design Strategy

Finish Project

Actions

DesignBenefits

Timeline 90 min 2 Days 1 day 60 min 60 min 30 days

FrontlineEngagement

LeadershipEngagement

FrontlineEngagement

Tester Engagement

FrontlineEngagement

DesignBasics of theActions

ConversationSpecificMethodology

Anchoring Questions

Frontline Feedback

Align work

Gauge Capacity

ArticulateImplications

Study the next defect

Y/N FrontlineData Collection

Determinefrequency

DefineBoundaries

Determine Simplemeasures

Frontline Input

SmallTests

Frontline Defect Driven Project Design

R Resar

Page 21: Sepsis and Defect Analysis

21

AdvantagesProjects are accomplished by a dyad

No team meetings

No training other than JIT

No data collection other than pencil and paper

Creates enthusiasm for improvement